Compare commits

..

196 Commits

Author SHA1 Message Date
Paulus Schoutsen
1ced8fa80c Change order related items 2025-09-17 13:07:29 -04:00
Jan-Philipp Benecke
846692bc8a Migrate ha-slider to webawesome (#27075)
* Migrate ha-slider to webawesome

* Fix labeled slider

* Change slider surface color

* Trigger Build

* Remove large and border

* Run prettier

* enable tooltip and focus ring
2025-09-17 19:06:13 +02:00
Douwe
3b90b5fcb1 Add feature gap theme variable for hui-card-features (#27076)
* Update hui-card-features.ts

Add CSS variable for gap

* Renamed variable
2025-09-17 14:03:49 +02:00
Paulus Schoutsen
cac978344f Add more binary sensors to security dashboard (#27041)
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-09-17 13:56:51 +02:00
karwosts
6a40631e6d Add diagnostics download to helpers menu (#27077) 2025-09-17 14:19:15 +03:00
Aidan Timson
48f5b6dfd3 Safe area: Fix double padding for sidebar (#27078)
Fix double padding for sidebar
2025-09-17 14:16:02 +03:00
Björn Ebbinghaus
04b01d2cd9 Add relative timestamp state_content for input_datetime (#24135)
* Fix digit grouping in input_datetime `year`

* Display `input_datetime`s `timestamp` attribute as relative time instead of number
2025-09-17 10:22:00 +00:00
Jan Layola
0e8e054db1 Sync charts zoom in history tab (#26898)
* Add chart zoom event system and sync infrastructure to chart-base

- Replace inline datazoom handler with dedicated _handleDataZoomEvent method
- Add _syncZoomState method for zoom state synchronization
- Refactor zoom detection to be more robust and reliable

* Add hide reset button functionality

- Add hideResetButton property to ha-chart-base component
- Add hideResetButton property to state-history-chart-line component
- Add hideResetButton property to state-history-chart-timeline component
- Implement conditional reset button rendering based on hideResetButton flag
- Pass hideResetButton prop through component hierarchy

This allows parent components to control reset button visibility when
implementing custom reset functionality or coordinated multi-chart resets.

* Implement chart zoom synchronization

- Add chart-zoom event handlers to state-history-chart-line component
- Add chart-zoom event handlers to state-history-chart-timeline component
- Forward zoom events with chart index for identification

This enables individual charts to communicate zoom changes to parent
components for coordinated multi-chart synchronization.

* Add floating reset button and sync orchestration

- Add chart-zoom event type definition to HASSDomEvents interface
- Add global zoom state tracking with _hasZoomedCharts property
- Add _isSyncing flag to prevent infinite sync loops
- Implement _handleTimelineSync method for coordinating chart synchronization
- Implement _handleGlobalZoomReset method for resetting all charts
- Enable hide-reset-button on individual charts to use global reset
- Add floating reset button with Material Design styling

On history page the floating reset button appears when any chart is zoomed
and provides a single point to reset all synchronized charts simultaneously.

* Refactor chart zoom synchronization to use public API

Replace direct ECharts dispatchAction calls with proper zoom methods. The parent component now calls chartComponent.zoom() instead of accessing internal chart.dispatchAction() directly.

* Remove duplicate TypeScript declaration of the "chart-zoom" event

* Fix tooltips not shown due to xAxisPointer hidden

* Use chart zoom function in history charts

* Apply code review feedback

* Remove unnecessary any types

* Apply code review feedback
2025-09-17 10:36:28 +03:00
renovate[bot]
477a893193 Update dependency color-name to v2.0.2 (#27074)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-16 20:38:31 +02:00
puddly
bd0822f09f Wrap overflowing menu step option descriptions (#27072)
Make menu step option descriptions multiline
2025-09-16 20:25:41 +02:00
Paul Bottein
07c3ffb55d Use computed config for strategy visibility and disabled flag (#27071) 2025-09-16 19:10:51 +02:00
Paulus Schoutsen
fbfb4709d2 Add section strategy showing entities we expect user to use (#27014)
* Extend favorites with predicted entities

* Split out into own section

* Better component loaded check

* Use section strategy

* Feedbacks

* Remove hardcoded limit

* Add translations

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2025-09-16 12:24:08 -04:00
Aidan Timson
0a5b31e328 Add safe areas to bottom sheets and sidebar (#27009)
* Add safe areas to bottom sheet

* Add safe areas to automation sidebar

* Remove

* Add safe areas

* Add safe areas

* Switch
2025-09-16 16:48:06 +02:00
Aidan Timson
8cf0d8d2c3 Safe area: devtools (#26969)
* Remove extra padding

* Remove extra padding

* Remove extra padding

* Fixes

* use change from #26971

* Remove

* Remove

* Remove

* Remove

* Restore for future change

* Fix
2025-09-16 16:35:48 +02:00
Wendelin
61c16ce020 Automation editor: Copy always enabled (#27069) 2025-09-16 16:09:18 +02:00
Wendelin
6bede4ddca Automation editor: Disable click on drag handle (#27063)
Add stopPropagation to click events in automation components
2025-09-16 15:22:26 +03:00
Paul Bottein
bd88b91071 Order tile card config according to struct (#27060) 2025-09-16 15:13:37 +03:00
renovate[bot]
29b02a3c99 Update dependency jsdom to v27 (#27066)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-16 15:04:10 +03:00
Timothy
ac87e2280d Add External app version into ha-config-info (#27064) 2025-09-16 13:18:18 +02:00
Jan Layola
98c4e34a23 Sort installed addons by name in the ha-config-logs component (#27056) 2025-09-15 17:01:54 +02:00
karwosts
3d005c8316 Manual entry mode for media selector (#26753) 2025-09-15 16:48:03 +02:00
Paul Bottein
af31b5add3 Add formatEntityName helper on hass object. (#26057) 2025-09-15 14:18:52 +00:00
Aidan Timson
9d02a1d391 Fix calendar toggle group wrapping (#27049) 2025-09-15 14:12:37 +00:00
Petar Petrov
98e6f32fe8 Improve device section organization in energy Sankey card (#26978) 2025-09-15 15:57:52 +02:00
Aidan Timson
2726c6a849 Fix calendar toggle group button sizes (#27050)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-09-15 13:31:49 +00:00
Aidan Timson
c09ec54c76 Safe area: containers and panels (#26971)
This commit squashes the following development history:

1e78af3aa - Restore, moved to #26969
d672d9f44 - Restore
53ee5fbbc - Restore
16b4eb98e - Restore
8d8b13f50 - Restore
62e16619d - Apply changes from #27003
f5ee79a47 - Fix
60678689c - Fix
766ed6a25 - Fix
f76bd4f7e - Fix fabs
1879fd0d9 - Fix
ea3ee6de5 - Add safe areas to ha-hanel-custom
aa3384b9a - Add missing
c9a7f76dc - Fix
78351fd1f - Fix
59789d379 - Fix
1c7aabd34 - Remove
eaf1373cf - Fix
8481a93d7 - Fix
fe7df1f2f - Remove
69f244ff3 - Restore
2eb936b64 - Adjust
b09350637 - Fix
c0504bb7e - Clean
b0773d73e - Fix
4caa4a43b - make sure narrow is passed
8885f6bf6 - Add safe areas to 2 pane fixed
62df70f63 - Clean
a87e68d87 - FIx
5086be030 - Fix energy
ac3478e54 - Fix
0f28098a6 - Restore
b65ba3df9 - Restore
b0e1ea6db - Restore
7bb78d1c7 - Fix
26c95df71 - Update
7369c79d3 - Remove
b5f31dad6 - Fix
40cfc437d - Set top level padding instead of individual panels
83b49729f - Restore
25db15816 - Fix
8c9c39827 - Set top level app bar padding instead of individual panels
b7a1b27c9 - Remove
1e9368705 - Device
1482502f9 - Integration page
98dc1bf56 - Fix
1c3de1376 - Add
a08bee4d8 - Remove
0d462439b - Area subpage
4bfd60875 - Areas fix
b5cbcdaf7 - Fix
9fb272074 - Add safe areas to script editor
7c3bc9433 - Add safe areas to scene editor
1cf1b999a - Fix mobile for automation editors
4413bd4b7 - Add safe areas to automation editor
2e6953327 - Add safe areas to blueprint editor
989776dd1 - Add config section padding
6692b7ccf - Fix header row
22337b5e2 - Fix calendar
414e058cd - Fix pane
f09ae0e0c - Fix calendar
fb5a984ee - Fix pane
1daee18c8 - Todo fab
6f52cb42b - Todo content
9b317c583 - Media browser
0f8ca248d - Fix history panel
cd7843799 - Fix logbook
b8d47ecf3 - Fix
d15e9311d - Safe area: dashboard view container should only apply left safe area when in full view

Summary of changes:
- Add narrow property to top app bar components for conditional safe area padding
- Update safe area inset calculations to use fallback values (0px) for better compatibility
- Fix content height calculations to account for safe area insets
- Apply safe area padding conditionally based on narrow state
- Update FAB positioning to respect safe area insets
- Ensure proper spacing and layout on mobile devices with notches/dynamic islands
2025-09-15 15:54:04 +03:00
Norbert Rittel
9f045538a2 Update beta / stable channel descriptions (#27047) 2025-09-15 11:49:11 +02:00
Paul Bottein
c6c4f91b0e Use slot for tile card info (#27046) 2025-09-15 11:29:48 +03:00
karwosts
f71d8f4367 Fix incorrect logbook entity filters (#27037)
* Fix incorrect logbook filters

* Update src/panels/lovelace/editor/config-elements/hui-logbook-card-editor.ts

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-09-15 08:06:03 +00:00
Wendelin
68c1a38231 Unit tests for common/entity/get_states (#27007) 2025-09-15 09:28:02 +02:00
dependabot[bot]
a9796e4216 Bump github/codeql-action from 3.30.0 to 3.30.3 (#27045)
Bumps [github/codeql-action](https://github.com/github/codeql-action) from 3.30.0 to 3.30.3.
- [Release notes](https://github.com/github/codeql-action/releases)
- [Changelog](https://github.com/github/codeql-action/blob/main/CHANGELOG.md)
- [Commits](2d92b76c45...192325c861)

---
updated-dependencies:
- dependency-name: github/codeql-action
  dependency-version: 3.30.3
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-09-15 08:38:26 +02:00
Aidan Timson
bf6eefb692 Migrate from date-fns-tz to @date-fns/tz (#26809)
* Add @date-fns/tz

* Update calc_date

* Refactor ha-date-range-picker

* Refactor calendar panel

* Refactor todo panel

* Remove date-fns-tz

* Cleanup

* Move util functions

* Fix comment

* Reuse

* Restore old check for rrulejs, update to new format
2025-09-15 07:38:08 +03:00
Paul Bottein
7ec3b08444 Add disabled option for cards and sections (#27026)
* Add hidden config option for cards and sections

* Rename to disabled
2025-09-15 07:23:39 +03:00
Norbert Rittel
f3355671d1 Capitalize "Core" and "Supervisor" as component names (#27039) 2025-09-14 17:50:44 +02:00
Simon Lamon
c0e240a3bf Revert SHA pinning for home-assistant/wheels (#27034) 2025-09-13 16:47:57 +02:00
renovate[bot]
00fd4753e4 Update dependency @rspack/core to v1.5.3 (#27032)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-13 09:54:56 +03:00
renovate[bot]
08ac873e3b Update dependency globals to v16.4.0 (#27031)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-13 09:54:37 +03:00
renovate[bot]
d12b8d1b1b Update dependency hls.js to v1.6.12 (#27028)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-12 19:23:15 +02:00
Simon Lamon
977207dde4 Pin SHA for all github actions (#26958) 2025-09-12 19:17:44 +02:00
Norbert Rittel
87a5f1a315 Treat "Recorder" as a (capitalized) name that should not be translated (#27023) 2025-09-12 18:29:56 +02:00
renovate[bot]
acab2d5ead Update dependency ua-parser-js to v2.0.5 (#27024)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-12 16:42:16 +02:00
Paul Bottein
046fc00f73 Add home assistant bottom sheet (#26948)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-09-12 15:33:30 +02:00
Marcin
05775c411b Add transition to button background (#27021) 2025-09-12 14:57:33 +02:00
Simon Lamon
dcbc8b627f Migrate ha-tooltip to webawesome (#26540)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-09-12 13:09:24 +02:00
Aidan Timson
0d8d18617c Create and implement goBack helper function (#27015)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-09-12 11:39:45 +02:00
Lukas Waslowski
7eb87c78cc fix: Pass hass object to <ha-form/> in <hassio-addon-config/> (#26995)
fix: Pass  object to <ha-form/> in <hassio-addon-config/>
2025-09-12 05:03:53 -04:00
Paul Bottein
0eaf9ead9e Move section edit logic to its own component (#27017) 2025-09-12 08:51:10 +00:00
Paul Bottein
7082646fe5 Only copy/cut/delete selected automation rows (#26966) 2025-09-12 10:46:23 +02:00
karwosts
96d364b3bd Full width ha-select dropdowns for z-wave (#27013) 2025-09-12 10:45:31 +02:00
Wendelin
e726eb7370 Fix automation sidebar overflow icon size (#27016) 2025-09-12 10:43:55 +02:00
renovate[bot]
e6f587da78 Update dependency typescript-eslint to v8.43.0 (#27010)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-11 19:43:02 +02:00
Petar Petrov
c595392abe Support opening a new config flow when the current one is finished (#26964) 2025-09-11 15:49:09 +02:00
Aidan Timson
5bcffd0dbe Fix hass-subpage toolbar position (#27003) 2025-09-11 15:26:14 +02:00
Aidan Timson
df801833fc Move close to the secondary action to allow enter key to submit (#27005) 2025-09-11 13:16:02 +00:00
Paul Bottein
5ba5c00c70 Include non-primary entities targeted directly by label (#26952) 2025-09-11 15:12:20 +02:00
Paul Bottein
dcea227f4a Add themes variables to tile card to change border radius (#26999) 2025-09-11 14:55:07 +02:00
Wendelin
1abedcd5f0 Migrate tab-group to webawesome (#26951) 2025-09-11 11:15:24 +02:00
Lukas Waslowski
9e29693293 nitpick: Rename HaFormExpendable to HaFormExpandable (#26994)
nitpick: Rename HaFormExpendable to HaFormExpandable
2025-09-10 21:38:07 +02:00
Lukas Waslowski
3bfafc794f fix: Import ha-expansion-panel in ha-form-expandable (#26996)
fix: Import ha-expansion-panel in ha-form-expandable

The current usages of ha-form-expandable only work correctly because
ha-expansion-panel is already imported somewhere else by coincidence.

This adds an explicit import to avoid breakages when using
ha-form-expandable in a standalone context (e.g. within ./hassio).
2025-09-10 21:37:37 +02:00
Simon Lamon
89c43b2b33 Don't show "condition did not pass" before testing (#26987)
Testing wrapper
2025-09-10 16:58:26 +03:00
Wendelin
466115d916 Prettier one line format in style .globals.ts files (#26991) 2025-09-10 14:54:34 +02:00
Wendelin
a34ca3c085 Fix disabled automation style (#26988)
* Update disabled state logic in action and condition editors to account for indent property

* Remove opacity
2025-09-10 14:01:05 +02:00
karwosts
9a8ca36047 Filter entities from energy sources table with no data (#26974)
Filtere entities from energy sources table with no data
2025-09-10 09:48:53 +03:00
dependabot[bot]
b454e89613 Bump vite from 7.1.2 to 7.1.5 (#26983)
* Bump vite from 7.1.2 to 7.1.5

Bumps [vite](https://github.com/vitejs/vite/tree/HEAD/packages/vite) from 7.1.2 to 7.1.5.
- [Release notes](https://github.com/vitejs/vite/releases)
- [Changelog](https://github.com/vitejs/vite/blob/main/packages/vite/CHANGELOG.md)
- [Commits](https://github.com/vitejs/vite/commits/v7.1.5/packages/vite)

---
updated-dependencies:
- dependency-name: vite
  dependency-version: 7.1.5
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>

* dedupe

---------

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-09-10 05:45:12 +00:00
Simon Lamon
0b76109272 Fix Webhook Trigger doesn't display correctly (#26982)
Webhook
2025-09-10 08:42:47 +03:00
Paulus Schoutsen
942d264693 Allow storing AI Task generate image preferred entity (#26959) 2025-09-10 08:41:22 +03:00
Petar Petrov
b10fdf8438 Fix for batteries with long names in energy dashboard (#26972) 2025-09-09 19:28:09 +02:00
Petar Petrov
bee8980192 Fix battery to grid connection in Sankey card (#26973) 2025-09-09 19:27:41 +02:00
Lukas Waslowski
61487565db nitpick: Rename _filteredShchema to _filteredSchema (#26979) 2025-09-09 19:26:52 +02:00
Aidan Timson
cc70eb46c9 Safe area: sidebar and notification drawer (#26853)
* sidebar: account for safe-area top inset in menu height/padding; adjust list height calc

* Defaults

* Defaults

* Restore

* Remove test

* Adjust

* Adjust

* Only apply on smaller layouts

* Fix

* Restore

* Restore

* No default in this case

* Restore

* Gain back some space

* Fix

* Adjust

* Tweak

* Calculate when mobile

* Use fallbacks for calculations and others anyway
2025-09-09 11:59:24 +02:00
Aidan Timson
dec9d304da Add analog card clock style options (#26711)
* Options

* Add default analog options (or delete) when changing style, hide when digital

* Fix rebase error

* Format

* Update description

Co-authored-by: Norbert Rittel <norbert@rittel.de>

* Flatten config options

* Flatten config options

* Add analog clock style options

Show lines

Adjust

Adjust

Replace 'ticks_style' with 'face_style' and use numbers over numeric

Use numbers over numeric

* Rebase fixes

* Missing translations mapping

* Remove rotated numbers and roman upright options

* Remove rotated numbers and roman upright options

* Edit description

* Update src/translations/en.json

Co-authored-by: Norbert Rittel <norbert@rittel.de>

* Update src/translations/en.json

Co-authored-by: Norbert Rittel <norbert@rittel.de>

---------

Co-authored-by: Norbert Rittel <norbert@rittel.de>
2025-09-09 11:30:19 +03:00
Paul Bottein
7f8e856102 Don't trigger automation shortcuts when a field is focused or text selected (#26965)
* Don't trigger automation shortcut when a field is focused

* Don't trigger automation shortcut when a text is selected
2025-09-09 10:53:06 +03:00
karwosts
4bd60a1366 Mark new automation as dirty if it has initData (#26953) 2025-09-09 10:26:18 +03:00
Wendelin
e9ca1758a0 Fix yaml editor save in config-flow (#26963) 2025-09-09 10:25:06 +03:00
Paulus Schoutsen
dff3b82f0d Show action being called in action dev tools (#26923) 2025-09-09 08:57:36 +02:00
J. Nick Koston
1b630e7b66 Hide useless configure bluetooth options button for remote scanners (#26960)
This avoids showing the button when all they get is
"Bluetooth configuration for remote adapters is not supported."
2025-09-09 09:46:22 +03:00
Aidan Timson
f4238bf291 Safe area: bars (#26816)
* app-bars: apply safe-area insets (top padding and fixed-adjust; add content padding in fixed)

* Set toolbar

* Set bars

* Add left and right insets to root ll

* Add to dev tools header

* Fix

* Apply to subpages (config pages mainly)

* Adjust

* Remove old comment
2025-09-09 08:13:03 +02:00
karwosts
ef8cb8b393 Add a bulk delete to devices table (#26914) 2025-09-08 20:33:53 +02:00
karwosts
bed161d485 Deduplicate table rendering code in energy sources table (#26918) 2025-09-08 20:14:15 +02:00
renovate[bot]
22e0ef4308 Update dependency eslint to v9.35.0 (#26955)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-08 19:34:36 +02:00
renovate[bot]
eb355d110d Update babel monorepo to v7.28.4 (#26954)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-08 19:34:07 +02:00
Wendelin
c041c295d5 Use @home-assistant/webawesome (#26942) 2025-09-08 14:25:47 +02:00
Wendelin
c582896574 Update missing border radius variables (#26944) 2025-09-08 14:01:24 +02:00
renovate[bot]
3e6b59fe1e Update dependency luxon to v3.7.2 (#26941)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-08 14:43:53 +03:00
Aidan Timson
62714b2b68 Safe area: dialogs (#26814)
* dialogs: apply safe-area insets (content padding, header mobile insets, more-info top margin)

* Set default (40px prio if not set)

* Set default (default padding prio if not set)

* Set default to avoid issues

* Set on container

* Sort

* No longer needed

* No longer needed

* No longer needed

* Remove

* Restore

* Restore

* Move to padding

* Switch to margins, set min and max height

* Set default

* Account for insets to remove extra scrollbars

* Fix content for filter dialog

* Move margins outside of media check

* Use padding instead

* use min-width instead

* Use padding for just top and bottom

* Calculate lit-virtualizer to include safe areas

* Calculate lit-virtualizer to include safe areas

* Fix double scrollbar from previous

* Remove calculation

* Default

* Remove double calculation

* Remove double calculation
2025-09-08 09:39:27 +02:00
renovate[bot]
07fdd5b7af Update vaadinWebComponents monorepo to v24.8.7 (#26936)
* Update vaadinWebComponents monorepo to v24.8.7

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-08 07:35:30 +00:00
Phil White
720f435987 Fix refresh button appending logs instead of clearing them (#26875) 2025-09-08 09:18:05 +02:00
Yosi Levy
52061d6c1a Variour RTL fixes for automation and others (#26891) 2025-09-08 09:13:10 +02:00
Paulus Schoutsen
ae35164a57 Update clipboard copy template message in actions dev tool (#26925) 2025-09-08 08:59:11 +02:00
karwosts
d1c814bd6b Fix condition action in config flow dialog (#26929) 2025-09-08 08:33:02 +02:00
dependabot[bot]
bb50512c89 Bump softprops/action-gh-release from 2.3.2 to 2.3.3 (#26935)
Bumps [softprops/action-gh-release](https://github.com/softprops/action-gh-release) from 2.3.2 to 2.3.3.
- [Release notes](https://github.com/softprops/action-gh-release/releases)
- [Changelog](https://github.com/softprops/action-gh-release/blob/master/CHANGELOG.md)
- [Commits](https://github.com/softprops/action-gh-release/compare/v2.3.2...v2.3.3)

---
updated-dependencies:
- dependency-name: softprops/action-gh-release
  dependency-version: 2.3.3
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-09-08 08:20:26 +02:00
dependabot[bot]
0fae45edc9 Bump actions/setup-node from 4.4.0 to 5.0.0 (#26934)
Bumps [actions/setup-node](https://github.com/actions/setup-node) from 4.4.0 to 5.0.0.
- [Release notes](https://github.com/actions/setup-node/releases)
- [Commits](https://github.com/actions/setup-node/compare/v4.4.0...v5.0.0)

---
updated-dependencies:
- dependency-name: actions/setup-node
  dependency-version: 5.0.0
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-09-08 08:20:00 +02:00
dependabot[bot]
0a8d3cc8fa Bump actions/setup-python from 5 to 6 (#26933)
Bumps [actions/setup-python](https://github.com/actions/setup-python) from 5 to 6.
- [Release notes](https://github.com/actions/setup-python/releases)
- [Commits](https://github.com/actions/setup-python/compare/v5...v6)

---
updated-dependencies:
- dependency-name: actions/setup-python
  dependency-version: '6'
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-09-08 08:19:11 +02:00
dependabot[bot]
db09947a67 Bump actions/labeler from 5.0.0 to 6.0.1 (#26932)
Bumps [actions/labeler](https://github.com/actions/labeler) from 5.0.0 to 6.0.1.
- [Release notes](https://github.com/actions/labeler/releases)
- [Commits](https://github.com/actions/labeler/compare/v5.0.0...v6.0.1)

---
updated-dependencies:
- dependency-name: actions/labeler
  dependency-version: 6.0.1
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-09-08 08:18:47 +02:00
dependabot[bot]
5eb600726f Bump actions/stale from 9.1.0 to 10.0.0 (#26931)
Bumps [actions/stale](https://github.com/actions/stale) from 9.1.0 to 10.0.0.
- [Release notes](https://github.com/actions/stale/releases)
- [Changelog](https://github.com/actions/stale/blob/main/CHANGELOG.md)
- [Commits](https://github.com/actions/stale/compare/v9.1.0...v10.0.0)

---
updated-dependencies:
- dependency-name: actions/stale
  dependency-version: 10.0.0
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-09-08 08:18:07 +02:00
dependabot[bot]
17a2e6e1f6 Bump actions/github-script from 7 to 8 (#26930)
Bumps [actions/github-script](https://github.com/actions/github-script) from 7 to 8.
- [Release notes](https://github.com/actions/github-script/releases)
- [Commits](https://github.com/actions/github-script/compare/v7...v8)

---
updated-dependencies:
- dependency-name: actions/github-script
  dependency-version: '8'
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-09-08 08:17:35 +02:00
renovate[bot]
53e7959d54 Update dependency serve to v14.2.5 (#26922)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-07 20:21:02 +02:00
Aidan Timson
5f140c5fc4 Safe area: main content and onboarding (#26813)
* foundation: define --safe-area-content-inset-*; adjust drawer width; apply top inset to pre-login templates

* Set default for var

* Update demo template

* Set default to avoid issues

* Allow for left and right insets or 560px

* Remove
2025-09-07 13:25:29 +03:00
renovate[bot]
688b8e5229 Update dependency @types/leaflet.markercluster to v1.5.6 (#26911)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-06 14:59:59 +00:00
renovate[bot]
34b50b45a3 Update dependency @types/leaflet-draw to v1.0.13 (#26910)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-06 16:49:58 +02:00
karwosts
c17c9c6cc9 Remove an unused translation (#26908) 2025-09-05 22:39:01 -04:00
renovate[bot]
c9d72b5253 Update dependency @types/culori to v4.0.1 (#26899)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-05 23:22:30 +02:00
renovate[bot]
f5dbb28fb2 Update dependency typescript-eslint to v8.42.0 (#26897)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-05 23:22:22 +02:00
renovate[bot]
9acfe5c1cc Update dependency @codemirror/autocomplete to v6.18.7 (#26896)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-05 23:22:15 +02:00
Jan-Philipp Benecke
701cbcfbad Do not show state-card-content in new more-info dialog in gallery (#26889)
* Do not show `state-card-content` in new more-info dialog in gallery

* Use `computeShowNewMoreInfo`
2025-09-05 14:13:28 -04:00
renovate[bot]
38685127d2 Update dependency @codemirror/view to v6.38.2 (#26890)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-05 08:59:04 +03:00
renovate[bot]
4275f6c6b6 Update dependency lint-staged to v16.1.6 (#26885)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-04 19:33:55 +02:00
renovate[bot]
bfc186b612 Update dependency @rspack/core to v1.5.2 (#26880)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-04 16:41:29 +02:00
Paul Bottein
cb4d92ccf4 Add UI editor for trend graph feature (#26872) 2025-09-04 16:28:02 +02:00
Wendelin
1dc7256fb5 Translate del in shortcut dialog (#26865) 2025-09-04 16:11:38 +02:00
Wendelin
012e710e45 Test-device-tracker-entity-filter (#26881) 2025-09-04 16:08:38 +02:00
Paul Bottein
5abb7d0286 Fix testing condition in iOS (#26879) 2025-09-04 15:50:39 +02:00
Petar Petrov
ce74946706 Fix highlighting issue in Energy Sankey card (#26878) 2025-09-04 15:42:39 +02:00
Bram Kragten
bf351d67e9 Revert "Rename "Logbook" to "Activity" in user-facing strings" (#26867)
Revert "Rename "Logbook" to "Activity" in user-facing strings (#26619)"

This reverts commit 057fad55e8.
2025-09-04 11:14:16 +02:00
Wendelin
b75fa013d2 Fix script with fields fields in tile card button feature (#26866)
Check script fields in tile card button feature
2025-09-04 11:42:41 +03:00
Paul Bottein
2601b0d89c Display area with only sensors in climate view in home dashboard (#26863)
* Display area with only sensors in climate view in home dashboard

* Update home-climate-view-strategy.ts

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2025-09-04 10:11:35 +02:00
Mike Kelly
ef8410e121 Add MCF as another volume unit (#26400) 2025-09-04 09:30:13 +03:00
karwosts
37610703c8 Pass first weekday to recorder/statistic_during_period (#26229)
* Pass first weekday to recorder/statistic_during_period

* switch order
2025-09-04 09:27:40 +03:00
Aidan Timson
4efd9bba8a Fix weather more info forecast layout jump when loading data (#26764)
* Fix weather more info forecast layout jump when loading data

* Tabs arent always populated

* Apply suggestions from code review

Co-authored-by: Copilot <175728472+Copilot@users.noreply.github.com>

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
Co-authored-by: Copilot <175728472+Copilot@users.noreply.github.com>
2025-09-04 06:04:56 +00:00
Paulus Schoutsen
e1fe7976d8 Do not allow filtering by automation labels on mobile (#26861) 2025-09-04 08:47:52 +03:00
Simon Lamon
53b96107d9 Home dashboard: Climate fix (#26856)
* Climate dashboard fix

* Update home-climate-view-strategy.ts
2025-09-03 18:55:33 +02:00
Bram Kragten
dcbad9e798 Dont align with clipboard on copy/cut automation item (#26855) 2025-09-03 14:19:02 +00:00
karwosts
26b3212c7e Enable sorting step flow menu options in user language (#26845)
* Enable sorting step flow menu options in user language

* Remove menu_sort_values

* Update src/dialogs/config-flow/step-flow-menu.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* prettier

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-09-03 17:03:09 +03:00
Paul Bottein
f3f4bcfe45 Rename history chart to trend graph (#26854)
* Rename history chart to trend graph

* rename element and prettier

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-09-03 10:56:05 +00:00
Bram Kragten
7cfa9de75f Bumped version to 20250903.0 2025-09-03 12:05:19 +02:00
Paul Bottein
b66dc8894d Improve responsive support for history graph feature (#26851) 2025-09-03 12:00:49 +02:00
Wendelin
14a7813ab0 Fix automation narrow bottom sheet close animation (#26850) 2025-09-03 09:45:13 +00:00
Bram Kragten
70a2ca281f Update shortcuts dialog (#26849) 2025-09-03 10:01:10 +02:00
Wendelin
d982f042fc Update device action button variant based on warning class (#26848) 2025-09-03 07:06:18 +00:00
J. Nick Koston
e60f9e326b Show scanner-type-specific power cycle instructions in Bluetooth UI (#26847)
* Show scanner-type-specific power cycle instructions in Bluetooth UI

* preen
2025-09-03 10:03:03 +03:00
J. Nick Koston
ba39d189e7 Show scanner current state in the Bluetooth UI (#26792)
* Show scanner current state in the Bluetooth UI

The state updates live as the scanner changes mode, and provides
a warning on what to do if the scanner gets in a bad state

* Show scanner current state in the Bluetooth UI

The state updates live as the scanner changes mode, and provides
a warning on what to do if the scanner gets in a bad state

* cleanup

* switch
2025-09-02 15:20:06 -03:00
Paul Bottein
78867b2cd9 Remove non numerical sensor and binary-sensor for history chart feature (#26838)
* Use hui-graph-base for chart history feature and remove non numerical sensor support

* Fix chart opacity
2025-09-02 14:38:06 -03:00
Paul Bottein
1dff42dc00 Change home summaries color (#26839) 2025-09-02 18:14:46 +02:00
Bram Kragten
0c9b3a0765 Remove expand all/collapse all options from overflow (#26837)
* remove expand all/collapse all options from overflow

* ignore
2025-09-02 16:26:44 +02:00
Bram Kragten
5a109c0ba8 Align box shadows (#26835)
* Align box shadows

* update colors
2025-09-02 14:15:48 +00:00
Bram Kragten
f3b214c30a Add new shortcuts to shortcuts dialog (#26836) 2025-09-02 17:08:32 +03:00
Petar Petrov
c49d2a0be6 Add support for option descriptions in config flows (#26825)
* Add support for option descriptions in config flows

* use `twoline`

* remove unused classes
2025-09-02 14:03:35 +00:00
Bram Kragten
c6c3170c1b Tweak automation row (#26834)
tweak automation row
2025-09-02 13:50:05 +00:00
Paul Bottein
0abb958aea Clean graph in security and climate view in home dashboard (#26833) 2025-09-02 14:58:56 +02:00
Bram Kragten
9d55843629 Fix scrolling items in the bottom into view (#26830) 2025-09-02 14:57:11 +02:00
Bram Kragten
b70d309297 add shadow when scrollable in automation bottom sheet, min height 50vh (#26828) 2025-09-02 14:12:48 +02:00
Simon Lamon
5961b71562 Home dashboard: Ensure temperature sensor entity exists (#26831) 2025-09-02 13:03:18 +02:00
karwosts
6942626f60 Differentate service vs device in more-info link (#26823) 2025-09-02 12:44:16 +02:00
Aidan Timson
069c0acdff Fix capitalization on data table filter button (#26829) 2025-09-02 10:44:01 +00:00
Bram Kragten
1f0d83190d prevent keyboard shortcuts with more modifier keys (#26826) 2025-09-02 09:39:54 +02:00
Wendelin
7c6c92c856 Automation-keybindings (#26762)
Co-authored-by: Norbert Rittel <norbert@rittel.de>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-09-01 21:41:50 +02:00
Robert Resch
eff352cde1 Warn about system performance when setting camera stream orientation (#26616) 2025-09-01 20:54:48 +02:00
Bram Kragten
62a75c188c Change drag selected styling (#26822) 2025-09-01 20:26:25 +02:00
Paul Bottein
4ffa6b6186 Force energy distribution to display the data of today (#26811) 2025-09-01 18:12:34 +02:00
Paul Bottein
25173cf605 Don't use ha-automation-row-selected to know if the item was selected (#26812) 2025-09-01 18:12:08 +02:00
Paul Bottein
3277d8e80b Add automation testing logic to sidebar (#26815) 2025-09-01 18:08:59 +02:00
Bram Kragten
55864fdc82 Update hover and hightlight states for automation rows (#26820) 2025-09-01 17:40:03 +02:00
Paul Bottein
d4d662ba46 Fix automation sidebar z index (#26810) 2025-09-01 17:21:36 +02:00
Paul Bottein
3ea5f508bb Remove box shadow for ha card in automation bottom sheet on mobile (#26817) 2025-09-01 17:19:09 +02:00
Paul Bottein
902a5dd678 Fix tag trigger when using it inside sidebar (#26819) 2025-09-01 17:18:18 +02:00
renovate[bot]
4a3ed62583 Update dependency @types/chromecast-caf-receiver to v6.0.24 (#26500)
* Update dependency @types/chromecast-caf-receiver to v6.0.24

* Use enum strings directly to make TS happy

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-09-01 14:53:10 +00:00
Paul Bottein
b4223e9e92 Use summary card in home dashboard (#26775) 2025-09-01 15:13:53 +02:00
Paul Bottein
99955d7818 Fix add dialog on dashboards on mobile (#26807) 2025-09-01 15:39:52 +03:00
Paul Bottein
f66768726c Update heading subtitle height to better fix grid (#26808) 2025-09-01 15:39:03 +03:00
Michel van de Wetering
0e4be02b2c Remove Hue bridge v1 image (#26674) 2025-09-01 15:27:50 +03:00
Bram Kragten
6daea23b3c Enable drag and drop on mobile for automations (#26805) 2025-09-01 14:09:13 +02:00
Petar Petrov
e21ddcb1e5 Handle negative values in History chart card feature (#26806) 2025-09-01 11:45:52 +00:00
Wendelin
ded85d9f27 Automation editor: fix yaml editor and editor switch (#26772) 2025-09-01 13:26:17 +02:00
Petar Petrov
eea43494da Use feature-color in History chart feature (#26802) 2025-09-01 11:34:44 +02:00
Norbert Rittel
9cf9ef927d Expand description for disabled services (#26782)
* Expand description for disabled services

* Drop "not added to Home Assistant"
2025-09-01 09:51:22 +03:00
Paulus Schoutsen
779ec4f583 Do not add graphs to every sensor tile card (#26793) 2025-08-31 15:11:41 +00:00
renovate[bot]
c541831cd2 Update dependency marked to v16.2.1 (#26785)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-31 17:07:02 +02:00
renovate[bot]
fd20c2a554 Update dependency @rspack/core to v1.5.1 (#26790)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-31 17:06:55 +02:00
uptimeZERO_
14fd29808c Bugfix: Fixed column widths in the dashboard config page (#26777)
Fixed column widths in dashboard config
2025-08-30 11:54:37 +00:00
Aidan Timson
7132ee157f Adjust states set state layout (#26765) 2025-08-30 13:11:41 +02:00
J. Nick Koston
1596b313d5 Add RSSI color gradient to Bluetooth visualization to identify connection problems (#26778) 2025-08-29 14:15:00 -05:00
karwosts
70cd68ded7 Don't use context for media selector with 'accept' (#26773) 2025-08-29 14:08:11 +00:00
renovate[bot]
cc91a6185e Update dependency @rspack/core to v1.5.0 (#26768)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-29 17:05:14 +03:00
Paul Bottein
1fd7c84583 Use fixed layout for automation sidebar to have scrollbar on the side (#26751)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-08-29 14:19:13 +02:00
Paul Bottein
0269540ee9 Add translations for home dashboard (#26763) 2025-08-29 14:17:55 +02:00
renovate[bot]
98390b3843 Update Yarn to v4.9.4 (#26760)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-29 08:12:28 +00:00
Paul Bottein
269628929c Fix alert z-index for automation and script (#26759) 2025-08-29 08:05:05 +00:00
Norbert Rittel
21fcc84afd Improve OAuth setup explanation (#26758)
* Improve OAuth setup explanation

* Add "your"

* Include "application" in headline
2025-08-29 09:59:31 +02:00
Wendelin
b86c1db83d Automation editor: fix focus handling (#26755) 2025-08-29 08:39:06 +02:00
renovate[bot]
a376670478 Update dependency typescript-eslint to v8.41.0 (#26757)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-29 08:21:34 +02:00
renovate[bot]
72c62079aa Update dependency hls.js to v1.6.11 (#26756)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-29 08:21:28 +02:00
Surya Prakash
9baf875585 Fix: Keep buttons active in picture-glance-card regardless of state (#26718)
* Fix: Keep buttons active in picture-glance-card regardless of state


Fixes #26683

**Problem:**
Buttons in the picture-glance-card were incorrectly disabled when their state was 'unknown', making them unclickable.

**Root Cause:**
The `disabled` property was being set based on the state value, but buttons should remain clickable regardless of their state since their state only reflects the last time they were pressed.

**Solution:**
Set `disabled=${false}` to ensure buttons are always active and clickable.

**Testing:**
Verified that buttons remain active and functional even when state is 'unknown'.

* Fix: Ensure buttons get state-on class when state is unknown

Fixes #26683

The "state-on" class was not being applied when button state was
"unknown" because "unknown" was included in the STATES_OFF set.
This ensures buttons appear active regardless of their state.

* Update hui-picture-glance-card.ts

* Update hui-picture-glance-card.ts

* Update hui-picture-glance-card.ts

* Update hui-picture-glance-card.ts

* Update hui-picture-glance-card.ts

* Update hui-picture-glance-card.ts

* Update hui-picture-glance-card.ts
2025-08-29 08:20:39 +02:00
Jonathan Keslin
175915218f Hide leading zero in clock card hour when using 12-hour time format (#26669)
Remove leading zero on hour on Clock card when displayed with 12-hour time format
2025-08-29 08:42:07 +03:00
Wendelin
25f25243bd Automation editor: overflow changes and style fixes (#26744)
* Fix for width also for blueprint editor

* Fix overflow menus

* Fix option icons

* Fix iOS bottom sheet flickering and drag handle

* Fix mobile padding

* Fix padding in sidebar

* Fix overflow placement

* Add new a11y sort

* Remove overflow in rows

* Fix a11y select row

* Revert "Fix a11y select row"

This reverts commit 54260c4a37.

* Fix option padding on blueprint

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2025-08-28 16:42:45 +00:00
karwosts
cf8d36b1f3 Hide 'options' from enum more info (#26736)
* Hide 'options' from enum more info

* restrict to specific domain and class
2025-08-28 18:08:33 +02:00
Aidan Timson
e3a9d754df Change loading detailed storage to use ha-alert with spinner (#26749)
* Change spinner overlay to use `ha-alert` with messaging

* Use spinner for icon slot
2025-08-28 18:05:53 +02:00
Petar Petrov
7b303a699b Increase disk usage request timeout (#26748) 2025-08-28 16:32:52 +03:00
renovate[bot]
ee45eb00f7 Update vaadinWebComponents monorepo to v24.8.6 (#26746)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-28 15:38:03 +03:00
Norbert Rittel
24a6aa2669 Different spelling fixes of user-facing strings (#26745)
* Different spelling fixes of user-facing strings

* Fix menu "Application credentials" menu item name
2025-08-28 15:37:06 +03:00
Aidan Timson
66d011cfb9 Move automation and script ha-alerts to main flow (#26735)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-08-28 13:53:15 +02:00
Wendelin
35895735cc Fix automation editor drag selected row in/out nested (#26740)
Fix nested sort
2025-08-28 13:30:14 +02:00
Norbert Rittel
e71df0b71a Improve section descriptions in Automation editor (#26741)
Replace "listed here" or "list of" with "added here"
2025-08-28 11:05:31 +02:00
Paulus Schoutsen
2a9846c598 Show configured area sensors on climate domain dashboard (#26737) 2025-08-28 08:34:45 +03:00
Paulus Schoutsen
b243d56bee Show binary sensors with graphs on the security dashboard (#26738) 2025-08-28 08:26:44 +03:00
J. Nick Koston
6a372a165e Improve network adapter configuration discoverability (#26734) 2025-08-27 09:59:23 -05:00
Paul Bottein
a5dad9bc22 Use entity picture for home favorite and update home dashboard icon (#26732)
* Add strategy icon

* Use entity picture for favorite
2025-08-27 16:33:48 +02:00
260 changed files with 7109 additions and 4264 deletions

View File

@@ -21,12 +21,12 @@ jobs:
url: ${{ steps.deploy.outputs.NETLIFY_LIVE_URL || steps.deploy.outputs.NETLIFY_URL }}
steps:
- name: Check out files from GitHub
uses: actions/checkout@v5.0.0
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
with:
ref: dev
- name: Setup Node
uses: actions/setup-node@v4.4.0
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -56,12 +56,12 @@ jobs:
url: ${{ steps.deploy.outputs.NETLIFY_LIVE_URL || steps.deploy.outputs.NETLIFY_URL }}
steps:
- name: Check out files from GitHub
uses: actions/checkout@v5.0.0
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
with:
ref: master
- name: Setup Node
uses: actions/setup-node@v4.4.0
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn

View File

@@ -24,9 +24,9 @@ jobs:
runs-on: ubuntu-latest
steps:
- name: Check out files from GitHub
uses: actions/checkout@v5.0.0
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Setup Node
uses: actions/setup-node@v4.4.0
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -37,7 +37,7 @@ jobs:
- name: Build resources
run: ./node_modules/.bin/gulp gen-icons-json build-translations build-locale-data gather-gallery-pages
- name: Setup lint cache
uses: actions/cache@v4.2.4
uses: actions/cache@0400d5f644dc74513175e3cd8d07132dd4860809 # v4.2.4
with:
path: |
node_modules/.cache/prettier
@@ -58,9 +58,9 @@ jobs:
runs-on: ubuntu-latest
steps:
- name: Check out files from GitHub
uses: actions/checkout@v5.0.0
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Setup Node
uses: actions/setup-node@v4.4.0
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -76,9 +76,9 @@ jobs:
runs-on: ubuntu-latest
steps:
- name: Check out files from GitHub
uses: actions/checkout@v5.0.0
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Setup Node
uses: actions/setup-node@v4.4.0
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -89,7 +89,7 @@ jobs:
env:
IS_TEST: "true"
- name: Upload bundle stats
uses: actions/upload-artifact@v4.6.2
uses: actions/upload-artifact@ea165f8d65b6e75b540449e92b4886f43607fa02 # v4.6.2
with:
name: frontend-bundle-stats
path: build/stats/*.json
@@ -100,9 +100,9 @@ jobs:
runs-on: ubuntu-latest
steps:
- name: Check out files from GitHub
uses: actions/checkout@v5.0.0
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Setup Node
uses: actions/setup-node@v4.4.0
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -113,7 +113,7 @@ jobs:
env:
IS_TEST: "true"
- name: Upload bundle stats
uses: actions/upload-artifact@v4.6.2
uses: actions/upload-artifact@ea165f8d65b6e75b540449e92b4886f43607fa02 # v4.6.2
with:
name: supervisor-bundle-stats
path: build/stats/*.json

View File

@@ -23,7 +23,7 @@ jobs:
steps:
- name: Checkout repository
uses: actions/checkout@v5.0.0
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
with:
# We must fetch at least the immediate parents so that if this is
# a pull request then we can checkout the head.
@@ -36,14 +36,14 @@ jobs:
# Initializes the CodeQL tools for scanning.
- name: Initialize CodeQL
uses: github/codeql-action/init@v3
uses: github/codeql-action/init@192325c86100d080feab897ff886c34abd4c83a3 # v3.30.3
with:
languages: ${{ matrix.language }}
# Autobuild attempts to build any compiled languages (C/C++, C#, or Java).
# If this step fails, then you should remove it and run the build manually (see below)
- name: Autobuild
uses: github/codeql-action/autobuild@v3
uses: github/codeql-action/autobuild@192325c86100d080feab897ff886c34abd4c83a3 # v3.30.3
# Command-line programs to run using the OS shell.
# 📚 https://git.io/JvXDl
@@ -57,4 +57,4 @@ jobs:
# make release
- name: Perform CodeQL Analysis
uses: github/codeql-action/analyze@v3
uses: github/codeql-action/analyze@192325c86100d080feab897ff886c34abd4c83a3 # v3.30.3

View File

@@ -22,12 +22,12 @@ jobs:
url: ${{ steps.deploy.outputs.NETLIFY_LIVE_URL || steps.deploy.outputs.NETLIFY_URL }}
steps:
- name: Check out files from GitHub
uses: actions/checkout@v5.0.0
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
with:
ref: dev
- name: Setup Node
uses: actions/setup-node@v4.4.0
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -57,12 +57,12 @@ jobs:
url: ${{ steps.deploy.outputs.NETLIFY_LIVE_URL || steps.deploy.outputs.NETLIFY_URL }}
steps:
- name: Check out files from GitHub
uses: actions/checkout@v5.0.0
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
with:
ref: master
- name: Setup Node
uses: actions/setup-node@v4.4.0
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn

View File

@@ -16,10 +16,10 @@ jobs:
url: ${{ steps.deploy.outputs.NETLIFY_LIVE_URL || steps.deploy.outputs.NETLIFY_URL }}
steps:
- name: Check out files from GitHub
uses: actions/checkout@v5.0.0
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Setup Node
uses: actions/setup-node@v4.4.0
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn

View File

@@ -21,10 +21,10 @@ jobs:
if: github.repository == 'home-assistant/frontend' && contains(github.event.pull_request.labels.*.name, 'needs design preview')
steps:
- name: Check out files from GitHub
uses: actions/checkout@v5.0.0
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Setup Node
uses: actions/setup-node@v4.4.0
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn

View File

@@ -10,6 +10,6 @@ jobs:
runs-on: ubuntu-latest
steps:
- name: Apply labels
uses: actions/labeler@v5.0.0
uses: actions/labeler@634933edcd8ababfe52f92936142cc22ac488b1b # v6.0.1
with:
sync-labels: true

View File

@@ -9,7 +9,7 @@ jobs:
lock:
runs-on: ubuntu-latest
steps:
- uses: dessant/lock-threads@v5.0.1
- uses: dessant/lock-threads@1bf7ec25051fe7c00bdd17e6a7cf3d7bfb7dc771 # v5.0.1
with:
github-token: ${{ github.token }}
process-only: "issues, prs"

View File

@@ -20,15 +20,15 @@ jobs:
contents: write
steps:
- name: Checkout the repository
uses: actions/checkout@v5.0.0
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Set up Python ${{ env.PYTHON_VERSION }}
uses: actions/setup-python@v5
uses: actions/setup-python@e797f83bcb11b83ae66e0230d6156d7c80228e7c # v6
with:
python-version: ${{ env.PYTHON_VERSION }}
- name: Setup Node
uses: actions/setup-node@v4.4.0
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -57,14 +57,14 @@ jobs:
run: tar -czvf translations.tar.gz translations
- name: Upload build artifacts
uses: actions/upload-artifact@v4.6.2
uses: actions/upload-artifact@ea165f8d65b6e75b540449e92b4886f43607fa02 # v4.6.2
with:
name: wheels
path: dist/home_assistant_frontend*.whl
if-no-files-found: error
- name: Upload translations
uses: actions/upload-artifact@v4.6.2
uses: actions/upload-artifact@ea165f8d65b6e75b540449e92b4886f43607fa02 # v4.6.2
with:
name: translations
path: translations.tar.gz

View File

@@ -17,7 +17,7 @@ jobs:
runs-on: ubuntu-latest
steps:
- name: Send bundle stats and build information to RelativeCI
uses: relative-ci/agent-action@v3.0.1
uses: relative-ci/agent-action@1707825cbfcc7452b2913d273414705415ae64d4 # v3.0.1
with:
key: ${{ secrets[format('RELATIVE_CI_KEY_{0}_{1}', matrix.bundle, matrix.build)] }}
token: ${{ github.token }}

View File

@@ -18,6 +18,6 @@ jobs:
pull-requests: read
runs-on: ubuntu-latest
steps:
- uses: release-drafter/release-drafter@v6.1.0
- uses: release-drafter/release-drafter@b1476f6e6eb133afa41ed8589daba6dc69b4d3f5 # v6.1.0
env:
GITHUB_TOKEN: ${{ secrets.GITHUB_TOKEN }}

View File

@@ -23,10 +23,10 @@ jobs:
contents: write # Required to upload release assets
steps:
- name: Checkout the repository
uses: actions/checkout@v5.0.0
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Set up Python ${{ env.PYTHON_VERSION }}
uses: actions/setup-python@v5
uses: actions/setup-python@e797f83bcb11b83ae66e0230d6156d7c80228e7c # v6.0.0
with:
python-version: ${{ env.PYTHON_VERSION }}
@@ -34,7 +34,7 @@ jobs:
uses: home-assistant/actions/helpers/verify-version@master
- name: Setup Node
uses: actions/setup-node@v4.4.0
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -55,7 +55,7 @@ jobs:
script/release
- name: Upload release assets
uses: softprops/action-gh-release@v2.3.2
uses: softprops/action-gh-release@6cbd405e2c4e67a21c47fa9e383d020e4e28b836 # v2.3.3
with:
files: |
dist/*.whl
@@ -73,6 +73,7 @@ jobs:
version=$(echo "${{ github.ref }}" | awk -F"/" '{print $NF}' )
echo "home-assistant-frontend==$version" > ./requirements.txt
# home-assistant/wheels doesn't support SHA pinning
- name: Build wheels
uses: home-assistant/wheels@2025.07.0
with:
@@ -90,9 +91,9 @@ jobs:
contents: write # Required to upload release assets
steps:
- name: Checkout the repository
uses: actions/checkout@v5.0.0
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Setup Node
uses: actions/setup-node@v4.4.0
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -107,7 +108,7 @@ jobs:
- name: Tar folder
run: tar -czf landing-page/home_assistant_frontend_landingpage-${{ github.event.release.tag_name }}.tar.gz -C landing-page/dist .
- name: Upload release asset
uses: softprops/action-gh-release@v2.3.2
uses: softprops/action-gh-release@6cbd405e2c4e67a21c47fa9e383d020e4e28b836 # v2.3.3
with:
files: landing-page/home_assistant_frontend_landingpage-${{ github.event.release.tag_name }}.tar.gz
@@ -119,9 +120,9 @@ jobs:
contents: write # Required to upload release assets
steps:
- name: Checkout the repository
uses: actions/checkout@v5.0.0
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Setup Node
uses: actions/setup-node@v4.4.0
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -136,6 +137,6 @@ jobs:
- name: Tar folder
run: tar -czf hassio/home_assistant_frontend_supervisor-${{ github.event.release.tag_name }}.tar.gz -C hassio/build .
- name: Upload release asset
uses: softprops/action-gh-release@v2.3.2
uses: softprops/action-gh-release@6cbd405e2c4e67a21c47fa9e383d020e4e28b836 # v2.3.3
with:
files: hassio/home_assistant_frontend_supervisor-${{ github.event.release.tag_name }}.tar.gz

View File

@@ -12,7 +12,7 @@ jobs:
if: github.event.issue.type.name == 'Task'
steps:
- name: Check if user is authorized
uses: actions/github-script@v7
uses: actions/github-script@ed597411d8f924073f98dfc5c65a23a2325f34cd # v8
with:
script: |
const issueAuthor = context.payload.issue.user.login;

View File

@@ -10,7 +10,7 @@ jobs:
runs-on: ubuntu-latest
steps:
- name: 90 days stale policy
uses: actions/stale@v9.1.0
uses: actions/stale@3a9db7e6a41a89f618792c92c0e97cc736e1b13f # v10.0.0
with:
repo-token: ${{ secrets.GITHUB_TOKEN }}
days-before-stale: 90

View File

@@ -14,7 +14,7 @@ jobs:
runs-on: ubuntu-latest
steps:
- name: Checkout the repository
uses: actions/checkout@v5.0.0
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Upload Translations
run: |

File diff suppressed because one or more lines are too long

View File

@@ -6,4 +6,4 @@ enableGlobalCache: false
nodeLinker: node-modules
yarnPath: .yarn/releases/yarn-4.9.3.cjs
yarnPath: .yarn/releases/yarn-4.9.4.cjs

View File

@@ -5,17 +5,17 @@ const castContext = framework.CastReceiverContext.getInstance();
const playerManager = castContext.getPlayerManager();
playerManager.setMessageInterceptor(
framework.messages.MessageType.LOAD,
"LOAD" as framework.messages.MessageType.LOAD,
(loadRequestData) => {
const media = loadRequestData.media;
// Special handling if it came from Google Assistant
if (media.entity) {
media.contentId = media.entity;
media.streamType = framework.messages.StreamType.LIVE;
media.streamType = "LIVE" as framework.messages.StreamType.LIVE;
media.contentType = "application/vnd.apple.mpegurl";
// @ts-ignore
media.hlsVideoSegmentFormat =
framework.messages.HlsVideoSegmentFormat.FMP4;
"fmp4" as framework.messages.HlsVideoSegmentFormat.FMP4;
}
return loadRequestData;
}

View File

@@ -40,7 +40,8 @@ const playDummyMedia = (viewTitle?: string) => {
loadRequestData.media.contentId =
"https://cast.home-assistant.io/images/google-nest-hub.png";
loadRequestData.media.contentType = "image/jpeg";
loadRequestData.media.streamType = framework.messages.StreamType.NONE;
loadRequestData.media.streamType =
"NONE" as framework.messages.StreamType.NONE;
const metadata = new framework.messages.GenericMediaMetadata();
metadata.title = viewTitle;
loadRequestData.media.metadata = metadata;
@@ -89,7 +90,7 @@ const showMediaPlayer = () => {
const options = new framework.CastReceiverOptions();
options.disableIdleTimeout = true;
options.customNamespaces = {
[CAST_NS]: framework.system.MessageType.JSON,
[CAST_NS]: "json" as framework.system.MessageType.JSON,
};
castContext.addCustomMessageListener(
@@ -97,9 +98,7 @@ castContext.addCustomMessageListener(
// @ts-ignore
(ev: ReceivedMessage<HassMessage>) => {
// We received a show Lovelace command, stop media from playing, hide media player and show Lovelace controller
if (
playerManager.getPlayerState() !== framework.messages.PlayerState.IDLE
) {
if (playerManager.getPlayerState() !== "IDLE") {
playerManager.stop();
} else {
showLovelaceController();
@@ -113,7 +112,7 @@ castContext.addCustomMessageListener(
const playerManager = castContext.getPlayerManager();
playerManager.setMessageInterceptor(
framework.messages.MessageType.LOAD,
"LOAD" as framework.messages.MessageType.LOAD,
(loadRequestData) => {
if (
loadRequestData.media.contentId ===
@@ -127,24 +126,23 @@ playerManager.setMessageInterceptor(
// Special handling if it came from Google Assistant
if (media.entity) {
media.contentId = media.entity;
media.streamType = framework.messages.StreamType.LIVE;
media.streamType = "LIVE" as framework.messages.StreamType.LIVE;
media.contentType = "application/vnd.apple.mpegurl";
// @ts-ignore
media.hlsVideoSegmentFormat =
framework.messages.HlsVideoSegmentFormat.FMP4;
"fmp4" as framework.messages.HlsVideoSegmentFormat.FMP4;
}
return loadRequestData;
}
);
playerManager.addEventListener(
framework.events.EventType.MEDIA_STATUS,
"MEDIA_STATUS" as framework.events.EventType.MEDIA_STATUS,
(event) => {
if (
event.mediaStatus?.playerState === framework.messages.PlayerState.IDLE &&
event.mediaStatus?.playerState === "IDLE" &&
event.mediaStatus?.idleReason &&
event.mediaStatus?.idleReason !==
framework.messages.IdleReason.INTERRUPTED
event.mediaStatus?.idleReason !== "INTERRUPTED"
) {
// media finished or stopped, return to default Lovelace
showLovelaceController();

View File

@@ -68,7 +68,7 @@
}
#ha-launch-screen .ha-launch-screen-spacer-top {
flex: 1;
margin-top: calc( 2 * max(var(--safe-area-inset-bottom, 0px), 48px) + 46px );
margin-top: calc( 2 * max(var(--safe-area-inset-top, 0px), 48px) + 46px );
padding-top: 48px;
}
#ha-launch-screen .ha-launch-screen-spacer-bottom {

View File

@@ -1,10 +1,11 @@
import { LitElement, css, html } from "lit";
import { LitElement, css, html, nothing } from "lit";
import { customElement, property } from "lit/decorators";
import "../../../src/components/ha-card";
import "../../../src/dialogs/more-info/more-info-content";
import "../../../src/state-summary/state-card-content";
import "../ha-demo-options";
import type { HomeAssistant } from "../../../src/types";
import { computeShowNewMoreInfo } from "../../../src/dialogs/more-info/const";
@customElement("demo-more-info")
class DemoMoreInfo extends LitElement {
@@ -21,11 +22,13 @@ class DemoMoreInfo extends LitElement {
<div class="root">
<div id="card">
<ha-card>
<state-card-content
.stateObj=${state}
.hass=${this.hass}
in-dialog
></state-card-content>
${!computeShowNewMoreInfo(state)
? html`<state-card-content
.stateObj=${state}
.hass=${this.hass}
in-dialog
></state-card-content>`
: nothing}
<more-info-content
.hass=${this.hass}

View File

@@ -1106,7 +1106,7 @@ export default {
friendly_name: "Philips Hue",
entity_picture: null,
description:
"Press the button on the bridge to register Philips Hue with Home Assistant.\n\n![Description image](/static/images/config_philips_hue.jpg)",
"Press the button on the bridge to register Philips Hue with Home Assistant.",
submit_caption: "I have pressed the button",
},
last_changed: "2018-07-19T10:44:46.515160+00:00",

View File

@@ -0,0 +1,36 @@
---
title: Slider
subtitle: A slider component for selecting a value from a range.
---
<style>
.wrapper {
display: flex;
gap: 24px;
}
</style>
# Slider `<ha-slider>`
## Implementation
### Example Usage
<div class="wrapper">
<ha-slider size="small" with-markers min="0" max="8" value="4"></ha-slider>
<ha-slider size="medium"></ha-slider>
</div>
```html
<ha-slider size="small" with-markers min="0" max="8" value="4"></ha-slider>
<ha-slider size="medium"></ha-slider>
```
### API
This component is based on the webawesome slider component.
Check the [webawesome documentation](https://webawesome.com/docs/components/slider/) for more details.
**CSS Custom Properties**
- `--ha-slider-track-size` - Height of the slider track. Defaults to `4px`.

View File

@@ -0,0 +1,100 @@
import type { TemplateResult } from "lit";
import { css, html, LitElement } from "lit";
import { customElement, property } from "lit/decorators";
import { applyThemesOnElement } from "../../../../src/common/dom/apply_themes_on_element";
import "../../../../src/components/ha-bar";
import "../../../../src/components/ha-card";
import "../../../../src/components/ha-spinner";
import "../../../../src/components/ha-slider";
import type { HomeAssistant } from "../../../../src/types";
@customElement("demo-components-ha-slider")
export class DemoHaSlider extends LitElement {
@property({ attribute: false }) hass!: HomeAssistant;
protected render(): TemplateResult {
return html`
${["light", "dark"].map(
(mode) => html`
<div class=${mode}>
<ha-card header="ha-slider ${mode} demo">
<div class="card-content">
<span>Default (disabled)</span>
<ha-slider
disabled
min="0"
max="8"
value="4"
with-markers
></ha-slider>
<span>Small</span>
<ha-slider
size="small"
min="0"
max="8"
value="4"
with-markers
></ha-slider>
<span>Medium</span>
<ha-slider
size="medium"
min="0"
max="8"
value="4"
with-markers
></ha-slider>
</div>
</ha-card>
</div>
`
)}
`;
}
firstUpdated(changedProps) {
super.firstUpdated(changedProps);
applyThemesOnElement(
this.shadowRoot!.querySelector(".dark"),
{
default_theme: "default",
default_dark_theme: "default",
themes: {},
darkMode: true,
theme: "default",
},
undefined,
undefined,
true
);
}
static styles = css`
:host {
display: flex;
justify-content: center;
}
.dark,
.light {
display: block;
background-color: var(--primary-background-color);
padding: 0 50px;
margin: 16px;
border-radius: 8px;
}
ha-card {
margin: 24px auto;
}
.card-content {
display: flex;
flex-direction: column;
align-items: center;
gap: 24px;
}
`;
}
declare global {
interface HTMLElementTagNameMap {
"demo-components-ha-slider": DemoHaSlider;
}
}

View File

@@ -6,21 +6,23 @@ A tooltip's target is its _first child element_, so you should only wrap one ele
Tooltips use `display: contents` so they won't interfere with how elements are positioned in a flex or grid layout.
<ha-tooltip content="This is a tooltip">
<ha-button>Hover Me</ha-button>
<ha-button id="hover">Hover Me</ha-button>
<ha-tooltip for="hover">
This is a tooltip
</ha-tooltip>
```
<ha-tooltip content="This is a tooltip">
<ha-button>Hover Me</ha-button>
<ha-button id="hover">Hover Me</ha-button>
<ha-tooltip for="hover">
This is a tooltip
</ha-tooltip>
```
## Documentation
This element is based on shoelace `sl-tooltip` it only sets some css tokens and has a custom show/hide animation.
This element is based on webawesome `wa-tooltip` it only sets some css tokens and has a custom show/hide animation.
<a href="https://shoelace.style/components/tooltip" target="_blank" rel="noopener noreferrer">Shoelace documentation</a>
<a href="https://webawesome.com/docs/components/tooltip/" target="_blank" rel="noopener noreferrer">Webawesome documentation</a>
### HA style tokens
@@ -28,7 +30,7 @@ In your theme settings use this without the prefixed `--`.
- `--ha-tooltip-border-radius` (Default: 4px)
- `--ha-tooltip-arrow-size` (Default: 8px)
- `--sl-tooltip-font-family` (Default: `var(--ha-font-family-body)`)
- `--wa-tooltip-font-family` (Default: `var(--ha-font-family-body)`)
- `--ha-tooltip-font-size` (Default: `var(--ha-font-size-s)`)
- `--sl-tooltip-font-weight` (Default: `var(--ha-font-weight-normal)`)
- `--sl-tooltip-line-height` (Default: `var(--ha-line-height-condensed)`)
- `--wa-tooltip-font-weight` (Default: `var(--ha-font-weight-normal)`)
- `--wa-tooltip-line-height` (Default: `var(--ha-line-height-condensed)`)

View File

@@ -149,7 +149,7 @@ class HassioAddonConfig extends LitElement {
)
);
private _filteredShchema = memoizeOne(
private _filteredSchema = memoizeOne(
(options: Record<string, unknown>, schema: HaFormSchema[]) =>
schema.filter((entry) => entry.name in options || entry.required)
);
@@ -161,7 +161,7 @@ class HassioAddonConfig extends LitElement {
showForm &&
JSON.stringify(this.addon.schema) !==
JSON.stringify(
this._filteredShchema(this.addon.options, this.addon.schema!)
this._filteredSchema(this.addon.options, this.addon.schema!)
);
return html`
<h1>${this.addon.name}</h1>
@@ -199,6 +199,7 @@ class HassioAddonConfig extends LitElement {
<div class="card-content">
${showForm
? html`<ha-form
.hass=${this.hass}
.disabled=${this.disabled}
.data=${this._options!}
@value-changed=${this._configChanged}
@@ -207,7 +208,7 @@ class HassioAddonConfig extends LitElement {
.schema=${this._convertSchema(
this._showOptional
? this.addon.schema!
: this._filteredShchema(
: this._filteredSchema(
this.addon.options,
this.addon.schema!
)

View File

@@ -781,7 +781,7 @@ class HassioAddonInfo extends LitElement {
${this.addon.long_description
? html`
<ha-card outlined>
<ha-card class="long-description" outlined>
<div class="card-content">
<ha-markdown
.content=${this.addon.long_description}
@@ -1333,6 +1333,9 @@ class HassioAddonInfo extends LitElement {
.description a {
color: var(--primary-color);
}
.long-description {
direction: ltr;
}
ha-assist-chip {
--md-sys-color-primary: var(--text-primary-color);
--md-sys-color-on-surface: var(--text-primary-color);

View File

@@ -15,6 +15,8 @@ import "../../../../src/components/ha-list";
import "../../../../src/components/ha-list-item";
import "../../../../src/components/ha-password-field";
import "../../../../src/components/ha-radio";
import "../../../../src/components/ha-tab-group";
import "../../../../src/components/ha-tab-group-tab";
import "../../../../src/components/ha-textfield";
import type { HaTextField } from "../../../../src/components/ha-textfield";
import { extractApiErrorMessage } from "../../../../src/data/hassio/common";
@@ -36,7 +38,6 @@ import type { HassDialog } from "../../../../src/dialogs/make-dialog-manager";
import { haStyleDialog } from "../../../../src/resources/styles";
import type { HomeAssistant } from "../../../../src/types";
import type { HassioNetworkDialogParams } from "./show-dialog-network";
import "../../../../src/components/sl-tab-group";
const IP_VERSIONS = ["ipv4", "ipv6"];
@@ -114,19 +115,19 @@ export class DialogHassioNetwork
></ha-icon-button>
</ha-header-bar>
${this._interfaces.length > 1
? html`<sl-tab-group @sl-tab-show=${this._handleTabActivated}
? html`<ha-tab-group @wa-tab-show=${this._handleTabActivated}
>${this._interfaces.map(
(device, index) =>
html`<sl-tab
html`<ha-tab-group-tab
slot="nav"
.id=${device.interface}
.panel=${index.toString()}
.active=${this._curTabIndex === index}
>
${device.interface}
</sl-tab>`
</ha-tab-group-tab>`
)}
</sl-tab-group>`
</ha-tab-group>`
: ""}
</div>
${cache(this._renderTab())}
@@ -627,10 +628,10 @@ export class DialogHassioNetwork
--mdc-list-side-padding: 10px;
}
sl-tab {
ha-tab-group-tab {
flex: 1;
}
sl-tab::part(base) {
ha-tab-group-tab::part(base) {
width: 100%;
justify-content: center;
}

View File

@@ -119,26 +119,27 @@ class HassioRepositoriesDialog extends LitElement {
<div>${repo.url}</div>
</div>
<ha-tooltip
.for="icon-button-${repo.slug}"
class="delete"
slot="end"
.content=${this._dialogParams!.supervisor.localize(
>
${this._dialogParams!.supervisor.localize(
usedRepositories.includes(repo.slug)
? "dialog.repositories.used"
: "dialog.repositories.remove"
)}
>
<div>
<ha-icon-button
.disabled=${usedRepositories.includes(repo.slug)}
.slug=${repo.slug}
.path=${usedRepositories.includes(repo.slug)
? mdiDeleteOff
: mdiDelete}
@click=${this._removeRepository}
>
</ha-icon-button>
</div>
</ha-tooltip>
<div .id="icon-button-${repo.slug}">
<ha-icon-button
.disabled=${usedRepositories.includes(repo.slug)}
.slug=${repo.slug}
.path=${usedRepositories.includes(repo.slug)
? mdiDeleteOff
: mdiDelete}
@click=${this._removeRepository}
>
</ha-icon-button>
</div>
</ha-md-list-item>
`
)

View File

@@ -3,7 +3,7 @@ import type { PropertyValues, TemplateResult } from "lit";
import { css, html, LitElement } from "lit";
import { customElement, property, state } from "lit/decorators";
import { fireEvent } from "../../../src/common/dom/fire_event";
import { navigate } from "../../../src/common/navigate";
import { goBack, navigate } from "../../../src/common/navigate";
import { extractSearchParam } from "../../../src/common/url/search-params";
import { nextRender } from "../../../src/common/util/render-status";
import "../../../src/components/ha-icon-button";
@@ -193,7 +193,7 @@ class HassioIngressView extends LitElement {
title: addon.name,
});
await nextRender();
history.back();
goBack();
return;
}
@@ -275,7 +275,7 @@ class HassioIngressView extends LitElement {
title: addon.name,
});
await nextRender();
history.back();
goBack();
return;
}

View File

@@ -2,6 +2,7 @@ import type { TemplateResult } from "lit";
import { css, html, LitElement } from "lit";
import { customElement, property } from "lit/decorators";
import type { Supervisor } from "../../../src/data/supervisor/supervisor";
import { goBack } from "../../../src/common/navigate";
import "../../../src/layouts/hass-subpage";
import type { HomeAssistant, Route } from "../../../src/types";
import "./update-available-card";
@@ -35,7 +36,7 @@ class UpdateAvailableDashboard extends LitElement {
}
private _updateComplete() {
history.back();
goBack();
}
static styles = css`

View File

@@ -19,8 +19,9 @@
height: auto;
padding: 32px 0;
}
.content {
max-width: 560px;
max-width: min(560px, calc(100vw - var(--safe-area-inset-right, 0px) - var(--safe-area-inset-left, 0px)));
margin: 0 auto;
padding: 0 16px;
box-sizing: content-box;

View File

@@ -26,16 +26,16 @@
"license": "Apache-2.0",
"type": "module",
"dependencies": {
"@awesome.me/webawesome": "3.0.0-beta.4",
"@babel/runtime": "7.28.3",
"@babel/runtime": "7.28.4",
"@braintree/sanitize-url": "7.1.1",
"@codemirror/autocomplete": "6.18.6",
"@codemirror/autocomplete": "6.18.7",
"@codemirror/commands": "6.8.1",
"@codemirror/language": "6.11.3",
"@codemirror/legacy-modes": "6.5.1",
"@codemirror/search": "6.5.11",
"@codemirror/state": "6.5.2",
"@codemirror/view": "6.38.1",
"@codemirror/view": "6.38.2",
"@date-fns/tz": "1.4.1",
"@egjs/hammerjs": "2.0.17",
"@formatjs/intl-datetimeformat": "6.18.0",
"@formatjs/intl-displaynames": "6.8.11",
@@ -52,6 +52,7 @@
"@fullcalendar/list": "6.1.19",
"@fullcalendar/luxon3": "6.1.19",
"@fullcalendar/timegrid": "6.1.19",
"@home-assistant/webawesome": "3.0.0-beta.4.ha.3",
"@lezer/highlight": "1.2.1",
"@lit-labs/motion": "1.0.9",
"@lit-labs/observers": "2.0.6",
@@ -84,26 +85,24 @@
"@mdi/js": "7.4.47",
"@mdi/svg": "7.4.47",
"@replit/codemirror-indentation-markers": "6.5.3",
"@shoelace-style/shoelace": "2.20.1",
"@swc/helpers": "0.5.17",
"@thomasloven/round-slider": "0.6.0",
"@tsparticles/engine": "3.9.1",
"@tsparticles/preset-links": "3.2.0",
"@vaadin/combo-box": "24.8.5",
"@vaadin/vaadin-themable-mixin": "24.8.5",
"@vaadin/combo-box": "24.8.7",
"@vaadin/vaadin-themable-mixin": "24.8.7",
"@vibrant/color": "4.0.0",
"@vue/web-component-wrapper": "1.3.0",
"@webcomponents/scoped-custom-element-registry": "0.0.10",
"@webcomponents/webcomponentsjs": "2.8.0",
"app-datepicker": "5.1.1",
"barcode-detector": "3.0.5",
"color-name": "2.0.0",
"color-name": "2.0.2",
"comlink": "4.4.2",
"core-js": "3.45.1",
"cropperjs": "1.6.2",
"culori": "4.0.2",
"date-fns": "4.1.0",
"date-fns-tz": "3.2.0",
"deep-clone-simple": "1.1.1",
"deep-freeze": "0.0.1",
"dialog-polyfill": "0.5.6",
@@ -112,7 +111,7 @@
"fuse.js": "7.1.0",
"google-timezones-json": "1.2.0",
"gulp-zopfli-green": "6.0.2",
"hls.js": "1.6.10",
"hls.js": "1.6.12",
"home-assistant-js-websocket": "9.5.0",
"idb-keyval": "6.2.2",
"intl-messageformat": "10.7.16",
@@ -122,8 +121,8 @@
"leaflet.markercluster": "1.5.3",
"lit": "3.3.1",
"lit-html": "3.3.1",
"luxon": "3.7.1",
"marked": "16.2.0",
"luxon": "3.7.2",
"marked": "16.2.1",
"memoize-one": "6.0.0",
"node-vibrant": "4.0.3",
"object-hash": "3.0.0",
@@ -136,7 +135,7 @@
"stacktrace-js": "2.0.2",
"superstruct": "2.0.2",
"tinykeys": "3.0.0",
"ua-parser-js": "2.0.4",
"ua-parser-js": "2.0.5",
"vue": "2.7.16",
"vue2-daterange-picker": "0.6.8",
"weekstart": "2.0.0",
@@ -149,7 +148,7 @@
"xss": "1.0.15"
},
"devDependencies": {
"@babel/core": "7.28.3",
"@babel/core": "7.28.4",
"@babel/helper-define-polyfill-provider": "0.6.5",
"@babel/plugin-transform-runtime": "7.28.3",
"@babel/preset-env": "7.28.3",
@@ -159,18 +158,18 @@
"@octokit/plugin-retry": "8.0.1",
"@octokit/rest": "22.0.0",
"@rsdoctor/rspack-plugin": "1.2.3",
"@rspack/core": "1.4.11",
"@rspack/core": "1.5.3",
"@rspack/dev-server": "1.1.4",
"@types/babel__plugin-transform-runtime": "7.9.5",
"@types/chromecast-caf-receiver": "6.0.22",
"@types/chromecast-caf-receiver": "6.0.24",
"@types/chromecast-caf-sender": "1.0.11",
"@types/color-name": "2.0.0",
"@types/culori": "4.0.0",
"@types/culori": "4.0.1",
"@types/html-minifier-terser": "7.0.2",
"@types/js-yaml": "4.0.9",
"@types/leaflet": "1.9.20",
"@types/leaflet-draw": "1.0.12",
"@types/leaflet.markercluster": "1.5.5",
"@types/leaflet-draw": "1.0.13",
"@types/leaflet.markercluster": "1.5.6",
"@types/lodash.merge": "4.6.9",
"@types/luxon": "3.7.1",
"@types/mocha": "10.0.10",
@@ -184,7 +183,7 @@
"babel-plugin-template-html-minifier": "4.1.0",
"browserslist-useragent-regexp": "4.1.3",
"del": "8.0.0",
"eslint": "9.34.0",
"eslint": "9.35.0",
"eslint-config-airbnb-base": "15.0.0",
"eslint-config-prettier": "10.1.8",
"eslint-import-resolver-webpack": "0.13.10",
@@ -202,9 +201,9 @@
"gulp-rename": "2.1.0",
"html-minifier-terser": "7.2.0",
"husky": "9.1.7",
"jsdom": "26.1.0",
"jsdom": "27.0.0",
"jszip": "3.10.1",
"lint-staged": "16.1.5",
"lint-staged": "16.1.6",
"lit-analyzer": "2.0.3",
"lodash.merge": "4.6.2",
"lodash.template": "4.5.0",
@@ -212,13 +211,13 @@
"pinst": "3.0.0",
"prettier": "3.6.2",
"rspack-manifest-plugin": "5.0.3",
"serve": "14.2.4",
"serve": "14.2.5",
"sinon": "21.0.0",
"tar": "7.4.3",
"terser-webpack-plugin": "5.3.14",
"ts-lit-plugin": "2.0.2",
"typescript": "5.9.2",
"typescript-eslint": "8.40.0",
"typescript-eslint": "8.43.0",
"vite-tsconfig-paths": "5.1.4",
"vitest": "3.2.4",
"webpack-stats-plugin": "1.1.3",
@@ -232,10 +231,9 @@
"clean-css": "5.3.3",
"@lit/reactive-element": "2.1.1",
"@fullcalendar/daygrid": "6.1.19",
"globals": "16.3.0",
"globals": "16.4.0",
"tslib": "2.8.1",
"@material/mwc-list@^0.27.0": "patch:@material/mwc-list@npm%3A0.27.0#~/.yarn/patches/@material-mwc-list-npm-0.27.0-5344fc9de4.patch",
"@vaadin/vaadin-themable-mixin": "24.8.5"
"@material/mwc-list@^0.27.0": "patch:@material/mwc-list@npm%3A0.27.0#~/.yarn/patches/@material-mwc-list-npm-0.27.0-5344fc9de4.patch"
},
"packageManager": "yarn@4.9.3"
"packageManager": "yarn@4.9.4"
}

View File

@@ -1,3 +1,11 @@
export default {
trailingComma: "es5",
overrides: [
{
files: "*.globals.ts",
options: {
printWidth: 9999, // Effectively disables line wrapping for these files
},
},
],
};

Binary file not shown.

Before

Width:  |  Height:  |  Size: 5.4 KiB

View File

@@ -4,7 +4,7 @@ build-backend = "setuptools.build_meta"
[project]
name = "home-assistant-frontend"
version = "20250903.5"
version = "20250903.0"
license = "Apache-2.0"
license-files = ["LICENSE*"]
description = "The Home Assistant frontend"

View File

@@ -11,7 +11,7 @@ import {
differenceInDays,
addDays,
} from "date-fns";
import { toZonedTime, fromZonedTime } from "date-fns-tz";
import { TZDate } from "@date-fns/tz";
import type { HassConfig } from "home-assistant-js-websocket";
import type { FrontendLocaleData } from "../../data/translation";
import { TimeZone } from "../../data/translation";
@@ -22,12 +22,13 @@ const calcZonedDate = (
fn: (date: Date, options?: any) => Date | number | boolean,
options?
) => {
const inputZoned = toZonedTime(date, tz);
const fnZoned = fn(inputZoned, options);
if (fnZoned instanceof Date) {
return fromZonedTime(fnZoned, tz) as Date;
const tzDate = new TZDate(date, tz);
const fnResult = fn(tzDate, options);
if (fnResult instanceof Date) {
// Convert back to regular Date in the specified timezone
return new Date(fnResult.getTime());
}
return fnZoned;
return fnResult;
};
export const calcDate = (
@@ -65,7 +66,7 @@ export const calcDateDifferenceProperty = (
locale,
config,
locale.time_zone === TimeZone.server
? toZonedTime(startDate, config.time_zone)
? new TZDate(startDate, config.time_zone)
: startDate
);
@@ -144,3 +145,36 @@ export const shiftDateRange = (
}
return { start, end };
};
/**
* @description Parses a date in browser display timezone
* @param date - The date to parse
* @param timezone - The timezone to parse the date in
* @returns The parsed date as a Date object
*/
export const parseDate = (date: string, timezone: string): Date => {
const tzDate = new TZDate(date, timezone);
return new Date(tzDate.getTime());
};
/**
* @description Formats a date in browser display timezone
* @param date - The date to format
* @param timezone - The timezone to format the date in
* @returns The formatted date in YYYY-MM-DD format
*/
export const formatDate = (date: Date, timezone: string): string => {
const tzDate = new TZDate(date, timezone);
return tzDate.toISOString().split("T")[0];
};
/**
* @description Formats a time in browser display timezone
* @param date - The date to format
* @param timezone - The timezone to format the time in
* @returns The formatted time in HH:mm:ss format
*/
export const formatTime = (date: Date, timezone: string): string => {
const tzDate = new TZDate(date, timezone);
return tzDate.toISOString().split("T")[1].split(".")[0];
};

View File

@@ -10,9 +10,10 @@ import { stripPrefixFromEntityName } from "./strip_prefix_from_entity_name";
export const computeEntityName = (
stateObj: HassEntity,
hass: HomeAssistant
entities: HomeAssistant["entities"],
devices: HomeAssistant["devices"]
): string | undefined => {
const entry = hass.entities[stateObj.entity_id] as
const entry = entities[stateObj.entity_id] as
| EntityRegistryDisplayEntry
| undefined;
@@ -20,12 +21,13 @@ export const computeEntityName = (
// Fall back to state name if not in the entity registry (friendly name)
return computeStateName(stateObj);
}
return computeEntityEntryName(entry, hass);
return computeEntityEntryName(entry, devices);
};
export const computeEntityEntryName = (
entry: EntityRegistryDisplayEntry | EntityRegistryEntry,
hass: HomeAssistant
devices: HomeAssistant["devices"],
fallbackStateObj?: HassEntity
): string | undefined => {
const name =
entry.name ||
@@ -33,15 +35,14 @@ export const computeEntityEntryName = (
? String(entry.original_name)
: undefined);
const device = entry.device_id ? hass.devices[entry.device_id] : undefined;
const device = entry.device_id ? devices[entry.device_id] : undefined;
if (!device) {
if (name) {
return name;
}
const stateObj = hass.states[entry.entity_id] as HassEntity | undefined;
if (stateObj) {
return computeStateName(stateObj);
if (fallbackStateObj) {
return computeStateName(fallbackStateObj);
}
return undefined;
}

View File

@@ -18,9 +18,12 @@ interface EntityContext {
export const getEntityContext = (
stateObj: HassEntity,
hass: HomeAssistant
entities: HomeAssistant["entities"],
devices: HomeAssistant["devices"],
areas: HomeAssistant["areas"],
floors: HomeAssistant["floors"]
): EntityContext => {
const entry = hass.entities[stateObj.entity_id] as
const entry = entities[stateObj.entity_id] as
| EntityRegistryDisplayEntry
| undefined;
@@ -32,7 +35,7 @@ export const getEntityContext = (
floor: null,
};
}
return getEntityEntryContext(entry, hass);
return getEntityEntryContext(entry, entities, devices, areas, floors);
};
export const getEntityEntryContext = (
@@ -40,15 +43,18 @@ export const getEntityEntryContext = (
| EntityRegistryDisplayEntry
| EntityRegistryEntry
| ExtEntityRegistryEntry,
hass: HomeAssistant
entities: HomeAssistant["entities"],
devices: HomeAssistant["devices"],
areas: HomeAssistant["areas"],
floors: HomeAssistant["floors"]
): EntityContext => {
const entity = hass.entities[entry.entity_id];
const entity = entities[entry.entity_id];
const deviceId = entry?.device_id;
const device = deviceId ? hass.devices[deviceId] : undefined;
const device = deviceId ? devices[deviceId] : undefined;
const areaId = entry?.area_id || device?.area_id;
const area = areaId ? hass.areas[areaId] : undefined;
const area = areaId ? areas[areaId] : undefined;
const floorId = area?.floor_id;
const floor = floorId ? hass.floors[floorId] : undefined;
const floor = floorId ? floors[floorId] : undefined;
return {
entity: entity,

View File

@@ -60,17 +60,20 @@ export const generateEntityFilter = (
}
}
const { area, floor, device, entity } = getEntityContext(stateObj, hass);
const { area, floor, device, entity } = getEntityContext(
stateObj,
hass.entities,
hass.devices,
hass.areas,
hass.floors
);
if (entity && entity.hidden) {
return false;
}
if (floors) {
if (!floor) {
return false;
}
if (!floors) {
if (!floor || !floors.has(floor.floor_id)) {
return false;
}
}

View File

@@ -63,3 +63,21 @@ export const navigate = async (
});
return true;
};
/**
* Navigate back in history, with fallback to a default path if no history exists.
* This prevents a user from getting stuck when they navigate directly to a page with no history.
*/
export const goBack = (fallbackPath?: string) => {
const { history } = mainWindow;
// Check if we have history to go back to
if (history.length > 1) {
history.back();
return;
}
// No history available, navigate to fallback path
const fallback = fallbackPath || "/";
navigate(fallback, { replace: true });
};

View File

@@ -2,6 +2,12 @@ import type { HassConfig, HassEntity } from "home-assistant-js-websocket";
import type { FrontendLocaleData } from "../../data/translation";
import type { HomeAssistant } from "../../types";
import type { LocalizeFunc } from "./localize";
import { computeEntityName } from "../entity/compute_entity_name";
import { computeDeviceName } from "../entity/compute_device_name";
import { getEntityContext } from "../entity/context/get_entity_context";
import { computeAreaName } from "../entity/compute_area_name";
import { computeFloorName } from "../entity/compute_floor_name";
import { ensureArray } from "../array/ensure-array";
export type FormatEntityStateFunc = (
stateObj: HassEntity,
@@ -17,16 +23,28 @@ export type FormatEntityAttributeNameFunc = (
attribute: string
) => string;
export type EntityNameType = "entity" | "device" | "area" | "floor";
export type FormatEntityNameFunc = (
stateObj: HassEntity,
type: EntityNameType | EntityNameType[],
separator?: string
) => string;
export const computeFormatFunctions = async (
localize: LocalizeFunc,
locale: FrontendLocaleData,
config: HassConfig,
entities: HomeAssistant["entities"],
devices: HomeAssistant["devices"],
areas: HomeAssistant["areas"],
floors: HomeAssistant["floors"],
sensorNumericDeviceClasses: string[]
): Promise<{
formatEntityState: FormatEntityStateFunc;
formatEntityAttributeValue: FormatEntityAttributeValueFunc;
formatEntityAttributeName: FormatEntityAttributeNameFunc;
formatEntityName: FormatEntityNameFunc;
}> => {
const { computeStateDisplay } = await import(
"../entity/compute_state_display"
@@ -57,5 +75,45 @@ export const computeFormatFunctions = async (
),
formatEntityAttributeName: (stateObj, attribute) =>
computeAttributeNameDisplay(localize, stateObj, entities, attribute),
formatEntityName: (stateObj, type, separator = " ") => {
const types = ensureArray(type);
const namesList: (string | undefined)[] = [];
const { device, area, floor } = getEntityContext(
stateObj,
entities,
devices,
areas,
floors
);
for (const t of types) {
switch (t) {
case "entity": {
namesList.push(computeEntityName(stateObj, entities, devices));
break;
}
case "device": {
if (device) {
namesList.push(computeDeviceName(device));
}
break;
}
case "area": {
if (area) {
namesList.push(computeAreaName(area));
}
break;
}
case "floor": {
if (floor) {
namesList.push(computeFloorName(floor));
}
break;
}
}
}
return namesList.filter((name) => name !== undefined).join(separator);
},
};
};

View File

@@ -0,0 +1,18 @@
/**
* Orders object properties according to a specified key order.
* Properties not in the order array will be placed at the end.
*/
export function orderProperties<T extends Record<string, any>>(
obj: T,
keys: readonly string[]
): T {
const orderedEntries = keys
.filter((key) => key in obj)
.map((key) => [key, obj[key]] as const);
const extraEntries = Object.entries(obj).filter(
([key]) => !keys.includes(key)
);
return Object.fromEntries([...orderedEntries, ...extraEntries]) as T;
}

View File

@@ -63,6 +63,9 @@ export class HaChartBase extends LitElement {
@property({ attribute: "small-controls", type: Boolean })
public smallControls?: boolean;
@property({ attribute: "hide-reset-button", type: Boolean })
public hideResetButton?: boolean;
// extraComponents is not reactive and should not trigger updates
public extraComponents?: any[];
@@ -215,7 +218,7 @@ export class HaChartBase extends LitElement {
</div>
${this._renderLegend()}
<div class="chart-controls ${classMap({ small: this.smallControls })}">
${this._isZoomed
${this._isZoomed && !this.hideResetButton
? html`<ha-icon-button
class="zoom-reset"
.path=${mdiRestart}
@@ -353,20 +356,12 @@ export class HaChartBase extends LitElement {
this.chart = echarts.init(container, "custom");
this.chart.on("datazoom", (e: any) => {
const { start, end } = e.batch?.[0] ?? e;
this._isZoomed = start !== 0 || end !== 100;
this._zoomRatio = (end - start) / 100;
if (this._isTouchDevice) {
// zooming changes the axis pointer so we need to hide it
this.chart?.dispatchAction({
type: "hideTip",
from: "datazoom",
});
}
this._handleDataZoomEvent(e);
});
this.chart.on("click", (e: ECElementEvent) => {
fireEvent(this, "chart-click", e);
});
if (!this.options?.dataZoom) {
this.chart.getZr().on("dblclick", this._handleClickZoom);
}
@@ -868,10 +863,60 @@ export class HaChartBase extends LitElement {
});
};
public zoom(start: number, end: number, silent = false) {
this.chart?.dispatchAction({
type: "dataZoom",
start,
end,
silent,
});
}
private _handleZoomReset() {
this.chart?.dispatchAction({ type: "dataZoom", start: 0, end: 100 });
}
private _handleDataZoomEvent(e: any) {
const zoomData = e.batch?.[0] ?? e;
let start = typeof zoomData.start === "number" ? zoomData.start : 0;
let end = typeof zoomData.end === "number" ? zoomData.end : 100;
if (
start === 0 &&
end === 100 &&
zoomData.startValue !== undefined &&
zoomData.endValue !== undefined
) {
const option = this.chart!.getOption();
const xAxis = option.xAxis?.[0] ?? option.xAxis;
if (xAxis?.min && xAxis?.max) {
const axisMin = new Date(xAxis.min).getTime();
const axisMax = new Date(xAxis.max).getTime();
const axisRange = axisMax - axisMin;
start = Math.max(
0,
Math.min(100, ((zoomData.startValue - axisMin) / axisRange) * 100)
);
end = Math.max(
0,
Math.min(100, ((zoomData.endValue - axisMin) / axisRange) * 100)
);
}
}
this._isZoomed = start !== 0 || end !== 100;
this._zoomRatio = (end - start) / 100;
if (this._isTouchDevice) {
this.chart?.dispatchAction({
type: "hideTip",
from: "datazoom",
});
}
fireEvent(this, "chart-zoom", { start, end });
}
private _legendClick(ev: any) {
if (!this.chart) {
return;
@@ -1024,5 +1069,9 @@ declare global {
"dataset-hidden": { id: string };
"dataset-unhidden": { id: string };
"chart-click": ECElementEvent;
"chart-zoom": {
start: number;
end: number;
};
}
}

View File

@@ -66,6 +66,9 @@ export class StateHistoryChartLine extends LitElement {
@property({ attribute: "expand-legend", type: Boolean })
public expandLegend?: boolean;
@property({ attribute: "hide-reset-button", type: Boolean })
public hideResetButton?: boolean;
@state() private _chartData: LineSeriesOption[] = [];
@state() private _entityIds: string[] = [];
@@ -94,7 +97,9 @@ export class StateHistoryChartLine extends LitElement {
style=${styleMap({ height: this.height })}
@dataset-hidden=${this._datasetHidden}
@dataset-unhidden=${this._datasetUnhidden}
@chart-zoom=${this._handleDataZoom}
.expandLegend=${this.expandLegend}
.hideResetButton=${this.hideResetButton}
></ha-chart-base>
`;
}
@@ -192,6 +197,19 @@ export class StateHistoryChartLine extends LitElement {
this._hiddenStats.delete(ev.detail.id);
}
public zoom(start: number, end: number) {
const chartBase = this.shadowRoot!.querySelector("ha-chart-base")!;
chartBase.zoom(start, end, true);
}
private _handleDataZoom(ev: CustomEvent) {
fireEvent(this, "chart-zoom-with-index", {
start: ev.detail.start ?? 0,
end: ev.detail.end ?? 100,
chartIndex: this.chartIndex,
});
}
public willUpdate(changedProps: PropertyValues) {
if (
changedProps.has("data") ||

View File

@@ -51,6 +51,9 @@ export class StateHistoryChartTimeline extends LitElement {
@property({ attribute: false, type: Number }) public chartIndex?;
@property({ attribute: "hide-reset-button", type: Boolean })
public hideResetButton?: boolean;
@state() private _chartData: CustomSeriesOption[] = [];
@state() private _chartOptions?: ECOption;
@@ -68,6 +71,8 @@ export class StateHistoryChartTimeline extends LitElement {
.data=${this._chartData as ECOption["series"]}
small-controls
@chart-click=${this._handleChartClick}
@chart-zoom=${this._handleDataZoom}
.hideResetButton=${this.hideResetButton}
></ha-chart-base>
`;
}
@@ -256,6 +261,19 @@ export class StateHistoryChartTimeline extends LitElement {
};
}
public zoom(start: number, end: number) {
const chartBase = this.shadowRoot!.querySelector("ha-chart-base")!;
chartBase.zoom(start, end, true);
}
private _handleDataZoom(ev: CustomEvent) {
fireEvent(this, "chart-zoom-with-index", {
start: ev.detail.start ?? 0,
end: ev.detail.end ?? 100,
chartIndex: this.chartIndex,
});
}
private _generateData() {
const computedStyles = getComputedStyle(this);
let stateHistory = this.data;

View File

@@ -1,7 +1,8 @@
import type { PropertyValues } from "lit";
import { css, html, LitElement } from "lit";
import { css, html, LitElement, nothing } from "lit";
import { customElement, eventOptions, property, state } from "lit/decorators";
import type { RenderItemFunction } from "@lit-labs/virtualizer/virtualize";
import { mdiRestart } from "@mdi/js";
import { isComponentLoaded } from "../../common/config/is_component_loaded";
import { restoreScroll } from "../../common/decorators/restore-scroll";
import type {
@@ -11,6 +12,10 @@ import type {
} from "../../data/history";
import { loadVirtualizer } from "../../resources/virtualizer";
import type { HomeAssistant } from "../../types";
import type { StateHistoryChartLine } from "./state-history-chart-line";
import type { StateHistoryChartTimeline } from "./state-history-chart-timeline";
import "../ha-fab";
import "../ha-svg-icon";
import "./state-history-chart-line";
import "./state-history-chart-timeline";
@@ -29,6 +34,11 @@ const chunkData = (inputArray: any[], chunks: number) =>
declare global {
interface HASSDomEvents {
"y-width-changed": { value: number; chartIndex: number };
"chart-zoom-with-index": {
start: number;
end: number;
chartIndex: number;
};
}
}
@@ -84,6 +94,10 @@ export class StateHistoryCharts extends LitElement {
@state() private _chartCount = 0;
@state() private _hasZoomedCharts = false;
private _isSyncing = false;
// @ts-ignore
@restoreScroll(".container") private _savedScrollPos?: number;
@@ -115,19 +129,36 @@ export class StateHistoryCharts extends LitElement {
// eslint-disable-next-line lit/no-this-assign-in-render
this._chartCount = combinedItems.length;
return this.virtualize
? html`<div class="container ha-scrollbar" @scroll=${this._saveScrollPos}>
<lit-virtualizer
scroller
class="ha-scrollbar"
.items=${combinedItems}
.renderItem=${this._renderHistoryItem}
return html`
${this.virtualize
? html`<div
class="container ha-scrollbar"
@scroll=${this._saveScrollPos}
>
</lit-virtualizer>
</div>`
: html`${combinedItems.map((item, index) =>
this._renderHistoryItem(item, index)
)}`;
<lit-virtualizer
scroller
class="ha-scrollbar"
.items=${combinedItems}
.renderItem=${this._renderHistoryItem}
>
</lit-virtualizer>
</div>`
: html`${combinedItems.map((item, index) =>
this._renderHistoryItem(item, index)
)}`}
${this._hasZoomedCharts
? html`<ha-fab
slot="fab"
class="reset-button"
.label=${this.hass.localize(
"ui.components.history_charts.zoom_reset"
)}
@click=${this._handleGlobalZoomReset}
>
<ha-svg-icon slot="icon" .path=${mdiRestart}></ha-svg-icon>
</ha-fab>`
: nothing}
`;
}
private _renderHistoryItem: RenderItemFunction<
@@ -156,8 +187,10 @@ export class StateHistoryCharts extends LitElement {
.maxYAxis=${this.maxYAxis}
.fitYData=${this.fitYData}
@y-width-changed=${this._yWidthChanged}
@chart-zoom-with-index=${this._handleTimelineSync}
.height=${this.virtualize ? undefined : this.height}
.expandLegend=${this.expandLegend}
hide-reset-button
></state-history-chart-line>
</div> `;
}
@@ -175,6 +208,8 @@ export class StateHistoryCharts extends LitElement {
.chartIndex=${index}
.clickForMoreInfo=${this.clickForMoreInfo}
@y-width-changed=${this._yWidthChanged}
@chart-zoom-with-index=${this._handleTimelineSync}
hide-reset-button
></state-history-chart-timeline>
</div> `;
};
@@ -264,6 +299,66 @@ export class StateHistoryCharts extends LitElement {
this._maxYWidth = Math.max(...Object.values(this._childYWidths), 0);
}
private _handleTimelineSync(
e: CustomEvent<HASSDomEvents["chart-zoom-with-index"]>
) {
if (this._isSyncing) {
return;
}
const { start, end, chartIndex } = e.detail;
this._hasZoomedCharts = start !== 0 || end !== 100;
this._syncZoomToAllCharts(start, end, chartIndex);
}
private _syncZoomToAllCharts(
start: number,
end: number,
sourceChartIndex?: number
) {
this._isSyncing = true;
requestAnimationFrame(() => {
const chartComponents = this.renderRoot.querySelectorAll(
"state-history-chart-line, state-history-chart-timeline"
) as unknown as (StateHistoryChartLine | StateHistoryChartTimeline)[];
chartComponents.forEach((chartComponent, index) => {
if (index === sourceChartIndex) {
return;
}
if ("zoom" in chartComponent) {
chartComponent.zoom(start, end);
}
});
this._isSyncing = false;
});
}
private _handleGlobalZoomReset() {
this._hasZoomedCharts = false;
this._isSyncing = true;
requestAnimationFrame(() => {
const chartComponents = this.renderRoot.querySelectorAll(
"state-history-chart-line, state-history-chart-timeline"
);
chartComponents.forEach((chartComponent: any) => {
const chartBase =
chartComponent.renderRoot?.querySelector("ha-chart-base");
if (chartBase && chartBase.chart) {
chartBase.zoom(0, 100);
}
});
this._isSyncing = false;
});
}
private _isHistoryEmpty(): boolean {
const historyDataEmpty =
!this.historyData ||
@@ -345,6 +440,11 @@ export class StateHistoryCharts extends LitElement {
state-history-chart-line {
width: 100%;
}
.reset-button {
position: fixed;
bottom: calc(24px + var(--safe-area-inset-bottom));
right: calc(24px + var(--safe-area-inset-bottom));
}
`;
}

View File

@@ -12,9 +12,8 @@ class HaDataTableIcon extends LitElement {
protected render(): TemplateResult {
return html`
<ha-tooltip .content=${this.tooltip}>
<ha-svg-icon .path=${this.path}></ha-svg-icon>
</ha-tooltip>
<ha-tooltip for="svg-icon">${this.tooltip}</ha-tooltip>
<ha-svg-icon id="svg-icon" .path=${this.path}></ha-svg-icon>
`;
}

View File

@@ -5,12 +5,8 @@ import { html, LitElement, nothing, type PropertyValues } from "lit";
import { customElement, property, query } from "lit/decorators";
import memoizeOne from "memoize-one";
import { fireEvent } from "../../common/dom/fire_event";
import { computeAreaName } from "../../common/entity/compute_area_name";
import { computeDeviceName } from "../../common/entity/compute_device_name";
import { computeDomain } from "../../common/entity/compute_domain";
import { computeEntityName } from "../../common/entity/compute_entity_name";
import { computeStateName } from "../../common/entity/compute_state_name";
import { getEntityContext } from "../../common/entity/context/get_entity_context";
import { isValidEntityId } from "../../common/entity/valid_entity_id";
import { computeRTL } from "../../common/util/compute_rtl";
import { domainToName } from "../../data/integration";
@@ -148,11 +144,9 @@ export class HaEntityPicker extends LitElement {
`;
}
const { area, device } = getEntityContext(stateObj, this.hass);
const entityName = computeEntityName(stateObj, this.hass);
const deviceName = device ? computeDeviceName(device) : undefined;
const areaName = area ? computeAreaName(area) : undefined;
const entityName = this.hass.formatEntityName(stateObj, "entity");
const deviceName = this.hass.formatEntityName(stateObj, "device");
const areaName = this.hass.formatEntityName(stateObj, "area");
const isRTL = computeRTL(this.hass);
@@ -311,12 +305,10 @@ export class HaEntityPicker extends LitElement {
items = entityIds.map<EntityComboBoxItem>((entityId) => {
const stateObj = hass!.states[entityId];
const { area, device } = getEntityContext(stateObj, hass);
const friendlyName = computeStateName(stateObj); // Keep this for search
const entityName = computeEntityName(stateObj, hass);
const deviceName = device ? computeDeviceName(device) : undefined;
const areaName = area ? computeAreaName(area) : undefined;
const entityName = this.hass.formatEntityName(stateObj, "entity");
const deviceName = this.hass.formatEntityName(stateObj, "device");
const areaName = this.hass.formatEntityName(stateObj, "area");
const domainName = domainToName(
this.hass.localize,

View File

@@ -6,11 +6,7 @@ import { customElement, property, query } from "lit/decorators";
import memoizeOne from "memoize-one";
import { ensureArray } from "../../common/array/ensure-array";
import { fireEvent } from "../../common/dom/fire_event";
import { computeAreaName } from "../../common/entity/compute_area_name";
import { computeDeviceName } from "../../common/entity/compute_device_name";
import { computeEntityName } from "../../common/entity/compute_entity_name";
import { computeStateName } from "../../common/entity/compute_state_name";
import { getEntityContext } from "../../common/entity/context/get_entity_context";
import { computeRTL } from "../../common/util/compute_rtl";
import { domainToName } from "../../data/integration";
import {
@@ -259,12 +255,10 @@ export class HaStatisticPicker extends LitElement {
}
const id = meta.statistic_id;
const { area, device } = getEntityContext(stateObj, hass);
const friendlyName = computeStateName(stateObj); // Keep this for search
const entityName = computeEntityName(stateObj, hass);
const deviceName = device ? computeDeviceName(device) : undefined;
const areaName = area ? computeAreaName(area) : undefined;
const entityName = hass.formatEntityName(stateObj, "entity");
const deviceName = hass.formatEntityName(stateObj, "device");
const areaName = hass.formatEntityName(stateObj, "area");
const primary = entityName || deviceName || id;
const secondary = [areaName, entityName ? deviceName : undefined]
@@ -337,11 +331,9 @@ export class HaStatisticPicker extends LitElement {
const stateObj = this.hass.states[statisticId];
if (stateObj) {
const { area, device } = getEntityContext(stateObj, this.hass);
const entityName = computeEntityName(stateObj, this.hass);
const deviceName = device ? computeDeviceName(device) : undefined;
const areaName = area ? computeAreaName(area) : undefined;
const entityName = this.hass.formatEntityName(stateObj, "entity");
const deviceName = this.hass.formatEntityName(stateObj, "device");
const areaName = this.hass.formatEntityName(stateObj, "area");
const isRTL = computeRTL(this.hass);

View File

@@ -36,39 +36,38 @@ class StateInfo extends LitElement {
</div>
${this.inDialog
? html`<div class="time-ago">
<ha-tooltip>
<ha-relative-time
.hass=${this.hass}
.datetime=${this.stateObj.last_changed}
capitalize
></ha-relative-time>
<div slot="content">
<div class="row">
<span class="column-name">
${this.hass.localize(
"ui.dialogs.more_info_control.last_changed"
)}:
</span>
<ha-relative-time
.hass=${this.hass}
.datetime=${this.stateObj.last_changed}
capitalize
></ha-relative-time>
</div>
<div class="row">
<span>
${this.hass.localize(
"ui.dialogs.more_info_control.last_updated"
)}:
</span>
<ha-relative-time
.hass=${this.hass}
.datetime=${this.stateObj.last_updated}
capitalize
></ha-relative-time>
</div>
<ha-tooltip for="relative-time">
<div class="row">
<span class="column-name">
${this.hass.localize(
"ui.dialogs.more_info_control.last_changed"
)}:
</span>
<ha-relative-time
.hass=${this.hass}
.datetime=${this.stateObj.last_changed}
capitalize
></ha-relative-time>
</div>
<div class="row">
<span>
${this.hass.localize(
"ui.dialogs.more_info_control.last_updated"
)}:
</span>
<ha-relative-time
.hass=${this.hass}
.datetime=${this.stateObj.last_updated}
capitalize
></ha-relative-time>
</div>
</ha-tooltip>
<ha-relative-time
id="relative-time"
.hass=${this.hass}
.datetime=${this.stateObj.last_changed}
capitalize
></ha-relative-time>
</div>`
: html`<div class="extra-info"><slot></slot></div>`}
</div>`;

View File

@@ -67,20 +67,19 @@ export class HaAnalytics extends LitElement {
)}
</span>
<span>
<ha-tooltip
content=${this.localize(
`ui.panel.${this.translationKeyPanel}.analytics.need_base_enabled`
)}
placement="right"
<ha-switch
.id="switch-${preference}"
@change=${this._handleRowClick}
.checked=${this.analytics?.preferences[preference]}
.preference=${preference}
name=${preference}
?disabled=${baseEnabled}
>
<ha-switch
@change=${this._handleRowClick}
.checked=${this.analytics?.preferences[preference]}
.preference=${preference}
name=${preference}
>
</ha-switch>
</ha-switch>
<ha-tooltip .for="switch-${preference}" placement="right">
${this.localize(
`ui.panel.${this.translationKeyPanel}.analytics.need_base_enabled`
)}
</ha-tooltip>
</span>
</ha-settings-row>

View File

@@ -1,262 +1,62 @@
import { css, html, LitElement } from "lit";
import { customElement, query, state } from "lit/decorators";
import { styleMap } from "lit/directives/style-map";
import { fireEvent } from "../common/dom/fire_event";
import { css, html, LitElement, type PropertyValues } from "lit";
import "@home-assistant/webawesome/dist/components/drawer/drawer";
import { customElement, property, state } from "lit/decorators";
const ANIMATION_DURATION_MS = 300;
export const BOTTOM_SHEET_ANIMATION_DURATION_MS = 300;
/**
* A bottom sheet component that slides up from the bottom of the screen.
*
* The bottom sheet provides a draggable interface that allows users to resize
* the sheet by dragging the handle at the top. It supports both mouse and touch
* interactions and automatically closes when dragged below a 20% of screen height.
*
* @fires bottom-sheet-closed - Fired when the bottom sheet is closed
*
* @cssprop --ha-bottom-sheet-border-width - Border width for the sheet
* @cssprop --ha-bottom-sheet-border-style - Border style for the sheet
* @cssprop --ha-bottom-sheet-border-color - Border color for the sheet
*/
@customElement("ha-bottom-sheet")
export class HaBottomSheet extends LitElement {
@query("dialog") private _dialog!: HTMLDialogElement;
@property({ type: Boolean }) public open = false;
private _dragging = false;
@state() private _drawerOpen = false;
private _dragStartY = 0;
private _handleAfterHide() {
this.open = false;
const ev = new Event("closed", {
bubbles: true,
composed: true,
});
this.dispatchEvent(ev);
}
private _initialSize = 0;
@state() private _dialogMaxViewpointHeight = 70;
@state() private _dialogMinViewpointHeight = 55;
@state() private _dialogViewportHeight?: number;
protected updated(changedProperties: PropertyValues): void {
super.updated(changedProperties);
if (changedProperties.has("open")) {
this._drawerOpen = this.open;
}
}
render() {
return html`<dialog
open
@transitionend=${this._handleTransitionEnd}
style=${styleMap({
height: this._dialogViewportHeight
? `${this._dialogViewportHeight}vh`
: "auto",
maxHeight: `${this._dialogMaxViewpointHeight}vh`,
minHeight: `${this._dialogMinViewpointHeight}vh`,
})}
>
<div class="handle-wrapper">
<div
@mousedown=${this._handleMouseDown}
@touchstart=${this._handleTouchStart}
class="handle"
></div>
</div>
<slot></slot>
</dialog>`;
}
protected firstUpdated(changedProperties) {
super.firstUpdated(changedProperties);
this._openSheet();
}
private _openSheet() {
requestAnimationFrame(() => {
// trigger opening animation
this._dialog.classList.add("show");
});
}
public closeSheet() {
requestAnimationFrame(() => {
this._dialog.classList.remove("show");
});
}
private _handleTransitionEnd() {
if (this._dialog.classList.contains("show")) {
// after show animation is done
// - set the height to the natural height, to prevent content shift when switch content
// - set max height to 90vh, so it opens at max 70vh but can be resized to 90vh
this._dialogViewportHeight =
(this._dialog.offsetHeight / window.innerHeight) * 100;
this._dialogMaxViewpointHeight = 90;
this._dialogMinViewpointHeight = 20;
} else {
// after close animation is done close dialog element and fire closed event
this._dialog.close();
fireEvent(this, "bottom-sheet-closed");
}
}
connectedCallback() {
super.connectedCallback();
// register event listeners for drag handling
document.addEventListener("mousemove", this._handleMouseMove);
document.addEventListener("mouseup", this._handleMouseUp);
document.addEventListener("touchmove", this._handleTouchMove, {
passive: false,
});
document.addEventListener("touchend", this._handleTouchEnd);
document.addEventListener("touchcancel", this._handleTouchEnd);
}
disconnectedCallback() {
super.disconnectedCallback();
// unregister event listeners for drag handling
document.removeEventListener("mousemove", this._handleMouseMove);
document.removeEventListener("mouseup", this._handleMouseUp);
document.removeEventListener("touchmove", this._handleTouchMove);
document.removeEventListener("touchend", this._handleTouchEnd);
document.removeEventListener("touchcancel", this._handleTouchEnd);
}
private _handleMouseDown = (ev: MouseEvent) => {
this._startDrag(ev.clientY);
};
private _handleTouchStart = (ev: TouchEvent) => {
// Prevent the browser from interpreting this as a scroll/PTR gesture.
ev.preventDefault();
this._startDrag(ev.touches[0].clientY);
};
private _startDrag(clientY: number) {
this._dragging = true;
this._dragStartY = clientY;
this._initialSize = (this._dialog.offsetHeight / window.innerHeight) * 100;
document.body.style.setProperty("cursor", "grabbing");
}
private _handleMouseMove = (ev: MouseEvent) => {
if (!this._dragging) {
return;
}
this._updateSize(ev.clientY);
};
private _handleTouchMove = (ev: TouchEvent) => {
if (!this._dragging) {
return;
}
ev.preventDefault(); // Prevent scrolling
this._updateSize(ev.touches[0].clientY);
};
private _updateSize(clientY: number) {
const deltaY = this._dragStartY - clientY;
const viewportHeight = window.innerHeight;
const deltaVh = (deltaY / viewportHeight) * 100;
// Calculate new size and clamp between 10vh and 90vh
let newSize = this._initialSize + deltaVh;
newSize = Math.max(10, Math.min(90, newSize));
// on drag down and below 20vh
if (newSize < 20 && deltaY < 0) {
this._endDrag();
this.closeSheet();
return;
}
this._dialogViewportHeight = newSize;
}
private _handleMouseUp = () => {
this._endDrag();
};
private _handleTouchEnd = () => {
this._endDrag();
};
private _endDrag() {
if (!this._dragging) {
return;
}
this._dragging = false;
document.body.style.removeProperty("cursor");
return html`
<wa-drawer
placement="bottom"
.open=${this._drawerOpen}
@wa-after-hide=${this._handleAfterHide}
without-header
>
<slot></slot>
</wa-drawer>
`;
}
static styles = css`
.handle-wrapper {
position: absolute;
top: 0;
width: 100%;
padding-bottom: 2px;
display: flex;
justify-content: center;
align-items: center;
cursor: grab;
touch-action: none;
}
.handle-wrapper .handle {
height: 20px;
width: 200px;
display: flex;
justify-content: center;
align-items: center;
z-index: 7;
padding-bottom: 76px;
}
.handle-wrapper .handle::after {
content: "";
border-radius: 8px;
height: 4px;
background: var(--divider-color, #e0e0e0);
width: 80px;
}
.handle-wrapper .handle:active::after {
cursor: grabbing;
}
dialog {
height: auto;
max-height: 70vh;
min-height: 30vh;
background-color: var(
wa-drawer {
--wa-color-surface-raised: var(
--ha-dialog-surface-background,
var(--mdc-theme-surface, #fff)
);
display: flex;
flex-direction: column;
top: 0;
inset-inline-start: 0;
position: fixed;
width: calc(100% - 4px);
max-width: 100%;
border: none;
box-shadow: var(--wa-shadow-l);
padding: 0;
margin: 0;
top: auto;
inset-inline-end: auto;
bottom: 0;
inset-inline-start: 0;
box-shadow: 0px -8px 16px rgba(0, 0, 0, 0.2);
border-top-left-radius: var(
--ha-dialog-border-radius,
var(--ha-border-radius-2xl)
);
border-top-right-radius: var(
--ha-dialog-border-radius,
var(--ha-border-radius-2xl)
);
transform: translateY(100%);
transition: transform ${ANIMATION_DURATION_MS}ms ease;
border-top-width: var(--ha-bottom-sheet-border-width);
border-right-width: var(--ha-bottom-sheet-border-width);
border-left-width: var(--ha-bottom-sheet-border-width);
border-bottom-width: 0;
border-style: var(--ha-bottom-sheet-border-style);
border-color: var(--ha-bottom-sheet-border-color);
--spacing: 0;
--size: auto;
--show-duration: ${BOTTOM_SHEET_ANIMATION_DURATION_MS}ms;
--hide-duration: ${BOTTOM_SHEET_ANIMATION_DURATION_MS}ms;
}
dialog.show {
transform: translateY(0);
wa-drawer::part(dialog) {
border-top-left-radius: var(--ha-border-radius-lg);
border-top-right-radius: var(--ha-border-radius-lg);
max-height: 90vh;
margin-bottom: var(--safe-area-inset-bottom);
margin-left: var(--safe-area-inset-left);
margin-right: var(--safe-area-inset-right);
}
`;
}
@@ -265,8 +65,4 @@ declare global {
interface HTMLElementTagNameMap {
"ha-bottom-sheet": HaBottomSheet;
}
interface HASSDomEvents {
"bottom-sheet-closed": undefined;
}
}

View File

@@ -1,82 +0,0 @@
import ButtonGroup from "@awesome.me/webawesome/dist/components/button-group/button-group";
import { customElement } from "lit/decorators";
import type { HaButton } from "./ha-button";
import { StateSet } from "../resources/polyfills/stateset";
export type Appearance = "accent" | "filled" | "outlined" | "plain";
/**
* Finds an ha-button element either as the current element or within its descendants.
* @param el - The HTML element to search from
* @returns The found HaButton element, or null if not found
*/
function findButton(el: HTMLElement) {
const selector = "ha-button";
return (el.closest(selector) ?? el.querySelector(selector)) as HaButton;
}
/**
* @element ha-button-group
* @extends {ButtonGroup}
* @summary
* Group buttons. Extend Webawesome to be able to work with ha-button tags
*
* @documentation https://webawesome.com/components/button-group
*/
@customElement("ha-button-group") // @ts-expect-error Intentionally overriding private methods
export class HaButtonGroup extends ButtonGroup {
attachInternals() {
const internals = super.attachInternals();
Object.defineProperty(internals, "states", {
value: new StateSet(this, internals.states),
});
return internals;
}
// @ts-expect-error updateClassNames is used in super class
// eslint-disable-next-line @typescript-eslint/naming-convention
private override updateClassNames() {
const slottedElements = [
...this.defaultSlot.assignedElements({ flatten: true }),
] as HTMLElement[];
this.hasOutlined = false;
slottedElements.forEach((el) => {
const index = slottedElements.indexOf(el);
const button = findButton(el);
if (button) {
if ((button as HaButton).appearance === "outlined")
this.hasOutlined = true;
if (this.size) button.setAttribute("size", this.size);
button.classList.add("wa-button-group__button");
button.classList.toggle(
"wa-button-group__horizontal",
this.orientation === "horizontal"
);
button.classList.toggle(
"wa-button-group__vertical",
this.orientation === "vertical"
);
button.classList.toggle("wa-button-group__button-first", index === 0);
button.classList.toggle(
"wa-button-group__button-inner",
index > 0 && index < slottedElements.length - 1
);
button.classList.toggle(
"wa-button-group__button-last",
index === slottedElements.length - 1
);
// use button-group variant
button.setAttribute("variant", this.variant);
}
});
}
}
declare global {
interface HTMLElementTagNameMap {
"ha-button-group": HaButtonGroup;
}
}

View File

@@ -1,11 +1,11 @@
import "@home-assistant/webawesome/dist/components/button-group/button-group";
import type { TemplateResult } from "lit";
import { css, html, LitElement } from "lit";
import { customElement, property } from "lit/decorators";
import { fireEvent } from "../common/dom/fire_event";
import type { ToggleButton } from "../types";
import "./ha-svg-icon";
import "./ha-button";
import "./ha-button-group";
import "./ha-svg-icon";
/**
* @element ha-button-toggle-group
@@ -28,6 +28,9 @@ export class HaButtonToggleGroup extends LitElement {
@property({ reflect: true }) size: "small" | "medium" = "medium";
@property({ type: Boolean, reflect: true, attribute: "no-wrap" })
public nowrap = false;
@property() public variant:
| "brand"
| "neutral"
@@ -37,11 +40,14 @@ export class HaButtonToggleGroup extends LitElement {
protected render(): TemplateResult {
return html`
<ha-button-group .variant=${this.variant} .size=${this.size}>
<wa-button-group childSelector="ha-button">
${this.buttons.map(
(button) =>
html`<ha-button
iconTag="ha-svg-icon"
class="icon"
.variant=${this.variant}
.size=${this.size}
.value=${button.value}
@click=${this._handleClick}
.title=${button.label}
@@ -55,7 +61,7 @@ export class HaButtonToggleGroup extends LitElement {
: button.label}
</ha-button>`
)}
</ha-button-group>
</wa-button-group>
`;
}
@@ -68,6 +74,10 @@ export class HaButtonToggleGroup extends LitElement {
:host {
--mdc-icon-size: var(--button-toggle-icon-size, 20px);
}
:host([no-wrap]) wa-button-group::part(base) {
flex-wrap: nowrap;
}
`;
}

View File

@@ -1,9 +1,7 @@
import Button from "@awesome.me/webawesome/dist/components/button/button";
import Button from "@home-assistant/webawesome/dist/components/button/button";
import { css, type CSSResultGroup } from "lit";
import { customElement } from "lit/decorators";
import { StateSet } from "../resources/polyfills/stateset";
export type Appearance = "accent" | "filled" | "outlined" | "plain";
/**
@@ -35,54 +33,10 @@ export type Appearance = "accent" | "filled" | "outlined" | "plain";
* @attr {boolean} loading - shows a loading indicator instead of the buttons label and disable buttons click.
* @attr {boolean} disabled - Disables the button and prevents user interaction.
*/
@customElement("ha-button") // @ts-expect-error Intentionally overriding private methods
@customElement("ha-button")
export class HaButton extends Button {
variant: "brand" | "neutral" | "success" | "warning" | "danger" = "brand";
attachInternals() {
const internals = super.attachInternals();
Object.defineProperty(internals, "states", {
value: new StateSet(this, internals.states),
});
return internals;
}
// @ts-expect-error handleLabelSlotChange is used in super class
// eslint-disable-next-line @typescript-eslint/naming-convention
private override handleLabelSlotChange() {
const nodes = this.labelSlot.assignedNodes({ flatten: true });
let hasIconLabel = false;
let hasIcon = false;
let text = "";
// If there's only an icon and no text, it's an icon button
[...nodes].forEach((node) => {
if (
node.nodeType === Node.ELEMENT_NODE &&
(node as HTMLElement).localName === "ha-svg-icon"
) {
hasIcon = true;
if (!hasIconLabel)
hasIconLabel = (node as HTMLElement).hasAttribute("aria-label");
}
// Concatenate text nodes
if (node.nodeType === Node.TEXT_NODE) {
text += node.textContent;
}
});
this.isIconButton = text.trim() === "" && hasIcon;
if (__DEV__ && this.isIconButton && !hasIconLabel) {
// eslint-disable-next-line no-console
console.warn(
'Icon buttons must have a label for screen readers. Add <ha-svg-icon aria-label="..."> to remove this warning.',
this
);
}
}
static get styles(): CSSResultGroup {
return [
Button.styles,
@@ -103,6 +57,8 @@ export class HaButton extends Button {
font-size: var(--ha-font-size-m);
line-height: 1;
transition: background-color 0.15s ease-in-out;
}
:host([size="small"]) .button {
@@ -262,10 +218,10 @@ export class HaButton extends Button {
}
.button.has-start {
padding-left: 8px;
padding-inline-start: 8px;
}
.button.has-end {
padding-right: 8px;
padding-inline-end: 8px;
}
`,
];

View File

@@ -330,7 +330,13 @@ export class HaCodeEditor extends ReactiveElement {
private _renderInfo = (completion: Completion): CompletionInfo => {
const key = completion.label;
const context = getEntityContext(this.hass!.states[key], this.hass!);
const context = getEntityContext(
this.hass!.states[key],
this.hass!.entities,
this.hass!.devices,
this.hass!.areas,
this.hass!.floors
);
const completionInfo = document.createElement("div");
completionInfo.classList.add("completion-info");

View File

@@ -528,6 +528,10 @@ export class HaControlSlider extends LitElement {
background-color: white;
}
.slider .slider-track-bar {
--slider-track-bar-border-radius: min(
var(--control-slider-border-radius),
var(--ha-border-radius-md)
);
top: 0;
left: 0;
transform: translate3d(
@@ -535,7 +539,7 @@ export class HaControlSlider extends LitElement {
0,
0
);
border-radius: 0 8px 8px 0;
border-radius: var(--slider-track-bar-border-radius);
}
.slider .slider-track-bar:after {
top: 0;
@@ -548,7 +552,6 @@ export class HaControlSlider extends LitElement {
right: 0;
left: initial;
transform: translate3d(calc(var(--value, 0) * var(--slider-size)), 0, 0);
border-radius: 8px 0 0 8px;
}
.slider .slider-track-bar.end::after {
right: initial;
@@ -563,7 +566,6 @@ export class HaControlSlider extends LitElement {
calc((1 - var(--value, 0)) * var(--slider-size)),
0
);
border-radius: 8px 8px 0 0;
}
:host([vertical]) .slider .slider-track-bar:after {
top: var(--handle-margin);
@@ -581,7 +583,6 @@ export class HaControlSlider extends LitElement {
calc((0 - var(--value, 0)) * var(--slider-size)),
0
);
border-radius: 0 0 8px 8px;
}
:host([vertical]) .slider .slider-track-bar.end::after {
top: initial;
@@ -605,7 +606,10 @@ export class HaControlSlider extends LitElement {
--cursor-size: calc(var(--control-slider-thickness) / 4);
position: absolute;
background-color: white;
border-radius: var(--handle-size);
border-radius: min(
var(--handle-size),
var(--control-slider-border-radius)
);
transition:
left 180ms ease-in-out,
bottom 180ms ease-in-out;

View File

@@ -2,7 +2,7 @@ import type { ActionDetail } from "@material/mwc-list/mwc-list-foundation";
import { mdiCalendar } from "@mdi/js";
import { isThisYear } from "date-fns";
import { fromZonedTime, toZonedTime } from "date-fns-tz";
import { TZDate } from "@date-fns/tz";
import type { PropertyValues, TemplateResult } from "lit";
import { LitElement, css, html, nothing } from "lit";
import { customElement, property, state } from "lit/decorators";
@@ -275,8 +275,8 @@ export class HaDateRangePicker extends LitElement {
}
if (this.hass.locale.time_zone === TimeZone.server) {
start = fromZonedTime(start, this.hass.config.time_zone);
end = fromZonedTime(end, this.hass.config.time_zone);
start = new Date(new TZDate(start, this.hass.config.time_zone).getTime());
end = new Date(new TZDate(end, this.hass.config.time_zone).getTime());
}
if (
@@ -290,7 +290,7 @@ export class HaDateRangePicker extends LitElement {
private _formatDate(date: Date): string {
if (this.hass.locale.time_zone === TimeZone.server) {
return toZonedTime(date, this.hass.config.time_zone).toISOString();
return new TZDate(date, this.hass.config.time_zone).toISOString();
}
return date.toISOString();
}

View File

@@ -90,7 +90,7 @@ export class HaDialog extends DialogBase {
}
.mdc-dialog__actions {
justify-content: var(--justify-action-buttons, flex-end);
padding: 12px 16px max(var(--safe-area-inset-bottom), 16px) 16px;
padding: 12px 16px 16px 16px;
}
.mdc-dialog__actions span:nth-child(1) {
flex: var(--secondary-action-button-flex, unset);
@@ -100,6 +100,8 @@ export class HaDialog extends DialogBase {
}
.mdc-dialog__container {
align-items: var(--vertical-align-dialog, center);
padding-top: var(--safe-area-inset-top);
padding-bottom: var(--safe-area-inset-bottom);
}
.mdc-dialog__title {
padding: 16px 16px 0 16px;
@@ -115,15 +117,17 @@ export class HaDialog extends DialogBase {
padding: var(--dialog-content-padding, 24px);
}
:host([hideactions]) .mdc-dialog .mdc-dialog__content {
padding-bottom: max(
var(--dialog-content-padding, 24px),
var(--safe-area-inset-bottom)
);
padding-bottom: var(--dialog-content-padding, 24px);
}
.mdc-dialog .mdc-dialog__surface {
position: var(--dialog-surface-position, relative);
top: var(--dialog-surface-top);
margin-top: var(--dialog-surface-margin-top);
min-width: calc(
var(--mdc-dialog-min-width, 100vw) - var(
--safe-area-inset-left
) - var(--safe-area-inset-right)
);
min-height: var(--mdc-dialog-min-height, auto);
border-radius: var(--ha-dialog-border-radius, 24px);
-webkit-backdrop-filter: var(--ha-dialog-surface-backdrop-filter, none);
@@ -137,6 +141,24 @@ export class HaDialog extends DialogBase {
display: flex;
flex-direction: column;
}
@media all and (max-width: 450px), all and (max-height: 500px) {
.mdc-dialog .mdc-dialog__surface {
min-height: calc(
100vh - var(--safe-area-inset-top, 0px) - var(
--safe-area-inset-bottom,
0px
)
);
max-height: calc(
100vh - var(--safe-area-inset-top, 0px) - var(
--safe-area-inset-bottom,
0px
)
);
}
}
.header_title {
display: flex;
align-items: center;

View File

@@ -1,4 +1,4 @@
import WaAnimation from "@awesome.me/webawesome/dist/components/animation/animation";
import WaAnimation from "@home-assistant/webawesome/dist/components/animation/animation";
import { customElement, property } from "lit/decorators";
@customElement("ha-fade-in")

View File

@@ -2,6 +2,7 @@ import { css, html, LitElement, nothing } from "lit";
import { customElement, property } from "lit/decorators";
import type { HomeAssistant } from "../../types";
import "./ha-form";
import "../ha-expansion-panel";
import type {
HaFormDataContainer,
HaFormElement,
@@ -10,7 +11,7 @@ import type {
} from "./types";
@customElement("ha-form-expandable")
export class HaFormExpendable extends LitElement implements HaFormElement {
export class HaFormExpandable extends LitElement implements HaFormElement {
@property({ attribute: false }) public hass!: HomeAssistant;
@property({ attribute: false }) public data!: HaFormDataContainer;
@@ -131,6 +132,6 @@ export class HaFormExpendable extends LitElement implements HaFormElement {
declare global {
interface HTMLElementTagNameMap {
"ha-form-expandable": HaFormExpendable;
"ha-form-expandable": HaFormExpandable;
}
}

View File

@@ -38,6 +38,7 @@ export class HaHeaderBar extends LitElement {
.mdc-top-app-bar {
position: static;
color: var(--mdc-theme-on-primary, #fff);
padding: var(--header-bar-padding);
}
.mdc-top-app-bar__section.mdc-top-app-bar__section--align-start {
flex: 1;

View File

@@ -25,8 +25,9 @@ export class HaHelpTooltip extends LitElement {
protected render(): TemplateResult {
return html`
<ha-tooltip .placement=${this.position} .content=${this.label}>
<ha-svg-icon .path=${mdiHelpCircle}></ha-svg-icon>
<ha-svg-icon id="svg-icon" .path=${mdiHelpCircle}></ha-svg-icon>
<ha-tooltip for="svg-icon" .placement=${this.position}>
${this.label}
</ha-tooltip>
`;
}

View File

@@ -74,16 +74,16 @@ export class HaIconOverflowMenu extends LitElement {
: item.divider
? html`<div role="separator"></div>`
: html`<ha-tooltip
.disabled=${!item.tooltip}
.content=${item.tooltip ?? ""}
>
<ha-icon-button
.disabled=${!item.tooltip}
.for="icon-button-${item.label}"
>${item.tooltip ?? ""} </ha-tooltip
><ha-icon-button
.id="icon-button-${item.label}"
@click=${item.action}
.label=${item.label}
.path=${item.path}
?disabled=${item.disabled}
></ha-icon-button>
</ha-tooltip>`
></ha-icon-button> `
)}
`}
`;

View File

@@ -36,15 +36,17 @@ class HaLabeledSlider extends LitElement {
<div class="extra-container"><slot name="extra"></slot></div>
<div class="slider-container">
${this.icon ? html`<ha-icon icon=${this.icon}></ha-icon>` : nothing}
<ha-slider
.min=${this.min}
.max=${this.max}
.step=${this.step}
.labeled=${this.labeled}
.disabled=${this.disabled}
.value=${this.value}
@change=${this._inputChanged}
></ha-slider>
<div class="slider-wrapper">
<ha-slider
.min=${this.min}
.max=${this.max}
.step=${this.step}
.labeled=${this.labeled}
.disabled=${this.disabled}
.value=${this.value}
@change=${this._inputChanged}
></ha-slider>
</div>
</div>
${this.helper
? html`<ha-input-helper-text .disabled=${this.disabled}>
@@ -83,7 +85,8 @@ class HaLabeledSlider extends LitElement {
color: var(--secondary-text-color);
}
ha-slider {
.slider-wrapper {
padding: 0 8px;
display: flex;
flex-grow: 1;
align-items: center;
@@ -91,6 +94,10 @@ class HaLabeledSlider extends LitElement {
border-radius: 4px;
height: 32px;
}
ha-slider {
width: 100%;
}
`;
}

View File

@@ -1,21 +1,12 @@
import ProgressRing from "@awesome.me/webawesome/dist/components/progress-ring/progress-ring";
import ProgressRing from "@home-assistant/webawesome/dist/components/progress-ring/progress-ring";
import { css } from "lit";
import type { CSSResultGroup } from "lit";
import { customElement, property } from "lit/decorators";
import { StateSet } from "../resources/polyfills/stateset";
@customElement("ha-progress-ring")
export class HaProgressRing extends ProgressRing {
@property() public size?: "tiny" | "small" | "medium" | "large";
attachInternals() {
const internals = super.attachInternals();
Object.defineProperty(internals, "states", {
value: new StateSet(this, internals.states),
});
return internals;
}
public updated(changedProps) {
super.updated(changedProps);

View File

@@ -153,6 +153,58 @@ export class HaRelatedItems extends LitElement {
);
return html`
${this._related.entity
? html`
<h3>${this.hass.localize("ui.components.related-items.entity")}</h3>
<ha-list>
${this._relatedEntities(this._related.entity).map(
(entity) => html`
<ha-list-item
@click=${this._openMoreInfo}
.entityId=${entity.entity_id}
hasMeta
graphic="icon"
>
<ha-state-icon
.hass=${this.hass}
.stateObj=${entity}
slot="graphic"
></ha-state-icon>
${entity.attributes.friendly_name || entity.entity_id}
<ha-icon-next slot="meta"></ha-icon-next>
</ha-list-item>
`
)}
</ha-list>
`
: nothing}
${this._related.device
? html`<h3>
${this.hass.localize("ui.components.related-items.device")}
</h3>
<ha-list>
${this._related.device.map((relatedDeviceId) => {
const device = this.hass.devices[relatedDeviceId];
if (!device) {
return nothing;
}
return html`
<a href="/config/devices/device/${relatedDeviceId}">
<ha-list-item hasMeta graphic="icon">
<ha-svg-icon
.path=${device.entry_type === "service"
? mdiTransitConnectionVariant
: mdiDevices}
slot="graphic"
></ha-svg-icon>
${device.name_by_user || device.name}
<ha-icon-next slot="meta"></ha-icon-next>
</ha-list-item>
</a>
`;
})}
</ha-list>`
: nothing}
${configEntries || this._related.integration
? html`<h3>
${this.hass.localize("ui.components.related-items.integration")}
@@ -253,58 +305,6 @@ export class HaRelatedItems extends LitElement {
})}
</ha-list>`
: nothing}
${this._related.device
? html`<h3>
${this.hass.localize("ui.components.related-items.device")}
</h3>
<ha-list>
${this._related.device.map((relatedDeviceId) => {
const device = this.hass.devices[relatedDeviceId];
if (!device) {
return nothing;
}
return html`
<a href="/config/devices/device/${relatedDeviceId}">
<ha-list-item hasMeta graphic="icon">
<ha-svg-icon
.path=${device.entry_type === "service"
? mdiTransitConnectionVariant
: mdiDevices}
slot="graphic"
></ha-svg-icon>
${device.name_by_user || device.name}
<ha-icon-next slot="meta"></ha-icon-next>
</ha-list-item>
</a>
`;
})}
</ha-list>`
: nothing}
${this._related.entity
? html`
<h3>${this.hass.localize("ui.components.related-items.entity")}</h3>
<ha-list>
${this._relatedEntities(this._related.entity).map(
(entity) => html`
<ha-list-item
@click=${this._openMoreInfo}
.entityId=${entity.entity_id}
hasMeta
graphic="icon"
>
<ha-state-icon
.hass=${this.hass}
.stateObj=${entity}
slot="graphic"
></ha-state-icon>
${entity.attributes.friendly_name || entity.entity_id}
<ha-icon-next slot="meta"></ha-icon-next>
</ha-list-item>
`
)}
</ha-list>
`
: nothing}
${this._related.group
? html`
<h3>${this.hass.localize("ui.components.related-items.group")}</h3>
@@ -492,6 +492,7 @@ export class HaRelatedItems extends LitElement {
h3 {
padding: 0 24px;
margin-bottom: 0;
margin-bottom: -8px;
}
h3:first-child {
margin-top: 0;

View File

@@ -0,0 +1,276 @@
import { css, html, LitElement } from "lit";
import { customElement, query, state } from "lit/decorators";
import { styleMap } from "lit/directives/style-map";
import { fireEvent } from "../common/dom/fire_event";
import { BOTTOM_SHEET_ANIMATION_DURATION_MS } from "./ha-bottom-sheet";
/**
* A bottom sheet component that slides up from the bottom of the screen.
*
* The bottom sheet provides a draggable interface that allows users to resize
* the sheet by dragging the handle at the top. It supports both mouse and touch
* interactions and automatically closes when dragged below a 20% of screen height.
*
* @fires bottom-sheet-closed - Fired when the bottom sheet is closed
*
* @cssprop --ha-bottom-sheet-border-width - Border width for the sheet
* @cssprop --ha-bottom-sheet-border-style - Border style for the sheet
* @cssprop --ha-bottom-sheet-border-color - Border color for the sheet
*/
@customElement("ha-resizable-bottom-sheet")
export class HaResizableBottomSheet extends LitElement {
@query("dialog") private _dialog!: HTMLDialogElement;
private _dragging = false;
private _dragStartY = 0;
private _initialSize = 0;
@state() private _dialogMaxViewpointHeight = 70;
@state() private _dialogMinViewpointHeight = 55;
@state() private _dialogViewportHeight?: number;
render() {
return html`<dialog
open
@transitionend=${this._handleTransitionEnd}
style=${styleMap({
height: this._dialogViewportHeight
? `${this._dialogViewportHeight}vh`
: "auto",
maxHeight: `${this._dialogMaxViewpointHeight}vh`,
minHeight: `${this._dialogMinViewpointHeight}vh`,
})}
>
<div class="handle-wrapper">
<div
@mousedown=${this._handleMouseDown}
@touchstart=${this._handleTouchStart}
class="handle"
></div>
</div>
<slot></slot>
</dialog>`;
}
protected firstUpdated(changedProperties) {
super.firstUpdated(changedProperties);
this._openSheet();
}
private _openSheet() {
requestAnimationFrame(() => {
// trigger opening animation
this._dialog.classList.add("show");
});
}
public closeSheet() {
requestAnimationFrame(() => {
this._dialog.classList.remove("show");
});
}
private _handleTransitionEnd() {
if (this._dialog.classList.contains("show")) {
// after show animation is done
// - set the height to the natural height, to prevent content shift when switch content
// - set max height to 90vh, so it opens at max 70vh but can be resized to 90vh
this._dialogViewportHeight =
(this._dialog.offsetHeight / window.innerHeight) * 100;
this._dialogMaxViewpointHeight = 90;
this._dialogMinViewpointHeight = 20;
} else {
// after close animation is done close dialog element and fire closed event
this._dialog.close();
fireEvent(this, "bottom-sheet-closed");
}
}
connectedCallback() {
super.connectedCallback();
// register event listeners for drag handling
document.addEventListener("mousemove", this._handleMouseMove);
document.addEventListener("mouseup", this._handleMouseUp);
document.addEventListener("touchmove", this._handleTouchMove, {
passive: false,
});
document.addEventListener("touchend", this._handleTouchEnd);
document.addEventListener("touchcancel", this._handleTouchEnd);
}
disconnectedCallback() {
super.disconnectedCallback();
// unregister event listeners for drag handling
document.removeEventListener("mousemove", this._handleMouseMove);
document.removeEventListener("mouseup", this._handleMouseUp);
document.removeEventListener("touchmove", this._handleTouchMove);
document.removeEventListener("touchend", this._handleTouchEnd);
document.removeEventListener("touchcancel", this._handleTouchEnd);
}
private _handleMouseDown = (ev: MouseEvent) => {
this._startDrag(ev.clientY);
};
private _handleTouchStart = (ev: TouchEvent) => {
// Prevent the browser from interpreting this as a scroll/PTR gesture.
ev.preventDefault();
this._startDrag(ev.touches[0].clientY);
};
private _startDrag(clientY: number) {
this._dragging = true;
this._dragStartY = clientY;
this._initialSize = (this._dialog.offsetHeight / window.innerHeight) * 100;
document.body.style.setProperty("cursor", "grabbing");
}
private _handleMouseMove = (ev: MouseEvent) => {
if (!this._dragging) {
return;
}
this._updateSize(ev.clientY);
};
private _handleTouchMove = (ev: TouchEvent) => {
if (!this._dragging) {
return;
}
ev.preventDefault(); // Prevent scrolling
this._updateSize(ev.touches[0].clientY);
};
private _updateSize(clientY: number) {
const deltaY = this._dragStartY - clientY;
const viewportHeight = window.innerHeight;
const deltaVh = (deltaY / viewportHeight) * 100;
// Calculate new size and clamp between 10vh and 90vh
let newSize = this._initialSize + deltaVh;
newSize = Math.max(10, Math.min(90, newSize));
// on drag down and below 20vh
if (newSize < 20 && deltaY < 0) {
this._endDrag();
this.closeSheet();
return;
}
this._dialogViewportHeight = newSize;
}
private _handleMouseUp = () => {
this._endDrag();
};
private _handleTouchEnd = () => {
this._endDrag();
};
private _endDrag() {
if (!this._dragging) {
return;
}
this._dragging = false;
document.body.style.removeProperty("cursor");
}
static styles = css`
.handle-wrapper {
position: absolute;
top: 0;
width: 100%;
padding-bottom: 2px;
display: flex;
justify-content: center;
align-items: center;
cursor: grab;
touch-action: none;
}
.handle-wrapper .handle {
height: 20px;
width: 200px;
display: flex;
justify-content: center;
align-items: center;
z-index: 7;
padding-bottom: 76px;
}
.handle-wrapper .handle::after {
content: "";
border-radius: 8px;
height: 4px;
background: var(--divider-color, #e0e0e0);
width: 80px;
}
.handle-wrapper .handle:active::after {
cursor: grabbing;
}
dialog {
height: auto;
max-height: 70vh;
min-height: 30vh;
background-color: var(
--ha-dialog-surface-background,
var(--mdc-theme-surface, #fff)
);
display: flex;
flex-direction: column;
top: 0;
inset-inline-start: 0;
position: fixed;
width: calc(
100% - 4px - var(--safe-area-inset-left) - var(--safe-area-inset-right)
);
max-width: 100%;
border: none;
box-shadow: var(--wa-shadow-l);
padding: 0;
margin: 0;
top: auto;
inset-inline-end: auto;
bottom: 0;
inset-inline-start: 0;
box-shadow: 0px -8px 16px rgba(0, 0, 0, 0.2);
border-top-left-radius: var(
--ha-dialog-border-radius,
var(--ha-border-radius-2xl)
);
border-top-right-radius: var(
--ha-dialog-border-radius,
var(--ha-border-radius-2xl)
);
transform: translateY(100%);
transition: transform ${BOTTOM_SHEET_ANIMATION_DURATION_MS}ms ease;
border-top-width: var(--ha-bottom-sheet-border-width);
border-right-width: var(--ha-bottom-sheet-border-width);
border-left-width: var(--ha-bottom-sheet-border-width);
border-bottom-width: 0;
border-style: var(--ha-bottom-sheet-border-style);
border-color: var(--ha-bottom-sheet-border-color);
margin-bottom: var(--safe-area-inset-bottom);
margin-left: var(--safe-area-inset-left);
margin-right: var(--safe-area-inset-right);
}
dialog.show {
transform: translateY(0);
}
`;
}
declare global {
interface HTMLElementTagNameMap {
"ha-resizable-bottom-sheet": HaResizableBottomSheet;
}
interface HASSDomEvents {
"bottom-sheet-closed": undefined;
}
}

View File

@@ -246,6 +246,8 @@ export class HaMediaSelector extends LitElement {
entityId: this._getActiveEntityId(),
navigateIds: this.value?.metadata?.navigateIds,
accept: this.selector.media?.accept,
defaultId: this.value?.media_content_id,
defaultType: this.value?.media_content_type,
mediaPickedCallback: (pickedMedia: MediaPickedEvent) => {
fireEvent(this, "value-changed", {
value: {

View File

@@ -666,7 +666,7 @@ class HaSidebar extends SubscribeMixin(LitElement) {
tooltip.style.display = "block";
tooltip.style.position = "fixed";
tooltip.style.top = `${top}px`;
tooltip.style.left = `${item.offsetLeft + item.clientWidth + 8}px`;
tooltip.style.left = `calc(${item.offsetLeft + item.clientWidth + 8}px + var(--safe-area-inset-left, 0px))`;
}
private _hideTooltip() {
@@ -705,9 +705,10 @@ class HaSidebar extends SubscribeMixin(LitElement) {
background-color: var(--sidebar-background-color);
width: 100%;
box-sizing: border-box;
padding-bottom: calc(14px + var(--safe-area-inset-bottom, 0px));
}
.menu {
height: var(--header-height);
height: calc(var(--header-height) + var(--safe-area-inset-top, 0px));
box-sizing: border-box;
display: flex;
padding: 0 4px;
@@ -725,12 +726,16 @@ class HaSidebar extends SubscribeMixin(LitElement) {
);
font-size: var(--ha-font-size-xl);
align-items: center;
padding-left: calc(4px + var(--safe-area-inset-left));
padding-inline-start: calc(4px + var(--safe-area-inset-left));
padding-left: calc(4px + var(--safe-area-inset-left, 0px));
padding-inline-start: calc(4px + var(--safe-area-inset-left, 0px));
padding-inline-end: initial;
padding-top: var(--safe-area-inset-top, 0px);
}
:host([expanded]) .menu {
width: calc(256px + var(--safe-area-inset-left));
width: calc(256px + var(--safe-area-inset-left, 0px));
}
:host([narrow][expanded]) .menu {
width: 100%;
}
.menu ha-icon-button {
color: var(--sidebar-icon-color);
@@ -756,22 +761,23 @@ class HaSidebar extends SubscribeMixin(LitElement) {
ha-fade-in,
ha-md-list {
height: calc(
100% - var(--header-height) - 132px - var(--safe-area-inset-bottom)
100% - var(--header-height) - var(--safe-area-inset-top, 0px) -
132px
);
}
ha-fade-in {
padding: 4px 0;
box-sizing: border-box;
display: flex;
justify-content: center;
align-items: center;
}
ha-md-list {
padding: 4px 0;
box-sizing: border-box;
overflow-x: hidden;
background: none;
margin-left: var(--safe-area-inset-left);
margin-left: var(--safe-area-inset-left, 0px);
}
ha-md-list-item {
@@ -791,7 +797,9 @@ class HaSidebar extends SubscribeMixin(LitElement) {
}
:host([expanded]) ha-md-list-item {
width: 248px;
width: calc(248px - var(--safe-area-inset-left));
}
:host([narrow][expanded]) ha-md-list-item {
width: calc(240px - var(--safe-area-inset-left, 0px));
}
ha-md-list-item.selected {

View File

@@ -1,33 +1,81 @@
import { Slider } from "@material/web/slider/internal/slider";
import { styles } from "@material/web/slider/internal/slider-styles";
import { css } from "lit";
import { customElement } from "lit/decorators";
import Slider from "@home-assistant/webawesome/dist/components/slider/slider";
import { css, type CSSResultGroup } from "lit";
import { customElement, property } from "lit/decorators";
import { mainWindow } from "../common/dom/get_main_window";
@customElement("ha-slider")
export class HaSlider extends Slider {
@property({ reflect: true }) size: "small" | "medium" = "small";
@property({ type: Boolean, attribute: "with-tooltip" }) withTooltip = true;
public connectedCallback() {
super.connectedCallback();
this.dir = mainWindow.document.dir;
}
static override styles = [
styles,
css`
:host {
--md-sys-color-primary: var(--primary-color);
--md-sys-color-on-primary: var(--text-primary-color);
--md-sys-color-outline: var(--outline-color);
--md-sys-color-on-surface: var(--primary-text-color);
--md-slider-handle-width: 14px;
--md-slider-handle-height: 14px;
--md-slider-state-layer-size: 24px;
min-width: 100px;
min-inline-size: 100px;
width: 200px;
}
`,
];
static get styles(): CSSResultGroup {
return [
Slider.styles,
css`
:host {
--wa-form-control-activated-color: var(--primary-color);
--track-size: var(--ha-slider-track-size, 4px);
--marker-height: calc(var(--ha-slider-track-size, 4px) / 2);
--marker-width: calc(var(--ha-slider-track-size, 4px) / 2);
--wa-color-surface-default: var(--card-background-color);
--wa-color-neutral-fill-normal: var(--disabled-color);
--wa-tooltip-background-color: var(--secondary-background-color);
--wa-tooltip-color: var(--primary-text-color);
--wa-tooltip-font-family: var(
--ha-tooltip-font-family,
var(--ha-font-family-body)
);
--wa-tooltip-font-size: var(
--ha-tooltip-font-size,
var(--ha-font-size-s)
);
--wa-tooltip-font-weight: var(
--ha-tooltip-font-weight,
var(--ha-font-weight-normal)
);
--wa-tooltip-line-height: var(
--ha-tooltip-line-height,
var(--ha-line-height-condensed)
);
--wa-tooltip-padding: 8px;
--wa-tooltip-border-radius: var(--ha-tooltip-border-radius, 4px);
--wa-tooltip-arrow-size: var(--ha-tooltip-arrow-size, 8px);
--wa-z-index-tooltip: var(--ha-tooltip-z-index, 1000);
min-width: 100px;
min-inline-size: 100px;
width: 200px;
}
#thumb {
border: none;
}
#slider {
&:focus-visible:not(.disabled) #thumb,
&:focus-visible:not(.disabled) #thumb-min,
&:focus-visible:not(.disabled) #thumb-max {
outline: var(--wa-focus-ring);
}
}
:host([size="medium"]) {
--thumb-width: var(--ha-font-size-l, 1.25em);
--thumb-height: var(--ha-font-size-l, 1.25em);
}
:host([size="small"]) {
--thumb-width: var(--ha-font-size-m, 1em);
--thumb-height: var(--ha-font-size-m, 1em);
}
`,
];
}
}
declare global {

View File

@@ -1,10 +1,8 @@
import Spinner from "@awesome.me/webawesome/dist/components/spinner/spinner";
import Spinner from "@home-assistant/webawesome/dist/components/spinner/spinner";
import type { CSSResultGroup, PropertyValues } from "lit";
import { css } from "lit";
import { customElement, property } from "lit/decorators";
import { StateSet } from "../resources/polyfills/stateset";
@customElement("ha-spinner")
export class HaSpinner extends Spinner {
@property() public size?: "tiny" | "small" | "medium" | "large";
@@ -33,14 +31,6 @@ export class HaSpinner extends Spinner {
}
}
attachInternals() {
const internals = super.attachInternals();
Object.defineProperty(internals, "states", {
value: new StateSet(this, internals.states),
});
return internals;
}
static get styles(): CSSResultGroup {
return [
Spinner.styles,

View File

@@ -0,0 +1,42 @@
import Tab from "@home-assistant/webawesome/dist/components/tab/tab";
import { css, type CSSResultGroup } from "lit";
import { customElement } from "lit/decorators";
@customElement("ha-tab-group-tab")
export class HaTabGroupTab extends Tab {
static get styles(): CSSResultGroup {
return [
Tab.styles,
css`
:host {
font-size: var(--ha-font-size-m);
--wa-color-brand-on-quiet: var(
--ha-tab-active-text-color,
var(--primary-color)
);
2
--wa-color-neutral-on-quiet: var(--wa-color-brand-on-quiet);
opacity: 0.8;
color: inherit;
}
:host([active]:not([disabled])) {
opacity: 1;
}
@media (hover: hover) {
:host(:hover:not([disabled]):not([active])) .tab {
color: var(--wa-color-brand-on-quiet);
}
}
`,
];
}
}
declare global {
interface HTMLElementTagNameMap {
"ha-tab-group-tab": HaTabGroupTab;
}
}

View File

@@ -0,0 +1,64 @@
import TabGroup from "@home-assistant/webawesome/dist/components/tab-group/tab-group";
import { css, type CSSResultGroup } from "lit";
import { customElement, property } from "lit/decorators";
import { DragScrollController } from "../common/controllers/drag-scroll-controller";
@customElement("ha-tab-group")
export class HaTabGroup extends TabGroup {
private _dragScrollController = new DragScrollController(this, {
selector: ".nav",
});
@property({ attribute: "tab-tag" }) override tabTag = "ha-tab-group-tab";
@property({ attribute: "tab-only", type: Boolean }) tabOnly = true;
protected override handleClick(event: MouseEvent) {
if (this._dragScrollController.scrolled) {
return;
}
super.handleClick(event);
}
static get styles(): CSSResultGroup {
return [
TabGroup.styles,
css`
:host {
--track-width: 2px;
--track-color: var(--ha-tab-track-color, var(--divider-color));
--indicator-color: var(
--ha-tab-indicator-color,
var(--primary-color)
);
--wa-color-neutral-on-quiet: var(--indicator-color);
}
.tab-group-top ::slotted(ha-tab-group-tab[active]) {
border-block-end: solid var(--track-width) var(--indicator-color);
margin-block-end: calc(-1 * var(--track-width));
}
.tab-group-start ::slotted(ha-tab-group-tab[active]) {
border-inline-end: solid var(--track-width) var(--indicator-color);
margin-inline-end: calc(-1 * var(--track-width));
}
.tab-group-end ::slotted(ha-tab-group-tab[active]) {
border-inline-start: solid var(--track-width) var(--indicator-color);
margin-inline-start: calc(-1 * var(--track-width));
}
.scroll-button::part(base):hover {
background-color: transparent;
}
`,
];
}
}
declare global {
interface HTMLElementTagNameMap {
"ha-tab-group": HaTabGroup;
}
}

View File

@@ -343,40 +343,36 @@ export class HaTargetPicker extends SubscribeMixin(LitElement) {
${type === "entity_id"
? ""
: html`<span role="gridcell">
<ha-tooltip
.content=${this.hass.localize(
<ha-tooltip .for="expand-${id}"
>${this.hass.localize(
`ui.components.target-picker.expand_${type}`
)}
>
<ha-icon-button
class="expand-btn mdc-chip__icon mdc-chip__icon--trailing"
.label=${this.hass.localize(
"ui.components.target-picker.expand"
)}
.path=${mdiUnfoldMoreVertical}
hide-title
.id=${id}
.type=${type}
@click=${this._handleExpand}
></ha-icon-button>
</ha-tooltip>
<ha-icon-button
class="expand-btn mdc-chip__icon mdc-chip__icon--trailing"
.label=${this.hass.localize(
"ui.components.target-picker.expand"
)}
.path=${mdiUnfoldMoreVertical}
hide-title
.id="expand-${id}"
.type=${type}
@click=${this._handleExpand}
></ha-icon-button>
</span>`}
<span role="gridcell">
<ha-tooltip
.content=${this.hass.localize(
`ui.components.target-picker.remove_${type}`
)}
>
<ha-icon-button
class="mdc-chip__icon mdc-chip__icon--trailing"
.label=${this.hass.localize("ui.components.target-picker.remove")}
.path=${mdiClose}
hide-title
.id=${id}
.type=${type}
@click=${this._handleRemove}
></ha-icon-button>
<ha-tooltip .for="remove-${id}">
${this.hass.localize(`ui.components.target-picker.remove_${type}`)}
</ha-tooltip>
<ha-icon-button
class="mdc-chip__icon mdc-chip__icon--trailing"
.label=${this.hass.localize("ui.components.target-picker.remove")}
.path=${mdiClose}
hide-title
.id="remove-${id}"
.type=${type}
@click=${this._handleRemove}
></ha-icon-button>
</span>
</div>
`;
@@ -592,7 +588,7 @@ export class HaTargetPicker extends SubscribeMixin(LitElement) {
if (
entity.labels.includes(target.id) &&
!this.value!.entity_id?.includes(entity.entity_id) &&
this._entityRegMeetsFilter(entity)
this._entityRegMeetsFilter(entity, true)
) {
newEntities.push(entity.entity_id);
}
@@ -717,8 +713,11 @@ export class HaTargetPicker extends SubscribeMixin(LitElement) {
return true;
}
private _entityRegMeetsFilter(entity: EntityRegistryDisplayEntry): boolean {
if (entity.hidden || entity.entity_category) {
private _entityRegMeetsFilter(
entity: EntityRegistryDisplayEntry,
includeSecondary = false
): boolean {
if (entity.hidden || (entity.entity_category && !includeSecondary)) {
return false;
}

View File

@@ -1,50 +1,47 @@
import SlTooltip from "@shoelace-style/shoelace/dist/components/tooltip/tooltip.component";
import styles from "@shoelace-style/shoelace/dist/components/tooltip/tooltip.styles";
import Tooltip from "@home-assistant/webawesome/dist/components/tooltip/tooltip";
import { css } from "lit";
import { customElement } from "lit/decorators";
import { setDefaultAnimation } from "@shoelace-style/shoelace/dist/utilities/animation-registry";
setDefaultAnimation("tooltip.show", {
keyframes: [{ opacity: 0 }, { opacity: 1 }],
options: { duration: 150, easing: "ease" },
});
setDefaultAnimation("tooltip.hide", {
keyframes: [{ opacity: 1 }, { opacity: 0 }],
options: { duration: 400, easing: "ease" },
});
import type { CSSResultGroup } from "lit";
import { customElement, property } from "lit/decorators";
@customElement("ha-tooltip")
export class HaTooltip extends SlTooltip {
static override styles = [
styles,
css`
:host {
--sl-tooltip-background-color: var(--secondary-background-color);
--sl-tooltip-color: var(--primary-text-color);
--sl-tooltip-font-family: var(
--ha-tooltip-font-family,
var(--ha-font-family-body)
);
--sl-tooltip-font-size: var(
--ha-tooltip-font-size,
var(--ha-font-size-s)
);
--sl-tooltip-font-weight: var(
--ha-tooltip-font-weight,
var(--ha-font-weight-normal)
);
--sl-tooltip-line-height: var(
--ha-tooltip-line-height,
var(--ha-line-height-condensed)
);
--sl-tooltip-padding: 8px;
--sl-tooltip-border-radius: var(--ha-tooltip-border-radius, 4px);
--sl-tooltip-arrow-size: var(--ha-tooltip-arrow-size, 8px);
--sl-z-index-tooltip: var(--ha-tooltip-z-index, 1000);
}
`,
];
export class HaTooltip extends Tooltip {
/** The amount of time to wait before showing the tooltip when the user mouses in. */
@property({ attribute: "show-delay", type: Number }) showDelay = 150;
/** The amount of time to wait before hiding the tooltip when the user mouses out.. */
@property({ attribute: "hide-delay", type: Number }) hideDelay = 400;
static get styles(): CSSResultGroup {
return [
Tooltip.styles,
css`
:host {
--wa-tooltip-background-color: var(--secondary-background-color);
--wa-tooltip-color: var(--primary-text-color);
--wa-tooltip-font-family: var(
--ha-tooltip-font-family,
var(--ha-font-family-body)
);
--wa-tooltip-font-size: var(
--ha-tooltip-font-size,
var(--ha-font-size-s)
);
--wa-tooltip-font-weight: var(
--ha-tooltip-font-weight,
var(--ha-font-weight-normal)
);
--wa-tooltip-line-height: var(
--ha-tooltip-line-height,
var(--ha-line-height-condensed)
);
--wa-tooltip-padding: 8px;
--wa-tooltip-border-radius: var(--ha-tooltip-border-radius, 4px);
--wa-tooltip-arrow-size: var(--ha-tooltip-arrow-size, 8px);
--wa-z-index-tooltip: var(--ha-tooltip-z-index, 1000);
}
`,
];
}
}
declare global {

View File

@@ -1,19 +1,31 @@
import { TopAppBarFixedBase } from "@material/mwc-top-app-bar-fixed/mwc-top-app-bar-fixed-base";
import { styles } from "@material/mwc-top-app-bar/mwc-top-app-bar.css";
import { css } from "lit";
import { customElement } from "lit/decorators";
import { customElement, property } from "lit/decorators";
@customElement("ha-top-app-bar-fixed")
export class HaTopAppBarFixed extends TopAppBarFixedBase {
@property({ type: Boolean, reflect: true }) public narrow = false;
static override styles = [
styles,
css`
header {
padding-top: var(--safe-area-inset-top);
}
.mdc-top-app-bar__row {
height: var(--header-height);
border-bottom: var(--app-header-border-bottom);
}
.mdc-top-app-bar--fixed-adjust {
padding-top: var(--header-height);
padding-top: calc(
var(--header-height, 0px) + var(--safe-area-inset-top, 0px)
);
padding-bottom: var(--safe-area-inset-bottom);
padding-right: var(--safe-area-inset-right);
}
:host([narrow]) .mdc-top-app-bar--fixed-adjust {
padding-left: var(--safe-area-inset-left);
}
.mdc-top-app-bar {
--mdc-typography-headline6-font-weight: var(--ha-font-weight-normal);
@@ -22,6 +34,11 @@ export class HaTopAppBarFixed extends TopAppBarFixedBase {
--app-header-background-color,
var(--mdc-theme-primary)
);
padding-top: var(--safe-area-inset-top);
padding-right: var(--safe-area-inset-right);
}
:host([narrow]) .mdc-top-app-bar {
padding-left: var(--safe-area-inset-left);
}
.mdc-top-app-bar__title {
font-size: var(--ha-font-size-xl);

View File

@@ -13,7 +13,7 @@ export class HaTopAppBar extends TopAppBarBase {
border-bottom: var(--app-header-border-bottom);
}
.mdc-top-app-bar--fixed-adjust {
padding-top: var(--header-height);
padding-top: calc(var(--safe-area-inset-top) + var(--header-height));
}
.mdc-top-app-bar {
--mdc-typography-headline6-font-weight: var(--ha-font-weight-normal);
@@ -22,6 +22,9 @@ export class HaTopAppBar extends TopAppBarBase {
--app-header-background-color,
var(--mdc-theme-primary)
);
padding-top: var(--safe-area-inset-top);
padding-left: var(--safe-area-inset-left);
padding-right: var(--safe-area-inset-right);
}
`,
];

View File

@@ -32,6 +32,8 @@ export class TopAppBarBaseBase extends BaseElement {
protected _scrollTarget!: HTMLElement | Window;
@property({ type: Boolean, reflect: true }) public narrow = false;
@property({ attribute: "center-title", type: Boolean }) centerTitle = false;
@property({ type: Boolean, reflect: true }) prominent = false;
@@ -244,12 +246,22 @@ export class TopAppBarBaseBase extends BaseElement {
styles,
haStyleScrollbar,
css`
header {
padding-top: var(--safe-area-inset-top);
}
.mdc-top-app-bar__row {
height: var(--header-height);
border-bottom: var(--app-header-border-bottom);
}
.mdc-top-app-bar--fixed-adjust {
padding-top: var(--header-height);
padding-top: calc(
var(--header-height, 0px) + var(--safe-area-inset-top, 0px)
);
padding-bottom: var(--safe-area-inset-bottom);
padding-right: var(--safe-area-inset-right);
}
:host([narrow]) .mdc-top-app-bar--fixed-adjust {
padding-left: var(--safe-area-inset-left);
}
.shadow-container {
position: absolute;
@@ -274,6 +286,11 @@ export class TopAppBarBaseBase extends BaseElement {
--app-header-background-color,
var(--mdc-theme-primary)
);
padding-top: var(--safe-area-inset-top);
padding-right: var(--safe-area-inset-right);
}
:host([narrow]) .mdc-top-app-bar {
padding-left: var(--safe-area-inset-left);
}
.mdc-top-app-bar--pane.mdc-top-app-bar--fixed-scrolled {
box-shadow: none;
@@ -288,7 +305,12 @@ export class TopAppBarBaseBase extends BaseElement {
}
div.mdc-top-app-bar--pane {
display: flex;
height: calc(100vh - var(--header-height));
height: calc(
100vh - var(--header-height, 0px) - var(
--safe-area-inset-top,
0px
) - var(--safe-area-inset-bottom, 0px)
);
}
.pane {
border-right: 1px solid var(--divider-color);

View File

@@ -165,6 +165,8 @@ class DialogMediaPlayerBrowse extends LitElement {
.action=${this._action}
.preferredLayout=${this._preferredLayout}
.accept=${this._params.accept}
.defaultId=${this._params.defaultId}
.defaultType=${this._params.defaultType}
@close-dialog=${this.closeDialog}
@media-picked=${this._mediaPicked}
@media-browsed=${this._mediaBrowsed}

View File

@@ -0,0 +1,112 @@
import { css, html, LitElement } from "lit";
import { customElement, property } from "lit/decorators";
import memoizeOne from "memoize-one";
import { fireEvent } from "../../common/dom/fire_event";
import type { HomeAssistant } from "../../types";
import "../ha-button";
import "../ha-card";
import "../ha-form/ha-form";
import type { SchemaUnion } from "../ha-form/types";
import type { MediaPlayerItemId } from "./ha-media-player-browse";
export interface ManualMediaPickedEvent {
item: MediaPlayerItemId;
}
@customElement("ha-browse-media-manual")
class BrowseMediaManual extends LitElement {
@property({ attribute: false }) public hass!: HomeAssistant;
@property({ attribute: false }) public item!: MediaPlayerItemId;
private _schema = memoizeOne(
() =>
[
{
name: "media_content_id",
required: true,
selector: {
text: {},
},
},
{
name: "media_content_type",
required: false,
selector: {
text: {},
},
},
] as const
);
protected render() {
return html`
<ha-card>
<div class="card-content">
<ha-form
.hass=${this.hass}
.schema=${this._schema()}
.data=${this.item}
.computeLabel=${this._computeLabel}
.computeHelper=${this._computeHelper}
@value-changed=${this._valueChanged}
></ha-form>
</div>
<div class="card-actions">
<ha-button @click=${this._mediaPicked}>
${this.hass.localize("ui.common.submit")}
</ha-button>
</div>
</ha-card>
`;
}
private _valueChanged(ev: CustomEvent) {
const value = { ...ev.detail.value };
this.item = value;
}
private _computeLabel = (
entry: SchemaUnion<ReturnType<typeof this._schema>>
): string =>
this.hass.localize(`ui.components.selectors.media.${entry.name}`);
private _computeHelper = (
entry: SchemaUnion<ReturnType<typeof this._schema>>
): string =>
this.hass.localize(`ui.components.selectors.media.${entry.name}_detail`);
private _mediaPicked() {
fireEvent(this, "manual-media-picked", {
item: {
media_content_id: this.item.media_content_id || "",
media_content_type: this.item.media_content_type || "",
},
});
}
static override styles = css`
:host {
margin: 16px auto;
padding: 0 8px;
display: flex;
flex-direction: column;
max-width: 448px;
}
.card-actions {
display: flex;
justify-content: flex-end;
}
`;
}
declare global {
interface HTMLElementTagNameMap {
"ha-browse-media-manual": BrowseMediaManual;
}
interface HASSDomEvents {
"manual-media-picked": ManualMediaPickedEvent;
}
}

View File

@@ -1,7 +1,7 @@
import type { LitVirtualizer } from "@lit-labs/virtualizer";
import { grid } from "@lit-labs/virtualizer/layouts/grid";
import { mdiArrowUpRight, mdiPlay, mdiPlus } from "@mdi/js";
import { mdiArrowUpRight, mdiPlay, mdiPlus, mdiKeyboard } from "@mdi/js";
import type { CSSResultGroup, PropertyValues, TemplateResult } from "lit";
import { css, html, LitElement, nothing } from "lit";
import {
@@ -28,7 +28,11 @@ import {
BROWSER_PLAYER,
MediaClassBrowserSettings,
} from "../../data/media-player";
import { browseLocalMediaPlayer } from "../../data/media_source";
import {
browseLocalMediaPlayer,
isManualMediaSourceContentId,
MANUAL_MEDIA_SOURCE_PREFIX,
} from "../../data/media_source";
import { isTTSMediaSource } from "../../data/tts";
import { showAlertDialog } from "../../dialogs/generic/show-dialog-box";
import { haStyle } from "../../resources/styles";
@@ -53,7 +57,9 @@ import "../ha-spinner";
import "../ha-svg-icon";
import "../ha-tooltip";
import "./ha-browse-media-tts";
import "./ha-browse-media-manual";
import type { TtsMediaPickedEvent } from "./ha-browse-media-tts";
import type { ManualMediaPickedEvent } from "./ha-browse-media-manual";
declare global {
interface HASSDomEvents {
@@ -74,6 +80,18 @@ export interface MediaPlayerItemId {
media_content_type: string | undefined;
}
const MANUAL_ITEM: MediaPlayerItem = {
can_expand: true,
can_play: false,
can_search: false,
children_media_class: "",
media_class: "app",
media_content_id: MANUAL_MEDIA_SOURCE_PREFIX,
media_content_type: "",
iconPath: mdiKeyboard,
title: "Manual entry",
};
@customElement("ha-media-player-browse")
export class HaMediaPlayerBrowse extends LitElement {
@property({ attribute: false }) public hass!: HomeAssistant;
@@ -91,6 +109,10 @@ export class HaMediaPlayerBrowse extends LitElement {
@property({ attribute: false }) public accept?: string[];
@property({ attribute: false }) public defaultId?: string;
@property({ attribute: false }) public defaultType?: string;
// @todo Consider reworking to eliminate need for attribute since it is manipulated internally
@property({ type: Boolean, reflect: true }) public narrow = false;
@@ -216,56 +238,69 @@ export class HaMediaPlayerBrowse extends LitElement {
}
}
// Fetch current
if (!currentProm) {
currentProm = this._fetchData(
this.entityId,
currentId.media_content_id,
currentId.media_content_type
if (
currentId.media_content_id &&
isManualMediaSourceContentId(currentId.media_content_id)
) {
this._currentItem = MANUAL_ITEM;
fireEvent(this, "media-browsed", {
ids: navigateIds,
current: this._currentItem,
});
} else {
if (!currentProm) {
currentProm = this._fetchData(
this.entityId,
currentId.media_content_id,
currentId.media_content_type
);
}
currentProm.then(
(item) => {
this._currentItem = item;
fireEvent(this, "media-browsed", {
ids: navigateIds,
current: item,
});
},
(err) => {
// When we change entity ID, we will first try to see if the new entity is
// able to resolve the new path. If that results in an error, browse the root.
const isNewEntityWithSamePath =
oldNavigateIds &&
changedProps.has("entityId") &&
navigateIds.length === oldNavigateIds.length &&
oldNavigateIds.every(
(oldItem, idx) =>
navigateIds[idx].media_content_id ===
oldItem.media_content_id &&
navigateIds[idx].media_content_type ===
oldItem.media_content_type
);
if (isNewEntityWithSamePath) {
fireEvent(this, "media-browsed", {
ids: [
{ media_content_id: undefined, media_content_type: undefined },
],
replace: true,
});
} else if (
err.code === "entity_not_found" &&
this.entityId &&
isUnavailableState(this.hass.states[this.entityId]?.state)
) {
this._setError({
message: this.hass.localize(
`ui.components.media-browser.media_player_unavailable`
),
code: "entity_not_found",
});
} else {
this._setError(err);
}
}
);
}
currentProm.then(
(item) => {
this._currentItem = item;
fireEvent(this, "media-browsed", {
ids: navigateIds,
current: item,
});
},
(err) => {
// When we change entity ID, we will first try to see if the new entity is
// able to resolve the new path. If that results in an error, browse the root.
const isNewEntityWithSamePath =
oldNavigateIds &&
changedProps.has("entityId") &&
navigateIds.length === oldNavigateIds.length &&
oldNavigateIds.every(
(oldItem, idx) =>
navigateIds[idx].media_content_id === oldItem.media_content_id &&
navigateIds[idx].media_content_type === oldItem.media_content_type
);
if (isNewEntityWithSamePath) {
fireEvent(this, "media-browsed", {
ids: [
{ media_content_id: undefined, media_content_type: undefined },
],
replace: true,
});
} else if (
err.code === "entity_not_found" &&
this.entityId &&
isUnavailableState(this.hass.states[this.entityId]?.state)
) {
this._setError({
message: this.hass.localize(
`ui.components.media-browser.media_player_unavailable`
),
code: "entity_not_found",
});
} else {
this._setError(err);
}
}
);
// Fetch parent
if (!parentProm && parentId !== undefined) {
parentProm = this._fetchData(
@@ -479,111 +514,120 @@ export class HaMediaPlayerBrowse extends LitElement {
</ha-alert>
</div>
`
: isTTSMediaSource(currentItem.media_content_id)
? html`
<ha-browse-media-tts
.item=${currentItem}
.hass=${this.hass}
.action=${this.action}
@tts-picked=${this._ttsPicked}
></ha-browse-media-tts>
`
: !children.length && !currentItem.not_shown
: isManualMediaSourceContentId(currentItem.media_content_id)
? html`<ha-browse-media-manual
.item=${{
media_content_id: this.defaultId || "",
media_content_type: this.defaultType || "",
}}
.hass=${this.hass}
@manual-media-picked=${this._manualPicked}
></ha-browse-media-manual>`
: isTTSMediaSource(currentItem.media_content_id)
? html`
<div class="container no-items">
${currentItem.media_content_id ===
"media-source://media_source/local/."
? html`
<div class="highlight-add-button">
<span>
<ha-svg-icon
.path=${mdiArrowUpRight}
></ha-svg-icon>
</span>
<span>
${this.hass.localize(
"ui.components.media-browser.file_management.highlight_button"
)}
</span>
</div>
`
: this.hass.localize(
"ui.components.media-browser.no_items"
)}
</div>
<ha-browse-media-tts
.item=${currentItem}
.hass=${this.hass}
.action=${this.action}
@tts-picked=${this._ttsPicked}
></ha-browse-media-tts>
`
: this.preferredLayout === "grid" ||
(this.preferredLayout === "auto" &&
childrenMediaClass.layout === "grid")
: !children.length && !currentItem.not_shown
? html`
<lit-virtualizer
scroller
.layout=${grid({
itemSize: {
width: "175px",
height:
childrenMediaClass.thumbnail_ratio ===
"portrait"
? "312px"
: "225px",
},
gap: "16px",
flex: { preserve: "aspect-ratio" },
justify: "space-evenly",
direction: "vertical",
})}
.items=${children}
.renderItem=${this._renderGridItem}
class="children ${classMap({
portrait:
childrenMediaClass.thumbnail_ratio ===
"portrait",
not_shown: !!currentItem.not_shown,
})}"
></lit-virtualizer>
${currentItem.not_shown
? html`
<div class="grid not-shown">
<div class="title">
${this.hass.localize(
"ui.components.media-browser.not_shown",
{ count: currentItem.not_shown }
)}
<div class="container no-items">
${currentItem.media_content_id ===
"media-source://media_source/local/."
? html`
<div class="highlight-add-button">
<span>
<ha-svg-icon
.path=${mdiArrowUpRight}
></ha-svg-icon>
</span>
<span>
${this.hass.localize(
"ui.components.media-browser.file_management.highlight_button"
)}
</span>
</div>
</div>
`
: ""}
`
: this.hass.localize(
"ui.components.media-browser.no_items"
)}
</div>
`
: html`
<ha-list>
: this.preferredLayout === "grid" ||
(this.preferredLayout === "auto" &&
childrenMediaClass.layout === "grid")
? html`
<lit-virtualizer
scroller
.items=${children}
style=${styleMap({
height: `${children.length * 72 + 26}px`,
.layout=${grid({
itemSize: {
width: "175px",
height:
childrenMediaClass.thumbnail_ratio ===
"portrait"
? "312px"
: "225px",
},
gap: "16px",
flex: { preserve: "aspect-ratio" },
justify: "space-evenly",
direction: "vertical",
})}
.renderItem=${this._renderListItem}
.items=${children}
.renderItem=${this._renderGridItem}
class="children ${classMap({
portrait:
childrenMediaClass.thumbnail_ratio ===
"portrait",
not_shown: !!currentItem.not_shown,
})}"
></lit-virtualizer>
${currentItem.not_shown
? html`
<ha-list-item
noninteractive
class="not-shown"
.graphic=${mediaClass.show_list_images
? "medium"
: "avatar"}
>
<span class="title">
<div class="grid not-shown">
<div class="title">
${this.hass.localize(
"ui.components.media-browser.not_shown",
{ count: currentItem.not_shown }
)}
</span>
</ha-list-item>
</div>
</div>
`
: ""}
</ha-list>
`
`
: html`
<ha-list>
<lit-virtualizer
scroller
.items=${children}
style=${styleMap({
height: `${children.length * 72 + 26}px`,
})}
.renderItem=${this._renderListItem}
></lit-virtualizer>
${currentItem.not_shown
? html`
<ha-list-item
noninteractive
class="not-shown"
.graphic=${mediaClass.show_list_images
? "medium"
: "avatar"}
>
<span class="title">
${this.hass.localize(
"ui.components.media-browser.not_shown",
{ count: currentItem.not_shown }
)}
</span>
</ha-list-item>
`
: ""}
</ha-list>
`
}
</div>
</div>
@@ -617,8 +661,9 @@ export class HaMediaPlayerBrowse extends LitElement {
: html`
<div class="icon-holder image">
<ha-svg-icon
class="folder"
.path=${MediaClassBrowserSettings[
class=${child.iconPath ? "icon" : "folder"}
.path=${child.iconPath ||
MediaClassBrowserSettings[
child.media_class === "directory"
? child.children_media_class || child.media_class
: child.media_class
@@ -642,9 +687,10 @@ export class HaMediaPlayerBrowse extends LitElement {
`
: ""}
</div>
<ha-tooltip distance="-4" .content=${child.title}>
<div class="title">${child.title}</div>
<ha-tooltip .for="grid-${child.title}" distance="-4">
${child.title}
</ha-tooltip>
<div .id="grid-${child.title}" class="title">${child.title}</div>
</ha-card>
</div>
`;
@@ -767,6 +813,14 @@ export class HaMediaPlayerBrowse extends LitElement {
});
}
private _manualPicked(ev: CustomEvent<ManualMediaPickedEvent>) {
ev.stopPropagation();
fireEvent(this, "media-picked", {
item: ev.detail.item as MediaPlayerItem,
navigateIds: this.navigateIds,
});
}
private _childClicked = async (ev: MouseEvent): Promise<void> => {
const target = ev.currentTarget as any;
const item: MediaPlayerItem = target.item;
@@ -790,9 +844,23 @@ export class HaMediaPlayerBrowse extends LitElement {
mediaContentId?: string,
mediaContentType?: string
): Promise<MediaPlayerItem> {
return entityId && entityId !== BROWSER_PLAYER
? browseMediaPlayer(this.hass, entityId, mediaContentId, mediaContentType)
: browseLocalMediaPlayer(this.hass, mediaContentId);
const prom =
entityId && entityId !== BROWSER_PLAYER
? browseMediaPlayer(
this.hass,
entityId,
mediaContentId,
mediaContentType
)
: browseLocalMediaPlayer(this.hass, mediaContentId);
return prom.then((item) => {
if (!mediaContentId && this.action === "pick") {
item.children = item.children || [];
item.children.push(MANUAL_ITEM);
}
return item;
});
}
private _measureCard(): void {
@@ -1140,6 +1208,11 @@ export class HaMediaPlayerBrowse extends LitElement {
--mdc-icon-size: calc(var(--media-browse-item-size, 175px) * 0.4);
}
.child .icon {
color: #00a9f7; /* Match the png color from brands repo */
--mdc-icon-size: calc(var(--media-browse-item-size, 175px) * 0.4);
}
.child .play {
position: absolute;
transition: color 0.5s;

View File

@@ -12,6 +12,8 @@ export interface MediaPlayerBrowseDialogParams {
navigateIds?: MediaPlayerItemId[];
minimumNavigateLevel?: number;
accept?: string[];
defaultId?: string;
defaultType?: string;
}
export const showMediaBrowserDialog = (

View File

@@ -1,88 +0,0 @@
import TabGroup from "@shoelace-style/shoelace/dist/components/tab-group/tab-group.component";
import TabGroupStyles from "@shoelace-style/shoelace/dist/components/tab-group/tab-group.styles";
import "@shoelace-style/shoelace/dist/components/tab/tab";
import { css } from "lit";
import { customElement } from "lit/decorators";
import { DragScrollController } from "../common/controllers/drag-scroll-controller";
@customElement("sl-tab-group")
// @ts-ignore
export class HaSlTabGroup extends TabGroup {
private _dragScrollController = new DragScrollController(this, {
selector: ".tab-group__nav",
});
override setAriaLabels() {
// Override the method to prevent setting aria-labels, as we don't use panels
// and don't want to set aria-labels for the tabs
}
override getAllPanels() {
// Override the method to prevent querying for panels
// and return an empty array instead
// as we don't use panels
return [];
}
// @ts-ignore
protected override handleClick(event: MouseEvent) {
if (this._dragScrollController.scrolled) {
return;
}
// @ts-ignore
super.handleClick(event);
}
static override styles = [
TabGroupStyles,
css`
:host {
--sl-spacing-3x-small: 0.125rem;
--sl-spacing-2x-small: 0.25rem;
--sl-spacing-x-small: 0.5rem;
--sl-spacing-small: 0.75rem;
--sl-spacing-medium: 1rem;
--sl-spacing-large: 1.25rem;
--sl-spacing-x-large: 1.75rem;
--sl-spacing-2x-large: 2.25rem;
--sl-spacing-3x-large: 3rem;
--sl-spacing-4x-large: 4.5rem;
--sl-transition-x-slow: 1000ms;
--sl-transition-slow: 500ms;
--sl-transition-medium: 250ms;
--sl-transition-fast: 150ms;
--sl-transition-x-fast: 50ms;
--transition-speed: var(--sl-transition-fast);
--sl-border-radius-small: 0.1875rem;
--sl-border-radius-medium: 0.25rem;
--sl-border-radius-large: 0.5rem;
--sl-border-radius-x-large: 1rem;
--sl-border-radius-circle: 50%;
--sl-border-radius-pill: 9999px;
--sl-color-neutral-600: inherit;
--sl-font-weight-semibold: var(--ha-font-weight-medium);
--sl-font-size-small: var(--ha-font-size-m);
--sl-color-primary-600: var(
--ha-tab-active-text-color,
var(--primary-color)
);
--track-color: var(--ha-tab-track-color, var(--divider-color));
--indicator-color: var(--ha-tab-indicator-color, var(--primary-color));
}
::slotted(sl-tab:not([active])) {
opacity: 0.8;
}
`,
];
}
declare global {
interface HTMLElementTagNameMap {
// @ts-ignore
"sl-tab-group": HaSlTabGroup;
}
}

View File

@@ -3,28 +3,35 @@ import { LitElement, css, html } from "lit";
import { customElement, property } from "lit/decorators";
import "../ha-icon";
import "../ha-svg-icon";
import { classMap } from "lit/directives/class-map";
export type TileIconImageStyle = "square" | "rounded-square" | "circle";
export const DEFAULT_TILE_ICON_BORDER_STYLE = "circle";
/**
* Home Assistant tile icon component
*
* @element ha-tile-icon
*
* @summary
* A tile icon component, used in tile card in Home Assistant to display an icon or image.
*
* @slot - Additional content (for example, a badge).
* @slot icon - The icon container (usually for icons).
*
* @cssprop --ha-tile-icon-border-radius - The border radius of the tile icon. defaults to `var(--ha-border-radius-pill)`.
*
* @attr {boolean} interactive - Whether the icon is interactive (hover and focus styles).
* @attr {string} image-url - The URL of the image to display instead of an icon.
*/
@customElement("ha-tile-icon")
export class HaTileIcon extends LitElement {
@property({ type: Boolean, reflect: true })
public interactive = false;
@property({ attribute: "border-style", type: String })
public imageStyle?: TileIconImageStyle;
@property({ attribute: false })
@property({ attribute: "image-url", type: String })
public imageUrl?: string;
protected render(): TemplateResult {
if (this.imageUrl) {
const imageStyle = this.imageStyle || DEFAULT_TILE_ICON_BORDER_STYLE;
return html`
<div class="container ${classMap({ [imageStyle]: this.imageUrl })}">
<div class="container">
<img alt="" src=${this.imageUrl} />
</div>
<slot></slot>
@@ -44,6 +51,11 @@ export class HaTileIcon extends LitElement {
--tile-icon-color: var(--disabled-color);
--tile-icon-opacity: 0.2;
--tile-icon-hover-opacity: 0.35;
--tile-icon-border-radius: var(
--ha-tile-icon-border-radius,
var(--ha-border-radius-pill)
);
--tile-icon-size: 36px;
--mdc-icon-size: 24px;
position: relative;
user-select: none;
@@ -60,21 +72,15 @@ export class HaTileIcon extends LitElement {
display: flex;
align-items: center;
justify-content: center;
width: 36px;
height: 36px;
border-radius: 18px;
width: var(--tile-icon-size);
height: var(--tile-icon-size);
border-radius: var(--tile-icon-border-radius);
overflow: hidden;
transition: box-shadow 180ms ease-in-out;
}
:host([interactive]:focus-visible) .container {
box-shadow: 0 0 0 2px var(--tile-icon-color);
}
.container.rounded-square {
border-radius: 8px;
}
.container.square {
border-radius: 0;
}
.container.background::before {
content: "";
position: absolute;

View File

@@ -1,20 +1,21 @@
import type { TemplateResult } from "lit";
import { html, css, LitElement, nothing } from "lit";
import { css, html, LitElement } from "lit";
import { customElement, property } from "lit/decorators";
@customElement("ha-tile-info")
export class HaTileInfo extends LitElement {
@property() public primary?: string;
@property() public secondary?: string | TemplateResult<1>;
@property() public secondary?: string;
protected render() {
return html`
<div class="info">
<span class="primary">${this.primary}</span>
${this.secondary
? html`<span class="secondary">${this.secondary}</span>`
: nothing}
<slot name="primary" class="primary">
<span>${this.primary}</span>
</slot>
<slot name="secondary" class="secondary">
<span>${this.secondary}</span>
</slot>
</div>
`;
}
@@ -27,7 +28,8 @@ export class HaTileInfo extends LitElement {
align-items: flex-start;
justify-content: center;
}
span {
span,
::slotted(*) {
text-overflow: ellipsis;
overflow: hidden;
white-space: nowrap;

View File

@@ -1,8 +1,14 @@
import type { HomeAssistant } from "../types";
import type { Selector } from "./selector";
export const enum AITaskEntityFeature {
GENERATE_DATA = 1,
SUPPORT_ATTACHMENTS = 2,
GENERATE_IMAGE = 4,
}
export interface AITaskPreferences {
gen_data_entity_id: string | null;
gen_image_entity_id: string | null;
}
export interface GenDataTask {

View File

@@ -24,11 +24,14 @@ export interface BluetoothConnectionData extends DataTableRowData {
source: string;
}
export type HaScannerType = "usb" | "uart" | "remote" | "unknown";
export interface BluetoothScannerDetails {
source: string;
connectable: boolean;
name: string;
adapter: string;
scanner_type?: HaScannerType;
}
export type BluetoothScannersDetails = Record<string, BluetoothScannerDetails>;
@@ -55,6 +58,13 @@ export interface BluetoothAllocationsData {
allocated: string[];
}
export interface BluetoothScannerState {
source: string;
adapter: string;
current_mode: "active" | "passive" | null;
requested_mode: "active" | "passive" | null;
}
export const subscribeBluetoothScannersDetailsUpdates = (
conn: Connection,
store: Store<BluetoothScannersDetails>
@@ -170,3 +180,20 @@ export const subscribeBluetoothConnectionAllocations = (
params
);
};
export const subscribeBluetoothScannerState = (
conn: Connection,
callbackFunction: (scannerState: BluetoothScannerState) => void,
configEntryId?: string
): Promise<() => Promise<void>> => {
const params: { type: string; config_entry_id?: string } = {
type: "bluetooth/subscribe_scanner_state",
};
if (configEntryId) {
params.config_entry_id = configEntryId;
}
return conn.subscribeMessage<BluetoothScannerState>(
(scannerState) => callbackFunction(scannerState),
params
);
};

View File

@@ -63,6 +63,7 @@ export interface DataEntryFlowStepCreateEntry {
type: "create_entry";
version: number;
flow_id: string;
next_flow?: [FlowType, string]; // [flow_type, flow_id]
handler: string;
title: string;
result?: ConfigEntry;
@@ -97,6 +98,7 @@ export interface DataEntryFlowStepMenu {
step_id: string;
/** If array, use value to lookup translations in strings.json */
menu_options: string[] | Record<string, string>;
sort?: boolean;
description_placeholders?: Record<string, string>;
translation_domain?: string;
}

View File

@@ -115,6 +115,9 @@ export const DOMAIN_ATTRIBUTES_FORMATERS: Record<
return formatDurationDigital(locale, { hours, minutes, seconds })!;
},
},
input_datetime: {
year: (value) => value.toString(),
},
};
export const NON_NUMERIC_ATTRIBUTES = [

View File

@@ -8,12 +8,12 @@ import { computeDomain } from "../common/entity/compute_domain";
import { computeStateDomain } from "../common/entity/compute_state_domain";
import { autoCaseNoun } from "../common/translations/auto_case_noun";
import type { LocalizeFunc } from "../common/translations/localize";
import type { HaEntityPickerEntityFilterFunc } from "../components/entity/ha-entity-picker";
import type { HomeAssistant } from "../types";
import { UNAVAILABLE, UNKNOWN } from "./entity";
import { isNumericEntity } from "./history";
const LOGBOOK_LOCALIZE_PATH = "ui.components.logbook.messages";
export const CONTINUOUS_DOMAINS = ["counter", "proximity", "sensor", "zone"];
export const CONTINUOUS_DOMAINS = ["counter", "proximity"];
export interface LogbookStreamMessage {
events: LogbookEntry[];
@@ -326,9 +326,14 @@ export const localizeStateMessage = (
});
};
export const filterLogbookCompatibleEntities: HaEntityPickerEntityFilterFunc = (
entity
) =>
computeStateDomain(entity) !== "sensor" ||
(entity.attributes.unit_of_measurement === undefined &&
entity.attributes.state_class === undefined);
export const filterLogbookCompatibleEntities = (
entity,
sensorNumericDeviceClasses: string[] = []
) => {
const domain = computeStateDomain(entity);
const continuous =
CONTINUOUS_DOMAINS.includes(domain) ||
(domain === "sensor" &&
isNumericEntity(domain, entity, undefined, sensorNumericDeviceClasses));
return !continuous;
};

View File

@@ -14,4 +14,5 @@ export interface LovelaceCardConfig {
type: string;
[key: string]: any;
visibility?: Condition[];
disabled?: boolean;
}

View File

@@ -4,6 +4,7 @@ import type { LovelaceStrategyConfig } from "./strategy";
export interface LovelaceBaseSectionConfig {
visibility?: Condition[];
disabled?: boolean;
column_span?: number;
row_span?: number;
/**

View File

@@ -199,10 +199,12 @@ export interface MediaPlayerItem {
media_content_type: string;
media_content_id: string;
media_class: keyof TranslationDict["ui"]["components"]["media-browser"]["class"];
children_media_class?: string;
children_media_class?: string | null;
can_play: boolean;
can_expand: boolean;
can_search: boolean;
thumbnail?: string;
iconPath?: string;
children?: MediaPlayerItem[];
not_shown?: number;
}

View File

@@ -24,6 +24,11 @@ export const browseLocalMediaPlayer = (
media_content_id: mediaContentId,
});
export const MANUAL_MEDIA_SOURCE_PREFIX = "__MANUAL_ENTRY__";
export const isManualMediaSourceContentId = (mediaContentId: string) =>
mediaContentId.startsWith(MANUAL_MEDIA_SOURCE_PREFIX);
export const isMediaSourceContentId = (mediaId: string) =>
mediaId.startsWith("media-source://");

View File

@@ -2,6 +2,7 @@ import type { Connection } from "home-assistant-js-websocket";
import { computeStateName } from "../common/entity/compute_state_name";
import type { HaDurationData } from "../components/ha-duration-input";
import type { HomeAssistant } from "../types";
import { firstWeekday } from "../common/datetime/first_weekday";
export interface RecorderInfo {
backlog: number | null;
@@ -108,7 +109,7 @@ export interface StatisticsValidationResultMeanTypeChanged {
};
}
export const VOLUME_UNITS = ["L", "gal", "ft³", "m³", "CCF"] as const;
export const VOLUME_UNITS = ["L", "gal", "ft³", "m³", "CCF", "MCF"] as const;
export interface StatisticsUnitConfiguration {
energy?: "Wh" | "kWh" | "MWh" | "GJ";
@@ -211,7 +212,14 @@ export const fetchStatistic = (
: period.fixed_period.end,
}
: undefined,
calendar: period.calendar,
calendar: period.calendar
? {
...(period.calendar.period === "week"
? { first_weekday: firstWeekday(hass.locale).substring(0, 3) }
: {}),
...period.calendar,
}
: undefined,
rolling_window: period.rolling_window,
});
@@ -238,7 +246,7 @@ export const clearStatistics = (hass: HomeAssistant, statistic_ids: string[]) =>
});
export const calculateStatisticSumGrowth = (
values: StatisticValue[]
values?: StatisticValue[]
): number | null => {
let growth: number | null = null;

View File

@@ -1,8 +1,5 @@
import { ensureArray } from "../../common/array/ensure-array";
import { computeAreaName } from "../../common/entity/compute_area_name";
import { computeDeviceName } from "../../common/entity/compute_device_name";
import { computeEntityName } from "../../common/entity/compute_entity_name";
import { getEntityContext } from "../../common/entity/context/get_entity_context";
import { blankBeforeUnit } from "../../common/translations/blank_before_unit";
import type { HomeAssistant } from "../../types";
import type { Selector } from "../selector";
@@ -79,10 +76,8 @@ export const formatSelectorValue = (
if (!stateObj) {
return entityId;
}
const { device } = getEntityContext(stateObj, hass);
const deviceName = device ? computeDeviceName(device) : undefined;
const entityName = computeEntityName(stateObj, hass);
return [deviceName, entityName].filter(Boolean).join(" ") || entityId;
const name = hass.formatEntityName(stateObj, ["device", "entity"], " ");
return name || entityId;
})
.join(", ");
}

View File

@@ -0,0 +1,10 @@
import type { HomeAssistant } from "../types";
export interface CommonControlResult {
entities: string[];
}
export const getCommonControlUsagePrediction = (hass: HomeAssistant) =>
hass.callWS<CommonControlResult>({
type: "usage_prediction/common_control",
});

View File

@@ -256,6 +256,13 @@ export const showConfigFlowDialog = (
);
},
renderMenuOptionDescription(hass, step, option) {
return hass.localize(
`component.${step.translation_domain || step.handler}.config.step.${step.step_id}.menu_option_descriptions.${option}`,
step.description_placeholders
);
},
renderLoadingDescription(hass, reason, handler, step) {
if (reason !== "loading_flow" && reason !== "loading_step") {
return "";

Some files were not shown because too many files have changed in this diff Show More