Compare commits

..

5878 Commits

Author SHA1 Message Date
Paulus Schoutsen
1ced8fa80c Change order related items 2025-09-17 13:07:29 -04:00
Jan-Philipp Benecke
846692bc8a Migrate ha-slider to webawesome (#27075)
* Migrate ha-slider to webawesome

* Fix labeled slider

* Change slider surface color

* Trigger Build

* Remove large and border

* Run prettier

* enable tooltip and focus ring
2025-09-17 19:06:13 +02:00
Douwe
3b90b5fcb1 Add feature gap theme variable for hui-card-features (#27076)
* Update hui-card-features.ts

Add CSS variable for gap

* Renamed variable
2025-09-17 14:03:49 +02:00
Paulus Schoutsen
cac978344f Add more binary sensors to security dashboard (#27041)
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-09-17 13:56:51 +02:00
karwosts
6a40631e6d Add diagnostics download to helpers menu (#27077) 2025-09-17 14:19:15 +03:00
Aidan Timson
48f5b6dfd3 Safe area: Fix double padding for sidebar (#27078)
Fix double padding for sidebar
2025-09-17 14:16:02 +03:00
Björn Ebbinghaus
04b01d2cd9 Add relative timestamp state_content for input_datetime (#24135)
* Fix digit grouping in input_datetime `year`

* Display `input_datetime`s `timestamp` attribute as relative time instead of number
2025-09-17 10:22:00 +00:00
Jan Layola
0e8e054db1 Sync charts zoom in history tab (#26898)
* Add chart zoom event system and sync infrastructure to chart-base

- Replace inline datazoom handler with dedicated _handleDataZoomEvent method
- Add _syncZoomState method for zoom state synchronization
- Refactor zoom detection to be more robust and reliable

* Add hide reset button functionality

- Add hideResetButton property to ha-chart-base component
- Add hideResetButton property to state-history-chart-line component
- Add hideResetButton property to state-history-chart-timeline component
- Implement conditional reset button rendering based on hideResetButton flag
- Pass hideResetButton prop through component hierarchy

This allows parent components to control reset button visibility when
implementing custom reset functionality or coordinated multi-chart resets.

* Implement chart zoom synchronization

- Add chart-zoom event handlers to state-history-chart-line component
- Add chart-zoom event handlers to state-history-chart-timeline component
- Forward zoom events with chart index for identification

This enables individual charts to communicate zoom changes to parent
components for coordinated multi-chart synchronization.

* Add floating reset button and sync orchestration

- Add chart-zoom event type definition to HASSDomEvents interface
- Add global zoom state tracking with _hasZoomedCharts property
- Add _isSyncing flag to prevent infinite sync loops
- Implement _handleTimelineSync method for coordinating chart synchronization
- Implement _handleGlobalZoomReset method for resetting all charts
- Enable hide-reset-button on individual charts to use global reset
- Add floating reset button with Material Design styling

On history page the floating reset button appears when any chart is zoomed
and provides a single point to reset all synchronized charts simultaneously.

* Refactor chart zoom synchronization to use public API

Replace direct ECharts dispatchAction calls with proper zoom methods. The parent component now calls chartComponent.zoom() instead of accessing internal chart.dispatchAction() directly.

* Remove duplicate TypeScript declaration of the "chart-zoom" event

* Fix tooltips not shown due to xAxisPointer hidden

* Use chart zoom function in history charts

* Apply code review feedback

* Remove unnecessary any types

* Apply code review feedback
2025-09-17 10:36:28 +03:00
renovate[bot]
477a893193 Update dependency color-name to v2.0.2 (#27074)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-16 20:38:31 +02:00
puddly
bd0822f09f Wrap overflowing menu step option descriptions (#27072)
Make menu step option descriptions multiline
2025-09-16 20:25:41 +02:00
Paul Bottein
07c3ffb55d Use computed config for strategy visibility and disabled flag (#27071) 2025-09-16 19:10:51 +02:00
Paulus Schoutsen
fbfb4709d2 Add section strategy showing entities we expect user to use (#27014)
* Extend favorites with predicted entities

* Split out into own section

* Better component loaded check

* Use section strategy

* Feedbacks

* Remove hardcoded limit

* Add translations

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2025-09-16 12:24:08 -04:00
Aidan Timson
0a5b31e328 Add safe areas to bottom sheets and sidebar (#27009)
* Add safe areas to bottom sheet

* Add safe areas to automation sidebar

* Remove

* Add safe areas

* Add safe areas

* Switch
2025-09-16 16:48:06 +02:00
Aidan Timson
8cf0d8d2c3 Safe area: devtools (#26969)
* Remove extra padding

* Remove extra padding

* Remove extra padding

* Fixes

* use change from #26971

* Remove

* Remove

* Remove

* Remove

* Restore for future change

* Fix
2025-09-16 16:35:48 +02:00
Wendelin
61c16ce020 Automation editor: Copy always enabled (#27069) 2025-09-16 16:09:18 +02:00
Wendelin
6bede4ddca Automation editor: Disable click on drag handle (#27063)
Add stopPropagation to click events in automation components
2025-09-16 15:22:26 +03:00
Paul Bottein
bd88b91071 Order tile card config according to struct (#27060) 2025-09-16 15:13:37 +03:00
renovate[bot]
29b02a3c99 Update dependency jsdom to v27 (#27066)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-16 15:04:10 +03:00
Timothy
ac87e2280d Add External app version into ha-config-info (#27064) 2025-09-16 13:18:18 +02:00
Jan Layola
98c4e34a23 Sort installed addons by name in the ha-config-logs component (#27056) 2025-09-15 17:01:54 +02:00
karwosts
3d005c8316 Manual entry mode for media selector (#26753) 2025-09-15 16:48:03 +02:00
Paul Bottein
af31b5add3 Add formatEntityName helper on hass object. (#26057) 2025-09-15 14:18:52 +00:00
Aidan Timson
9d02a1d391 Fix calendar toggle group wrapping (#27049) 2025-09-15 14:12:37 +00:00
Petar Petrov
98e6f32fe8 Improve device section organization in energy Sankey card (#26978) 2025-09-15 15:57:52 +02:00
Aidan Timson
2726c6a849 Fix calendar toggle group button sizes (#27050)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-09-15 13:31:49 +00:00
Aidan Timson
c09ec54c76 Safe area: containers and panels (#26971)
This commit squashes the following development history:

1e78af3aa - Restore, moved to #26969
d672d9f44 - Restore
53ee5fbbc - Restore
16b4eb98e - Restore
8d8b13f50 - Restore
62e16619d - Apply changes from #27003
f5ee79a47 - Fix
60678689c - Fix
766ed6a25 - Fix
f76bd4f7e - Fix fabs
1879fd0d9 - Fix
ea3ee6de5 - Add safe areas to ha-hanel-custom
aa3384b9a - Add missing
c9a7f76dc - Fix
78351fd1f - Fix
59789d379 - Fix
1c7aabd34 - Remove
eaf1373cf - Fix
8481a93d7 - Fix
fe7df1f2f - Remove
69f244ff3 - Restore
2eb936b64 - Adjust
b09350637 - Fix
c0504bb7e - Clean
b0773d73e - Fix
4caa4a43b - make sure narrow is passed
8885f6bf6 - Add safe areas to 2 pane fixed
62df70f63 - Clean
a87e68d87 - FIx
5086be030 - Fix energy
ac3478e54 - Fix
0f28098a6 - Restore
b65ba3df9 - Restore
b0e1ea6db - Restore
7bb78d1c7 - Fix
26c95df71 - Update
7369c79d3 - Remove
b5f31dad6 - Fix
40cfc437d - Set top level padding instead of individual panels
83b49729f - Restore
25db15816 - Fix
8c9c39827 - Set top level app bar padding instead of individual panels
b7a1b27c9 - Remove
1e9368705 - Device
1482502f9 - Integration page
98dc1bf56 - Fix
1c3de1376 - Add
a08bee4d8 - Remove
0d462439b - Area subpage
4bfd60875 - Areas fix
b5cbcdaf7 - Fix
9fb272074 - Add safe areas to script editor
7c3bc9433 - Add safe areas to scene editor
1cf1b999a - Fix mobile for automation editors
4413bd4b7 - Add safe areas to automation editor
2e6953327 - Add safe areas to blueprint editor
989776dd1 - Add config section padding
6692b7ccf - Fix header row
22337b5e2 - Fix calendar
414e058cd - Fix pane
f09ae0e0c - Fix calendar
fb5a984ee - Fix pane
1daee18c8 - Todo fab
6f52cb42b - Todo content
9b317c583 - Media browser
0f8ca248d - Fix history panel
cd7843799 - Fix logbook
b8d47ecf3 - Fix
d15e9311d - Safe area: dashboard view container should only apply left safe area when in full view

Summary of changes:
- Add narrow property to top app bar components for conditional safe area padding
- Update safe area inset calculations to use fallback values (0px) for better compatibility
- Fix content height calculations to account for safe area insets
- Apply safe area padding conditionally based on narrow state
- Update FAB positioning to respect safe area insets
- Ensure proper spacing and layout on mobile devices with notches/dynamic islands
2025-09-15 15:54:04 +03:00
Norbert Rittel
9f045538a2 Update beta / stable channel descriptions (#27047) 2025-09-15 11:49:11 +02:00
Paul Bottein
c6c4f91b0e Use slot for tile card info (#27046) 2025-09-15 11:29:48 +03:00
karwosts
f71d8f4367 Fix incorrect logbook entity filters (#27037)
* Fix incorrect logbook filters

* Update src/panels/lovelace/editor/config-elements/hui-logbook-card-editor.ts

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-09-15 08:06:03 +00:00
Wendelin
68c1a38231 Unit tests for common/entity/get_states (#27007) 2025-09-15 09:28:02 +02:00
dependabot[bot]
a9796e4216 Bump github/codeql-action from 3.30.0 to 3.30.3 (#27045)
Bumps [github/codeql-action](https://github.com/github/codeql-action) from 3.30.0 to 3.30.3.
- [Release notes](https://github.com/github/codeql-action/releases)
- [Changelog](https://github.com/github/codeql-action/blob/main/CHANGELOG.md)
- [Commits](2d92b76c45...192325c861)

---
updated-dependencies:
- dependency-name: github/codeql-action
  dependency-version: 3.30.3
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-09-15 08:38:26 +02:00
Aidan Timson
bf6eefb692 Migrate from date-fns-tz to @date-fns/tz (#26809)
* Add @date-fns/tz

* Update calc_date

* Refactor ha-date-range-picker

* Refactor calendar panel

* Refactor todo panel

* Remove date-fns-tz

* Cleanup

* Move util functions

* Fix comment

* Reuse

* Restore old check for rrulejs, update to new format
2025-09-15 07:38:08 +03:00
Paul Bottein
7ec3b08444 Add disabled option for cards and sections (#27026)
* Add hidden config option for cards and sections

* Rename to disabled
2025-09-15 07:23:39 +03:00
Norbert Rittel
f3355671d1 Capitalize "Core" and "Supervisor" as component names (#27039) 2025-09-14 17:50:44 +02:00
Simon Lamon
c0e240a3bf Revert SHA pinning for home-assistant/wheels (#27034) 2025-09-13 16:47:57 +02:00
renovate[bot]
00fd4753e4 Update dependency @rspack/core to v1.5.3 (#27032)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-13 09:54:56 +03:00
renovate[bot]
08ac873e3b Update dependency globals to v16.4.0 (#27031)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-13 09:54:37 +03:00
renovate[bot]
d12b8d1b1b Update dependency hls.js to v1.6.12 (#27028)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-12 19:23:15 +02:00
Simon Lamon
977207dde4 Pin SHA for all github actions (#26958) 2025-09-12 19:17:44 +02:00
Norbert Rittel
87a5f1a315 Treat "Recorder" as a (capitalized) name that should not be translated (#27023) 2025-09-12 18:29:56 +02:00
renovate[bot]
acab2d5ead Update dependency ua-parser-js to v2.0.5 (#27024)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-12 16:42:16 +02:00
Paul Bottein
046fc00f73 Add home assistant bottom sheet (#26948)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-09-12 15:33:30 +02:00
Marcin
05775c411b Add transition to button background (#27021) 2025-09-12 14:57:33 +02:00
Simon Lamon
dcbc8b627f Migrate ha-tooltip to webawesome (#26540)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-09-12 13:09:24 +02:00
Aidan Timson
0d8d18617c Create and implement goBack helper function (#27015)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-09-12 11:39:45 +02:00
Lukas Waslowski
7eb87c78cc fix: Pass hass object to <ha-form/> in <hassio-addon-config/> (#26995)
fix: Pass  object to <ha-form/> in <hassio-addon-config/>
2025-09-12 05:03:53 -04:00
Paul Bottein
0eaf9ead9e Move section edit logic to its own component (#27017) 2025-09-12 08:51:10 +00:00
Paul Bottein
7082646fe5 Only copy/cut/delete selected automation rows (#26966) 2025-09-12 10:46:23 +02:00
karwosts
96d364b3bd Full width ha-select dropdowns for z-wave (#27013) 2025-09-12 10:45:31 +02:00
Wendelin
e726eb7370 Fix automation sidebar overflow icon size (#27016) 2025-09-12 10:43:55 +02:00
renovate[bot]
e6f587da78 Update dependency typescript-eslint to v8.43.0 (#27010)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-11 19:43:02 +02:00
Petar Petrov
c595392abe Support opening a new config flow when the current one is finished (#26964) 2025-09-11 15:49:09 +02:00
Aidan Timson
5bcffd0dbe Fix hass-subpage toolbar position (#27003) 2025-09-11 15:26:14 +02:00
Aidan Timson
df801833fc Move close to the secondary action to allow enter key to submit (#27005) 2025-09-11 13:16:02 +00:00
Paul Bottein
5ba5c00c70 Include non-primary entities targeted directly by label (#26952) 2025-09-11 15:12:20 +02:00
Paul Bottein
dcea227f4a Add themes variables to tile card to change border radius (#26999) 2025-09-11 14:55:07 +02:00
Wendelin
1abedcd5f0 Migrate tab-group to webawesome (#26951) 2025-09-11 11:15:24 +02:00
Lukas Waslowski
9e29693293 nitpick: Rename HaFormExpendable to HaFormExpandable (#26994)
nitpick: Rename HaFormExpendable to HaFormExpandable
2025-09-10 21:38:07 +02:00
Lukas Waslowski
3bfafc794f fix: Import ha-expansion-panel in ha-form-expandable (#26996)
fix: Import ha-expansion-panel in ha-form-expandable

The current usages of ha-form-expandable only work correctly because
ha-expansion-panel is already imported somewhere else by coincidence.

This adds an explicit import to avoid breakages when using
ha-form-expandable in a standalone context (e.g. within ./hassio).
2025-09-10 21:37:37 +02:00
Simon Lamon
89c43b2b33 Don't show "condition did not pass" before testing (#26987)
Testing wrapper
2025-09-10 16:58:26 +03:00
Wendelin
466115d916 Prettier one line format in style .globals.ts files (#26991) 2025-09-10 14:54:34 +02:00
Wendelin
a34ca3c085 Fix disabled automation style (#26988)
* Update disabled state logic in action and condition editors to account for indent property

* Remove opacity
2025-09-10 14:01:05 +02:00
karwosts
9a8ca36047 Filter entities from energy sources table with no data (#26974)
Filtere entities from energy sources table with no data
2025-09-10 09:48:53 +03:00
dependabot[bot]
b454e89613 Bump vite from 7.1.2 to 7.1.5 (#26983)
* Bump vite from 7.1.2 to 7.1.5

Bumps [vite](https://github.com/vitejs/vite/tree/HEAD/packages/vite) from 7.1.2 to 7.1.5.
- [Release notes](https://github.com/vitejs/vite/releases)
- [Changelog](https://github.com/vitejs/vite/blob/main/packages/vite/CHANGELOG.md)
- [Commits](https://github.com/vitejs/vite/commits/v7.1.5/packages/vite)

---
updated-dependencies:
- dependency-name: vite
  dependency-version: 7.1.5
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>

* dedupe

---------

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-09-10 05:45:12 +00:00
Simon Lamon
0b76109272 Fix Webhook Trigger doesn't display correctly (#26982)
Webhook
2025-09-10 08:42:47 +03:00
Paulus Schoutsen
942d264693 Allow storing AI Task generate image preferred entity (#26959) 2025-09-10 08:41:22 +03:00
Petar Petrov
b10fdf8438 Fix for batteries with long names in energy dashboard (#26972) 2025-09-09 19:28:09 +02:00
Petar Petrov
bee8980192 Fix battery to grid connection in Sankey card (#26973) 2025-09-09 19:27:41 +02:00
Lukas Waslowski
61487565db nitpick: Rename _filteredShchema to _filteredSchema (#26979) 2025-09-09 19:26:52 +02:00
Aidan Timson
cc70eb46c9 Safe area: sidebar and notification drawer (#26853)
* sidebar: account for safe-area top inset in menu height/padding; adjust list height calc

* Defaults

* Defaults

* Restore

* Remove test

* Adjust

* Adjust

* Only apply on smaller layouts

* Fix

* Restore

* Restore

* No default in this case

* Restore

* Gain back some space

* Fix

* Adjust

* Tweak

* Calculate when mobile

* Use fallbacks for calculations and others anyway
2025-09-09 11:59:24 +02:00
Aidan Timson
dec9d304da Add analog card clock style options (#26711)
* Options

* Add default analog options (or delete) when changing style, hide when digital

* Fix rebase error

* Format

* Update description

Co-authored-by: Norbert Rittel <norbert@rittel.de>

* Flatten config options

* Flatten config options

* Add analog clock style options

Show lines

Adjust

Adjust

Replace 'ticks_style' with 'face_style' and use numbers over numeric

Use numbers over numeric

* Rebase fixes

* Missing translations mapping

* Remove rotated numbers and roman upright options

* Remove rotated numbers and roman upright options

* Edit description

* Update src/translations/en.json

Co-authored-by: Norbert Rittel <norbert@rittel.de>

* Update src/translations/en.json

Co-authored-by: Norbert Rittel <norbert@rittel.de>

---------

Co-authored-by: Norbert Rittel <norbert@rittel.de>
2025-09-09 11:30:19 +03:00
Paul Bottein
7f8e856102 Don't trigger automation shortcuts when a field is focused or text selected (#26965)
* Don't trigger automation shortcut when a field is focused

* Don't trigger automation shortcut when a text is selected
2025-09-09 10:53:06 +03:00
karwosts
4bd60a1366 Mark new automation as dirty if it has initData (#26953) 2025-09-09 10:26:18 +03:00
Wendelin
e9ca1758a0 Fix yaml editor save in config-flow (#26963) 2025-09-09 10:25:06 +03:00
Paulus Schoutsen
dff3b82f0d Show action being called in action dev tools (#26923) 2025-09-09 08:57:36 +02:00
J. Nick Koston
1b630e7b66 Hide useless configure bluetooth options button for remote scanners (#26960)
This avoids showing the button when all they get is
"Bluetooth configuration for remote adapters is not supported."
2025-09-09 09:46:22 +03:00
Aidan Timson
f4238bf291 Safe area: bars (#26816)
* app-bars: apply safe-area insets (top padding and fixed-adjust; add content padding in fixed)

* Set toolbar

* Set bars

* Add left and right insets to root ll

* Add to dev tools header

* Fix

* Apply to subpages (config pages mainly)

* Adjust

* Remove old comment
2025-09-09 08:13:03 +02:00
karwosts
ef8cb8b393 Add a bulk delete to devices table (#26914) 2025-09-08 20:33:53 +02:00
karwosts
bed161d485 Deduplicate table rendering code in energy sources table (#26918) 2025-09-08 20:14:15 +02:00
renovate[bot]
22e0ef4308 Update dependency eslint to v9.35.0 (#26955)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-08 19:34:36 +02:00
renovate[bot]
eb355d110d Update babel monorepo to v7.28.4 (#26954)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-08 19:34:07 +02:00
Wendelin
c041c295d5 Use @home-assistant/webawesome (#26942) 2025-09-08 14:25:47 +02:00
Wendelin
c582896574 Update missing border radius variables (#26944) 2025-09-08 14:01:24 +02:00
renovate[bot]
3e6b59fe1e Update dependency luxon to v3.7.2 (#26941)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-08 14:43:53 +03:00
Aidan Timson
62714b2b68 Safe area: dialogs (#26814)
* dialogs: apply safe-area insets (content padding, header mobile insets, more-info top margin)

* Set default (40px prio if not set)

* Set default (default padding prio if not set)

* Set default to avoid issues

* Set on container

* Sort

* No longer needed

* No longer needed

* No longer needed

* Remove

* Restore

* Restore

* Move to padding

* Switch to margins, set min and max height

* Set default

* Account for insets to remove extra scrollbars

* Fix content for filter dialog

* Move margins outside of media check

* Use padding instead

* use min-width instead

* Use padding for just top and bottom

* Calculate lit-virtualizer to include safe areas

* Calculate lit-virtualizer to include safe areas

* Fix double scrollbar from previous

* Remove calculation

* Default

* Remove double calculation

* Remove double calculation
2025-09-08 09:39:27 +02:00
renovate[bot]
07fdd5b7af Update vaadinWebComponents monorepo to v24.8.7 (#26936)
* Update vaadinWebComponents monorepo to v24.8.7

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-08 07:35:30 +00:00
Phil White
720f435987 Fix refresh button appending logs instead of clearing them (#26875) 2025-09-08 09:18:05 +02:00
Yosi Levy
52061d6c1a Variour RTL fixes for automation and others (#26891) 2025-09-08 09:13:10 +02:00
Paulus Schoutsen
ae35164a57 Update clipboard copy template message in actions dev tool (#26925) 2025-09-08 08:59:11 +02:00
karwosts
d1c814bd6b Fix condition action in config flow dialog (#26929) 2025-09-08 08:33:02 +02:00
dependabot[bot]
bb50512c89 Bump softprops/action-gh-release from 2.3.2 to 2.3.3 (#26935)
Bumps [softprops/action-gh-release](https://github.com/softprops/action-gh-release) from 2.3.2 to 2.3.3.
- [Release notes](https://github.com/softprops/action-gh-release/releases)
- [Changelog](https://github.com/softprops/action-gh-release/blob/master/CHANGELOG.md)
- [Commits](https://github.com/softprops/action-gh-release/compare/v2.3.2...v2.3.3)

---
updated-dependencies:
- dependency-name: softprops/action-gh-release
  dependency-version: 2.3.3
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-09-08 08:20:26 +02:00
dependabot[bot]
0fae45edc9 Bump actions/setup-node from 4.4.0 to 5.0.0 (#26934)
Bumps [actions/setup-node](https://github.com/actions/setup-node) from 4.4.0 to 5.0.0.
- [Release notes](https://github.com/actions/setup-node/releases)
- [Commits](https://github.com/actions/setup-node/compare/v4.4.0...v5.0.0)

---
updated-dependencies:
- dependency-name: actions/setup-node
  dependency-version: 5.0.0
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-09-08 08:20:00 +02:00
dependabot[bot]
0a8d3cc8fa Bump actions/setup-python from 5 to 6 (#26933)
Bumps [actions/setup-python](https://github.com/actions/setup-python) from 5 to 6.
- [Release notes](https://github.com/actions/setup-python/releases)
- [Commits](https://github.com/actions/setup-python/compare/v5...v6)

---
updated-dependencies:
- dependency-name: actions/setup-python
  dependency-version: '6'
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-09-08 08:19:11 +02:00
dependabot[bot]
db09947a67 Bump actions/labeler from 5.0.0 to 6.0.1 (#26932)
Bumps [actions/labeler](https://github.com/actions/labeler) from 5.0.0 to 6.0.1.
- [Release notes](https://github.com/actions/labeler/releases)
- [Commits](https://github.com/actions/labeler/compare/v5.0.0...v6.0.1)

---
updated-dependencies:
- dependency-name: actions/labeler
  dependency-version: 6.0.1
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-09-08 08:18:47 +02:00
dependabot[bot]
5eb600726f Bump actions/stale from 9.1.0 to 10.0.0 (#26931)
Bumps [actions/stale](https://github.com/actions/stale) from 9.1.0 to 10.0.0.
- [Release notes](https://github.com/actions/stale/releases)
- [Changelog](https://github.com/actions/stale/blob/main/CHANGELOG.md)
- [Commits](https://github.com/actions/stale/compare/v9.1.0...v10.0.0)

---
updated-dependencies:
- dependency-name: actions/stale
  dependency-version: 10.0.0
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-09-08 08:18:07 +02:00
dependabot[bot]
17a2e6e1f6 Bump actions/github-script from 7 to 8 (#26930)
Bumps [actions/github-script](https://github.com/actions/github-script) from 7 to 8.
- [Release notes](https://github.com/actions/github-script/releases)
- [Commits](https://github.com/actions/github-script/compare/v7...v8)

---
updated-dependencies:
- dependency-name: actions/github-script
  dependency-version: '8'
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-09-08 08:17:35 +02:00
renovate[bot]
53e7959d54 Update dependency serve to v14.2.5 (#26922)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-07 20:21:02 +02:00
Aidan Timson
5f140c5fc4 Safe area: main content and onboarding (#26813)
* foundation: define --safe-area-content-inset-*; adjust drawer width; apply top inset to pre-login templates

* Set default for var

* Update demo template

* Set default to avoid issues

* Allow for left and right insets or 560px

* Remove
2025-09-07 13:25:29 +03:00
renovate[bot]
688b8e5229 Update dependency @types/leaflet.markercluster to v1.5.6 (#26911)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-06 14:59:59 +00:00
renovate[bot]
34b50b45a3 Update dependency @types/leaflet-draw to v1.0.13 (#26910)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-06 16:49:58 +02:00
karwosts
c17c9c6cc9 Remove an unused translation (#26908) 2025-09-05 22:39:01 -04:00
renovate[bot]
c9d72b5253 Update dependency @types/culori to v4.0.1 (#26899)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-05 23:22:30 +02:00
renovate[bot]
f5dbb28fb2 Update dependency typescript-eslint to v8.42.0 (#26897)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-05 23:22:22 +02:00
renovate[bot]
9acfe5c1cc Update dependency @codemirror/autocomplete to v6.18.7 (#26896)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-05 23:22:15 +02:00
Jan-Philipp Benecke
701cbcfbad Do not show state-card-content in new more-info dialog in gallery (#26889)
* Do not show `state-card-content` in new more-info dialog in gallery

* Use `computeShowNewMoreInfo`
2025-09-05 14:13:28 -04:00
renovate[bot]
38685127d2 Update dependency @codemirror/view to v6.38.2 (#26890)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-05 08:59:04 +03:00
renovate[bot]
4275f6c6b6 Update dependency lint-staged to v16.1.6 (#26885)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-04 19:33:55 +02:00
renovate[bot]
bfc186b612 Update dependency @rspack/core to v1.5.2 (#26880)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-09-04 16:41:29 +02:00
Paul Bottein
cb4d92ccf4 Add UI editor for trend graph feature (#26872) 2025-09-04 16:28:02 +02:00
Wendelin
1dc7256fb5 Translate del in shortcut dialog (#26865) 2025-09-04 16:11:38 +02:00
Wendelin
012e710e45 Test-device-tracker-entity-filter (#26881) 2025-09-04 16:08:38 +02:00
Paul Bottein
5abb7d0286 Fix testing condition in iOS (#26879) 2025-09-04 15:50:39 +02:00
Petar Petrov
ce74946706 Fix highlighting issue in Energy Sankey card (#26878) 2025-09-04 15:42:39 +02:00
Bram Kragten
bf351d67e9 Revert "Rename "Logbook" to "Activity" in user-facing strings" (#26867)
Revert "Rename "Logbook" to "Activity" in user-facing strings (#26619)"

This reverts commit 057fad55e8.
2025-09-04 11:14:16 +02:00
Wendelin
b75fa013d2 Fix script with fields fields in tile card button feature (#26866)
Check script fields in tile card button feature
2025-09-04 11:42:41 +03:00
Paul Bottein
2601b0d89c Display area with only sensors in climate view in home dashboard (#26863)
* Display area with only sensors in climate view in home dashboard

* Update home-climate-view-strategy.ts

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2025-09-04 10:11:35 +02:00
Mike Kelly
ef8410e121 Add MCF as another volume unit (#26400) 2025-09-04 09:30:13 +03:00
karwosts
37610703c8 Pass first weekday to recorder/statistic_during_period (#26229)
* Pass first weekday to recorder/statistic_during_period

* switch order
2025-09-04 09:27:40 +03:00
Aidan Timson
4efd9bba8a Fix weather more info forecast layout jump when loading data (#26764)
* Fix weather more info forecast layout jump when loading data

* Tabs arent always populated

* Apply suggestions from code review

Co-authored-by: Copilot <175728472+Copilot@users.noreply.github.com>

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
Co-authored-by: Copilot <175728472+Copilot@users.noreply.github.com>
2025-09-04 06:04:56 +00:00
Paulus Schoutsen
e1fe7976d8 Do not allow filtering by automation labels on mobile (#26861) 2025-09-04 08:47:52 +03:00
Simon Lamon
53b96107d9 Home dashboard: Climate fix (#26856)
* Climate dashboard fix

* Update home-climate-view-strategy.ts
2025-09-03 18:55:33 +02:00
Bram Kragten
dcbad9e798 Dont align with clipboard on copy/cut automation item (#26855) 2025-09-03 14:19:02 +00:00
karwosts
26b3212c7e Enable sorting step flow menu options in user language (#26845)
* Enable sorting step flow menu options in user language

* Remove menu_sort_values

* Update src/dialogs/config-flow/step-flow-menu.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* prettier

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-09-03 17:03:09 +03:00
Paul Bottein
f3f4bcfe45 Rename history chart to trend graph (#26854)
* Rename history chart to trend graph

* rename element and prettier

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-09-03 10:56:05 +00:00
Bram Kragten
7cfa9de75f Bumped version to 20250903.0 2025-09-03 12:05:19 +02:00
Paul Bottein
b66dc8894d Improve responsive support for history graph feature (#26851) 2025-09-03 12:00:49 +02:00
Wendelin
14a7813ab0 Fix automation narrow bottom sheet close animation (#26850) 2025-09-03 09:45:13 +00:00
Bram Kragten
70a2ca281f Update shortcuts dialog (#26849) 2025-09-03 10:01:10 +02:00
Wendelin
d982f042fc Update device action button variant based on warning class (#26848) 2025-09-03 07:06:18 +00:00
J. Nick Koston
e60f9e326b Show scanner-type-specific power cycle instructions in Bluetooth UI (#26847)
* Show scanner-type-specific power cycle instructions in Bluetooth UI

* preen
2025-09-03 10:03:03 +03:00
J. Nick Koston
ba39d189e7 Show scanner current state in the Bluetooth UI (#26792)
* Show scanner current state in the Bluetooth UI

The state updates live as the scanner changes mode, and provides
a warning on what to do if the scanner gets in a bad state

* Show scanner current state in the Bluetooth UI

The state updates live as the scanner changes mode, and provides
a warning on what to do if the scanner gets in a bad state

* cleanup

* switch
2025-09-02 15:20:06 -03:00
Paul Bottein
78867b2cd9 Remove non numerical sensor and binary-sensor for history chart feature (#26838)
* Use hui-graph-base for chart history feature and remove non numerical sensor support

* Fix chart opacity
2025-09-02 14:38:06 -03:00
Paul Bottein
1dff42dc00 Change home summaries color (#26839) 2025-09-02 18:14:46 +02:00
Bram Kragten
0c9b3a0765 Remove expand all/collapse all options from overflow (#26837)
* remove expand all/collapse all options from overflow

* ignore
2025-09-02 16:26:44 +02:00
Bram Kragten
5a109c0ba8 Align box shadows (#26835)
* Align box shadows

* update colors
2025-09-02 14:15:48 +00:00
Bram Kragten
f3b214c30a Add new shortcuts to shortcuts dialog (#26836) 2025-09-02 17:08:32 +03:00
Petar Petrov
c49d2a0be6 Add support for option descriptions in config flows (#26825)
* Add support for option descriptions in config flows

* use `twoline`

* remove unused classes
2025-09-02 14:03:35 +00:00
Bram Kragten
c6c3170c1b Tweak automation row (#26834)
tweak automation row
2025-09-02 13:50:05 +00:00
Paul Bottein
0abb958aea Clean graph in security and climate view in home dashboard (#26833) 2025-09-02 14:58:56 +02:00
Bram Kragten
9d55843629 Fix scrolling items in the bottom into view (#26830) 2025-09-02 14:57:11 +02:00
Bram Kragten
b70d309297 add shadow when scrollable in automation bottom sheet, min height 50vh (#26828) 2025-09-02 14:12:48 +02:00
Simon Lamon
5961b71562 Home dashboard: Ensure temperature sensor entity exists (#26831) 2025-09-02 13:03:18 +02:00
karwosts
6942626f60 Differentate service vs device in more-info link (#26823) 2025-09-02 12:44:16 +02:00
Aidan Timson
069c0acdff Fix capitalization on data table filter button (#26829) 2025-09-02 10:44:01 +00:00
Bram Kragten
1f0d83190d prevent keyboard shortcuts with more modifier keys (#26826) 2025-09-02 09:39:54 +02:00
Wendelin
7c6c92c856 Automation-keybindings (#26762)
Co-authored-by: Norbert Rittel <norbert@rittel.de>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-09-01 21:41:50 +02:00
Robert Resch
eff352cde1 Warn about system performance when setting camera stream orientation (#26616) 2025-09-01 20:54:48 +02:00
Bram Kragten
62a75c188c Change drag selected styling (#26822) 2025-09-01 20:26:25 +02:00
Paul Bottein
4ffa6b6186 Force energy distribution to display the data of today (#26811) 2025-09-01 18:12:34 +02:00
Paul Bottein
25173cf605 Don't use ha-automation-row-selected to know if the item was selected (#26812) 2025-09-01 18:12:08 +02:00
Paul Bottein
3277d8e80b Add automation testing logic to sidebar (#26815) 2025-09-01 18:08:59 +02:00
Bram Kragten
55864fdc82 Update hover and hightlight states for automation rows (#26820) 2025-09-01 17:40:03 +02:00
Paul Bottein
d4d662ba46 Fix automation sidebar z index (#26810) 2025-09-01 17:21:36 +02:00
Paul Bottein
3ea5f508bb Remove box shadow for ha card in automation bottom sheet on mobile (#26817) 2025-09-01 17:19:09 +02:00
Paul Bottein
902a5dd678 Fix tag trigger when using it inside sidebar (#26819) 2025-09-01 17:18:18 +02:00
renovate[bot]
4a3ed62583 Update dependency @types/chromecast-caf-receiver to v6.0.24 (#26500)
* Update dependency @types/chromecast-caf-receiver to v6.0.24

* Use enum strings directly to make TS happy

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-09-01 14:53:10 +00:00
Paul Bottein
b4223e9e92 Use summary card in home dashboard (#26775) 2025-09-01 15:13:53 +02:00
Paul Bottein
99955d7818 Fix add dialog on dashboards on mobile (#26807) 2025-09-01 15:39:52 +03:00
Paul Bottein
f66768726c Update heading subtitle height to better fix grid (#26808) 2025-09-01 15:39:03 +03:00
Michel van de Wetering
0e4be02b2c Remove Hue bridge v1 image (#26674) 2025-09-01 15:27:50 +03:00
Bram Kragten
6daea23b3c Enable drag and drop on mobile for automations (#26805) 2025-09-01 14:09:13 +02:00
Petar Petrov
e21ddcb1e5 Handle negative values in History chart card feature (#26806) 2025-09-01 11:45:52 +00:00
Wendelin
ded85d9f27 Automation editor: fix yaml editor and editor switch (#26772) 2025-09-01 13:26:17 +02:00
Petar Petrov
eea43494da Use feature-color in History chart feature (#26802) 2025-09-01 11:34:44 +02:00
Norbert Rittel
9cf9ef927d Expand description for disabled services (#26782)
* Expand description for disabled services

* Drop "not added to Home Assistant"
2025-09-01 09:51:22 +03:00
Paulus Schoutsen
779ec4f583 Do not add graphs to every sensor tile card (#26793) 2025-08-31 15:11:41 +00:00
renovate[bot]
c541831cd2 Update dependency marked to v16.2.1 (#26785)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-31 17:07:02 +02:00
renovate[bot]
fd20c2a554 Update dependency @rspack/core to v1.5.1 (#26790)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-31 17:06:55 +02:00
uptimeZERO_
14fd29808c Bugfix: Fixed column widths in the dashboard config page (#26777)
Fixed column widths in dashboard config
2025-08-30 11:54:37 +00:00
Aidan Timson
7132ee157f Adjust states set state layout (#26765) 2025-08-30 13:11:41 +02:00
J. Nick Koston
1596b313d5 Add RSSI color gradient to Bluetooth visualization to identify connection problems (#26778) 2025-08-29 14:15:00 -05:00
karwosts
70cd68ded7 Don't use context for media selector with 'accept' (#26773) 2025-08-29 14:08:11 +00:00
renovate[bot]
cc91a6185e Update dependency @rspack/core to v1.5.0 (#26768)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-29 17:05:14 +03:00
Paul Bottein
1fd7c84583 Use fixed layout for automation sidebar to have scrollbar on the side (#26751)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-08-29 14:19:13 +02:00
Paul Bottein
0269540ee9 Add translations for home dashboard (#26763) 2025-08-29 14:17:55 +02:00
renovate[bot]
98390b3843 Update Yarn to v4.9.4 (#26760)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-29 08:12:28 +00:00
Paul Bottein
269628929c Fix alert z-index for automation and script (#26759) 2025-08-29 08:05:05 +00:00
Norbert Rittel
21fcc84afd Improve OAuth setup explanation (#26758)
* Improve OAuth setup explanation

* Add "your"

* Include "application" in headline
2025-08-29 09:59:31 +02:00
Wendelin
b86c1db83d Automation editor: fix focus handling (#26755) 2025-08-29 08:39:06 +02:00
renovate[bot]
a376670478 Update dependency typescript-eslint to v8.41.0 (#26757)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-29 08:21:34 +02:00
renovate[bot]
72c62079aa Update dependency hls.js to v1.6.11 (#26756)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-29 08:21:28 +02:00
Surya Prakash
9baf875585 Fix: Keep buttons active in picture-glance-card regardless of state (#26718)
* Fix: Keep buttons active in picture-glance-card regardless of state


Fixes #26683

**Problem:**
Buttons in the picture-glance-card were incorrectly disabled when their state was 'unknown', making them unclickable.

**Root Cause:**
The `disabled` property was being set based on the state value, but buttons should remain clickable regardless of their state since their state only reflects the last time they were pressed.

**Solution:**
Set `disabled=${false}` to ensure buttons are always active and clickable.

**Testing:**
Verified that buttons remain active and functional even when state is 'unknown'.

* Fix: Ensure buttons get state-on class when state is unknown

Fixes #26683

The "state-on" class was not being applied when button state was
"unknown" because "unknown" was included in the STATES_OFF set.
This ensures buttons appear active regardless of their state.

* Update hui-picture-glance-card.ts

* Update hui-picture-glance-card.ts

* Update hui-picture-glance-card.ts

* Update hui-picture-glance-card.ts

* Update hui-picture-glance-card.ts

* Update hui-picture-glance-card.ts

* Update hui-picture-glance-card.ts
2025-08-29 08:20:39 +02:00
Jonathan Keslin
175915218f Hide leading zero in clock card hour when using 12-hour time format (#26669)
Remove leading zero on hour on Clock card when displayed with 12-hour time format
2025-08-29 08:42:07 +03:00
Wendelin
25f25243bd Automation editor: overflow changes and style fixes (#26744)
* Fix for width also for blueprint editor

* Fix overflow menus

* Fix option icons

* Fix iOS bottom sheet flickering and drag handle

* Fix mobile padding

* Fix padding in sidebar

* Fix overflow placement

* Add new a11y sort

* Remove overflow in rows

* Fix a11y select row

* Revert "Fix a11y select row"

This reverts commit 54260c4a37.

* Fix option padding on blueprint

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2025-08-28 16:42:45 +00:00
karwosts
cf8d36b1f3 Hide 'options' from enum more info (#26736)
* Hide 'options' from enum more info

* restrict to specific domain and class
2025-08-28 18:08:33 +02:00
Aidan Timson
e3a9d754df Change loading detailed storage to use ha-alert with spinner (#26749)
* Change spinner overlay to use `ha-alert` with messaging

* Use spinner for icon slot
2025-08-28 18:05:53 +02:00
Petar Petrov
7b303a699b Increase disk usage request timeout (#26748) 2025-08-28 16:32:52 +03:00
renovate[bot]
ee45eb00f7 Update vaadinWebComponents monorepo to v24.8.6 (#26746)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-28 15:38:03 +03:00
Norbert Rittel
24a6aa2669 Different spelling fixes of user-facing strings (#26745)
* Different spelling fixes of user-facing strings

* Fix menu "Application credentials" menu item name
2025-08-28 15:37:06 +03:00
Aidan Timson
66d011cfb9 Move automation and script ha-alerts to main flow (#26735)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-08-28 13:53:15 +02:00
Wendelin
35895735cc Fix automation editor drag selected row in/out nested (#26740)
Fix nested sort
2025-08-28 13:30:14 +02:00
Norbert Rittel
e71df0b71a Improve section descriptions in Automation editor (#26741)
Replace "listed here" or "list of" with "added here"
2025-08-28 11:05:31 +02:00
Paulus Schoutsen
2a9846c598 Show configured area sensors on climate domain dashboard (#26737) 2025-08-28 08:34:45 +03:00
Paulus Schoutsen
b243d56bee Show binary sensors with graphs on the security dashboard (#26738) 2025-08-28 08:26:44 +03:00
J. Nick Koston
6a372a165e Improve network adapter configuration discoverability (#26734) 2025-08-27 09:59:23 -05:00
Paul Bottein
a5dad9bc22 Use entity picture for home favorite and update home dashboard icon (#26732)
* Add strategy icon

* Use entity picture for favorite
2025-08-27 16:33:48 +02:00
Bram Kragten
954e0a5f63 Merge branch 'rc' into dev 2025-08-27 15:09:31 +02:00
Bram Kragten
4dbd4eebaa Bumped version to 20250827.0 2025-08-27 15:08:57 +02:00
Aidan Timson
09b01df366 Translate integration filters (#26728)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-08-27 13:02:38 +00:00
Paul Bottein
a76539c732 Revert background section (#26730) 2025-08-27 12:55:15 +00:00
Aidan Timson
c7babe884c Add variables for analog clock background (#26726) 2025-08-27 12:36:33 +00:00
Paul Bottein
ce83feec93 Use large section for summay view (#26729) 2025-08-27 12:35:45 +00:00
karwosts
150ee3fb12 Display sum/median labels in area card editor (#26721) 2025-08-27 14:35:10 +02:00
Wendelin
8fd3fcd323 Focus automation sidebar when open via keyboard (#26606)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-08-27 11:28:52 +00:00
Wendelin
6e3b3a53e4 Fix close automation bottom sheet on add (#26727) 2025-08-27 13:25:19 +02:00
Wendelin
22966485c7 Automation editor: New choose default styles and style fixes (#26708)
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2025-08-27 13:20:25 +02:00
karwosts
673ca8ba4b Use media selector for media_player.play_media (#26559) 2025-08-27 12:39:40 +02:00
Paul Bottein
c8be25dfc2 Rename overview to home and add widget section (#26715) 2025-08-27 12:35:43 +02:00
Aidan Timson
edaaa00038 Analog style for clock card (#26557)
Co-authored-by: Norbert Rittel <norbert@rittel.de>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-08-27 10:15:06 +01:00
Wendelin
2de605d97a Automation editor: expand only root rows per default (#26712)
* Add default expand/collapse

* Readd expanded search param functionality
2025-08-27 12:10:53 +03:00
Paul Bottein
0b11302b1d Align storage life time design with used storage (#26724) 2025-08-27 09:52:56 +02:00
Norbert Rittel
ddb224e145 Capitalize "Assist" as feature name in "Assist pipeline" (#26719)
Makes it consistent with all other occurrences of Assist in Frontend.
2025-08-27 08:47:15 +02:00
Paul Bottein
317149e51e Always show compact header for dashboards (#26706) 2025-08-26 20:09:57 +02:00
Norbert Rittel
51840b88b3 Add missing hyphens to compound adjectives with "specific" (#26717) 2025-08-26 18:56:48 +02:00
Norbert Rittel
319a1ad8c6 Fix description of battery energy sensors (#26714) 2025-08-26 16:13:38 +00:00
Wendelin
d75c84750d Add indent style to automation action, condition, and option editors (#26709) 2025-08-26 18:10:17 +02:00
renovate[bot]
492a73e345 Update dependency @bundle-stats/plugin-webpack-filter to v4.21.3 (#26713)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-26 18:01:25 +02:00
Wendelin
64bf101c95 Automation Editor: Move overflow actions to sidebar only (#26707)
Move all overflow actions to sidebar
2025-08-26 18:00:54 +02:00
hanwg
876ced25f1 Rename subentry (#26574)
* rename subentry

* rename subentry

* update subentry

* remove title from update subentry

* format

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-08-26 15:49:51 +00:00
Wendelin
72e3b72854 Fix automation action condition row left-chevron (#26705)
Enhance collapse logic to include condition block types in automation action row
2025-08-26 15:46:36 +00:00
Paulus Schoutsen
6ccd3d3b95 Tweak choose spacing (#26702) 2025-08-26 14:18:17 +00:00
Wendelin
5709cb6aa4 Add collapse/expand all for automations (#26695) 2025-08-26 15:21:03 +02:00
Wendelin
1fe7282b0e Fix action condition (#26703) 2025-08-26 13:56:49 +02:00
Paulus Schoutsen
6d29063b35 Adjust top-level spacing to move description a bit closer (#26698) 2025-08-26 13:16:53 +02:00
Paulus Schoutsen
d3e0b94d27 Show tag name in tag trigger (#26697) 2025-08-26 13:16:26 +02:00
Wendelin
f4f1f98433 Fix tablet sidebar RTL (#26700) 2025-08-26 13:14:42 +02:00
renovate[bot]
69e3d8e13d Update dependency eslint to v9.34.0 (#26694)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-26 08:12:36 +03:00
Paul Bottein
3ab6e389d3 Fixes dahsboard tab bar on mobile (#26690)
* Don't show toolbar in desktop

* Fix tab bar height

* Fix tab bar height

* rename to Add person

* Fix title

* Fix key
2025-08-25 15:41:49 +00:00
Paul Bottein
9cc85bc928 Fix hold action for picture element card in Android app (#26647)
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-08-25 14:36:20 +00:00
Wendelin
4f4343d6c8 Automation editor mobile bottom sheet (#26680) 2025-08-25 16:27:57 +02:00
Petar Petrov
7ab27d620a Sum & Median Area card sensors (#26681)
Co-authored-by: Copilot <175728472+Copilot@users.noreply.github.com>
2025-08-25 16:02:16 +02:00
Petar Petrov
fa4ee71803 Fix rounding in energy dashboard (#26689) 2025-08-25 14:00:44 +00:00
renovate[bot]
82026250c5 Update dependency @material/web to v2.4.0 (#26678)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-25 15:28:19 +02:00
Douwe
bc7533bb42 Add scene to button tile feature (#26520)
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-08-25 13:16:31 +00:00
Petar Petrov
7110c0381f Show detailed storage space info (#26686)
* Storage space breakdown

* update mock data

* update format

* new format

* clean up

* fix

* remove useless if

* use ha-tooltip and styleMap

* fix hover
2025-08-25 13:03:58 +00:00
Surya Prakash
87fa05accc Fix: Volume bar cut off at 100% in media player entity row (#26675) 2025-08-25 12:47:17 +00:00
dcapslock
56ee3f82fb Improve states tool performance (#26236)
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2025-08-25 14:15:56 +02:00
victorigualada
11872b076b Fix ha-alert icon z-index overlapping over other elements (#26685)
* Fix ha-alert icon z-index overlapping over other elements

* directly remove ha-alert's icon z-index property to fix overlapping
2025-08-25 14:14:37 +03:00
Kendell R
620db4238d Indirect -> direct use of @rspack/dev-server (#26665)
* Indirect -> direct use of @rspack/dev-server

* move to devdependencies
2025-08-25 08:26:38 +03:00
Surya Prakash
ef78bec48d Fix: Enable tile button feature for entities with 'unknown' state (#26673)
## What this fixes
Fixes #26670

The button tile feature was incorrectly disabled for entities in the 'unknown' state. It should only be disabled for 'unavailable' entities, as a button is always pressable.

## Changes made
Removed `"unknown"` from the disabled states check in `hui-button-card-feature.ts`.

**Before:** Button was disabled if state was `"unavailable"` OR `"unknown"`
**After:** Button is disabled **only** if state is `"unavailable"`
2025-08-25 08:06:06 +03:00
Kendell R
4dcf2287ce Fix invalid CSS (#26677) 2025-08-24 21:26:07 +02:00
renovate[bot]
a9766ed66b Update dependency core-js to v3.45.1 (#26667)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-23 22:03:05 +02:00
renovate[bot]
26a83feeb0 Update Yarn to v4.9.3 (#26662)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-23 22:02:49 +02:00
karwosts
8c5dd7cdba Fix shortcuts quickbar translation (#26666) 2025-08-23 22:02:35 +02:00
renovate[bot]
0d025a2355 Update dependency @rsdoctor/rspack-plugin to v1.2.3 (#26659)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-23 10:33:08 +02:00
karwosts
8216778d0c Fix last backup status counter on system page (#26655) 2025-08-23 09:46:43 +02:00
Paul Bottein
fe16b689a8 Remove floors from the area overview dashboard (#26622)
* Remove floors from the area overview dashboard

* Refactor summaries view code

* Update src/panels/lovelace/strategies/overview/overview-home-view-strategy.ts

---------

Co-authored-by: Paulus Schoutsen <balloob@gmail.com>
2025-08-23 07:44:47 +00:00
Aidan Timson
2653f6c874 Move section to other views/dashboards from edit dialog menu (#26621)
* Init

* Pass in lovelace

* Working move

* Finalise
2025-08-23 09:22:34 +02:00
Jan-Philipp Benecke
8093f7f4cb Add background opacity option to section styling (#26651)
* Add background opacity option to section styling

* Run updated prettier
2025-08-22 18:58:47 +02:00
Jan-Philipp Benecke
b26c914ff9 Use dedicated translation key for none option in section background type (#26652) 2025-08-22 18:13:04 +02:00
Jan-Philipp Benecke
b2fa97b6dc Add background styling options to section settings (#26369)
* Add background styling options to section settings

* Improve

* Fix linter

* Move to subkey

* Use hex instead of rgb to save in yaml

* Remove or
2025-08-22 12:51:07 +02:00
renovate[bot]
8a8bba422a Update dependency typescript-eslint to v8.40.0 (#26648)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-22 08:34:15 +03:00
Aidan Timson
76ca66b1b5 Change home and other zones edit dialog title to location name (#26637)
* Change home and other zone edit dialog title to location name

* Remove no longer used translations

* Use name as context

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Use name as context

* Add translation

* Use name as context

* Actually use the right key

* Use name as context

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-08-22 08:13:10 +03:00
Paul Bottein
280dbfc958 Add "add" button to lovelace dashboard toolbar (#26644)
* Add add button to lovelace dashboard toolbar

* Add person and area

* Fix typing
2025-08-21 20:45:57 +02:00
karwosts
0b10ad3e78 No multiline strings in state-history-chart-timeline (#26646) 2025-08-21 17:39:54 +02:00
Bram Kragten
c172f0c486 Bumped version to 20250811.1 2025-08-21 16:30:40 +02:00
Dav15Jr
1244ed73a2 Fix Inconsistent naming of "Input button" in Quickbar navigation (#26541)
* Fix Inconsistent naming of "Input button" in Quickbar navigation

* Fix Media Manage button default visibilty.

* undo wrong change
2025-08-21 16:29:44 +02:00
Petar Petrov
e2aef205cc Filter hidden entities from group more-info (#26527) 2025-08-21 16:29:43 +02:00
Paul Bottein
7434c9345a Fix related entities click behavior in the more info dialog (#26525) 2025-08-21 16:29:43 +02:00
Bram Kragten
287ff17107 Update tabs when user data changes (#26524) 2025-08-21 16:29:42 +02:00
Wendelin
21309944e5 Fix ha-button icon padding (#26517) 2025-08-21 16:29:41 +02:00
Wendelin
c0e39ffd67 Fix handling empty release notes in more-info-update (#26515)
Fix handling empty release nots in more-info-update
2025-08-21 16:29:40 +02:00
Bram Kragten
3da2cb3123 Fix style variable in base chart (#26509) 2025-08-21 16:29:37 +02:00
karwosts
7957bd1f25 Fix search in raw configuration editor (#26496) 2025-08-21 16:29:36 +02:00
Aidan Timson
04d0aa2f22 Remove "hassio" option from commands in quick bar (#26640) 2025-08-21 16:42:40 +03:00
Aidan Timson
4b901101da Fix voice assist setup success step translations (#26638) 2025-08-21 16:41:16 +03:00
Aidan Timson
4960284e2d Media player playback controls card feature (#26608)
* Setup

* Add buttons

* Fix

* Move to function

* Clean

* Cleanup

* Check client size

* Get width from host component

* Fix

* Spacing

* use current target

* Ensure state updates update render

* Apply suggestions from code review

Co-authored-by: Copilot <175728472+Copilot@users.noreply.github.com>

* Update src/panels/lovelace/card-features/hui-media-player-playback-card-feature.ts

* Resolve code suggestion type errors

* Resize observer not needed

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
Co-authored-by: Copilot <175728472+Copilot@users.noreply.github.com>
2025-08-21 10:28:43 +00:00
renovate[bot]
11d32300e9 Update dependency eslint-plugin-unused-imports to v4.2.0 (#26641)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-21 13:26:40 +03:00
Philipp Waller
f131e93e63 Refactor automation editor event naming for consistency (#26634) 2025-08-21 13:23:59 +03:00
Wendelin
5a540dd889 Use automation sidebar in scripts (#26602) 2025-08-21 12:21:00 +02:00
Drinor Dalipi
3a70310f78 Follow-up: revert ultimate fallback to undefined in computeEntityEntryName (#26629) 2025-08-21 09:50:48 +02:00
Philipp Waller
feed58c33e Add show-automation-editor event for custom cards & panels (#26613)
* expose showAutomationEditor functionality in ha-panel-custom

* drop connectedCallback change (leftover from earlier test)

* enhance documentation for showAutomationEditor method

* Add automation editor mixin and event declaration for show-automation-editor
2025-08-21 08:22:05 +03:00
Philipp Waller
e5585e13fe Replace deprecated ESLint flag to remove warning (#26630)
replace deprecated ESLint flag
2025-08-21 04:43:17 +00:00
renovate[bot]
edd49e1511 Update dependency marked to v16.2.0 (#26632)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-21 06:35:54 +02:00
Copilot
057fad55e8 Rename "Logbook" to "Activity" in user-facing strings (#26619)
* Initial plan

* Update user-facing strings from "Logbook" to "Activity"

Co-authored-by: balloob <1444314+balloob@users.noreply.github.com>

* Apply suggestions from code review

---------

Co-authored-by: copilot-swe-agent[bot] <198982749+Copilot@users.noreply.github.com>
Co-authored-by: balloob <1444314+balloob@users.noreply.github.com>
Co-authored-by: Paulus Schoutsen <balloob@gmail.com>
2025-08-20 17:36:32 +03:00
Aidan Timson
d1a8165de2 Allow clock to show without background (#26554) 2025-08-20 17:31:25 +03:00
Petar Petrov
31c555445d Bar gauge card feature for sensors (#26585)
* Bar graph card feature for sensors

* use state color

* tweak name

* rename and improve colors

* Update src/panels/lovelace/card-features/hui-progress-bar-card-feature.ts

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* rename to Bar gauge

* name fix

* Force dark-only themes to be in dark mode (#26583)

* Fetch translations for switch-as-x domains (#26566)

* Fetch translations for switch-as-x domains

* no cache

* Migrate ha-progress-ring to webawesome (#26542)

* Migrate all sl-animation usages to wa-animation (#26544)

* Remove unused shoelace animation import (#26584)

* Bump actions/checkout from 4.2.2 to 5.0.0 (#26586)

Bumps [actions/checkout](https://github.com/actions/checkout) from 4.2.2 to 5.0.0.
- [Release notes](https://github.com/actions/checkout/releases)
- [Changelog](https://github.com/actions/checkout/blob/main/CHANGELOG.md)
- [Commits](https://github.com/actions/checkout/compare/v4.2.2...v5.0.0)

---
updated-dependencies:
- dependency-name: actions/checkout
  dependency-version: 5.0.0
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>

* Add date card feature (#26531)

* Add date card feature

* Rename from "date" to "date-set"

* Better label

* Fix

* Parse date for datetime

* Show accurate state of show_header_toggle in entities card editor (#26564)

* Add clipboard support to condition card conditions (#26535)

* Add copy paste support to condition card conditions

* Don't clear the clipboard

* Fix selection

* Add cut and duplicate

* Remove

* Fix event

* Fix picture glance mouse pointer (#26391)

* Fix picture glance mouse pointer

* More action updates

* Capitalize "Samba" as the name of the Open Source project (#26590)

Capitalize "Samba" as name for the Open Source project

* Update dependency @codemirror/language to v6.11.3 (#26589)

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>

* Set default forecast option in weather forecast card editor (#26592)

* Add fan oscillate feature (#26519)

* First working fan-oscillate feature

This a first working impl, need at least to do:
- Tooltip not yet "Yes/No"
- Need implementation verification

* Use same strings as more info label for control tooltip

* Add missing label for editor

* Rename some variables

* Add fan features in gallery

* Fix lint:types by applying suggestions from code review

Co-authored-by: Aidan Timson <aidan@timmo.dev>

* fix lint new line after import

* fix typo

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* fix event value type treating

* remove type magic as suggested

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Update localize.ts

Complete suggestion change to have tooltip

* fix lint by removing unused import

---------

Co-authored-by: Aidan Timson <aidan@timmo.dev>
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Lock file maintenance (#26598)

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>

* Fix legend in devices-detail-graph (#26596)

* Change Suggest with AI label to Suggest (#26603)

* Automation row remember collapsed status (#26604)

* Summaries overview dashboard (#26594)

* Change categories to lights, climate and security

* Add entities grouped by devices

* Fix garage cover device class

* Rename category to summary

* Add media players categories

* Reduce spacing

* Remove person

* Remove translations

* Use media player cards

* Display entities without device

* Add missing entity category

* Update src/panels/lovelace/strategies/overview/helpers/overview-summaries.ts

Co-authored-by: Paulus Schoutsen <balloob@gmail.com>

* Add white space

---------

Co-authored-by: Paulus Schoutsen <balloob@gmail.com>

* Fix entities not showing due to JavaScript crash (fixes #25363) (#26599)

* Fix entity UI crash from undefined entity names (fixes #25363)

* Fix mock function type compatibility in test

- Update mock to handle string | undefined parameter
- Maintain test functionality while satisfying type checker

* Simplify approach based on reviewer feedback

- Use String() coercion to preserve numeric entity names (e.g., power strip outlets)
- Single line change instead of complex type validation across multiple files
- Revert stripPrefixFromEntityName to original (no longer needs null handling)
- Remove separate test file, update existing test to expect stringified numbers
- More conservative approach that preserves data rather than replacing with fallbacks

* History chart card feature (#26555)

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Fix space in overview welcome caption (#26618)

* Fix space in overview welcome caption

* Update src/panels/lovelace/strategies/overview/overview-home-view-strategy.ts

---------

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
Co-authored-by: karwosts <32912880+karwosts@users.noreply.github.com>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Co-authored-by: Aidan Timson <aidan@timmo.dev>
Co-authored-by: Norbert Rittel <norbert@rittel.de>
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: pcan08 <155250376+pcan08@users.noreply.github.com>
Co-authored-by: Paulus Schoutsen <balloob@gmail.com>
Co-authored-by: Drinor Dalipi <45405217+Drinory@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-08-20 17:27:05 +03:00
Paul Bottein
61bb5d33e5 Add home structure helper to overview dashboard (#26620)
* Use home structure in overview home

* Use home structure in summary views
2025-08-20 14:53:05 +02:00
Paulus Schoutsen
20a3bab5bc Fix space in overview welcome caption (#26618)
* Fix space in overview welcome caption

* Update src/panels/lovelace/strategies/overview/overview-home-view-strategy.ts
2025-08-20 09:48:59 +00:00
Petar Petrov
e8d916acd7 History chart card feature (#26555)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-08-20 11:30:42 +02:00
Drinor Dalipi
8b73d664b4 Fix entities not showing due to JavaScript crash (fixes #25363) (#26599)
* Fix entity UI crash from undefined entity names (fixes #25363)

* Fix mock function type compatibility in test

- Update mock to handle string | undefined parameter
- Maintain test functionality while satisfying type checker

* Simplify approach based on reviewer feedback

- Use String() coercion to preserve numeric entity names (e.g., power strip outlets)
- Single line change instead of complex type validation across multiple files
- Revert stripPrefixFromEntityName to original (no longer needs null handling)
- Remove separate test file, update existing test to expect stringified numbers
- More conservative approach that preserves data rather than replacing with fallbacks
2025-08-20 06:10:13 +00:00
Paul Bottein
10dcc08068 Summaries overview dashboard (#26594)
* Change categories to lights, climate and security

* Add entities grouped by devices

* Fix garage cover device class

* Rename category to summary

* Add media players categories

* Reduce spacing

* Remove person

* Remove translations

* Use media player cards

* Display entities without device

* Add missing entity category

* Update src/panels/lovelace/strategies/overview/helpers/overview-summaries.ts

Co-authored-by: Paulus Schoutsen <balloob@gmail.com>

* Add white space

---------

Co-authored-by: Paulus Schoutsen <balloob@gmail.com>
2025-08-19 19:48:43 +00:00
Wendelin
fc5adc3753 Automation row remember collapsed status (#26604) 2025-08-19 12:13:35 +02:00
Paulus Schoutsen
d1db8f456f Change Suggest with AI label to Suggest (#26603) 2025-08-19 11:39:12 +02:00
karwosts
0dd07a395a Fix legend in devices-detail-graph (#26596) 2025-08-19 09:12:30 +03:00
renovate[bot]
589771df5c Lock file maintenance (#26598)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-19 08:44:22 +03:00
pcan08
92812048dc Add fan oscillate feature (#26519)
* First working fan-oscillate feature

This a first working impl, need at least to do:
- Tooltip not yet "Yes/No"
- Need implementation verification

* Use same strings as more info label for control tooltip

* Add missing label for editor

* Rename some variables

* Add fan features in gallery

* Fix lint:types by applying suggestions from code review

Co-authored-by: Aidan Timson <aidan@timmo.dev>

* fix lint new line after import

* fix typo

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* fix event value type treating

* remove type magic as suggested

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Update localize.ts

Complete suggestion change to have tooltip

* fix lint by removing unused import

---------

Co-authored-by: Aidan Timson <aidan@timmo.dev>
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-08-18 18:22:41 +03:00
Aidan Timson
9fc14d6627 Set default forecast option in weather forecast card editor (#26592) 2025-08-18 16:18:50 +03:00
renovate[bot]
3da6b85593 Update dependency @codemirror/language to v6.11.3 (#26589)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-18 15:59:13 +03:00
Norbert Rittel
d2a4f481be Capitalize "Samba" as the name of the Open Source project (#26590)
Capitalize "Samba" as name for the Open Source project
2025-08-18 14:54:51 +02:00
karwosts
e37f67c548 Fix picture glance mouse pointer (#26391)
* Fix picture glance mouse pointer

* More action updates
2025-08-18 13:33:10 +03:00
Aidan Timson
e775a6770b Add clipboard support to condition card conditions (#26535)
* Add copy paste support to condition card conditions

* Don't clear the clipboard

* Fix selection

* Add cut and duplicate

* Remove

* Fix event
2025-08-18 13:10:58 +03:00
karwosts
4ba5ef6c37 Show accurate state of show_header_toggle in entities card editor (#26564) 2025-08-18 13:01:25 +03:00
Aidan Timson
d528ab06d9 Add date card feature (#26531)
* Add date card feature

* Rename from "date" to "date-set"

* Better label

* Fix

* Parse date for datetime
2025-08-18 09:57:09 +00:00
dependabot[bot]
03a628cfe2 Bump actions/checkout from 4.2.2 to 5.0.0 (#26586)
Bumps [actions/checkout](https://github.com/actions/checkout) from 4.2.2 to 5.0.0.
- [Release notes](https://github.com/actions/checkout/releases)
- [Changelog](https://github.com/actions/checkout/blob/main/CHANGELOG.md)
- [Commits](https://github.com/actions/checkout/compare/v4.2.2...v5.0.0)

---
updated-dependencies:
- dependency-name: actions/checkout
  dependency-version: 5.0.0
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-08-18 12:38:04 +03:00
Wendelin
973851b332 Remove unused shoelace animation import (#26584) 2025-08-18 10:42:59 +03:00
Simon Lamon
4c5795c276 Migrate all sl-animation usages to wa-animation (#26544) 2025-08-18 09:04:42 +02:00
Simon Lamon
41d016d96a Migrate ha-progress-ring to webawesome (#26542) 2025-08-18 09:02:32 +02:00
karwosts
22e647cad4 Fetch translations for switch-as-x domains (#26566)
* Fetch translations for switch-as-x domains

* no cache
2025-08-18 08:40:31 +03:00
karwosts
b63dd9dbbf Force dark-only themes to be in dark mode (#26583) 2025-08-18 08:39:32 +03:00
renovate[bot]
3b3b9e269d Update dependency hls.js to v1.6.10 (#26581)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-18 08:33:39 +03:00
renovate[bot]
d2c3b9ee83 Update dependency @lokalise/node-api to v15.2.1 (#26577)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-17 15:33:15 +02:00
renovate[bot]
5b50a8692b Update babel monorepo to v7.28.3 (#26576)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-17 15:32:52 +02:00
Paulus Schoutsen
8a8bbee8e0 Update theme color in web app manifests (#26572) 2025-08-17 10:19:40 +02:00
TheJulianJES
28e28d1417 Fix restrict-task-creation workflow (#26569) 2025-08-17 10:19:16 +02:00
renovate[bot]
ea77a0f3d6 Update dependency @lokalise/node-api to v15.1.0 (#26567)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-16 21:23:51 +02:00
karwosts
10e09b238a Configurable todo item tap action (#26551)
* Configurable todo item tap action

* string
2025-08-15 16:33:50 +03:00
Simon Lamon
f9cd2b66cb Migrate ha-fade-in to webawesome (#26543)
fade in
2025-08-15 13:29:34 +03:00
renovate[bot]
b1c0fba8cf Update dependency @rsdoctor/rspack-plugin to v1.2.2 (#26553)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-15 13:27:29 +03:00
Norbert Rittel
fdae6257b3 Consistently use "Home Assistant OS" as name (#26552) 2025-08-15 10:02:00 +02:00
Dav15Jr
6a48aea128 Fix media manage button default visibilty (#26548)
* Fix Inconsistent naming of "Input button" in Quickbar navigation

* Fix Media Manage button default visibilty.

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2025-08-15 07:19:09 +00:00
Norbert Rittel
a90b173671 Fix missing sentence-case in a few strings (#26547)
* Fix missing sentence-case in a few strings

* One more

* And another one
2025-08-15 09:10:00 +02:00
Dav15Jr
d9971bfaa9 Fix Inconsistent naming of "Input button" in Quickbar navigation (#26541)
* Fix Inconsistent naming of "Input button" in Quickbar navigation

* Fix Media Manage button default visibilty.

* undo wrong change
2025-08-15 07:09:54 +00:00
renovate[bot]
369d56a809 Update dependency typescript-eslint to v8.39.1 (#26546)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-15 09:04:30 +02:00
Norbert Rittel
939a3cdf63 Fix missing sentence-casing in People settings (#26539)
* Fix missing sentence-casing in People settings

* Remove hyphen from "presence detection integration"
2025-08-14 16:56:02 +02:00
Wendelin
208fd0662c Migrate ha-button-toggle-group to webawesome (#26506)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-08-14 14:52:39 +02:00
renovate[bot]
f133f246cb Update vaadinWebComponents monorepo to v24.8.5 (#25954)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-14 14:51:25 +02:00
Paul Bottein
b9b8997d68 Makes ha-combo-box clear value compatible with vaadin 24.8 (#26530) 2025-08-14 14:50:24 +02:00
Aidan Timson
46c4a19a13 Fix conditional card options alignment (#26534) 2025-08-14 12:27:21 +00:00
Paul Bottein
8d63654211 Create overview dashboard with lights, covers, energy and favorite entities (#26504)
* Create overview dashboard with light, cover, energy and favorite

* Add welcome message

* Add person entities

* Add editor for favorite entities

* Don't use property
2025-08-14 11:56:35 +02:00
Wendelin
3bf25f125b Automation editor sidebar (#26413) 2025-08-14 10:06:16 +02:00
Petar Petrov
8c65876413 Filter hidden entities from group more-info (#26527) 2025-08-13 17:50:00 +02:00
Bram Kragten
2ab6d49553 Update tabs when user data changes (#26524) 2025-08-13 16:24:56 +02:00
Aidan Timson
67b0cf0952 Add small amount of extra padding to ohf card in about section (#26523) 2025-08-13 17:23:01 +03:00
Bram Kragten
5138276f8a Show password forgot link on mobile (#26526)
show password forgot link on mobile
2025-08-13 17:22:17 +03:00
Paul Bottein
30e6777529 Fix related entities click behavior in the more info dialog (#26525) 2025-08-13 16:08:52 +02:00
Aidan Timson
1686ab4b9d Add valve position card feature (#26511) 2025-08-13 15:04:44 +03:00
Wendelin
b7102c0d7d Fix ha-button icon padding (#26517) 2025-08-13 13:40:44 +02:00
Petar Petrov
d41d524850 Show battery in and out energy in Sankey chart (#26490) 2025-08-13 12:40:45 +03:00
renovate[bot]
4f05f6305a Update fullcalendar monorepo to v6.1.19 (#26516)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-13 09:50:40 +02:00
karwosts
ba0b1239be Fix search in automation yaml editor (#26513) 2025-08-13 09:07:50 +03:00
Wendelin
708b68f35d Fix handling empty release notes in more-info-update (#26515)
Fix handling empty release nots in more-info-update
2025-08-13 09:03:25 +03:00
Aidan Timson
3108e98b97 Update ha-spinner component to webawesome (#26507) 2025-08-12 21:00:40 +02:00
Bram Kragten
ba7609cc2c Fix style variable in base chart (#26509) 2025-08-12 17:14:29 +02:00
Bram Kragten
506fd7d480 center spinner 2025-08-12 15:30:47 +02:00
Bram Kragten
9767ebe1fb Show spinner when loading application credential config (#26510) 2025-08-12 15:25:18 +02:00
Aidan Timson
539e89e7b5 Add valve open/close card feature (#26488)
* Add valve open/close card feature

* Toggle button UI if no assumed state
2025-08-12 14:26:12 +02:00
karwosts
a7eef81272 Fix search in raw configuration editor (#26496) 2025-08-12 14:31:38 +03:00
Aidan Timson
7986be103f Fix invalid loading margin while variables are loading (#26495)
* Fix invalid loading margin while variables are loading

* Fix invalid loading margin while variables are loading
2025-08-12 07:53:36 +03:00
karwosts
055e65c45e Add a dashboard condition based on user's location (#26401)
* Add a dashboard condition based on user's location

* Update src/translations/en.json

Co-authored-by: Norbert Rittel <norbert@rittel.de>

* Update src/data/person.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Use multiple: true

---------

Co-authored-by: Norbert Rittel <norbert@rittel.de>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-08-12 07:51:31 +03:00
renovate[bot]
fe762e9ae4 Update dependency eslint to v9.33.0 (#26502)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-12 07:47:01 +03:00
pcan08
5267c6fdfc Add fan direction feature in gallery (#26499) 2025-08-11 19:40:32 +02:00
Andrew Jackson
8eff913845 Sort subentries within integration devices by title (#26497)
Sort subentries by title
2025-08-11 17:34:36 +00:00
renovate[bot]
1c845d0052 Update dependency lint-staged to v16.1.5 (#26498)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-11 19:22:34 +02:00
pcan08
60a1d25e1e Add fan direction feature (#26467)
* Create fan-direction feature

* Translate direction buttons tooltip

* Update src/translations/en.json

fix fan-direction label to sentence-cased

Co-authored-by: Norbert Rittel <norbert@rittel.de>

* Update src/translations/en.json

Remove usued translation

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

---------

Co-authored-by: Norbert Rittel <norbert@rittel.de>
Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2025-08-11 16:32:42 +03:00
Aidan Timson
3439d1d663 Add area, device, floor and formatted state to template editor completions (#26383) 2025-08-11 15:28:34 +02:00
renovate[bot]
bf120d9cb2 Update dependency @rsdoctor/rspack-plugin to v1.2.1 (#26492)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-11 14:25:53 +03:00
Paul Bottein
b5a024c879 Fix default alarm modes order when customizing it in card feature (#26491) 2025-08-11 14:13:02 +03:00
renovate[bot]
602d754e5e Update dependency typescript to v5.9.2 (#26372)
* Update dependency typescript to v5.9.2

* fix types

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-08-11 11:11:15 +00:00
Wendelin
b7c4f4029d Translate service worker update toast notification (#26487)
* Translate service worker update toast notification

* Update src/managers/notification-manager.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update src/managers/notification-manager.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Fix toast translation args

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-08-11 14:07:32 +03:00
dependabot[bot]
7fdb5d4862 Bump actions/cache from 4.2.3 to 4.2.4 (#26489)
Bumps [actions/cache](https://github.com/actions/cache) from 4.2.3 to 4.2.4.
- [Release notes](https://github.com/actions/cache/releases)
- [Changelog](https://github.com/actions/cache/blob/main/RELEASES.md)
- [Commits](https://github.com/actions/cache/compare/v4.2.3...v4.2.4)

---
updated-dependencies:
- dependency-name: actions/cache
  dependency-version: 4.2.4
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-08-11 13:32:14 +03:00
Aidan Timson
bc52ab410c Split repeat building blocks in picker (#26385)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-08-11 11:07:41 +02:00
karwosts
3b0220fa92 Support multiple for StateSelector (#25716)
* Support `multiple` for StateSelector

* lint

* Fixup after merge
2025-08-11 11:24:37 +03:00
Bram Kragten
64e00e559f Bumped version to 20250811.0 2025-08-11 09:58:49 +02:00
Wendelin
b407bd4c4f Fix first letter uppercase in some buttons (#26485) 2025-08-11 09:58:39 +02:00
Simon Lamon
d466abf9c4 Fix diagnostic download (#26466)
Diagnostic fix 2
2025-08-11 09:58:38 +02:00
karwosts
4d98230145 Support button feature for input_button (#26444) 2025-08-11 09:58:38 +02:00
Petar Petrov
8a5bca0eb0 Show sankey chart in vertical layout on mobile (#26439)
* Show sankey chart in vertical layout on mobile

* ts fix
2025-08-11 09:58:37 +02:00
Petar Petrov
1638da858c Font improvements for Sankey chart (#26438)
* Use theme vars for sankey chart font

* improve font size calculation
2025-08-11 09:58:36 +02:00
Wendelin
bfb11102cc Fix css var naming --ha-color-border-primary (#26433) 2025-08-11 09:58:35 +02:00
Wendelin
a3d3539e82 Fix button start/end slot margins, add reduce-left-padding flag (#26431)
* Fix button start/end slot margins, add reduce-left-padding flag

* Always reduce padding when icons are there

* Revert icon padding changes
2025-08-11 09:58:35 +02:00
Timothy
1fc6cff857 Fix typo in Neutral80 color (#26430) 2025-08-11 09:58:34 +02:00
Wendelin
c5d7eb5384 Fix plain button in legacy browsers (#26426) 2025-08-11 09:58:33 +02:00
karwosts
759e6eba35 Fix mqtt config panel (#26422) 2025-08-11 09:58:32 +02:00
karwosts
153129e066 Fix a dangerous button color (#26418) 2025-08-11 09:58:31 +02:00
Aidan Timson
7bf3c7273e Fix Mod-S (Ctrl-S/Cmd-S) support for automation/scene/script YAML editors (#26412)
* Fix automation and script yaml mode Mod-S (Ctrl/Cmd-S) support

* Fix manual script editor

* Fix manual automation editor save

* Fix scene yaml mode
2025-08-11 09:58:31 +02:00
Wendelin
08765e6ce2 Add border radius css var ha prefix (#26411) 2025-08-11 09:58:30 +02:00
Wendelin
a60c9f788d Fix first letter uppercase in some buttons (#26485) 2025-08-11 10:47:06 +03:00
karwosts
d9c297c06a Improve robustness of UI for if/then action (#26477) 2025-08-11 08:40:42 +03:00
renovate[bot]
3789bebb2b Update dependency @bundle-stats/plugin-webpack-filter to v4.21.2 (#26480)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-11 08:36:51 +03:00
renovate[bot]
bbecf5f368 Update dependency hls.js to v1.6.9 (#26474)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-10 14:30:38 +02:00
renovate[bot]
e580b30219 Update dependency @rsdoctor/rspack-plugin to v1.2.0 (#26471)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-10 14:30:12 +02:00
renovate[bot]
ed8c8ad3e3 Update dependency @rsdoctor/rspack-plugin to v1.1.11 (#26470)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-09 15:19:04 +02:00
Simon Lamon
4f61d5689b Fix diagnostic download (#26466)
Diagnostic fix 2
2025-08-09 15:17:59 +02:00
renovate[bot]
60a18185d7 Update dependency @tsparticles/engine to v3.9.1 (#26420)
* Update dependency @tsparticles/engine to v3.9.1
2025-08-09 06:19:38 +00:00
karwosts
e0246b8488 Support button feature for input_button (#26444) 2025-08-09 07:52:14 +02:00
renovate[bot]
1cd0fae84a Update dependency @awesome.me/webawesome to v3.0.0-beta.4 (#26465)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-08 21:42:37 +02:00
renovate[bot]
e8a1ebbff4 Update dependency fs-extra to v11.3.1 (#26464)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-08 19:38:28 +02:00
karwosts
c5010b8502 Fix some date-range bugs (#26441) 2025-08-08 16:57:54 +03:00
Petar Petrov
a7db401b62 Show sankey chart in vertical layout on mobile (#26439)
* Show sankey chart in vertical layout on mobile

* ts fix
2025-08-08 16:37:44 +03:00
Petar Petrov
49c7dad6eb Font improvements for Sankey chart (#26438)
* Use theme vars for sankey chart font

* improve font size calculation
2025-08-08 08:43:59 +02:00
Aidan Timson
521c3d40b7 Add missing button feature translation (#26437) 2025-08-08 08:42:45 +02:00
renovate[bot]
709a1d2ef0 Update dependency typescript-eslint to v8.39.0 (#26446)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-08 08:42:06 +02:00
renovate[bot]
3c5d7b97d1 Update dependency core-js to v3.45.0 (#26449)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-08 08:41:49 +02:00
renovate[bot]
9165c8bc57 Update dependency hls.js to v1.6.8 (#26451)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-08 08:40:58 +02:00
Luke Mondy
0b3e4eab23 Add 'Not' to lovelace visibility conditions (#26408)
:Add 'Not' to lovelace visibility conditions
2025-08-07 16:40:27 +03:00
Wendelin
39d14c943c Revert "Add Mobile team and design has codeowner of the theme colors" (#26432)
Revert "Add Mobile team and design has codeowner of the theme colors (#26428)"

This reverts commit 9588987e30.
2025-08-07 15:06:41 +02:00
Wendelin
09469be93f Fix css var naming --ha-color-border-primary (#26433) 2025-08-07 15:06:13 +02:00
karwosts
6e215870ef Fix mqtt config panel (#26422) 2025-08-07 16:06:07 +03:00
Wendelin
d5985dcaaf Fix button start/end slot margins, add reduce-left-padding flag (#26431)
* Fix button start/end slot margins, add reduce-left-padding flag

* Always reduce padding when icons are there

* Revert icon padding changes
2025-08-07 15:05:56 +02:00
Timothy
bbd9d8887d Fix typo in Neutral80 color (#26430) 2025-08-07 10:07:12 +00:00
Timothy
9588987e30 Add Mobile team and design has codeowner of the theme colors (#26428) 2025-08-07 09:56:47 +00:00
Wendelin
52c05a4426 Fix plain button in legacy browsers (#26426) 2025-08-07 09:50:05 +02:00
renovate[bot]
e8224df4e5 Update dependency echarts to v6 (#26356)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-07 09:41:59 +03:00
karwosts
83a6df1621 Fix a dangerous button color (#26418) 2025-08-07 07:40:31 +02:00
renovate[bot]
c46ebc8d3e Update dependency marked to v16.1.2 (#26423)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-07 07:38:25 +02:00
Aidan Timson
fca530411f Fix Mod-S (Ctrl-S/Cmd-S) support for automation/scene/script YAML editors (#26412)
* Fix automation and script yaml mode Mod-S (Ctrl/Cmd-S) support

* Fix manual script editor

* Fix manual automation editor save

* Fix scene yaml mode
2025-08-06 18:52:41 +02:00
Norbert Rittel
c2c64b9923 Fix summary for Choose building block by counting options (#26409)
* Fix summary for Choose building block

* Sentence-case "If-then" to match label of that building block
2025-08-06 18:52:03 +02:00
renovate[bot]
9968c27a8e Update dependency lint-staged to v16.1.4 (#26414)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-06 18:45:36 +02:00
Wendelin
96796ac5da Add border radius css var ha prefix (#26411) 2025-08-06 12:59:34 +00:00
Bram Kragten
550e4cd4aa Bumped version to 20250806.0 2025-08-06 14:33:58 +02:00
Bram Kragten
f6041c5cbb add save button to AI suggestions settings (#26407) 2025-08-06 14:32:48 +02:00
Bram Kragten
42f65c2ca1 Fix buttons in button row (#26405) 2025-08-06 14:32:46 +02:00
Bram Kragten
588f171f7f Update zwave js buttons (#26404) 2025-08-06 14:32:44 +02:00
Bram Kragten
bd1445840d Update color variables (#26403) 2025-08-06 14:32:42 +02:00
Bram Kragten
37def6d3e4 add save button to AI suggestions settings (#26407) 2025-08-06 14:27:58 +02:00
Bram Kragten
013d603ba0 Fix buttons in button row (#26405) 2025-08-06 11:15:09 +00:00
Bram Kragten
b76407d28d Update zwave js buttons (#26404) 2025-08-06 13:13:22 +02:00
Bram Kragten
4e969ccf09 Update color variables (#26403) 2025-08-06 10:42:21 +00:00
Bram Kragten
97a0903cec Bumped version to 20250805.0 2025-08-05 15:21:31 +02:00
Bram Kragten
e2525a3d07 Fix colors in network graphs (#26397) 2025-08-05 15:21:22 +02:00
Bram Kragten
8bc0f5a42c Fix network graph not rendering (#26396) 2025-08-05 15:21:21 +02:00
Jan-Philipp Benecke
bf7e8ffd24 Add localization for third-party data reporting in the Z-Wave JS dashboard (#26395)
* Add localization for third-party data reporting in the Z-Wave JS dashboard

* Run prettier
2025-08-05 15:21:21 +02:00
Stefan Agner
255e598c65 Fix System information dialog unhealthy/unsupported list (#26393)
The System Information dialog was not displaying translated list of
unhealthy and unsupported reasons because the wrong translation keys
were used. This commit updates the translation keys to the correct
ones.
2025-08-05 15:21:19 +02:00
karwosts
5e22178225 Fix energy now button (#26384)
Update hui-energy-period-selector.ts
2025-08-05 15:21:19 +02:00
Wendelin
56b7a6abec Improve ha button radius variables (#26382)
* Improve ha button radius variables

* fixes

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-08-05 15:21:18 +02:00
Wendelin
f34c4a11af Improve neutral color palette (#26381)
Improve neutral, add docs, removed unused var.
2025-08-05 15:21:17 +02:00
Stefan Agner
102689b711 Remove eMMC specific references in disk life time handling (#26379)
* Remove eMMC specific references in disk life time handling

Remove eMMC specific calculations and references in the disk life
time handling to generalize the code for all disk types. This includes
updating translations and UI components to reflect a more generic
approach to disk life time metrics.

* Assume 30 MB/s as the speed for disk operations

The previous code tried to estimate based on disk type, 30 MB/s for
eMMC devices and 10 MB/s for others. However, this did not work
correctly since the disk_life_time returns null for non-eMMC devices,
leading to 30 MB/s being used for all devices.

Now disk_life_time is not a eMMC indicator anymore. Simply assume a
constant speed of 30 MB/s for all disk operations explicitly.
2025-08-05 15:21:16 +02:00
Wendelin
b16d769192 Fix ha-buttons (#26373)
* Fix ha-button supervisor network

* Fix button appearance for entity row

* Fix logs button menu mobile width

* Fix new logs indicator
2025-08-05 15:21:15 +02:00
Jan-Philipp Benecke
29bcacc64e Improve Z-Wave JS config dashboard styling (#26368) 2025-08-05 15:21:14 +02:00
Jan-Philipp Benecke
c7f3331373 Do not show AI suggestion button when no inputs in save dialog (#26357) 2025-08-05 15:21:13 +02:00
Squazel
c32444b70c Fix picture-glance card icon styling for unavailable/unknown entities (#26352) 2025-08-05 15:21:12 +02:00
Wendelin
11c6b90eb0 Fix dialog secondary button design (#26344) 2025-08-05 15:21:11 +02:00
Simon Lamon
f7a17598f0 Fix diagnostic download on integration level (#26341) 2025-08-05 15:21:10 +02:00
Bram Kragten
56967bc0c1 Add support for sub config flows in conversation agent picker (#26336) 2025-08-05 15:21:09 +02:00
Bram Kragten
cdfd6431c3 Fix colors in network graphs (#26397) 2025-08-05 15:14:21 +02:00
Bram Kragten
c363995718 Fix network graph not rendering (#26396) 2025-08-05 15:05:23 +02:00
Jan-Philipp Benecke
53497aa632 Add localization for third-party data reporting in the Z-Wave JS dashboard (#26395)
* Add localization for third-party data reporting in the Z-Wave JS dashboard

* Run prettier
2025-08-05 13:00:14 +02:00
Stefan Agner
8d89b0e57f Fix System information dialog unhealthy/unsupported list (#26393)
The System Information dialog was not displaying translated list of
unhealthy and unsupported reasons because the wrong translation keys
were used. This commit updates the translation keys to the correct
ones.
2025-08-05 12:10:51 +02:00
Stefan Agner
92cf8b5579 Remove eMMC specific references in disk life time handling (#26379)
* Remove eMMC specific references in disk life time handling

Remove eMMC specific calculations and references in the disk life
time handling to generalize the code for all disk types. This includes
updating translations and UI components to reflect a more generic
approach to disk life time metrics.

* Assume 30 MB/s as the speed for disk operations

The previous code tried to estimate based on disk type, 30 MB/s for
eMMC devices and 10 MB/s for others. However, this did not work
correctly since the disk_life_time returns null for non-eMMC devices,
leading to 30 MB/s being used for all devices.

Now disk_life_time is not a eMMC indicator anymore. Simply assume a
constant speed of 30 MB/s for all disk operations explicitly.
2025-08-05 10:42:42 +02:00
karwosts
6068c32176 Pass narrow through parallel/sequence automation actions (#26386) 2025-08-04 17:51:17 +02:00
karwosts
38893324af Fix energy now button (#26384)
Update hui-energy-period-selector.ts
2025-08-04 16:19:26 +02:00
Wendelin
a39ab3c174 Improve ha button radius variables (#26382)
* Improve ha button radius variables

* fixes

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-08-04 12:58:12 +00:00
Christoph
797d2be5bf show spinner on update button (during update installation) (#26110)
* scroll to top when installing an update

* Revert "scroll to top when installing an update"

This reverts commit d0051b0c4c.

* add progress spinner to update button

* refactor disabled logic for update/skip button

* do not run update when disabled button is clicked

* refactor: use new ha-button to show progress

* refactor: move functions to update.ts
2025-08-04 14:51:38 +02:00
Wendelin
99a91e1019 Improve neutral color palette (#26381)
Improve neutral, add docs, removed unused var.
2025-08-04 12:24:42 +00:00
Wendelin
5de8d07ce0 Fix ha-buttons (#26373)
* Fix ha-button supervisor network

* Fix button appearance for entity row

* Fix logs button menu mobile width

* Fix new logs indicator
2025-08-04 14:18:31 +02:00
dependabot[bot]
3a31a4a721 Bump home-assistant/wheels from 2025.03.0 to 2025.07.0 (#26375)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-08-04 11:01:02 +02:00
Squazel
05f4419a92 Fix picture-glance card icon styling for unavailable/unknown entities (#26352) 2025-08-04 08:16:11 +02:00
renovate[bot]
5ea8feb86b Update rspack monorepo to v1.4.11 (#26365)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-04 06:52:21 +02:00
Jan-Philipp Benecke
8fd70b3ae6 Improve Z-Wave JS config dashboard styling (#26368) 2025-08-04 06:50:35 +02:00
renovate[bot]
343aa40bc8 Update dependency @types/luxon to v3.7.1 (#26351)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-03 08:10:32 +02:00
Jan-Philipp Benecke
6022f9a77e Do not show AI suggestion button when no inputs in save dialog (#26357) 2025-08-03 08:10:06 +02:00
renovate[bot]
bd9de0680e Update dependency @types/luxon to v3.7.0 (#26342)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-08-01 17:09:44 +02:00
Simon Lamon
b8000d5bc1 Fix diagnostic download on integration level (#26341) 2025-08-01 13:16:09 +02:00
Wendelin
c6efa1127f Fix dialog secondary button design (#26344) 2025-08-01 13:13:42 +02:00
Bram Kragten
688a3d91d3 Add support for sub config flows in conversation agent picker (#26336) 2025-08-01 13:13:28 +02:00
Timothy
68151a2a70 Add Bruno and Timo as codeowners of the external_app folders (#26345) 2025-08-01 11:49:47 +02:00
Bram Kragten
b01ab9234b Bumped version to 20250731.0 2025-07-31 16:54:24 +02:00
Wendelin
ad39228dea Fix line-height, fix script editor buttons (#26337)
* Fix line-height

* Fix script root buttons
2025-07-31 16:54:03 +02:00
Wendelin
8cc48cdecb Use tilecard button feature editor (#26335)
Use button feature editor
2025-07-31 16:54:02 +02:00
Wendelin
524e89acf0 Revert "Use query params instead of path for media browser navigate ids" (#26333) 2025-07-31 16:54:01 +02:00
Wendelin
48f6b34882 Fix ha-button with missing label and links (#26332) 2025-07-31 16:54:00 +02:00
Bram Kragten
44d9185574 Fix area picker text alignment in voice wizard (#26330) 2025-07-31 16:53:59 +02:00
Joost Lekkerkerker
51ff6c6564 Use underscores in AI task name (#26327) 2025-07-31 16:53:58 +02:00
Franck Nijhof
b49b8e3db8 Add weekdays to time trigger (#25908)
* Add weekdays to time trigger

* Update src/translations/en.json

Co-authored-by: Norbert Rittel <norbert@rittel.de>

* Localization changes

---------

Co-authored-by: Norbert Rittel <norbert@rittel.de>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2025-07-31 16:53:57 +02:00
Wendelin
c2ca556151 Fix line-height, fix script editor buttons (#26337)
* Fix line-height

* Fix script root buttons
2025-07-31 16:52:36 +02:00
Wendelin
df86b27af4 Use tilecard button feature editor (#26335)
Use button feature editor
2025-07-31 13:27:40 +02:00
Wendelin
eba1f401cc Fix ha-button with missing label and links (#26332) 2025-07-31 12:40:17 +02:00
Wendelin
19c2f9c9e8 Revert "Use query params instead of path for media browser navigate ids" (#26333) 2025-07-31 12:38:52 +02:00
Bram Kragten
4250447d14 Fix area picker text alignment in voice wizard (#26330) 2025-07-31 11:52:33 +02:00
Joost Lekkerkerker
4666197f28 Use underscores in AI task name (#26327) 2025-07-30 21:52:09 +02:00
Franck Nijhof
a5ca36c93f Add weekdays to time trigger (#25908)
* Add weekdays to time trigger

* Update src/translations/en.json

Co-authored-by: Norbert Rittel <norbert@rittel.de>

* Localization changes

---------

Co-authored-by: Norbert Rittel <norbert@rittel.de>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2025-07-30 19:45:10 +02:00
Norbert Rittel
a88950e16c Correct the setup steps for Matter sharing in Google Home app (#26322)
Correct the setup steps in the Google Home app
2025-07-30 19:40:41 +02:00
Bram Kragten
c013c5ec64 Merge branch 'rc' into dev 2025-07-30 16:18:36 +02:00
Bram Kragten
53d5d0efbd Merge branch 'master' into rc 2025-07-30 16:18:22 +02:00
Bram Kragten
3577991553 Bumped version to 20250730.0 2025-07-30 16:16:28 +02:00
Wendelin
fa758f2bee Redesign ha-button (#25564)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-07-30 16:15:18 +02:00
Douwe
6dbfc2f4ed Add new card feature: button (#26165)
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-07-30 16:13:05 +02:00
Petar Petrov
b355556c07 Improve network graph layout (#26268) 2025-07-30 15:55:06 +02:00
renovate[bot]
fec336260e Pin dependency @types/culori to 4.0.0 (#26318)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-30 14:07:48 +02:00
Wendelin
3e67d91d1a Add color palettes (#26271) 2025-07-30 13:51:14 +02:00
karwosts
641e406502 Don't allow view URL to be a number (#26313) 2025-07-29 21:33:58 +02:00
renovate[bot]
073ba22233 Update dependency @bundle-stats/plugin-webpack-filter to v4.21.1 (#26316)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-29 21:29:30 +02:00
Norbert Rittel
6b4a4e6024 Fix doubled plural in "add-on(s) repositories / capabilities" (#26310)
The string "Manage add-on repositories" has it correct, so this makes the fixed ones more consistent, too.
2025-07-29 10:05:13 +02:00
karwosts
7d8b418a81 Fix some instability in ha-selector-object (#26301)
Fix some instability in ha-object-selector
2025-07-29 09:50:58 +03:00
karwosts
c14425b2d1 Allow picture card to serve media images (#26291)
* Allow picture card to serve media images

* small adjustments
2025-07-29 09:49:08 +03:00
renovate[bot]
4740a71bdd Update dependency eslint to v9.32.0 (#26309)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-28 22:12:27 +02:00
dependabot[bot]
6d0e0158ea Bump relative-ci/agent-action from 3.0.0 to 3.0.1 (#26307)
Bumps [relative-ci/agent-action](https://github.com/relative-ci/agent-action) from 3.0.0 to 3.0.1.
- [Release notes](https://github.com/relative-ci/agent-action/releases)
- [Commits](https://github.com/relative-ci/agent-action/compare/v3.0.0...v3.0.1)

---
updated-dependencies:
- dependency-name: relative-ci/agent-action
  dependency-version: 3.0.1
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-07-28 17:03:04 +03:00
renovate[bot]
e966d6f4f4 Update rspack monorepo to v1.4.10 (#26300)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-27 22:11:12 +02:00
karwosts
b99bb60cd0 Cleanup some selectors firing double value-changed events (#26302) 2025-07-27 22:10:30 +02:00
karwosts
080c79234c Fix typo in attribute (#26303)
Update hui-action-editor.ts
2025-07-27 22:09:16 +02:00
karwosts
9ad887942e Add raindrops to lightning-rainy state SVG (#26298) 2025-07-27 07:54:25 +02:00
renovate[bot]
27dfa514e7 Update dependency @lokalise/node-api to v15 (#26297)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-27 07:50:01 +02:00
renovate[bot]
ab5c5389e8 Update dependency @rsdoctor/rspack-plugin to v1.1.10 (#26295)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-27 07:49:07 +02:00
renovate[bot]
219679bce9 Update rspack monorepo to v1.4.9 (#26289)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-25 14:43:41 +02:00
Chai
aca4a1f86d Fix for integration 'Add entry' unnecessary dialogs (#26285) 2025-07-25 11:42:34 +00:00
Paulus Schoutsen
f428d6b3f2 Add download device info button (#26278)
* Add download device info button

* Update src/panels/config/core/ha-config-section-analytics.ts

* Guard download support

* Update src/translations/en.json
2025-07-24 19:53:04 +00:00
renovate[bot]
109c3e86d9 Lock file maintenance (#26230)
* Lock file maintenance

* Remove duplicated packages

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2025-07-24 19:02:51 +00:00
karwosts
e4b6c3fd4d Disallow special characters in view URL (#26280)
* Disallow special characters in view URL
2025-07-24 18:58:26 +00:00
renovate[bot]
43f1d9be44 Update dependency typescript-eslint to v8.38.0 (#26283)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-24 20:05:15 +02:00
renovate[bot]
5c405201b2 Update dependency eslint-plugin-lit-a11y to v5.1.1 (#26279)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-24 19:25:39 +03:00
karwosts
9fc91fbbcc Fix spelling, remove errant apostrophe (#26277)
Update en.json
2025-07-24 17:06:57 +03:00
Norbert Rittel
d9e3f2c15f Three smaller fixes in user-facing strings (#26276)
- change "eg." to "e.g." (four other occurrences are correct)
- add a comma after "Enter your email address, …" as the noun in the second part of the sentence changes to "we"
- sentence-case "Newest version"
2025-07-24 15:10:35 +03:00
Abílio Costa
3e2f5b0dd3 Handle visibility changes in camera players (#26235)
* Handle visibility changes in webrtc player

* Implement visibility handling for hls

* Remove console logs
2025-07-23 19:31:39 +02:00
dependabot[bot]
aae1a3604c Bump axios from 1.10.0 to 1.11.0 (#26273)
Bumps [axios](https://github.com/axios/axios) from 1.10.0 to 1.11.0.
- [Release notes](https://github.com/axios/axios/releases)
- [Changelog](https://github.com/axios/axios/blob/v1.x/CHANGELOG.md)
- [Commits](https://github.com/axios/axios/compare/v1.10.0...v1.11.0)

---
updated-dependencies:
- dependency-name: axios
  dependency-version: 1.11.0
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-07-23 17:03:08 +00:00
Bram Kragten
e31b9c4264 Update translations action with dispatch 2025-07-23 14:54:35 +02:00
Marcin
90a9dbafbf Fixed icon (#26249) 2025-07-23 14:52:07 +02:00
Marcin
7041557ee2 Changed area dashboard preview icon (#26269) 2025-07-23 14:50:51 +02:00
Joost Lekkerkerker
3d6e5ef1f0 Render AI task entities with formatted time (#26265) 2025-07-23 14:49:51 +02:00
Petar Petrov
d9bf605c3f Improve ZHA routes vizualization (#26270) 2025-07-23 14:48:47 +02:00
Copilot
20dab92ad8 Sort devices and services alphabetically in integration pages (#26231)
Co-authored-by: balloob <1444314+balloob@users.noreply.github.com>
Co-authored-by: copilot-swe-agent[bot] <198982749+Copilot@users.noreply.github.com>
2025-07-23 14:41:34 +02:00
Petar Petrov
98ed3bdd4d Add handle to axis pointer in charts on mobile (#26088)
* Add handle to axis pointer in charts on mobile

* Ignore hidden xAxis

* simplify
2025-07-23 13:13:43 +02:00
Petar Petrov
f5bc6309ae Add features to light & cover groups more-info (#26187)
* Add features to light & cover groups more-info

* 12 column tiles
2025-07-23 13:13:09 +02:00
Simon Lamon
620ebd8a61 Correct lokalise docker image (#26267)
Mistyped docker iamge
2025-07-23 13:11:57 +02:00
Norbert Rittel
ca30af5c8a Various spelling fixes in user-facing strings (#26261)
* Various spelling fixes in user-facing strings

* Fix triple apostrophes
2025-07-23 13:23:17 +03:00
Simon Lamon
9d30ce348f Bump Lokalise docker image to latest v3.1.4 (#26226)
Bump lokalise to latest version v3.1.4
2025-07-23 11:44:36 +02:00
karwosts
07c7b07362 Stabilize step flow errors (#26258) 2025-07-23 08:33:48 +03:00
karwosts
c13a80ce5e Hide hardware integrations in brand sub-menu (#26252)
* Hide hardware integrations in brand sub-menu

* Filter before sort
2025-07-22 16:16:03 +02:00
Wendelin
13868478f7 Download core logs via supervisor (#26251)
Use supervisor download dialog for core downloads
2025-07-22 14:55:11 +03:00
dependabot[bot]
77aca59dda Bump form-data from 4.0.3 to 4.0.4 (#26248)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-07-22 09:04:27 +02:00
renovate[bot]
b86605949b Update dependency marked to v16.1.1 (#26247)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-22 09:08:42 +03:00
renovate[bot]
cd19022e2e Update dependency eslint-config-prettier to v10.1.8 (#26246)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-22 09:08:17 +03:00
Petar Petrov
03368c1859 Improve Z-Wave firmware update dialog on device page (#26158)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-07-21 13:55:31 +00:00
Petar Petrov
8e0ed288e1 Tweak the color of sum/change lines in statistics chart (#26242) 2025-07-21 10:57:18 +02:00
Petar Petrov
879e0ed3d5 Show more details in statistics legend when only 1 entity (#26241) 2025-07-21 10:57:13 +02:00
renovate[bot]
657275fd17 Update dependency marked to v16.1.0 (#26238)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-21 08:48:59 +03:00
Paul Bottein
3d1c908a01 Add support for multiple entities and hide_states option in state and attribute selectors (#26207)
* Add support for multiple entities and target for state selector

* Add support for multiple entities for attribute selector

* Improve context support

* Add combine mode and fix hidden and entity category for service control

* Don't use combine mode

* Refactor options
2025-07-21 08:48:25 +03:00
Norbert Rittel
713e8e7b71 Fix missing sentence-casing in Quickbar navigation items (#26224)
Fix missing sentence-casing in Quickbar navigation

Also replace one occurrence of "configuration" with "settings" as this is now it's menu title.
2025-07-20 10:17:48 +02:00
Petar Petrov
9e597d22a5 Handle predefined options in Z-Wave config panel (#26097)
* Handle predefined options in Z-Wave config panel

* use ha-combo-box

* lint

* display invalid status on the input

* show number and label

* compute items outside of render
2025-07-19 09:18:27 +03:00
Petar Petrov
259e8a14da Fix history for energy_storage device class (#26223) 2025-07-18 20:34:05 +02:00
renovate[bot]
4de4243b55 Update rspack monorepo to v1.4.8 (#26222)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-18 18:35:35 +02:00
Paul Bottein
a667cb627b Add reorder option to entity selector (#26217) 2025-07-18 18:08:54 +02:00
Paul Bottein
9461634670 Fix interactions translation in area card editor (#26218) 2025-07-18 16:00:02 +02:00
Petar Petrov
51b79b33fb Disable network graph emphasis on mobile (#26106) 2025-07-18 14:04:22 +02:00
renovate[bot]
539884295b Update rspack monorepo to v1.4.7 (#26216)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-18 12:40:48 +02:00
Bram Kragten
a885c7e358 Merge branch 'rc' 2025-07-18 10:32:20 +02:00
Bram Kragten
fa968f49c1 Bumped version to 20250702.3 2025-07-18 10:32:06 +02:00
Petar Petrov
cf3c40f5f7 Fix "Cancel exclusion" button for Z-Wave (#26188) 2025-07-18 10:31:56 +02:00
Petar Petrov
361474885f Fix entity renaming when adding a new device (#26177) 2025-07-18 10:31:55 +02:00
Petar Petrov
1e06046bd6 Fix number format in statistics charts (#26176)
fix number format in statistics charts
2025-07-18 10:31:54 +02:00
Petar Petrov
4c940e62f3 Fix entities link on integration page (#26167) 2025-07-18 10:31:53 +02:00
dcapslock
7631c409e1 Improve performance of Helpers config page (#26153) 2025-07-18 10:31:52 +02:00
Paul Bottein
e1192403d9 Update card size icon for area strategy (#26213) 2025-07-18 10:22:37 +02:00
renovate[bot]
f5c49c83a0 Update dependency @codemirror/view to v6.38.1 (#26214)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-18 10:22:16 +02:00
Petar Petrov
faae7a2322 ZWaveJS network graph (#26112)
* ZwaveJS network visualization

* more progress

* working version

* lint

* remove unused code

* Update src/translations/en.json

Co-authored-by: Norbert Rittel <norbert@rittel.de>

* remove "live" toggle and use deepEqual

* styling tweak

---------

Co-authored-by: Norbert Rittel <norbert@rittel.de>
2025-07-18 10:12:28 +02:00
Petar Petrov
f6aa55ef74 Fix entities link on integration page (#26167) 2025-07-18 10:01:33 +02:00
Petar Petrov
1a0afc5079 Show more details on storage page (#26202) 2025-07-18 08:31:31 +02:00
Christoph
4a50ca4ea5 do not set "___ADD_NEW___" value in ha-area-picker (#26210) 2025-07-18 08:37:04 +03:00
Logan Rosen
6cb27ede09 Refresh store collection when adding or removing repository (#26174)
* Refresh store collection when adding new repository

* Remove store refresh from `hassio-addon-store`

* Only refresh store when adding/removing repositories
2025-07-18 08:35:41 +03:00
Petar Petrov
1b68c51a05 Add Sankey chart to the energy dashboard (#26192)
* Add Sankey chart to the energy dashboard

* hide floors & areas if there is an explicit hierarchy
2025-07-18 06:30:21 +02:00
renovate[bot]
5f2b11ca9f Update dependency typescript-eslint to v8.37.0 (#26211)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-18 06:08:59 +02:00
Tommy Goode
ec6666a4ea Add 'state' option for secondary entity info on Entities card (#26201)
* add 'state' option for secondary entity info on Entities card

* Use formatEntityState instead of computeStateDisplay
2025-07-17 14:02:09 +00:00
Paul Bottein
a10dbb64f0 Small improvements for area strategy editor (#26206) 2025-07-17 16:39:38 +03:00
Stefan Agner
aa17be0e33 Add Supervisor unhealthy reason translations (#26190)
* Add Supervisor unhealthy reason translations

This adds translations for new Supervisor unhealthy reasons, including:
- `oserror_bad_message` (https://github.com/home-assistant/supervisor/pull/4750)
- `duplicate_os_installation` (https://github.com/home-assistant/supervisor/pull/6024)

While at it, sort the keys alphabetically for consistency.
2025-07-17 10:27:36 +02:00
Norbert Rittel
a8919703ee Fix description of Picture elements card (#26203)
- change explanation from plural to singular to match first sentence
- remove the exclamation mark from the middle of the sentence and fix wrong capitalization
2025-07-17 11:01:36 +03:00
Norbert Rittel
1c66a5e437 Sentence-case "Enable state reporting" for Alexa (#26204)
Makes it consistent with identical `enable_state_reporting` string for `google`.
2025-07-17 11:00:33 +03:00
Paul Bottein
767d785d04 Increase area card default height when using camera and features (#26205) 2025-07-17 10:59:29 +03:00
Paul Bottein
0839528e22 Add option to change the area card size for area dashboard (#26199) 2025-07-17 09:07:24 +03:00
Norbert Rittel
1012245ef7 Different sentence-casing fixes in user-facing strings (#26200)
* Several casing fixes in en.json

* Include "Security Devices PIN"

* Include "Browser Media Player"
2025-07-17 09:03:00 +03:00
karwosts
0d6db8b834 Show picture-elements error messages for elements (#26196) 2025-07-17 09:01:42 +03:00
Petar Petrov
adea2efb01 Fix "Cancel exclusion" button for Z-Wave (#26188) 2025-07-16 17:29:28 +02:00
dcapslock
818914b837 Include card error message in card error (#26184)
Pass card error message to createErrorCardElement
2025-07-16 17:28:42 +02:00
Paul Bottein
b207528ecf Remove specific icons for area controls card features (#26195) 2025-07-16 17:27:05 +02:00
Norbert Rittel
039ef18d8c Fix spelling of "to log in to" (verb) and "login" (noun) (#26189)
Fix spelling of "to log in to" and "login"
2025-07-16 12:22:52 +03:00
Petar Petrov
db387834f2 Fix entity renaming when adding a new device (#26177) 2025-07-16 11:00:49 +03:00
Petar Petrov
1b7d9f9e3b Remove vis-data dependency (#26186) 2025-07-16 08:42:37 +02:00
Paulus Schoutsen
ed8c9f5ce5 AI Task automation save improvements (#26140)
* also assign category

* Extract Suggest AI button

* Add sick animation

* Show AI Task pref but disabled if not done loading

* Lint

* Update progress wording

* Define better interface

* Add My panel

* Adjust instructions to params.domain

* Mention sentence capitalization

* Update label when failure

* Keep width during suggestion
2025-07-16 08:20:37 +03:00
Norbert Rittel
c3bf1d8770 Consistently capitalize "Companion" for the mobile apps (#26180) 2025-07-15 19:27:04 +02:00
Paul Bottein
7db4693082 Don't show members for legacy groups (#26179) 2025-07-15 17:05:38 +00:00
Petar Petrov
72a12a4ba4 Fix for charts with identically named entities (#26166)
* Fix for charts with identically named entities

* lint

* type fix
2025-07-15 19:01:58 +02:00
Paul Bottein
aee9e4b0a5 Show group members in more info (#26178)
* Should group members in more info

* Fix flickering
2025-07-15 19:51:46 +03:00
Petar Petrov
55f6affc9e Fix number format in statistics charts (#26176)
fix number format in statistics charts
2025-07-15 18:40:23 +02:00
renovate[bot]
1e5f2f7215 Update dependency eslint to v9.31.0 (#26171)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-15 08:14:15 +03:00
renovate[bot]
da864d5bb7 Update dependency lit-html to v3.3.1 (#26162)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-14 12:23:55 +02:00
Paul Bottein
8d60f39cf4 Improve aria support in control elements (#26107)
* Improve aria support in control elements

* Use radiogroup for control select

* Fix switch
2025-07-14 12:56:31 +03:00
renovate[bot]
2045519814 Update dependency @lit/reactive-element to v2.1.1 (#26159)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-14 08:35:27 +00:00
renovate[bot]
3f70e88a4f Update dependency lit to v3.3.1 (#26160)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-14 11:27:40 +03:00
renovate[bot]
6ed5fbe102 Update dependency @lit-labs/observers to v2.0.6 (#26155)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-14 11:26:43 +03:00
renovate[bot]
4e72d5083d Update dependency @lit/context to v1.1.6 (#26157)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-14 11:25:55 +03:00
renovate[bot]
f9e102e537 Update dependency @lit-labs/virtualizer to v2.1.1 (#26156)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-14 11:05:03 +03:00
renovate[bot]
e54363875b Update dependency @lit-labs/motion to v1.0.9 (#26154)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-14 09:10:11 +03:00
dcapslock
1ce4e2a799 Improve performance of Helpers config page (#26153) 2025-07-14 08:42:37 +03:00
karwosts
80b86a89f0 Render energy-gas in the display unit of the sources (#26143) 2025-07-14 08:34:53 +03:00
renovate[bot]
1a316d251e Update rspack monorepo to v1.4.6 (#26148)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-13 09:00:49 +00:00
renovate[bot]
a74f90b768 Update dependency luxon to v3.7.1 (#26147)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-13 10:51:09 +02:00
renovate[bot]
fc6e457581 Update dependency @types/leaflet to v1.9.20 (#26142)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-11 23:25:08 +02:00
karwosts
ad7b8b66f2 Render energy-water in the display unit of the sources (#26141)
Render energy-water in the display unit of the source
2025-07-11 19:31:27 +03:00
renovate[bot]
0714677a8a Update dependency hls.js to v1.6.7 (#26137)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-11 12:37:28 +02:00
renovate[bot]
0a946a5c43 Update rspack monorepo to v1.4.5 (#26138)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-11 12:37:04 +02:00
renovate[bot]
4930a8d88e Update dependency typescript-eslint to v8.36.0 (#26136)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-11 12:36:55 +02:00
Petar Petrov
8b781cec8e Handle disabled ZWave provisionning entries (#26132)
* Handle disabled ZWave provisionning entries

* Update src/translations/en.json

Co-authored-by: Norbert Rittel <norbert@rittel.de>

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
Co-authored-by: Norbert Rittel <norbert@rittel.de>
2025-07-11 12:36:19 +02:00
Petar Petrov
065c98c5d7 "Add device" primary button on protocol integration pages (#26130) 2025-07-11 10:37:25 +03:00
Bram Kragten
6a3c58d20f Merge branch 'rc' 2025-07-10 21:35:08 +02:00
Bram Kragten
a87afe9fb3 Bumped version to 20250702.2 2025-07-10 21:34:53 +02:00
Christoph
61fe8983f3 do not set "___ADD_NEW___" value in ha-floor-picker (#26102) 2025-07-10 21:34:33 +02:00
Ezra Freedman
c10410ade3 Weather card smallest width is not set correctly (#26082)
set result.width, not result.height
2025-07-10 21:34:32 +02:00
Yosi Levy
761fded9e3 RTL fixes for 7-25 (#26074) 2025-07-10 21:34:32 +02:00
karwosts
b87fbe7a1e Fix default range icon (#26069) 2025-07-10 21:34:31 +02:00
karwosts
7fdf824e97 Revert changes to persistent notification in sidebar (#25984) 2025-07-10 21:34:30 +02:00
karwosts
69d8eeb7db Revert changes to persistent notification in sidebar (#25984) 2025-07-10 21:33:33 +02:00
Norbert Rittel
3b7d2869e5 Fix sentence-casing of two "More Info" button labels (#26135)
Fix sentence-casing of two "More Info" buttons

- the one in the Dev tools opens the "More info" dialog for the entity, so it's changed to that dialog's name
- the one for Thread configuration opens href=${documentationUrl(this.hass, `/integrations/thread`)}
therefore it's changed to "More information"
2025-07-10 16:07:11 +00:00
renovate[bot]
bcda5cd0cf Update dependency core-js to v3.44.0 (#26134)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-10 16:02:35 +00:00
renovate[bot]
eeb64a25ff Update dependency @rsdoctor/rspack-plugin to v1.1.8 (#26133)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-10 16:01:56 +00:00
Petar Petrov
9134132ba9 Only show loading for slow flow steps to avoid flickering (#26131) 2025-07-10 17:59:07 +02:00
karwosts
1ded254e5a Fix some weather-forecast card editor issues (#26125) 2025-07-10 11:27:37 +03:00
Christoph
fc104a7992 add floor column to datatable in config devices page (#26103)
* add floor column to datatable in config devices page

* refactor conditions related to floor column in config devices page
2025-07-10 11:25:56 +03:00
karwosts
e7e062a222 Pause map autofit when user initiates pan/zoom (#26114)
* Pause map autofit when user initiates pan/zoom

* not a state

* a different approach
2025-07-09 17:32:20 +03:00
Franck Nijhof
5233086efb Add Task issue form (#26121) 2025-07-09 14:14:37 +02:00
Christoph
8d95f0d95d add unit tests for common/url/search-params.ts (#26115) 2025-07-09 14:11:28 +03:00
karwosts
5cf8b39703 Coerce all energy distribution values to the same unit (#26117) 2025-07-09 14:06:47 +03:00
Franck Nijhof
15dabe372c Adjust feature request links in issue reporting (#26123) 2025-07-09 12:40:37 +02:00
renovate[bot]
aab52a8bb2 Update dependency vis-data to v7.1.10 (#26122)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-09 10:27:49 +00:00
Norbert Rittel
aa52825b40 Capitalize "REST", remove excessive commas (#26109) 2025-07-08 12:57:30 +02:00
Christoph
2809a306e6 do not set "___ADD_NEW___" value in ha-floor-picker (#26102) 2025-07-08 12:40:24 +02:00
renovate[bot]
a6304d6284 Update rspack monorepo to v1.4.4 (#26105)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-08 08:50:51 +03:00
Paul Bottein
8e866e86d6 Use query params instead of path for media browser navigate ids (#26099) 2025-07-08 08:50:28 +03:00
Kevin Lakotko
2e8203f666 Sort groups if same as sort column (#26010)
* fix(grouping): if sorted by column sort group

* chore: use props to group for memoization
2025-07-07 19:23:27 +03:00
Paulus Schoutsen
b60f2e3201 Add extra margin AI Task pref (#26096)
Add extra margin AI Task
2025-07-07 12:11:35 +03:00
renovate[bot]
c5f57f436c Update rspack monorepo to v1.4.3 (#26093)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-07 10:17:53 +03:00
steinmn
3bb930b906 Fix flickering Edit sidebar dialog by locking content padding (#26084)
Fix flickering Edit sidebar dialog
2025-07-07 05:29:25 +00:00
Ezra Freedman
e75331e159 Weather card smallest width is not set correctly (#26082)
set result.width, not result.height
2025-07-06 10:12:59 +02:00
renovate[bot]
d6b66a7145 Update dependency @rsdoctor/rspack-plugin to v1.1.7 (#26087)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-06 08:07:11 +00:00
Yosi Levy
5c346798c8 RTL fixes for 7-25 (#26074) 2025-07-06 10:04:09 +02:00
renovate[bot]
5ffe37407a Update dependency hls.js to v1.6.6 (#26085)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-06 09:58:49 +02:00
renovate[bot]
2b056c0434 Update dependency @lokalise/node-api to v14.9.1 (#26081)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-06 09:58:06 +02:00
Paulus Schoutsen
27b36707e5 Automation save dialog to suggest name, description and labels (#26071)
* AI Task structure

* Suggest description and labels too
2025-07-06 09:57:16 +02:00
renovate[bot]
5760614b65 Update babel monorepo to v7.28.0 (#26079)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-05 12:17:24 +02:00
renovate[bot]
3835912b01 Update dependency @rsdoctor/rspack-plugin to v1.1.6 (#26078)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-05 12:14:01 +02:00
Petar Petrov
a385655c85 Remove deprecated dependency @types/glob (#26075) 2025-07-05 08:27:41 +02:00
karwosts
e177012108 Fix default range icon (#26069) 2025-07-04 23:34:38 +02:00
renovate[bot]
cc3234ad8f Update dependency eslint to v9.30.1 (#26072)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-04 22:47:44 +02:00
karwosts
4d932f0b4a Support translating number selector UoM (#26070) 2025-07-04 21:06:49 +03:00
renovate[bot]
257769cdc7 Update dependency globals to v16.3.0 (#26068)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-04 18:42:09 +02:00
renovate[bot]
6619f064eb Update dependency @lokalise/node-api to v14.9.0 (#26067)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-04 15:12:03 +02:00
renovate[bot]
382a47a082 Update rspack monorepo to v1.4.2 (#26066)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-04 15:11:40 +02:00
Bram Kragten
fe946eb75b Merge branch 'rc' 2025-07-04 13:53:23 +02:00
Bram Kragten
3bfbe4bde6 Bumped version to 20250702.1 2025-07-04 13:53:08 +02:00
c0ffeeca7
7963a97358 Terminology: change controller to adapter (#26051)
* Terminology: change controller to adapter

* Update src/translations/en.json

Co-authored-by: AlCalzone <d.griesel@gmx.net>

* Apply suggestions from code review

---------

Co-authored-by: AlCalzone <d.griesel@gmx.net>
2025-07-04 13:52:37 +02:00
Ezra Freedman
0ed2b5966e Prevent uncaught TypeError on HuiWeatherForecastCard render (#26038) 2025-07-04 13:52:37 +02:00
Paul Bottein
70c5f77aa7 Fix play media action (#26035) 2025-07-04 13:52:36 +02:00
Paul Bottein
1013647249 Fix zoom in statistic chart (#26034) 2025-07-04 13:52:35 +02:00
Paul Bottein
45e9c51525 Reduce media selector size (#26033) 2025-07-04 13:52:34 +02:00
renovate[bot]
ad4be75fe1 Update dependency typescript-eslint to v8.35.1 (#26058)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-04 10:16:33 +03:00
Ezra Freedman
d605b67b41 Prevent uncaught TypeError on HuiWeatherForecastCard render (#26038) 2025-07-03 21:19:48 +02:00
renovate[bot]
dba6a3c756 Update fullcalendar monorepo to v6.1.18 (#26047)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-03 17:14:49 +03:00
c0ffeeca7
002e9ad071 Terminology: change controller to adapter (#26051)
* Terminology: change controller to adapter

* Update src/translations/en.json

Co-authored-by: AlCalzone <d.griesel@gmx.net>

* Apply suggestions from code review

---------

Co-authored-by: AlCalzone <d.griesel@gmx.net>
2025-07-03 15:51:35 +02:00
Paul Bottein
6e7874c2c9 Fix play media action (#26035) 2025-07-02 19:30:06 +02:00
Paul Bottein
978f9b0f83 Reduce media selector size (#26033) 2025-07-02 18:08:31 +02:00
renovate[bot]
2b88669a72 Update dependency eslint-plugin-lit-a11y to v5.1.0 (#26020)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-02 17:20:13 +02:00
renovate[bot]
252fd2bb6c Update dependency @bundle-stats/plugin-webpack-filter to v4.21.0 (#26032)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-02 17:19:41 +02:00
Paul Bottein
cc68a087a2 Fix zoom in statistic chart (#26034) 2025-07-02 17:18:39 +02:00
Bram Kragten
bbe3a9e0c2 Merge branch 'rc' 2025-07-02 13:45:20 +02:00
Bram Kragten
33ea02208a Bumped version to 20250702.0 2025-07-02 13:44:53 +02:00
Bram Kragten
cf531cd935 Disable fullscreen in trigger detail dialog (#26030) 2025-07-02 13:44:27 +02:00
Paul Bottein
232649c0cd Improve styling of the code editor in fullscreen mode (#26029) 2025-07-02 13:44:26 +02:00
Bram Kragten
1db8ef37a2 Dont fetch device actions on first updated (#26028) 2025-07-02 13:44:25 +02:00
Paul Bottein
eecd765d09 Fix UI jump when using drag and drop in areas strategy editor (#26026) 2025-07-02 13:44:25 +02:00
Paul Bottein
3d75831623 Add missing domain icon import in area controls (#26023) 2025-07-02 13:44:24 +02:00
Paul Bottein
c1934e0b9a Add missing area helper (#26022) 2025-07-02 13:44:23 +02:00
karwosts
c0e9c3b9dc Fix glitchy 'show' checkboxes on integration page (#26021) 2025-07-02 13:44:22 +02:00
karwosts
3e1341a731 Fix glitchy 'show' checkboxes on integration page (#26021) 2025-07-02 13:43:06 +02:00
Bram Kragten
6be25270fd Dont fetch device actions on first updated (#26028) 2025-07-02 13:42:21 +02:00
Bram Kragten
ce929aea46 Disable fullscreen in trigger detail dialog (#26030) 2025-07-02 13:41:52 +02:00
Paul Bottein
8853bf6ea2 Improve styling of the code editor in fullscreen mode (#26029) 2025-07-02 13:41:26 +02:00
Paul Bottein
2241807745 Fix UI jump when using drag and drop in areas strategy editor (#26026) 2025-07-02 09:03:21 +00:00
Paul Bottein
50d705c943 Add missing domain icon import in area controls (#26023) 2025-07-01 21:47:20 +02:00
Paul Bottein
eb111d3c32 Add missing area helper (#26022) 2025-07-01 21:46:58 +02:00
Paul Bottein
c3f0bba4a3 20250701.0 (#26019) 2025-07-01 15:04:35 +02:00
Paul Bottein
0026ee7563 Bumped version to 20250701.0 2025-07-01 15:02:51 +02:00
Paul Bottein
61f1c8cbd4 Force narrow style for action, condition and trigger in blueprint (#26018) 2025-07-01 15:02:17 +02:00
Paul Bottein
e0b32ea789 Increase target area in tile card and area card (#26017) 2025-07-01 15:02:17 +02:00
Paul Bottein
96bbfe8a93 Add dashboard title to strategy editor (#26015) 2025-07-01 15:02:16 +02:00
Paul Bottein
93837f01f7 Avoid selector to take to much space in action calls (#26014) 2025-07-01 15:02:15 +02:00
Ezra Freedman
d0737082a5 Fix translation in the integration page for entities (#26009)
add call to localize
2025-07-01 15:02:14 +02:00
Paul Bottein
57da4d3499 Fix object selector not displayed (#26007) 2025-07-01 15:02:13 +02:00
Paul Bottein
6e84fee791 Do not display quality scale for custom integrations (#26006) 2025-07-01 15:02:12 +02:00
Paul Bottein
2e223e637b Improve device row in integration page (#26005)
Improve device row in config entry page
2025-07-01 15:02:11 +02:00
Paul Bottein
3e45821fd0 Allow to re-order floors in areas dashboard (#26002)
* Allow to re-order floors in areas dashboard

* Move drag handle to right

* Improve typings

* Only show drag handle if there is at least 2 floors
2025-07-01 15:02:10 +02:00
Simon Lamon
b16087d5b5 Fix fullscreen yaml editor (transparency background) (#25989)
Fix fullscreen editor (transparency background)
2025-07-01 15:02:10 +02:00
Norbert Rittel
6300bfb200 Fix grammar of Light, Sensor and Tile card descriptions (#25988)
* Fix grammar of Light, Sensor and Entity card descriptions

* Capitalize "Tile card" as a name

* Apply same change to Entity badge description
2025-07-01 15:02:09 +02:00
Simon Lamon
05a9f69c9e Pass area control service calls through hass (#25986)
Connection logging
2025-07-01 15:02:08 +02:00
Norbert Rittel
e306e29d95 Fix sentence-casing, spelling and grammar issues (#25981)
* Fix sentence-casing, spelling and grammar issues

* Add "IP information" to the list

* More sentence-casing issues
2025-07-01 15:02:07 +02:00
Norbert Rittel
619974ffdb Dev Tools: Remove excessive space from "Input date times" (#25973)
Remove excessive space from "input date times"
2025-07-01 15:02:06 +02:00
Paul Bottein
6f753c4909 Use entity format state if only one entity for that domain in the area card (#25964)
Use entity format state if only one entity is area card
2025-07-01 15:02:05 +02:00
Paul Bottein
1e59f9f4be Increase target area in tile card and area card (#26017) 2025-07-01 14:34:19 +02:00
Paul Bottein
523eb9522f Add dashboard title to strategy editor (#26015) 2025-07-01 14:33:36 +02:00
Paul Bottein
f6cb322819 Avoid selector to take to much space in action calls (#26014) 2025-07-01 14:32:54 +02:00
Paul Bottein
4f97756f4e Force narrow style for action, condition and trigger in blueprint (#26018) 2025-07-01 15:22:55 +03:00
Ezra Freedman
8644dd5271 Fix translation in the integration page for entities (#26009)
add call to localize
2025-07-01 06:48:13 +00:00
renovate[bot]
26d842f432 Update dependency @babel/helper-define-polyfill-provider to v0.6.5 (#26008)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-01 08:34:48 +02:00
renovate[bot]
ad4f14ffaf Update dependency eslint to v9.30.0 (#26012)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-07-01 08:31:30 +02:00
Paul Bottein
948c858e78 Fix object selector not displayed (#26007) 2025-06-30 16:15:37 +00:00
Paul Bottein
49099223d3 Do not display quality scale for custom integrations (#26006) 2025-06-30 16:10:08 +00:00
Paul Bottein
0fbd430594 Allow to re-order floors in areas dashboard (#26002)
* Allow to re-order floors in areas dashboard

* Move drag handle to right

* Improve typings

* Only show drag handle if there is at least 2 floors
2025-06-30 16:09:42 +00:00
Kevin Lakotko
8cc762d839 Fix use of numeric option for collator (#25917)
* fix(string): use numeric option for collator

* test: add natural sort comparison tests
2025-06-30 18:00:45 +02:00
Paul Bottein
89d9dd2893 Improve device row in integration page (#26005)
Improve device row in config entry page
2025-06-30 17:44:50 +02:00
renovate[bot]
b7d1ce1c37 Update rspack monorepo to v1.4.1 (#26001)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-30 17:22:39 +02:00
renovate[bot]
869d10ca3f Update CodeMirror (#26003)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-30 17:22:09 +02:00
Simon Lamon
f338089148 Pass area control service calls through hass (#25986)
Connection logging
2025-06-30 14:59:15 +02:00
renovate[bot]
06b0f9fcaf Update dependency @rsdoctor/rspack-plugin to v1.1.5 (#26000)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-30 13:49:05 +02:00
Simon Lamon
7ad07e4c55 Fix fullscreen yaml editor (transparency background) (#25989)
Fix fullscreen editor (transparency background)
2025-06-30 14:16:59 +03:00
renovate[bot]
ad65600d11 Update dependency marked to v16 (#25997)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-30 14:15:16 +03:00
renovate[bot]
e91d907e56 Update dependency prettier to v3.6.2 (#25996) 2025-06-30 08:26:28 +02:00
renovate[bot]
b35a1fc9e0 Update dependency @babel/core to v7.27.7 (#25992)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-29 20:54:40 +03:00
renovate[bot]
dd18ad96f3 Update dependency gulp-rename to v2.1.0 (#25985)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-29 17:16:40 +02:00
Norbert Rittel
62eec56e5f Fix grammar of Light, Sensor and Tile card descriptions (#25988)
* Fix grammar of Light, Sensor and Entity card descriptions

* Capitalize "Tile card" as a name

* Apply same change to Entity badge description
2025-06-29 17:16:09 +02:00
renovate[bot]
7187e25cad Update rspack monorepo to v1.4.0 (#25987)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-29 11:06:34 +02:00
Norbert Rittel
6d9e6a616d Fix sentence-casing, spelling and grammar issues (#25981)
* Fix sentence-casing, spelling and grammar issues

* Add "IP information" to the list

* More sentence-casing issues
2025-06-29 09:25:29 +02:00
renovate[bot]
44d87e3c66 Update dependency barcode-detector to v3.0.5 (#25980)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-28 17:41:15 +02:00
renovate[bot]
085e2460bc Update dependency prettier to v3.6.1 (#25978)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-28 17:40:47 +02:00
karwosts
1f8a9e4caf Improve settings page accessibility (No. 2) (#25965) 2025-06-27 19:38:11 +02:00
Franck Nijhof
f08877437e Add initial instructions file for GitHub Copilot and Claude Code (#25967) 2025-06-27 18:06:23 +02:00
renovate[bot]
6690d1ef22 Update dependency @types/leaflet to v1.9.19 (#25974)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-27 17:54:52 +02:00
Paul Bottein
9d8a5b366e Use entity format state if only one entity for that domain in the area card (#25964)
Use entity format state if only one entity is area card
2025-06-27 17:41:58 +02:00
Franck Nijhof
22c798c9d6 Add Claude to gitignore (#25966) 2025-06-27 15:59:14 +02:00
Norbert Rittel
8aabb1f32f Dev Tools: Remove excessive space from "Input date times" (#25973)
Remove excessive space from "input date times"
2025-06-27 15:57:52 +02:00
renovate[bot]
33d5cecc85 Update dependency ua-parser-js to v2.0.4 (#25968)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-27 15:12:14 +03:00
Paul Bottein
a0a2b5f065 20250627.0 (#25971) 2025-06-27 13:51:57 +02:00
Paul Bottein
5430325127 Bumped version to 20250627.0 2025-06-27 13:50:14 +02:00
Paul Bottein
56d3cf7f1e Use areas dashboard name in the top bar (#25969) 2025-06-27 13:49:10 +02:00
Paul Bottein
b39e9c38b9 Bump vaadin to 24.7.9 (#25963) 2025-06-27 13:49:09 +02:00
Bram Kragten
c065efc52f Disable fullscreen editor for editors that are already fullscreen (#25959)
* Disabled fullscreen editor for editors that are already fullscreen

* Update ha-code-editor.ts
2025-06-27 13:49:08 +02:00
Paul Bottein
caaec7d34d Fix expand icon for entries and sub entries (#25955) 2025-06-27 13:49:07 +02:00
Paul Bottein
7693a4dc24 Use areas dashboard name in the top bar (#25969) 2025-06-27 10:40:15 +02:00
Paul Bottein
9ec38c7dd9 Bump vaadin to 24.7.9 (#25963) 2025-06-26 21:22:06 +00:00
Bram Kragten
e8cb85f7ff Disable fullscreen editor for editors that are already fullscreen (#25959)
* Disabled fullscreen editor for editors that are already fullscreen

* Update ha-code-editor.ts
2025-06-26 23:17:30 +02:00
renovate[bot]
ef964a2717 Update dependency typescript-eslint to v8.35.0 (#25956) 2025-06-26 19:32:39 +02:00
Paul Bottein
369881f8a6 Fix expand icon for entries and sub entries (#25955) 2025-06-26 19:21:15 +02:00
Bram Kragten
76509d8bd4 Bumped version to 20250626.0 2025-06-26 16:44:40 +02:00
Paul Bottein
11fcab87d4 Revert vaadin to 24.7.7 (#25953) 2025-06-26 16:44:05 +02:00
Paul Bottein
bfa0b8c0fc Don't limit combo-box dropdown size (#25952) 2025-06-26 16:44:04 +02:00
Bram Kragten
f54312a7bc Load title when fetching flow (#25951) 2025-06-26 16:44:03 +02:00
Bram Kragten
8ff3f7733f Fix filtering on device in entities config panel (#25948)
* Fix filtering on device in entities config panel

* fix

* set filters from url twice to catch race...
2025-06-26 16:44:02 +02:00
Paul Bottein
def8e8a713 Disable escape key to close edit card dialog (#25947) 2025-06-26 16:44:01 +02:00
Bram Kragten
e675283fcc Add label to version number (#25942)
Add label
2025-06-26 16:44:00 +02:00
Bram Kragten
1900cce7f9 make sure header is always shown in data entry flow (#25941) 2025-06-26 16:44:00 +02:00
Bram Kragten
8e2c943dff add version number to integration page (#25940)
* add version number to integration page

* Update ha-config-integration-page.ts
2025-06-26 16:43:59 +02:00
Bram Kragten
8c5beb724f Use different icon for services (#25939) 2025-06-26 16:43:58 +02:00
Paul Bottein
b9fb981fb2 Remove alert classes and only use slot sensors for areas dashboard (#25937)
* Remove alert classes and only used slot sensors for areas dashboard

* Rename group to sensors

* Rename group to sensors
2025-06-26 16:43:57 +02:00
Paul Bottein
3456aa96e8 Better handle case when no floors in areas dashboard (#25933) 2025-06-26 16:43:56 +02:00
Eric Stern
e88d9a1ffb Fix logbook stream subscription (#25927) 2025-06-26 16:43:56 +02:00
Paulus Schoutsen
0b488e1ffd Fix wrapping of add subentry buttons (#25925) 2025-06-26 16:43:55 +02:00
Paulus Schoutsen
47aea824aa Make the config entry row section wider on mobile (#25924) 2025-06-26 16:43:54 +02:00
Bram Kragten
570c63c50a Prevent overflow of ripple on device row on integration page (#25922) 2025-06-26 16:43:53 +02:00
Bram Kragten
d9a3a27245 Dont show internal quality scale (#25921)
dont show internal quality scale
2025-06-26 16:43:52 +02:00
Bram Kragten
3d1a3e2335 Only show own devices when there are devices... (#25920)
only show own devices when there are devices...
2025-06-26 16:43:51 +02:00
Bram Kragten
42815c4d5e Update confirm disable messages (#25919) 2025-06-26 16:43:50 +02:00
Bram Kragten
68e22d23f1 Fix filtering on device in entities config panel (#25948)
* Fix filtering on device in entities config panel

* fix

* set filters from url twice to catch race...
2025-06-26 16:42:11 +02:00
Paul Bottein
696ba69a9e Revert vaadin to 24.7.7 (#25953) 2025-06-26 14:41:58 +00:00
Paul Bottein
e2ab52e10e Don't limit combo-box dropdown size (#25952) 2025-06-26 14:12:07 +00:00
Bram Kragten
b154bc1502 Load title when fetching flow (#25951) 2025-06-26 14:07:46 +00:00
Paul Bottein
a952b880d8 Disable escape key to close edit card dialog (#25947) 2025-06-26 15:25:26 +02:00
Bram Kragten
018aceb542 Add label to version number (#25942)
Add label
2025-06-26 15:38:33 +03:00
Bram Kragten
2fb86f118e make sure header is always shown in data entry flow (#25941) 2025-06-26 11:07:08 +00:00
Bram Kragten
6c8caccfec Use different icon for services (#25939) 2025-06-26 13:05:28 +02:00
Paul Bottein
3dd3a80054 Remove alert classes and only use slot sensors for areas dashboard (#25937)
* Remove alert classes and only used slot sensors for areas dashboard

* Rename group to sensors

* Rename group to sensors
2025-06-26 13:05:05 +02:00
Bram Kragten
675310afdf add version number to integration page (#25940)
* add version number to integration page

* Update ha-config-integration-page.ts
2025-06-26 11:04:13 +00:00
Paul Bottein
f5df91d4c7 Better handle case when no floors in areas dashboard (#25933) 2025-06-26 12:18:34 +02:00
Bram Kragten
d8ab9b73ba Prevent overflow of ripple on device row on integration page (#25922) 2025-06-26 12:17:00 +02:00
renovate[bot]
89ab0b4a3d Update dependency prettier to v3.6.0 (#25930)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-26 10:18:03 +02:00
Eric Stern
dd4cb1df72 Fix logbook stream subscription (#25927) 2025-06-26 09:42:43 +02:00
Paulus Schoutsen
b81cd37776 Make the config entry row section wider on mobile (#25924) 2025-06-26 09:41:39 +02:00
Paulus Schoutsen
34112e7446 Fix wrapping of add subentry buttons (#25925) 2025-06-26 09:41:10 +02:00
Bram Kragten
2dee45b465 Update confirm disable messages (#25919) 2025-06-26 08:57:16 +03:00
Norbert Rittel
10eb0a8b87 Deduplicate weekdays in time conditions (#25915)
Replace weekdays conditions with references to common ui strings
2025-06-26 08:55:46 +03:00
Bram Kragten
551035238f Dont show internal quality scale (#25921)
dont show internal quality scale
2025-06-25 17:34:12 -04:00
Bram Kragten
eb9359e9e1 Only show own devices when there are devices... (#25920)
only show own devices when there are devices...
2025-06-25 17:31:43 -04:00
Bram Kragten
df2523a6a2 Merge branch 'rc' into dev 2025-06-25 17:25:23 +02:00
Bram Kragten
edb1e1bba7 Bumped version to 20250625.0 2025-06-25 17:24:02 +02:00
Bram Kragten
e5bc234ab3 make debug mode better visible, improve disabling device (#25910) 2025-06-25 17:23:22 +02:00
ildar170975
6006e926a7 fix hui-panel-view for a "warning_multiple_cards" (#25899) 2025-06-25 17:20:14 +02:00
Petar Petrov
93df473ad2 Translate select options in config flows (#25911) 2025-06-25 17:18:29 +02:00
Paul Bottein
af149dcfab Move exclude entities config to area card (#25909) 2025-06-25 16:18:47 +02:00
karwosts
3ab6a02994 Improve settings page accessibility (#25885) 2025-06-25 13:35:14 +00:00
Leon
e7a04eb3d2 Short-format negative and small numbers in energy-distribution-card (#25862) 2025-06-25 13:22:21 +00:00
karwosts
2dfe5f50a6 Support templates in action target (#25656) 2025-06-25 15:20:53 +02:00
Paul Bottein
174d54396f Add cover controls to area card and improve areas dashboard (#25892) 2025-06-25 13:14:41 +00:00
karwosts
5c1a8029bf Fix entity selector slicing value on load (#25854) 2025-06-25 15:11:23 +02:00
Franck Nijhof
884341656f Add full-screen button to code editors (#25903) 2025-06-25 13:07:31 +00:00
Bram Kragten
fcbc8de95a Update device row in integration page (#25907)
* Update ha-config-entry-device-row.ts

* Update src/panels/config/integrations/ha-config-entry-device-row.ts

---------

Co-authored-by: Paulus Schoutsen <balloob@gmail.com>
2025-06-25 12:16:11 +00:00
Paul Bottein
f90eb4fee0 Exclude entities in controls for areas dashboard (#25906) 2025-06-25 13:50:21 +03:00
Paulus Schoutsen
9afc4260c9 Move AI task prefs to system -> general (#25904)
Move AI task prefs
2025-06-25 08:27:09 +03:00
Franck Nijhof
3aafa47f6d Improve Entity ID auto-complete in YAML mode (#25901) 2025-06-24 16:22:31 -04:00
Paulus Schoutsen
35ba2fffda Also show sub entry services when sub entry expanded (#25900) 2025-06-24 19:46:47 +02:00
Paul Bottein
31bc708725 Improve alerts padding in area card (#25897) 2025-06-24 16:09:56 +00:00
Franck Nijhof
caa60e4e8c Fix warnings raised when migrating incomplete automation configuration (#25898) 2025-06-24 18:02:45 +02:00
Paul Bottein
edcca81acc Group area per floor in the areas strategy editor (#25895) 2025-06-24 15:28:46 +02:00
Stefan Agner
508e451f94 Add container arch to system health data (#25896) 2025-06-24 15:27:52 +02:00
Bram Kragten
bfcc36bb40 Update integration page layout (#25880) 2025-06-24 15:27:07 +02:00
Petar Petrov
976bf7c512 Update buttons in Z-Wave firmware update dialog (#25894)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-06-24 15:20:30 +02:00
Petar Petrov
fb28c8971b Update Z-Wave text (#25893) 2025-06-24 14:31:26 +02:00
Paul Bottein
641a2eb77c Use area card in area strategy (#25879)
* Bring area card to area strategy

* Add device classes

* Use subview
2025-06-24 14:46:12 +03:00
Bram Kragten
47b90feffa Bumped version to 20250531.4 2025-06-24 09:58:11 +02:00
Paul Bottein
45e66d8b6e Don't send double card updated event when rendering the card (#25883) 2025-06-24 09:56:53 +02:00
Petar Petrov
73cd1e8e9d Fix duplicated requests in statistics-graph (#25878) 2025-06-24 09:56:52 +02:00
Petar Petrov
1a8ff83e2d Another fix for history chart axis rounding (#25852) 2025-06-24 09:56:51 +02:00
Petar Petrov
e6fbe0d538 Round chart limits with fit_y_data (#25851) 2025-06-24 09:56:51 +02:00
Paul Bottein
5ac6781f7d Remove debug type in secondary line in statistic picker (#25835) 2025-06-24 09:56:50 +02:00
Petar Petrov
7f7e693547 Fix bar chart data order when using the legend (#25832)
* Fix bar chart data order when using the legend

* type fix
2025-06-24 09:56:49 +02:00
Paul Bottein
51246f119c Fix disabled color in dark mode in production (#25818) 2025-06-24 09:56:48 +02:00
Anthony Relle
d764187e8c Update ElectricityMaps URL in Energy Dashboard (#25816)
fix: update electricitymap domain
2025-06-24 09:56:47 +02:00
Petar Petrov
6738b7d708 Fix sankey total calculation to account for included_in_stat (#25805) 2025-06-24 09:56:47 +02:00
Petar Petrov
77c458a0e5 Reduce reset-zoom button size on timeline charts (#25796) 2025-06-24 09:56:46 +02:00
ildar170975
876e36b4e0 hui-graph-footer-editor: add margin to ha-switch to prevent a scrollbar (#25645)
* add padding-bottom to card-config to prevent a scrollbar

* revert padding for card-config

* add margin to ha-switch

* revert margin for ha-switch

* set margin for ha-switch
2025-06-24 08:27:16 +03:00
Paul Bottein
dd64fa228c Add color options to area card (#25881)
* Add color options to area card

* Color all controls with the same color

* Clean area card
2025-06-24 08:23:58 +03:00
renovate[bot]
b3f5eb256f Update dependency eslint-plugin-import to v2.32.0 (#25890)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-24 06:25:30 +02:00
ildar170975
a5005c0840 Device page: sort related automations, scenes, scripts (#24742)
* sort related items

* use memoize for sorted _related

* fix for "_entities" & "_getEntitiesSorted"
2025-06-24 06:25:09 +02:00
Paul Bottein
c73122d7ee Don't send double card updated event when rendering the card (#25883) 2025-06-23 14:10:27 +02:00
Petar Petrov
82da36825e Fix duplicated requests in statistics-graph (#25878) 2025-06-23 11:25:46 +02:00
Petar Petrov
3e2a5bff4d Zwave delete device button on device page (#25766)
* Handle ZWaveJS device delete in frontend according to status

* finishing touches

* Fix custom value selected when clicking item in combo box (#25734)

* Assist Chat: handle intent progress delta not always being there (#25730)

handle intent progress data type change

* More support for no-grid energy dashboard (#25644)

* More support for no-grid energy dashboard

* Update src/panels/lovelace/cards/energy/hui-energy-distribution-card.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* lint

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Z-Wave: apply sentence-style capitalization (#25739)

* Display full error for card preview mode (#25747)

* Fix edit card not working in chrome after editing (#25751)

* Change backup type order (#25759)

* Fix alerts refresh on device page (#25748)

* Fix alerts refresh on device page

* don't reset actions periodically

* reset stuff only on deviceId change

* Ensure grid options always return an object (#25760)

Assist Chat: handle intent progress delta not always being there (#25730)

handle intent progress data type change

More support for no-grid energy dashboard (#25644)

* More support for no-grid energy dashboard

* Update src/panels/lovelace/cards/energy/hui-energy-distribution-card.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* lint

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

Z-Wave: apply sentence-style capitalization (#25739)

Display full error for card preview mode (#25747)

Fix edit card not working in chrome after editing (#25751)

Change backup type order (#25759)

Fix alerts refresh on device page (#25748)

* Fix alerts refresh on device page

* don't reset actions periodically

* reset stuff only on deviceId change

Ensure grid options always return an object (#25760)

* fix merge issue

* lint

* Update text and buttons

* Update src/translations/en.json

Co-authored-by: Norbert Rittel <norbert@rittel.de>

* update text

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
Co-authored-by: Paulus Schoutsen <balloob@gmail.com>
Co-authored-by: karwosts <32912880+karwosts@users.noreply.github.com>
Co-authored-by: c0ffeeca7 <38767475+c0ffeeca7@users.noreply.github.com>
Co-authored-by: Norbert Rittel <norbert@rittel.de>
2025-06-23 11:07:19 +03:00
Paulus Schoutsen
1349d9d8e3 Hide AI Task from default dashboard (#25877) 2025-06-23 09:40:16 +02:00
Petar Petrov
f6f2cb0fce Round chart limits with fit_y_data (#25851) 2025-06-23 08:42:54 +03:00
Paulus Schoutsen
589fa75b17 Add support for accept keyword in media selector (#25808) 2025-06-22 14:02:39 -04:00
renovate[bot]
fdd6ccf379 Update dependency @rsdoctor/rspack-plugin to v1.1.4 (#25868)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-22 18:48:32 +03:00
Petar Petrov
f50d5d79a4 Another fix for history chart axis rounding (#25852) 2025-06-22 12:11:29 +02:00
iluvdata
ad589b32c9 allow previews in config_subentries_flow (#25859) 2025-06-21 08:09:13 +00:00
renovate[bot]
1990472970 Lock file maintenance (#25838)
* Lock file maintenance
2025-06-20 20:43:30 +00:00
Norbert Rittel
299713fd5e Fix inconsistently spelled occurrences of "add-on" (#25858)
* Fix inconsistently spelled occurrences of "add-on"

- add the missing hyphen on three occurrences of "addon"
- change one occurrence of "Add-on" to lowercase

* Also capitalize one inconsistent occurrence of "Ingress"
2025-06-20 22:09:09 +02:00
renovate[bot]
a13dae4745 Update vitest monorepo to v3.2.4 (#25857)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-20 18:30:39 +00:00
Paulus Schoutsen
8324c23618 Update people dashboard intro (#25856) 2025-06-20 20:30:25 +02:00
Norbert Rittel
9c8d6a939b Fix spelling of "to log in", "to set up" and more (#25855)
- add missing space to "log in" where it's the verb
- add missing space to "set up" where it's the verb
- fix sentence-casing of "Create area"
- fix spelling of "ID" as abbreviation
2025-06-20 20:20:00 +02:00
Paulus Schoutsen
1059b519af Add LLM Task to suggest automation name (#25778)
* Add AI Task to suggest automation name

* Use state and update styling
2025-06-20 12:07:47 -04:00
Paulus Schoutsen
52a02093e3 Allow changing LLM Task preferences (#25779)
* Allow changing LLM Task preferences

* value-changed
2025-06-20 12:07:29 -04:00
Paul Bottein
b608bd949b Add fields and multiple support to object selector (#25843)
* Add schema and multiple for object selector

* Add selector to gallery

* Fix description

* Improve formatting

* Add ellipsis

* Update fields instead of schema

* Update gallery

* Update format

* Fix format value

* Fix dialog size
2025-06-20 15:48:59 +02:00
Paul Bottein
f87e20cae9 Redesign area card (#25802)
* Use entity filter to get device classes in editor

* Add name and sensor states to area card

* Fix area type

* Add basic controls

* Fix editor

* Add image

* Add image type

* Add translation key for area controls

* Improve editor

* Fix unknown entity id in area

* Fix default feature position

* Add alert badge

* Add helper

* Display all alerts when using big card

* Disable covers and re-enable switches

* Filter compatible controls

* Use state icon for alerts

* Rename to display type

* Delete deprecated show camera

* Fix aspect ratio

* Improve helper

* Undo domain icon changes

* Undo domain icon changes

* Update types

* Fix translation cases

* Fix card size

* Feedback

* Don't fallback to compact

* Use plural form

* Refactor active color
2025-06-20 15:33:26 +02:00
renovate[bot]
d58186fec9 Update dependency typescript-eslint to v8.34.1 (#25848)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-20 15:01:44 +03:00
Bastian
f47336392c Fix/dhcp config network sort (#25799)
* Add ip sort method to compare helper

* Add ip sort functionality to dhcp config panel datatable

* Add type ip to DataTableColumnData

* Change ip sorting to padStart method for better readablity

* Rename ip compare method to clarify ipv4

* Enhance IP compare method to include ipv6

* Add compare IP test
2025-06-20 15:01:02 +03:00
karwosts
e9272b9a27 Remove gray colors from chart color set (#25844) 2025-06-20 13:50:12 +02:00
Norbert Rittel
b20d489bdd Fix sentence-casing of Z-Wave strings (#25846)
* Fix sentence-casing of Z-Wave strings

* Also fix casing of "Z-Wave JS Device Database"
2025-06-19 21:29:07 +02:00
Petar Petrov
f7634c45c2 Fix bar chart data order when using the legend (#25832)
* Fix bar chart data order when using the legend

* type fix
2025-06-19 17:49:58 +02:00
renovate[bot]
8ee80586a8 Update vaadinWebComponents monorepo to v24.8.0 (#25842)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-19 16:12:02 +02:00
Bram Kragten
6aa8a24aad Fix for my links ending with a slash (#25841) 2025-06-19 15:51:11 +03:00
Norbert Rittel
65e78de41c Improve explanation of 'Ping a Matter device' dialog (#25839)
* Fix explanation of 'Ping a Matter device' dialog

- change to more descriptive wording using third-person singular
- replace first "on" with "of" to clarify (currently "on" contradicts "server-side")
- remove the wrong hyphen in "IP-addresses"
2025-06-19 11:00:22 +00:00
Norbert Rittel
573c1db081 Add hyphen to all compounds with "-powered" (#25840) 2025-06-19 12:49:07 +02:00
Paul Bottein
cf03e041a8 Fix combobox helper (#25834)
* Fix combobox helper

* Pass disabled to all helpers
2025-06-18 17:57:11 +02:00
Paul Bottein
b4dbfa6f70 Remove debug type in secondary line in statistic picker (#25835) 2025-06-18 15:44:27 +00:00
Bastian
723bb4dfeb Change duration input to ha-time-input component (#25800)
* Change duration input to ha-time-input component

* Change ha-time-input to duration-input component

* Add DurationDict to ForDict cast
2025-06-18 15:31:15 +00:00
renovate[bot]
98dcce6af1 Update dependency lint-staged to v16.1.2 (#25833)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-18 17:24:40 +02:00
karwosts
e3cdd69835 Display yaml errors in all ha-yaml-editor (#25819) 2025-06-18 09:32:06 +03:00
karwosts
0ddf3aa675 Uncap width of ha-statistics-picker (#25822) 2025-06-17 21:12:50 +02:00
renovate[bot]
9c9ce78ff9 Update dependency lint-staged to v16.1.1 (#25817)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-17 20:05:09 +02:00
Paulus Schoutsen
4f8c50aaa9 Show voice ID in Cloud Pref (#25809)
* Show voice ID in Cloud Pref

* Address style comments

* Update src/panels/config/cloud/account/cloud-tts-pref.ts

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-06-17 13:32:27 +00:00
Petar Petrov
3cfc6297b5 Fix sankey total calculation to account for included_in_stat (#25805) 2025-06-17 15:14:33 +02:00
Paul Bottein
cc0586bf36 Fix disabled color in dark mode in production (#25818) 2025-06-17 15:14:07 +02:00
Petar Petrov
bdf48140e4 Reduce reset-zoom button size on timeline charts (#25796) 2025-06-17 15:07:57 +02:00
Anthony Relle
d7f4a7acb0 Update ElectricityMaps URL in Energy Dashboard (#25816)
fix: update electricitymap domain
2025-06-17 09:54:34 +00:00
renovate[bot]
154e85eb45 Update dependency eslint-plugin-lit-a11y to v5.0.1 (#25812)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-17 10:16:13 +03:00
renovate[bot]
ea15e5a44e Update dependency eslint-plugin-lit-a11y to v5 (#25718)
* Update dependency eslint-plugin-lit-a11y to v5

* Update import

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2025-06-17 09:06:44 +03:00
renovate[bot]
d581c4b0aa Update dependency eslint to v9.29.0 (#25810)
* Update dependency eslint to v9.29.0

* fix warning

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-06-17 05:55:13 +00:00
karwosts
5b7655cf72 Fix automation drag&drop loses item (#25811) 2025-06-17 08:42:20 +03:00
dependabot[bot]
634e1dbde8 Bump softprops/action-gh-release from 2.2.2 to 2.3.2 (#25795)
Bumps [softprops/action-gh-release](https://github.com/softprops/action-gh-release) from 2.2.2 to 2.3.2.
- [Release notes](https://github.com/softprops/action-gh-release/releases)
- [Changelog](https://github.com/softprops/action-gh-release/blob/master/CHANGELOG.md)
- [Commits](https://github.com/softprops/action-gh-release/compare/v2.2.2...v2.3.2)

---
updated-dependencies:
- dependency-name: softprops/action-gh-release
  dependency-version: 2.3.2
  dependency-type: direct:production
  update-type: version-update:semver-minor
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-06-16 11:03:16 +03:00
renovate[bot]
a255463a76 Update dependency sinon to v21 (#25794)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-16 08:53:23 +03:00
renovate[bot]
3c40b3112e Update dependency @codemirror/view to v6.37.2 (#25791)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-16 08:24:44 +03:00
renovate[bot]
9f33ec55f5 Update dependency glob to v11.0.3 (#25792)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-16 08:24:01 +03:00
Simon Lamon
c35c4d16f0 Remove Google Assistant link (#25780) 2025-06-15 17:17:38 +03:00
Simon Lamon
159c4d100a Add perform action with to translations (#25781) 2025-06-15 17:15:08 +03:00
quinnter
05035a281b Improved new dashboard dialog (#25676)
* tidied cards and more translations

* fix container heading padding

* updated filter to use fusejs, changes to how list is localized
2025-06-14 10:55:14 +02:00
renovate[bot]
67c7a3931f Update dependency typescript-eslint to v8.34.0 (#25770)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-13 10:18:48 +03:00
Paulus Schoutsen
cf41a43070 Hide backup during onboarding (#25768) 2025-06-12 13:48:59 -04:00
renovate[bot]
5c385d5368 Update vitest monorepo to v3.2.3 (#25765)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-12 16:25:22 +03:00
renovate[bot]
0ae78300c9 Update dependency core-js to v3.43.0 (#25761)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-12 16:24:57 +03:00
Paul Bottein
de42714505 20250531.3 (#25764) 2025-06-12 14:23:03 +02:00
Paul Bottein
359460b570 Bumped version to 20250531.3 2025-06-12 14:22:11 +02:00
Paul Bottein
38545a01dd Ensure grid options always return an object (#25760) 2025-06-12 14:21:51 +02:00
Paul Bottein
8cead75087 Change backup type order (#25759) 2025-06-12 14:21:50 +02:00
Petar Petrov
7f68447a4f Fix alerts refresh on device page (#25748)
* Fix alerts refresh on device page

* don't reset actions periodically

* reset stuff only on deviceId change
2025-06-12 14:21:49 +02:00
Paul Bottein
01d2ef13c6 Ensure grid options always return an object (#25760) 2025-06-12 10:44:20 +03:00
Petar Petrov
af6911e848 Fix alerts refresh on device page (#25748)
* Fix alerts refresh on device page

* don't reset actions periodically

* reset stuff only on deviceId change
2025-06-12 09:40:36 +02:00
Paul Bottein
21af10fd28 Change backup type order (#25759) 2025-06-12 07:29:58 +00:00
Paul Bottein
380f760f79 20250531.2 (#25752) 2025-06-11 16:27:54 +02:00
Paul Bottein
bffe38c827 Bumped version to 20250531.2 2025-06-11 16:27:06 +02:00
Paul Bottein
89d0746c7c Fix edit card not working in chrome after editing (#25751) 2025-06-11 16:25:20 +02:00
Paul Bottein
6d30d15638 Fix edit card not working in chrome after editing (#25751) 2025-06-11 14:15:50 +00:00
Paul Bottein
7e2059e836 20250531.1 (#25749) 2025-06-11 14:42:10 +02:00
Paul Bottein
0d97962578 Bumped version to 20250531.1 2025-06-11 14:30:59 +02:00
Paul Bottein
4c5015e178 Display full error for card preview mode (#25747) 2025-06-11 14:29:55 +02:00
Paul Bottein
28214aebc5 Reduce keypad gap and margin in alarm panel card (#25735) 2025-06-11 14:29:54 +02:00
Paul Bottein
a26ca7d065 Fix custom value selected when clicking item in combo box (#25734) 2025-06-11 14:29:54 +02:00
Paul Bottein
2ab20aef69 Allow to open more info using query params (#25733) 2025-06-11 14:29:53 +02:00
Petar Petrov
8149ee60cb Fix period boundaries in Energy dashboard (#25728) 2025-06-11 14:29:52 +02:00
Petar Petrov
89ce6870f6 Handle tiny values in a log chart (#25727) 2025-06-11 14:29:51 +02:00
Mathieu
4307e2350f Adjust tooltip positioning in ha-sidebar for not first lis… (#25696)
fix(tooltip): fix tooltip positioning in ha-sidebar for not first listbox
2025-06-11 14:29:50 +02:00
karwosts
7dc4d555ae Hoist integration card tooltips (#25679) 2025-06-11 14:29:50 +02:00
Bram Kragten
1483e8e38f Set answers to yes and no for cloud pipeline confirm (#25674) 2025-06-11 14:29:49 +02:00
Simon Lamon
5daec6bbc5 Calendar add event button gap alignment (#25662)
Calendar gap alignment
2025-06-11 14:29:48 +02:00
Paul Bottein
d542b52ebd Display full error for card preview mode (#25747) 2025-06-11 13:04:54 +03:00
c0ffeeca7
43cc49bb32 Z-Wave: apply sentence-style capitalization (#25739) 2025-06-11 09:13:32 +03:00
karwosts
b3f0a6328e More support for no-grid energy dashboard (#25644)
* More support for no-grid energy dashboard

* Update src/panels/lovelace/cards/energy/hui-energy-distribution-card.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* lint

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-06-11 09:11:46 +03:00
Paulus Schoutsen
9d6a7e7e6f Assist Chat: handle intent progress delta not always being there (#25730)
handle intent progress data type change
2025-06-10 10:59:10 -04:00
Paul Bottein
78d7da21aa Fix custom value selected when clicking item in combo box (#25734) 2025-06-10 16:46:09 +02:00
Paul Bottein
0474a24df6 Allow to open more info using query params (#25733) 2025-06-10 13:20:10 +03:00
Paul Bottein
6e7ac6fdf7 Reduce keypad gap and margin in alarm panel card (#25735) 2025-06-10 13:16:06 +03:00
Petar Petrov
7b9683df89 Fix period boundaries in Energy dashboard (#25728) 2025-06-10 10:28:51 +02:00
renovate[bot]
8523ddfd29 Update vaadinWebComponents monorepo to v24.7.8 (#25729)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-09 15:50:36 +03:00
Petar Petrov
2589e1a49f Handle tiny values in a log chart (#25727) 2025-06-09 14:45:23 +03:00
Paul Schreiber
5ce5f9a189 fix spelling of JavaScript in bug report template (#25726)
Correctly capitalize JavaScript in the bug report template.
2025-06-09 06:08:58 +00:00
renovate[bot]
6dd7217a20 Update dependency @babel/runtime to v7.27.6 (#25722)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-09 09:01:08 +03:00
renovate[bot]
0d02d0d334 Update vitest monorepo to v3.2.2 (#25723)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-09 09:00:45 +03:00
renovate[bot]
fed0dfa091 Update vitest monorepo to v3.2.1 (#25715)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-07 09:09:17 +02:00
renovate[bot]
39de40dec9 Update Yarn to v4.9.2 (#25714)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-07 09:09:11 +02:00
renovate[bot]
e1c42d9985 Update dependency typescript-eslint to v8.33.1 (#25712)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-06 20:33:20 +02:00
renovate[bot]
ad375c9b01 Update dependency hls.js to v1.6.5 (#25711)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-06 20:33:01 +02:00
renovate[bot]
07230e5ef5 Update dependency @codemirror/language to v6.11.1 (#25708)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-06 19:59:35 +02:00
renovate[bot]
52f5af6090 Update dependency @rsdoctor/rspack-plugin to v1.1.3 (#25709)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-06 19:59:08 +02:00
karwosts
3c07289077 Handle shorthand template conditions in trace (#25705) 2025-06-06 18:10:10 +02:00
Mathieu
8eb7fe8b0a Adjust tooltip positioning in ha-sidebar for not first lis… (#25696)
fix(tooltip): fix tooltip positioning in ha-sidebar for not first listbox
2025-06-05 04:35:32 +00:00
renovate[bot]
c8c2966d34 Update dependency gulp to v5.0.1 (#25698)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-05 06:25:43 +02:00
renovate[bot]
a8768a5d9d Update dependency @bundle-stats/plugin-webpack-filter to v4.20.2 (#25692)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-05 06:25:20 +02:00
karwosts
02bb7086e7 Hoist integration card tooltips (#25679) 2025-06-03 21:41:27 +02:00
renovate[bot]
42d8b2ae19 Update dependency lint-staged to v16 (#25463)
* Update dependency lint-staged to v16

* Remove shell parameter

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2025-06-03 19:18:39 +00:00
renovate[bot]
e08f4a6bba Update dependency @types/chromecast-caf-receiver to v6.0.22 (#25681)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-03 17:32:25 +02:00
renovate[bot]
2e6c35d977 Update dependency hls.js to v1.6.4 (#25682)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-03 17:32:08 +02:00
renovate[bot]
17305a818b Update dependency eslint to v9.28.0 (#25683)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-03 01:32:02 +02:00
renovate[bot]
08389dad04 Update babel monorepo to v7.27.4 (#25680)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-02 22:36:58 +03:00
Bram Kragten
ab6ace46b5 Set answers to yes and no for cloud pipeline confirm (#25674) 2025-06-02 14:02:06 +00:00
renovate[bot]
535dedbbc4 Update dependency hls.js to v1.6.3 (#25669)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-02 16:01:37 +02:00
renovate[bot]
412eb0c647 Update dependency @codemirror/view to v6.37.1 (#25672)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-02 16:01:29 +02:00
renovate[bot]
87c8ebd493 Update dependency @codemirror/view to v6.37.0 (#25664)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-06-01 09:31:21 +02:00
Simon Lamon
6e49f89126 Calendar add event button gap alignment (#25662)
Calendar gap alignment
2025-06-01 09:39:10 +03:00
Bram Kragten
77eae6044d Bumped version to 20250531.0 2025-05-31 16:15:54 +02:00
Bram Kragten
84ac0cd41e Add css variables for start and end padding of tabs (#25654) 2025-05-31 16:15:28 +02:00
Bram Kragten
74f9c1551e Add label to collapse button in data table groups (#25653) 2025-05-31 16:15:27 +02:00
Bram Kragten
aebd6350c0 fix line height entity card (#25652) 2025-05-31 16:15:27 +02:00
ildar170975
4c78eb4797 Add cyrilic letters to slugify() (#25647)
* add cyrilic

* Update src/common/string/slugify.ts

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-05-31 16:15:26 +02:00
ildar170975
560e3890b9 Revert #25027 "more-info-camera: disable download_snapshot if idle" (#25643)
remove a check for "idle"
2025-05-31 16:15:25 +02:00
Ville Skyttä
e448268feb Spelling fixes (#25638) 2025-05-31 16:15:24 +02:00
Ville Skyttä
7ceba218fa Fix Zigbee capitalization in manage device button (#25637) 2025-05-31 16:15:24 +02:00
Petar Petrov
cd61725cf5 Fix Z-WaveJS device count in dashboard (#25635) 2025-05-31 16:15:23 +02:00
Petar Petrov
228860a1ee Use theme variables for network graph labels (#25634) 2025-05-31 16:15:22 +02:00
karwosts
9f69347e1d Cleanup some styling on disabled entity picker (#25632) 2025-05-31 16:15:21 +02:00
ildar170975
a099e65a9d Fix "unavailable" state in Area card (#25063)
* fix "unavailable" state

* Show "-" for unavailable/undefined
2025-05-31 10:45:58 +03:00
renovate[bot]
11e4a9f056 Update dependency typescript-eslint to v8.33.0 (#25657)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-30 17:52:29 +00:00
Bram Kragten
b617299eee Add css variables for start and end padding of tabs (#25654) 2025-05-30 16:48:15 +02:00
Bram Kragten
768f27b1b9 Add label to collapse button in data table groups (#25653) 2025-05-30 16:47:54 +02:00
Bram Kragten
5ed816df6d fix line height entity card (#25652) 2025-05-30 15:34:03 +02:00
renovate[bot]
6692ac7517 Update dependency @lokalise/node-api to v14.8.0 (#25651)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-30 14:11:04 +02:00
renovate[bot]
65499db0cb Update babel monorepo to v7.27.3 (#25650)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-30 14:27:05 +03:00
renovate[bot]
11a1eabf61 Update rspack monorepo to v1.3.12 (#25649)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-30 14:26:40 +03:00
ildar170975
b30fa122ba Revert #25027 "more-info-camera: disable download_snapshot if idle" (#25643)
remove a check for "idle"
2025-05-30 10:59:03 +03:00
ildar170975
6730d08b85 Map card: add prefix & suffix for "label_mode: attribute" (#25033)
* added prefix & suffix

* added prefix & suffix

* added prefix & suffix

* added prefix & suffix

* added prefix & suffix

* remove prefix, rename suffix -> unit

* remove prefix, rename suffix -> unit

* remove prefix, rename suffix -> unit

* remove prefix, rename suffix -> unit

* remove prefix, rename suffix -> unit
2025-05-30 10:56:35 +03:00
ildar170975
67003d6fd1 Add cyrilic letters to slugify() (#25647)
* add cyrilic

* Update src/common/string/slugify.ts

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-05-30 05:38:45 +00:00
Petar Petrov
414d46be65 Add device button on the Z-Wave controller's device page (#25636) 2025-05-29 15:29:34 +03:00
Petar Petrov
1485d1a1de Fix Z-WaveJS device count in dashboard (#25635) 2025-05-29 15:29:24 +03:00
Ville Skyttä
fd13e41524 Spelling fixes (#25638) 2025-05-29 10:48:50 +02:00
Petar Petrov
77f7ca0368 Use theme variables for network graph labels (#25634) 2025-05-29 10:05:26 +02:00
Ville Skyttä
7471250a07 Fix Zigbee capitalization in manage device button (#25637) 2025-05-29 07:59:58 +00:00
karwosts
8b0a63d791 Cleanup some styling on disabled entity picker (#25632) 2025-05-29 08:53:30 +03:00
renovate[bot]
57ffa814ed Update dependency @octokit/rest to v22 (#25633)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-29 08:51:54 +03:00
Bram Kragten
46e05f10d1 Bumped version to 20250528.0 2025-05-28 22:35:50 +02:00
Paul Bottein
a1819d6189 Improve search in add automation element dialog (#25626)
* Improve search in add automation element dialog

* Remove unexpected import

* Take min character search into account
2025-05-28 22:35:43 +02:00
Paul Bottein
48a3e1fd63 Put item at the top of picker result if there is an exact match with entity id (#25625) 2025-05-28 22:35:43 +02:00
Paul Bottein
139c8b3702 Fix picker field height (#25623) 2025-05-28 22:35:42 +02:00
Paul Bottein
9458946dcc Fix missing helper for entity picker (#25622) 2025-05-28 22:35:41 +02:00
Paul Bottein
b907dbefad Force narrow style for action, condition and trigger in flows (#25619) 2025-05-28 22:35:40 +02:00
Wendelin
5371fd649c Set markdown code line-height (#25618) 2025-05-28 22:35:40 +02:00
Paul Bottein
61d9b0d2a3 Improve action picker UI and search (#25525) 2025-05-28 22:35:39 +02:00
Paul Bottein
16e20456e2 Put item at the top of picker result if there is an exact match with entity id (#25625) 2025-05-28 22:33:42 +02:00
Paul Bottein
9c0ce41ebb Improve search in add automation element dialog (#25626)
* Improve search in add automation element dialog

* Remove unexpected import

* Take min character search into account
2025-05-28 19:38:33 +02:00
Paul Bottein
b458a1d7c6 Improve action picker UI and search (#25525) 2025-05-28 15:03:17 +02:00
renovate[bot]
0eaeeb1141 Update dependency globals to v16.2.0 (#25624)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-28 14:51:35 +03:00
Paul Bottein
b7e63e697f Fix picker field height (#25623) 2025-05-28 14:07:22 +03:00
Paul Bottein
06db0f4b98 Fix missing helper for entity picker (#25622) 2025-05-28 14:06:45 +03:00
Paul Bottein
d33636c6fb Force narrow style for action, condition and trigger in flows (#25619) 2025-05-28 12:04:54 +02:00
Wendelin
bbb546159c Set markdown code line-height (#25618) 2025-05-28 10:04:54 +02:00
karwosts
e8fc36026a More error handling for preview flow (#25611)
* More error handling for preview flow

* await unsub
2025-05-28 07:04:03 +03:00
Bram Kragten
06270c771f Bumped version to 20250527.0 2025-05-27 21:43:42 +02:00
Norbert Rittel
ae49de8e71 Fix typo in restore_entity_id_selected::confirm_text (#25615) 2025-05-27 21:42:52 +02:00
Petar Petrov
6abdeeae20 Fix for history graph with tiny values (#25612) 2025-05-27 21:42:51 +02:00
Petar Petrov
116716c51d Fix duplicate legend items when comparing energy data (#25610) 2025-05-27 21:42:51 +02:00
Wendelin
77ee69b64d Fix font settings for button card (#25607) 2025-05-27 21:42:50 +02:00
Wendelin
1a57eeddde Fix sidebar loading and demo (#25606) 2025-05-27 21:42:49 +02:00
Petar Petrov
9131bf6dfd Fix double history graphs for a disabled entity (#25604) 2025-05-27 21:42:48 +02:00
Paul Bottein
1611423ca5 Fix duplicated items in strategy editor (#25600) 2025-05-27 21:42:48 +02:00
Petar Petrov
38f8c804af Fix for history graph with tiny values (#25612) 2025-05-27 20:46:03 +02:00
Petar Petrov
7c5bf26240 Fix duplicate legend items when comparing energy data (#25610) 2025-05-27 20:43:32 +02:00
Norbert Rittel
189067d14b Fix typo in restore_entity_id_selected::confirm_text (#25615) 2025-05-27 19:56:55 +02:00
Petar Petrov
e79e0f77b8 Navigate to newly added device (#25608) 2025-05-27 16:19:53 +02:00
Wendelin
b226e5c697 Fix font settings for button card (#25607) 2025-05-27 12:55:20 +02:00
Wendelin
52ad31601c Fix sidebar loading and demo (#25606) 2025-05-27 10:22:04 +02:00
Petar Petrov
cba3e4df7f Fix double history graphs for a disabled entity (#25604) 2025-05-27 09:08:58 +02:00
Paul Bottein
3532cfa974 Fix duplicated items in strategy editor (#25600) 2025-05-26 19:21:44 +02:00
Bram Kragten
de56c3376e Bumped version to 20250526.0 2025-05-26 18:32:32 +02:00
Bram Kragten
629eb29d42 Merge branch 'rc' into dev 2025-05-26 18:32:04 +02:00
Bram Kragten
61019447cf Update alarm card styling (#25598) 2025-05-26 18:31:27 +02:00
Bram Kragten
cde2b436d1 Add restore entity id (#25592) 2025-05-26 16:23:23 +00:00
Alex Gustafsson
6c7d750734 Add support for grouping media players (#24736)
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-05-26 14:35:09 +00:00
Paul Bottein
fcf5ed7731 Use context instead of stateObj for card features (#25577)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-05-26 13:59:26 +00:00
Cretezy
3ce639946c Make weather-forecast card more responsive (#24900)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-05-26 13:26:32 +00:00
Wendelin
bb5f01ac81 Use failed add-ons and folders of backup (#25548)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-05-26 13:25:57 +00:00
Wendelin
208e863327 Save sidebar in user data (#25555)
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-05-26 13:25:11 +00:00
karwosts
9f5f100e98 Tweak rules for entity-filter card (#25570)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-05-26 13:24:10 +00:00
renovate[bot]
114c1fb98b Update vaadinWebComponents monorepo to v24.7.7 (#25596)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-26 15:20:08 +02:00
Bram Kragten
3e5bd64b83 Update ha-selector-action.ts 2025-05-26 15:14:59 +02:00
karwosts
02b4b8e334 Fix device actions in step-flow-form (#24539)
* Fix device actions in step-flow-form

* Move xlation fetch to device action

* also conditions & triggers

* move to firstUpdated
2025-05-26 14:19:09 +02:00
Petar Petrov
da8d43f5d1 Allow href="data:..." in config flow step description (#25559)
* Allow href="data:..." in config flow step description

* Update src/dialogs/config-flow/show-dialog-config-flow.ts
2025-05-26 13:56:11 +02:00
Paul Bottein
18aaa44d2d Use constant for Home Assistant bluetooth node in graph (#25595) 2025-05-26 12:26:06 +02:00
Paul Bottein
7fa697a768 Add actions section and add domains to other section in area dashboard (#25558)
* Add actions section and add domains to other section in area dashboard

* Add timer and input button

* Better grouping
2025-05-26 10:50:42 +02:00
Jan-Philipp Benecke
28fe60f02b Improve broken cards on dashboards (#25557) 2025-05-26 08:45:22 +00:00
dependabot[bot]
549451eccb Bump relative-ci/agent-action from 2.2.0 to 3.0.0 (#25593)
Bumps [relative-ci/agent-action](https://github.com/relative-ci/agent-action) from 2.2.0 to 3.0.0.
- [Release notes](https://github.com/relative-ci/agent-action/releases)
- [Commits](https://github.com/relative-ci/agent-action/compare/v2.2.0...v3.0.0)

---
updated-dependencies:
- dependency-name: relative-ci/agent-action
  dependency-version: 3.0.0
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-05-26 08:26:06 +02:00
karwosts
113cc118cf Support for disabled selectors in config flow (#22592)
* Support for disabled selectors in config flow

* rename flag to readonly

* rename to read_only

* Merge branch 'dev' of https://github.com/home-assistant/frontend into disabled-fields-config-flow

* rework for new backend

* Fix disabled entity picker

* no longer used type

* Update src/dialogs/config-flow/step-flow-form.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-05-23 20:52:42 +03:00
Bram Kragten
7ffb0f1e3b rename android-safe-area-inset to app-safe-area-inset (#25575) 2025-05-23 18:34:53 +02:00
renovate[bot]
60ef43044b Update octokit monorepo to v8.0.1 (#25576)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-23 17:37:26 +02:00
renovate[bot]
4e4a82e023 Update rspack monorepo to v1.3.11 (#25574)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-23 17:36:56 +02:00
Paulus Schoutsen
f563146165 Sort discoveries by title on integration page (#25578) 2025-05-23 17:33:47 +02:00
Petar Petrov
81ba2db93a Custom variable down sampling for line charts (#25561) 2025-05-23 15:20:41 +02:00
renovate[bot]
4d8176ad6e Update octokit monorepo to v8 (major) (#25573)
Update octokit monorepo to v8

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-23 14:13:11 +03:00
Petar Petrov
9b8be9f1af Fix chart labels for multi year periods (#25572) 2025-05-23 12:08:22 +02:00
Wendelin
c11d2c10df Enable keyboard sorting for items-display-editor (#25546)
* Enable keyboard sorting for items-display-editor

* Add alt + arrow and fix bugs

* Fix alt bug

* Improve selected drag highlight
2025-05-23 10:42:27 +02:00
Paul Bottein
412a0e9f6a Improve area floor picker UI and search (#25540)
* Improve area floor picker UI and search

* Improve area floor picker UI and search

* Remove noResultSorting
2025-05-23 10:35:47 +02:00
renovate[bot]
67dc830bbf Update dependency marked to v15.0.12 (#25571)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-23 08:52:22 +03:00
renovate[bot]
5581c10139 Update vitest monorepo to v3.1.4 (#25569)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-22 16:36:02 +00:00
renovate[bot]
ec26818c53 Update dependency @types/leaflet to v1.9.18 (#25568)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-22 18:26:19 +02:00
Paul Bottein
399458f811 Improve category picker UI and search (#25560) 2025-05-22 18:14:26 +02:00
Paul Bottein
3355986585 Restore screen readers support on pickers (#25553) 2025-05-22 09:51:12 +00:00
Franck Nijhof
9b7db191a6 Add range support to icon translations (#25541)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-05-22 11:32:44 +02:00
Paulus Schoutsen
2d549ba22f Voice wizard: Wait 10s for update entity to change state (#25556) 2025-05-22 09:49:29 +02:00
Grzegorz Libiszewski
c3e155a95c Unified safe area (insets) for Android and iOS (#24689)
* feat: Introduce new css variables for safe area

* feat: Replace all safe area env with variable
2025-05-22 08:11:04 +03:00
Petar Petrov
754829a836 Localize ZHA visualization text (#25543) 2025-05-21 12:54:38 +00:00
c0ffeeca7
87bd039239 Add comma (#25547) 2025-05-21 15:44:16 +03:00
Wendelin
32b3c83337 Edit sidebar in a dialog (#25532) 2025-05-21 13:42:43 +02:00
karwosts
f0beef22d2 Add hint helpers to fields that support markdown (#25528)
* Add hint helpers to fields that support markdown

* reduce duplication
2025-05-21 08:13:28 +03:00
Petar Petrov
07e5f53469 Bluetooth network visualization (#25512)
* Bluetooth network visualization

* fix category symbol

* Add translations

* memoize bluetooth data

* throttle data updates to 10s

* handle proxies that appear as end devices too

* fix tab highlighting

* memoize fix
2025-05-21 07:59:44 +03:00
c0ffeeca7
97e0217906 Remote access strings: tiny typo fix (#25539) 2025-05-20 12:47:51 +00:00
Paul Bottein
006c7e1ea8 Improve floor picker UI and search (#25535)
* Improve floor picker UI and search

* sort by level
2025-05-20 14:45:40 +02:00
Andrej Shumkovski
9736d0cb55 Added Albanian (Shqip) Language (#25538)
Update translationMetadata.json

Added Shqip language following: 

https://developers.home-assistant.io/docs/translations/#maintainer-steps-to-add-a-new-language
2025-05-20 14:35:49 +02:00
Wendelin
9ec689382b Add has-fab to hass-tabs-subpage (#25536) 2025-05-20 14:00:27 +03:00
Paul Bottein
4de95f6710 Improve label picker UI and search (#25522) 2025-05-20 12:47:33 +02:00
Paul Bottein
a55ef8ad47 Fix entity picker in footer graph and media card (#25531) 2025-05-20 11:32:37 +02:00
Paul Bottein
01b398c2a3 Fix clear area action in area-picker (#25511)
* Fix clear area action in area-picker

* Fix area not displayed after creation
2025-05-20 10:01:01 +02:00
Paulus Schoutsen
83df10ef29 Tweaks to Assist chat dialog (#25494) 2025-05-20 08:39:56 +02:00
renovate[bot]
a026c72230 Update dependency eslint to v9.27.0 (#25529)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-20 07:44:11 +03:00
Petar Petrov
c4e391c264 Echarts network graph for ZHA (#25457)
* Echarts network graph for ZHA

* improve layout

* better diff

* remove vis-network

* not bad layout

* fix LQI and clean up a bit

* Use ha-chart-base and remove header

* legend

* use color vars

* use colorVariables

* fix

* add physics toggle

* tweak lines

* remove vis-network

* minor tweaks

* dynamically load graph chart

* type fix

* fix height

* navigate to device page on label click

* PR comments

* aria tweak

* make extraComponents non reactive

* PR comments

* quick fix

* just make hass non reactive

* button tweak

* Update src/components/chart/ha-network-graph.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-05-19 16:37:05 +03:00
karwosts
4b72a6029c Fix stack editor bugs (#25501)
* Fix stack editor bugs

* Update src/panels/lovelace/editor/config-elements/hui-stack-card-editor.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-05-19 16:36:46 +03:00
Timothy
8b87188075 Add navigate command to the external bus (#25516) 2025-05-19 13:22:19 +00:00
Paul Bottein
2a4c6c9af5 Improve user picker UI and search (#25514)
Improve user picker
2025-05-19 13:53:19 +03:00
Paul Bottein
5cbadaa5f9 Fix labels in duration input (#25510) 2025-05-19 11:26:25 +02:00
Paul Bottein
15fd4134d0 Improve device picker UI and search (#25401)
* Improve device picker

* Improve device search quick bar

* Fix types

* Fix selected device in the dropdown

* Move filter to picker

* Rename filters

* Use generic picker

* Update src/dialogs/quick-bar/ha-quick-bar.ts

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-05-19 09:24:54 +00:00
renovate[bot]
eda9abc3c5 Lock file maintenance (#25508)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-19 07:16:33 +03:00
karwosts
7e56d5f351 Fix loading behavior when manually typing card type (#25502) 2025-05-18 08:57:59 +03:00
renovate[bot]
5d4805cde6 Update dependency @codemirror/search to v6.5.11 (#25499)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-18 08:54:22 +03:00
karwosts
c94326bc08 Fix duplicate_id in energy-usage-graph (#25503) 2025-05-18 08:53:37 +03:00
karwosts
b61180baa6 Don't access hidden tabs via left/right arrow (#25495) 2025-05-17 12:43:12 +02:00
karwosts
bc15d1474e Force wrap too long expansion panel headers (#25496) 2025-05-17 12:42:08 +02:00
Bram Kragten
95c3013497 Merge branch 'rc' 2025-05-16 18:57:16 +02:00
Bram Kragten
69a156f352 Bumped version to 20250516.0 2025-05-16 18:57:02 +02:00
Paul Bottein
67f3d31a4b Fix domain not translated in entity picker and quick bar (#25444)
* Fix domain not translated in entity picker

* Remove unused param
2025-05-16 18:56:16 +02:00
Bram Kragten
98a2966432 Render choose and if action correctly on mobile (#25411) 2025-05-16 18:56:14 +02:00
karwosts
75a2c061c2 Fix card editor help links (#25408) 2025-05-16 18:56:13 +02:00
karwosts
724df18175 Fix devices graph max_devices (#25406) 2025-05-16 18:56:12 +02:00
Paul Bottein
c00b4120ab Fix selected entity in the entity picker dropdown (#25405) 2025-05-16 18:56:11 +02:00
Paul Bottein
d392bb4c83 Fallback to preferred pipeline if the pipeline doesn't exist (#25404) 2025-05-16 18:56:11 +02:00
Paul Bottein
30d46f2f8a Fix domain max-width in entity picker (#25400) 2025-05-16 18:56:10 +02:00
Paulus Schoutsen
7c879cc291 Add installation method to the about page (#25378)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
Co-authored-by: Franck Nijhof <git@frenck.dev>
2025-05-16 18:56:08 +02:00
renovate[bot]
9a731880f3 Update rspack monorepo to v1.3.10 (#25493)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-16 18:06:17 +02:00
Yosi Levy
77efaaf7de RTL base font fix (#25478)
* RTL base font fix

* Fix comments
2025-05-16 08:20:19 +03:00
Paulus Schoutsen
da96266454 Update media content type for picked TTS (#25489) 2025-05-16 08:18:31 +03:00
renovate[bot]
036d739d6e Update dependency @codemirror/view to v6.36.8 (#25487) 2025-05-15 19:56:20 +02:00
renovate[bot]
c274a94ee5 Update dependency typescript-eslint to v8.32.1 (#25488)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-15 19:53:57 +02:00
Paul Bottein
da7d359696 Use generic picker for statistic picker (#25484) 2025-05-15 19:38:36 +02:00
Paul Bottein
20a7b3870c Improve area picker UI and search (#25472)
* Improve area picker UI and search

* Feedbacks
2025-05-15 15:53:22 +02:00
Wendelin
9749a64ae1 Preload Roboto for Chrome OS (#25480) 2025-05-15 14:48:09 +02:00
renovate[bot]
68741f6ba4 Update vaadinWebComponents monorepo to v24.7.6 (#25475)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-15 14:33:08 +03:00
AlCalzone
e052ee04b4 Fix label for Thermostat Setback in Z-Wave JS installer panel (#25476) 2025-05-15 13:22:52 +02:00
Wendelin
d2cc4a624e Use ha-line-height css tokens in codebase (#25468) 2025-05-15 11:57:17 +02:00
Paul Bottein
5bcbe98f8e Create generic picker component (#25464)
* Create generic combo-box

* Fix focus

* Delete entity combo-box

* Rename components

* Create generic picker

* Fix undefined and placeholder

* Fix labels

* Fix icon and search

* Add missing hideClearIcon property to entity picker

* Make search string optional
2025-05-15 09:55:32 +00:00
Petar Petrov
beee76580d Keep screen on while adding new ZHA device (#25465) 2025-05-15 11:55:05 +02:00
karwosts
28e5a30772 Prioritize battery consumption before solar consumption (#25467) 2025-05-15 10:32:07 +03:00
David F. Mulcahey
785929b370 Add ZHA status details to configuration dashboard (#25425)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-05-14 11:57:30 +00:00
Petar Petrov
55cf7e635d Keep screen on while adding new ZwaveJS device (#25375)
* Keep screen on while adding new ZwaveJS device

* Add compatibility check

* Update src/mixins/wakelock-mixin.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* format

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-05-14 13:45:48 +03:00
Petar Petrov
4b270eb444 Periodically refresh alerts on the device page (#25385)
* Periodically refresh alerts on the device page

* Update src/panels/config/devices/ha-config-device-page.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* revert type change

* Apply suggestions from code review

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-05-14 11:28:56 +02:00
Jan-Philipp Benecke
d0e55719d1 Make map card clustering configurable (#25429)
* Persistent map clustering

* Make config option instead
2025-05-14 11:27:42 +02:00
renovate[bot]
87f9397643 Update dependency @bundle-stats/plugin-webpack-filter to v4.20.1 (#25461)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-14 08:47:57 +02:00
Wendelin
910e7e10a7 Use ha-dialog-header for data-entry-flow (#25403)
* Use ha-dialog-header for data-entry-flow header

* Fix header wrap
2025-05-13 14:17:54 +03:00
Wendelin
e1b9b47ac7 Hide map cluster toggle when there is just one entry (#25454) 2025-05-13 12:23:24 +03:00
Maciej Suchanecki
89e04fcc45 Allow for shift click in data table checkboxes (#25024)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-05-13 11:08:45 +02:00
David Rapan
93f2e75fc9 Update network_adapter_info translation as all core discovery integrations will now use network (#25452) 2025-05-13 09:27:54 +02:00
Wendelin
6c671d398f Fix zwave creating nvm backup translation (#25453) 2025-05-13 05:59:50 +00:00
Paul Bottein
2e5c6a4d3f Fix domain not translated in entity picker and quick bar (#25444)
* Fix domain not translated in entity picker

* Remove unused param
2025-05-13 08:54:31 +03:00
renovate[bot]
04e736a51e Update dependency @lokalise/node-api to v14.7.0 (#25450)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-13 08:53:25 +03:00
Wendelin
ec3fdc0ea7 Subscribe to frontend user data (#25445) 2025-05-12 16:01:56 +02:00
Robert Resch
a7a8c25d24 Remove getCandidatesUpfront (#25399) 2025-05-12 14:55:39 +02:00
c0ffeeca7
60d457c3d9 Register account: apply sentence-style capitalization (#25440) 2025-05-12 10:09:47 +02:00
renovate[bot]
a58b1e636d Update dependency @rsdoctor/rspack-plugin to v1.1.2 (#25420)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-12 09:12:13 +02:00
renovate[bot]
f67e7ae081 Update rspack monorepo to v1.3.9 (#25421)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-12 08:52:00 +02:00
renovate[bot]
0032c5508e Update dependency eslint-config-prettier to v10.1.5 (#25439)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-12 08:51:39 +02:00
renovate[bot]
036df78de8 Update dependency idb-keyval to v6.2.2 (#25432)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-11 21:02:47 +02:00
renovate[bot]
617a6ba938 Update dependency @lokalise/node-api to v14.6.0 (#25433)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-11 21:00:45 +02:00
Alex Gustafsson
76b9063aec Fix typo in lint config (#25419)
Fix a typo causing yaml and "aml" files to be formatted with prettier as
opposed to yaml and yml.
2025-05-10 13:22:25 +02:00
renovate[bot]
60c1d0a556 Update dependency globals to v16.1.0 (#25416)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-10 13:22:10 +02:00
Bram Kragten
193caec2df Render choose and if action correctly on mobile (#25411) 2025-05-10 09:03:53 +02:00
renovate[bot]
42c8d132bf Update dependency @babel/preset-env to v7.27.2 (#25409)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-10 09:03:37 +02:00
renovate[bot]
0311a7c976 Update dependency @rsdoctor/rspack-plugin to v1.1.1 (#25414)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-10 09:03:26 +02:00
renovate[bot]
40ffd50b8a Update dependency barcode-detector to v3.0.4 (#25412)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-10 09:03:22 +02:00
renovate[bot]
334991902a Update dependency eslint-config-prettier to v10.1.3 (#25415)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-10 09:03:14 +02:00
karwosts
c968266065 Fix card editor help links (#25408) 2025-05-09 18:38:03 +02:00
Paul Bottein
d4fc0318f7 Fix domain max-width in entity picker (#25400) 2025-05-09 18:37:14 +02:00
karwosts
8a0d3baf67 Fix devices graph max_devices (#25406) 2025-05-09 18:35:54 +02:00
Paul Bottein
8fc55cb6e2 Fix selected entity in the entity picker dropdown (#25405) 2025-05-09 18:35:38 +02:00
Paul Bottein
d6ebd9bfc4 Fallback to preferred pipeline if the pipeline doesn't exist (#25404) 2025-05-09 16:01:03 +02:00
Bram Kragten
15ae37d077 Move vaadin typography vars to typography globals (#25398) 2025-05-09 12:08:12 +00:00
Bram Kragten
461d5eb687 Add device rename to voice wizard (#25187)
Co-authored-by: Wendelin <w@pe8.at>
2025-05-09 13:56:50 +02:00
Wendelin
3058fcad46 Use ha-font-size typography css tokens (#25361) 2025-05-09 13:47:25 +02:00
renovate[bot]
06bd1ae4cd Update dependency @rsdoctor/rspack-plugin to v1.1.0 (#25389)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-05-09 13:43:39 +02:00
renovate[bot]
00733357a1 Update dependency lint-staged to v15.5.2 (#25394)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-09 13:19:20 +02:00
Bram Kragten
7f6ce97199 Merge branch 'rc' 2025-05-09 12:11:58 +02:00
Bram Kragten
0742aed8e7 Bumped version to 20250509.0 2025-05-09 12:11:36 +02:00
Bram Kragten
f675dd3388 Fix width of device in create entry step (#25392) 2025-05-09 12:11:08 +02:00
Bram Kragten
9751cb4e50 Fix bottom padding in service control when in narrow mode (#25390) 2025-05-09 12:11:07 +02:00
Bram Kragten
7919028780 Fix sidebar keyboard navigation in edit mode (#25376) 2025-05-09 12:11:07 +02:00
Wendelin
1508c7c905 Fix backup custom retention save issue (#25368) 2025-05-09 12:11:06 +02:00
Wendelin
3fe907f388 Fix backup settings undefined cloudStatus (#25366) 2025-05-09 12:11:05 +02:00
J. Nick Koston
5cc87661b9 Add a dialog to SSDP to show raw data (#25362)
* Add a dialog to SSDP to show raw data

* tweaks

* Add a dialog to SSDP to show raw data

* reduce

* tweaks

* Update src/panels/config/integrations/integration-panels/ssdp/dialog-ssdp-raw-data.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Update src/panels/config/integrations/integration-panels/ssdp/dialog-ssdp-discovery-info.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Update src/panels/config/integrations/integration-panels/ssdp/dialog-ssdp-discovery-info.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* add dump

* preen

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-05-09 12:11:04 +02:00
Wendelin
fc372172a6 Fix ha-dialog actions padding to use safe-area-inset (#25359)
* Fix ha-dialog actions padding to use safe-area-inset

* Update src/components/ha-dialog.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-05-09 12:11:03 +02:00
Simon Lamon
7bd9a39bf5 Fix bluetooth device info is encoding data twice (#25353)
Data is already encoded
2025-05-09 12:11:02 +02:00
Bram Kragten
665c971822 Fix width of device in create entry step (#25392) 2025-05-09 12:00:06 +02:00
Bram Kragten
eff5471dd1 Fix bottom padding in service control when in narrow mode (#25390) 2025-05-09 11:01:58 +02:00
Paulus Schoutsen
4fba9c3c0a Add installation method to the about page (#25378)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
Co-authored-by: Franck Nijhof <git@frenck.dev>
2025-05-09 10:23:52 +02:00
renovate[bot]
0b32b51e2f Update dependency @types/leaflet-draw to v1.0.12 (#25386)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-09 09:00:39 +02:00
Bram Kragten
6370b0b8e5 Fix sidebar keyboard navigation in edit mode (#25376) 2025-05-09 08:51:04 +02:00
renovate[bot]
681518f443 Update dependency typescript-eslint to v8.32.0 (#25383)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-08 23:51:36 +02:00
Simon Lamon
9f5b89978d Bump the hls patch (#25264) 2025-05-08 15:30:49 +00:00
Bram Kragten
130839ee7b Revert "Add left text alignment to call service button" (#25377) 2025-05-08 17:24:10 +02:00
Wendelin
ba4ec960c8 Use ha-font-weight typography css tokens (#25374)
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-05-08 15:11:53 +00:00
Petar Petrov
6692d9c6aa Use the new included_in_stat hierarchy in the Energy Sankey card (#25306) 2025-05-08 17:01:18 +02:00
renovate[bot]
4d2d94c54f Update dependency @lokalise/node-api to v14.5.2 (#25380)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-08 17:51:45 +03:00
Wendelin
d59c6612c6 Fix backup custom retention save issue (#25368) 2025-05-08 16:50:31 +02:00
Wendelin
498f158253 Use ha-font-smoothing typography css tokens (#25364) 2025-05-08 17:32:48 +03:00
renovate[bot]
b8026ccf46 Update vitest monorepo to v3.1.3 (#25379)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-08 17:29:57 +03:00
Wendelin
84def48222 Add tests for common name utils (#25373) 2025-05-08 16:59:28 +03:00
Wendelin
cea0ac02fe Improve ha-spinner gallery docs (#25369) 2025-05-08 15:50:03 +03:00
Wendelin
e1b099e88b Fix backup settings undefined cloudStatus (#25366) 2025-05-08 13:47:17 +02:00
Yosi Levy
d571ef3f18 Font style in side bar (#25367) 2025-05-08 13:21:39 +02:00
Lucas
c8cffef647 Add left text alignment to call service button (#24846) 2025-05-08 09:58:46 +02:00
Simon Lamon
6b568307a4 Fix bluetooth device info is encoding data twice (#25353)
Data is already encoded
2025-05-08 08:21:01 +03:00
J. Nick Koston
1b501907f1 Add a dialog to SSDP to show raw data (#25362)
* Add a dialog to SSDP to show raw data

* tweaks

* Add a dialog to SSDP to show raw data

* reduce

* tweaks

* Update src/panels/config/integrations/integration-panels/ssdp/dialog-ssdp-raw-data.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Update src/panels/config/integrations/integration-panels/ssdp/dialog-ssdp-discovery-info.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Update src/panels/config/integrations/integration-panels/ssdp/dialog-ssdp-discovery-info.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* add dump

* preen

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-05-08 08:18:26 +03:00
Wendelin
c7e79998a4 Fix ha-dialog actions padding to use safe-area-inset (#25359)
* Fix ha-dialog actions padding to use safe-area-inset

* Update src/components/ha-dialog.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-05-07 18:04:43 +02:00
Wendelin
03ccf014d9 Use ha-font-family typography css token (#25355)
Use ha-font-family
2025-05-07 17:38:07 +03:00
renovate[bot]
ab41bdb87d Update dependency @lokalise/node-api to v14.5.1 (#25360)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-07 17:35:54 +03:00
karwosts
821a0bc418 New solar-consumed-gauge algorithm (#25326)
* New solar-consumed-gauge algorithm

* update tests

* Apply suggestion

* reduce duplicate code
2025-05-07 17:35:24 +03:00
karwosts
6d931b9e37 Add UoM to location selector (#25358) 2025-05-07 16:13:29 +02:00
Bram Kragten
f0341f28ab Merge branch 'rc' 2025-05-07 13:14:55 +02:00
Paul Bottein
603663e0cc Fix badge overlay in scrolling mode (#25352)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-05-07 13:14:21 +02:00
Bram Kragten
80dddc9eef Only enable drag scroll controller when needed (#25351) 2025-05-07 13:14:20 +02:00
Paul Bottein
b823a3b139 Fix badge overlay in scrolling mode (#25352)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-05-07 10:39:25 +00:00
Bram Kragten
47c9a407e6 Only enable drag scroll controller when needed (#25351) 2025-05-07 12:30:26 +02:00
Bram Kragten
8494d0542e Bumped version to 20250507.0 2025-05-07 10:45:48 +02:00
Wendelin
467a5bef0b Fix data-table search clear button alignment (#25348) 2025-05-07 10:45:19 +02:00
Petar Petrov
24736e36ff Set <=0 chart values to null so they render as gaps on a log graph (#25347) 2025-05-07 10:45:18 +02:00
Paulus Schoutsen
604c00d772 Update network browser descriptions (#25345) 2025-05-07 10:45:17 +02:00
Bram Kragten
12bbba1bff fix height of stats graph card in section (#25344) 2025-05-07 10:45:16 +02:00
Petar Petrov
c0ba48beb6 Set <=0 chart values to null so they render as gaps on a log graph (#25347) 2025-05-07 10:43:30 +02:00
Paulus Schoutsen
075e1df204 Update network browser descriptions (#25345) 2025-05-07 10:40:38 +02:00
Wendelin
22c57853b4 Fix data-table search clear button alignment (#25348) 2025-05-07 11:30:36 +03:00
Bram Kragten
fe824062a5 fix height of stats graph card in section (#25344) 2025-05-07 08:11:34 +03:00
Bram Kragten
e3221ad4ee Merge branch 'rc' 2025-05-06 20:46:09 +02:00
Bram Kragten
7d3a7fa1db Bumped version to 20250506.0 2025-05-06 20:45:47 +02:00
Paul Bottein
5e67bf1fa7 Fix outlined icon button style (#25340) 2025-05-06 20:45:16 +02:00
Paul Bottein
7147c7578d Use right theme variable for dashboard tab color in edit mode (#25339) 2025-05-06 20:45:16 +02:00
Paul Bottein
90710fedf2 Simplify entity combo-box code (#25338) 2025-05-06 20:45:15 +02:00
Paul Bottein
9629159ef1 Use middle dot 00B7 as separator (#25336) 2025-05-06 20:45:14 +02:00
Paul Bottein
bfac6e1516 Add covers to overview view for area strategy (#25334) 2025-05-06 20:45:13 +02:00
Wendelin
7c288d1769 Fix sidebar item text width (#25332)
* Fix sidebar item text width to utilize full available space

* Update src/components/ha-sidebar.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-05-06 20:45:12 +02:00
Paul Bottein
39119eeb2a Align side bar title with items (#25330) 2025-05-06 20:45:11 +02:00
Wendelin
9c16ce3342 Fix flow form padding end (#25328)
* Fix flow form padding end

* Use more end padding if docs are present
2025-05-06 20:45:10 +02:00
Paulus Schoutsen
3595fab5cb Show voice ID in TTS media browser (#25324)
* Show voice ID in TTS media browser

* Apply suggestions from code review

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* Add copy button

* Now copy correct clipboard icon

* Improve styling

* GAP

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2025-05-06 20:45:09 +02:00
Wendelin
78b2d17f10 Add custom retention info to backup locations (#25318)
* Add retention messages to backup locations

* Fix mobile

* Use join
2025-05-06 20:45:09 +02:00
Paul Bottein
92bf9b4979 Simplify entity combo-box code (#25338) 2025-05-06 20:44:12 +02:00
Paul Bottein
ac616a4d3d Use right theme variable for dashboard tab color in edit mode (#25339) 2025-05-06 17:05:44 +02:00
Paul Bottein
1aa1bfda2c Use middle dot 00B7 as separator (#25336) 2025-05-06 15:56:20 +02:00
Paul Bottein
38a5035d68 Fix outlined icon button style (#25340) 2025-05-06 15:30:04 +02:00
Wendelin
042cd0d3a3 Fix sidebar item text width (#25332)
* Fix sidebar item text width to utilize full available space

* Update src/components/ha-sidebar.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-05-06 11:52:28 +00:00
Wendelin
00d708fbd4 Fix flow form padding end (#25328)
* Fix flow form padding end

* Use more end padding if docs are present
2025-05-06 13:52:00 +02:00
Wendelin
852278e8aa Add custom retention info to backup locations (#25318)
* Add retention messages to backup locations

* Fix mobile

* Use join
2025-05-06 13:50:23 +02:00
Paul Bottein
15dcdffe55 Add covers to overview view for area strategy (#25334) 2025-05-06 13:38:38 +02:00
Wendelin
0729aaacb8 Revert "Keyboard accessible panel sorting" (#25331) 2025-05-06 11:00:37 +02:00
Paul Bottein
92b8cd8f45 Align side bar title with items (#25330) 2025-05-06 10:57:47 +02:00
Simon Lamon
ad8d3dd598 Bump the sortable patch (#25262) 2025-05-06 09:52:04 +02:00
Paulus Schoutsen
d618c25095 Show voice ID in TTS media browser (#25324)
* Show voice ID in TTS media browser

* Apply suggestions from code review

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* Add copy button

* Now copy correct clipboard icon

* Improve styling

* GAP

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2025-05-06 09:49:35 +02:00
renovate[bot]
83289bdd41 Update dependency eslint to v9.26.0 (#25327)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-06 09:43:21 +02:00
Paul Bottein
7b8b8f9d0b 20250502.1 (#25323) 2025-05-05 20:14:29 +02:00
Paul Bottein
b7f866faff Bumped version to 20250502.1 2025-05-05 20:12:59 +02:00
Paulus Schoutsen
37671fd613 Populate integration domain My link (#25322)
* Populate integration domain My link

* break out of loop

* Actually just return from function

* Consolidate code
2025-05-05 20:12:06 +02:00
Paulus Schoutsen
92905c1433 Clean up network browser nav (#25321)
* Clean up network browser nav

* Add ha-md-list
2025-05-05 20:12:05 +02:00
Paulus Schoutsen
cb7251cb5e Reorder my links (#25319) 2025-05-05 20:12:04 +02:00
Paul Bottein
44485c0de4 Do not display no areas in entity pickers (#25317) 2025-05-05 20:12:03 +02:00
Paul Bottein
1191a09576 Use new entity naming in card entity picker (#25316) 2025-05-05 20:12:03 +02:00
karwosts
c178488aac Add energy hourly calculations to CSV report (#25315) 2025-05-05 20:12:02 +02:00
Wendelin
9f6463eec0 Fix zwave add device LR/mesh icons (#25313)
Fix zwave LR/mesh icons
2025-05-05 20:12:01 +02:00
Wendelin
70fef59401 Fix options and repair flow success (#25312) 2025-05-05 20:12:00 +02:00
Wendelin
3e053e07c6 Fix selected entity overflow (#25311) 2025-05-05 20:11:59 +02:00
Wendelin
376cac6002 Fix select entity change (#25310) 2025-05-05 20:11:58 +02:00
Paul Bottein
5cd68301ed Fix pasting yaml in automation code editor (#25309)
Fix pasting yaml in code editor
2025-05-05 20:11:57 +02:00
Wendelin
3121721ac7 Revert "Use md-select for entity-row and state-card" (#25308)
Revert "Use md-select for entity-row and state-card (#25307)"

This reverts commit 3c9dce20e2.
2025-05-05 20:11:56 +02:00
Wendelin
868daf692d Use md-select for entity-row and state-card (#25307) 2025-05-05 20:11:56 +02:00
Wendelin
75e9ac9e73 Fix flow-form header (#25305) 2025-05-05 20:11:55 +02:00
Paulus Schoutsen
f6e36f2038 Add profile security link to My Home Assistant (#25303) 2025-05-05 20:11:54 +02:00
Bram Kragten
55770f3e02 Fix display of disabled items in traces (#25293) 2025-05-05 20:11:53 +02:00
Bram Kragten
cfc7f91f03 Fix select entity row opening more info on select (#25292) 2025-05-05 20:11:52 +02:00
Jan-Philipp Benecke
74488c0b96 Use new entity picker style in quick bar (#25265)
* Use new entity picker style in quick bar

* Cleanup

* Add missing no area

* Process code review
2025-05-05 20:11:51 +02:00
Paulus Schoutsen
c7882f3926 Populate integration domain My link (#25322)
* Populate integration domain My link

* break out of loop

* Actually just return from function

* Consolidate code
2025-05-05 17:48:29 +00:00
Paul Bottein
7434b12d9f Use new entity naming in card entity picker (#25316) 2025-05-05 20:37:47 +03:00
Paulus Schoutsen
9081441d95 Clean up network browser nav (#25321)
* Clean up network browser nav

* Add ha-md-list
2025-05-05 17:29:24 +00:00
Wendelin
d63f610023 Fix options and repair flow success (#25312) 2025-05-05 19:20:22 +02:00
karwosts
e069875432 Add energy hourly calculations to CSV report (#25315) 2025-05-05 13:09:16 -04:00
renovate[bot]
91026b0986 Update dependency @codemirror/view to v6.36.7 (#25320)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-05 17:06:05 +00:00
Paul Bottein
4ec5fbc9a4 Do not display no areas in entity pickers (#25317) 2025-05-05 18:56:16 +02:00
Paulus Schoutsen
fb3a59272d Reorder my links (#25319) 2025-05-05 18:54:33 +02:00
Wendelin
9155c85509 Fix zwave add device LR/mesh icons (#25313)
Fix zwave LR/mesh icons
2025-05-05 09:05:35 -04:00
Wendelin
9d74cd7561 Fix selected entity overflow (#25311) 2025-05-05 13:11:42 +02:00
Paul Bottein
22ddcca954 Fix pasting yaml in automation code editor (#25309)
Fix pasting yaml in code editor
2025-05-05 11:42:21 +02:00
Wendelin
8f422357f1 Fix select entity change (#25310) 2025-05-05 09:13:50 +00:00
Jan-Philipp Benecke
44f5f7bdb5 Use new entity picker style in quick bar (#25265)
* Use new entity picker style in quick bar

* Cleanup

* Add missing no area

* Process code review
2025-05-05 11:12:43 +02:00
Wendelin
83819a9be0 Revert "Use md-select for entity-row and state-card" (#25308)
Revert "Use md-select for entity-row and state-card (#25307)"

This reverts commit 3c9dce20e2.
2025-05-05 08:57:50 +00:00
Wendelin
3c9dce20e2 Use md-select for entity-row and state-card (#25307) 2025-05-05 11:01:35 +03:00
Wendelin
a19e7002ea Fix flow-form header (#25305) 2025-05-05 10:40:54 +03:00
Paulus Schoutsen
75608db9b8 Add profile security link to My Home Assistant (#25303) 2025-05-05 08:33:52 +03:00
karwosts
08f30b714b Keyboard accessible panel sorting (#25288) 2025-05-04 14:58:41 +03:00
Volodymyr Honchar
9983129e26 Add a feature to display any attribute of an entity in the Gauge Card (#25258)
* Add a feature to display any attribute of an entity in the Gauge Card

* Extract list of non numeric attributes into a constant and reuse it in number card as well as in numeric condition
2025-05-04 11:51:01 +00:00
Bram Kragten
40fe62c2ec Fix select entity row opening more info on select (#25292) 2025-05-04 14:41:01 +03:00
Bram Kragten
d7660370ab Fix display of disabled items in traces (#25293) 2025-05-04 09:38:01 +02:00
renovate[bot]
bdad76937e Update babel monorepo to v7.27.1 (#25289)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-04 09:25:12 +02:00
renovate[bot]
d2822308ec Update dependency @lokalise/node-api to v14.5.0 (#25290)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-04 09:24:51 +02:00
renovate[bot]
99b94e799d Update dependency @bundle-stats/plugin-webpack-filter to v4.20.0 (#25285)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-03 08:53:39 +02:00
renovate[bot]
1fb28df1a6 Update dependency core-js to v3.42.0 (#25283)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-02 21:28:27 +02:00
Bram Kragten
1154d1769d Bumped version to 20250502.0 2025-05-02 21:34:23 +03:00
Bram Kragten
a820cd4576 Fix decorators with properties (#25282)
* Fix decorators with properties

* Green build

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2025-05-02 21:33:56 +03:00
Bram Kragten
678a8a85cb Fix alignment of ha-labeled-slider (#25279) 2025-05-02 21:33:55 +03:00
karwosts
358e450e60 Fix disabled language picker (#25278) 2025-05-02 21:33:54 +03:00
Jan-Philipp Benecke
32acef8fad Add save shortcut to shortcuts dialog (#25271) 2025-05-02 21:33:53 +03:00
J. Nick Koston
fae619085c Add my links for the Bluetooth monitors (#25270)
The plan is to link these in the Bluetooth docs for help debugging
2025-05-02 21:33:52 +03:00
Paulus Schoutsen
5d89563aa5 Import missing components on init page (#25269) 2025-05-02 21:33:52 +03:00
Bram Kragten
d7dd11ba7f Improve error handling in automation i18n (#25266) 2025-05-02 21:33:51 +03:00
Jan-Philipp Benecke
4624cc609f Always show backup location retention settings (#25261)
Always show backup location retention settings
2025-05-02 21:33:50 +03:00
karwosts
f24b6a4cb1 Fix typo in energy calculation (#25259)
* New energy calculation

* more tests and stricter tests. change priority order

* more test and fix error
2025-05-02 21:33:49 +03:00
Jan-Philipp Benecke
2b06742bb9 Hide the tab when view is a subview (#25256) 2025-05-02 21:33:48 +03:00
Jan-Philipp Benecke
9e5b7462af Add ? as shortcut for shortcuts dialog (#25253)
Bind shortcuts dialog to `?` key
2025-05-02 21:33:47 +03:00
J. Nick Koston
a544ff4c8a Improve message when no discovery data is found (#25252)
* Improve message when no discovery data is found

It was pointed out its a bit confusing when a device has not been
discovered yet for the discovery/network browser panels as we
only said there was no data. Give the user a better hint
as to why there is no data.

* Improve message when no discovery data is found

It was pointed out its a bit confusing when a device has not been
discovered yet for the discovery/network browser panels as we
only said there was no data. Give the user a better hint
as to why there is no data.

* Improve message when no discovery data is found

It was pointed out its a bit confusing when a device has not been
discovered yet for the discovery/network browser panels as we
only said there was no data. Give the user a better hint
as to why there is no data.

* Improve message when no discovery data is found

It was pointed out its a bit confusing when a device has not been
discovered yet for the discovery/network browser panels as we
only said there was no data. Give the user a better hint
as to why there is no data.
2025-05-02 21:33:46 +03:00
J. Nick Koston
b81d2013dc Fix formatting of mac address fields in device info (#25251)
Previous change lost the `:` seperator, and unexpectedly MAC became
title case instead of MAC when dhcp is loaded.
2025-05-02 21:33:45 +03:00
J. Nick Koston
9b7e2886b6 Better explain when DHCP discovery data will be available (#25250)
It was pointed out that users likely may not know what DHCP is
and wonder why the data is not available yet.
2025-05-02 21:33:44 +03:00
karwosts
69eaf178ca New energy calculation formula (#25242)
* New energy calculation

* more tests and stricter tests. change priority order
2025-05-02 21:33:44 +03:00
Yosi Levy
1a14511fa6 Various RTL fixes (#25231) 2025-05-02 21:33:43 +03:00
Bram Kragten
b4e8c56f58 Fix decorators with properties (#25282)
* Fix decorators with properties

* Green build

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2025-05-02 18:21:38 +02:00
Bram Kragten
17cc63deba Fix alignment of ha-labeled-slider (#25279) 2025-05-02 10:47:20 -04:00
karwosts
b4f1c8755d Fix disabled language picker (#25278) 2025-05-02 16:19:12 +03:00
J. Nick Koston
b0d4c699db Add my links for the Bluetooth monitors (#25270)
The plan is to link these in the Bluetooth docs for help debugging
2025-05-02 12:46:36 +02:00
renovate[bot]
c07bf68161 Update dependency typescript-eslint to v8.31.1 (#25272)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-02 12:16:28 +02:00
Jan-Philipp Benecke
d1a0eaece5 Add save shortcut to shortcuts dialog (#25271) 2025-05-02 12:16:04 +02:00
Bram Kragten
f608783551 Improve error handling in automation i18n (#25266) 2025-05-01 19:06:42 +02:00
Jan-Philipp Benecke
dddba58d38 Always show backup location retention settings (#25261)
Always show backup location retention settings
2025-05-01 19:02:55 +02:00
renovate[bot]
ebc16d6520 Update rspack monorepo to v1.3.8 (#25267)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-01 19:01:39 +02:00
renovate[bot]
4ed8ecad01 Update vaadinWebComponents monorepo to v24.7.5 (#25268)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-05-01 19:01:35 +02:00
Paulus Schoutsen
c26fb1713d Import missing components on init page (#25269) 2025-05-01 15:57:56 +03:00
Jan-Philipp Benecke
2b7b17625e Hide the tab when view is a subview (#25256) 2025-05-01 09:25:18 +02:00
karwosts
cd3e4f55e2 Fix typo in energy calculation (#25259)
* New energy calculation

* more tests and stricter tests. change priority order

* more test and fix error
2025-05-01 07:27:11 +03:00
Jan-Philipp Benecke
1c12aea8f6 Add ? as shortcut for shortcuts dialog (#25253)
Bind shortcuts dialog to `?` key
2025-04-30 22:23:45 +02:00
J. Nick Koston
3722f971ca Improve message when no discovery data is found (#25252)
* Improve message when no discovery data is found

It was pointed out its a bit confusing when a device has not been
discovered yet for the discovery/network browser panels as we
only said there was no data. Give the user a better hint
as to why there is no data.

* Improve message when no discovery data is found

It was pointed out its a bit confusing when a device has not been
discovered yet for the discovery/network browser panels as we
only said there was no data. Give the user a better hint
as to why there is no data.

* Improve message when no discovery data is found

It was pointed out its a bit confusing when a device has not been
discovered yet for the discovery/network browser panels as we
only said there was no data. Give the user a better hint
as to why there is no data.

* Improve message when no discovery data is found

It was pointed out its a bit confusing when a device has not been
discovered yet for the discovery/network browser panels as we
only said there was no data. Give the user a better hint
as to why there is no data.
2025-04-30 21:53:07 +02:00
J. Nick Koston
409f665641 Fix formatting of mac address fields in device info (#25251)
Previous change lost the `:` seperator, and unexpectedly MAC became
title case instead of MAC when dhcp is loaded.
2025-04-30 19:16:25 +00:00
J. Nick Koston
5b3b17ef6d Better explain when DHCP discovery data will be available (#25250)
It was pointed out that users likely may not know what DHCP is
and wonder why the data is not available yet.
2025-04-30 19:10:32 +00:00
Yosi Levy
05b49e8c80 Various RTL fixes (#25231) 2025-04-30 21:07:55 +02:00
renovate[bot]
2dbdbb4b64 Update dependency eslint-plugin-wc to v3.0.1 (#25249)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-30 20:50:34 +02:00
dependabot[bot]
a825b632bf Bump vite from 6.3.2 to 6.3.4 (#25248)
Bumps [vite](https://github.com/vitejs/vite/tree/HEAD/packages/vite) from 6.3.2 to 6.3.4.
- [Release notes](https://github.com/vitejs/vite/releases)
- [Changelog](https://github.com/vitejs/vite/blob/main/packages/vite/CHANGELOG.md)
- [Commits](https://github.com/vitejs/vite/commits/v6.3.4/packages/vite)

---
updated-dependencies:
- dependency-name: vite
  dependency-version: 6.3.4
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-04-30 20:34:02 +02:00
karwosts
f8d706277d New energy calculation formula (#25242)
* New energy calculation

* more tests and stricter tests. change priority order
2025-04-30 19:47:51 +03:00
Paul Bottein
e517175f68 20250430.2 (#25246) 2025-04-30 17:52:11 +02:00
Paul Bottein
ee9cbf7370 Bumped version to 20250430.2 2025-04-30 17:50:44 +02:00
Bram Kragten
efd7b380a9 Handle errrors/wrong values on paste (#25245) 2025-04-30 17:49:56 +02:00
Paul Bottein
46cc254f77 Use code font family variable in combo-box (#25243) 2025-04-30 17:49:55 +02:00
Bram Kragten
221bc732fb Handle errrors/wrong values on paste (#25245) 2025-04-30 17:45:35 +02:00
Paul Bottein
055c18463c Use code font family variable in combo-box (#25243) 2025-04-30 17:17:01 +03:00
Paul Bottein
d996ba818f 20250430.1 (#25244) 2025-04-30 16:10:12 +02:00
Paul Bottein
e5f41ceb3e Bumped version to 20250430.1 2025-04-30 16:08:42 +02:00
Bram Kragten
2e4ce71d06 Improve trigger condition check on paste (#25241) 2025-04-30 16:08:03 +02:00
Bram Kragten
50e39de974 Allow pasting more script config (#25240)
* Allow pasting more script config

* Update manual-script-editor.ts
2025-04-30 16:08:02 +02:00
Bram Kragten
1ba941282c Allow pasting more automation config formats (#25239) 2025-04-30 16:08:01 +02:00
J. Nick Koston
b656ddc1f0 Add DHCP Browser entry point to network (#25235)
* Add DHCP Browser entry point to network

* lint
2025-04-30 16:08:00 +02:00
Bram Kragten
ddd51ff097 Improve trigger condition check on paste (#25241) 2025-04-30 16:02:53 +02:00
Bram Kragten
55c75096d0 Allow pasting more script config (#25240)
* Allow pasting more script config

* Update manual-script-editor.ts
2025-04-30 13:15:10 +00:00
Bram Kragten
fd3502f3bc Allow pasting more automation config formats (#25239) 2025-04-30 14:57:16 +02:00
J. Nick Koston
7d6bec01ae Add DHCP Browser entry point to network (#25235)
* Add DHCP Browser entry point to network

* lint
2025-04-30 08:51:22 -04:00
Paul Bottein
a699149388 20250430.0 (#25237) 2025-04-30 13:10:20 +02:00
Paul Bottein
0aeb8fa75c Merge branch 'rc' into dev 2025-04-30 12:53:10 +02:00
Paul Bottein
456a44fdfd Bumped version to 20250430.0 2025-04-30 12:35:26 +02:00
Paul Bottein
53a0b311de Use list item for statistic picker (#25228)
* Use list item for statistic picker

* Use item interface

* Fix icon
2025-04-30 11:40:56 +03:00
Petar Petrov
ded5ade0f2 Grouping options for hui-energy-sankey-card (#25207)
* Grouping options for hui-energy-sankey-card

* use getEntityContext for area/floor

* Update rspack monorepo to v1.3.7 (#25206)

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>

* Update vaadinWebComponents monorepo to v24.7.4 (#25204)

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>

* Add typography styles (#25171)

* Add typoghrapy styles

* Split styles

* Fix duplicated html

* remove unused paper vars

* Fix vars

* Add vars autocompletion extension

* Fix css syntax highlighting

* History tooltip RTL fix (#24917)

* History tooltip RTL fix

* Fix background color

* Render todo items with no state, change look of read only items (#24529)

* Render todo items with no state, change look of read only items

Co-authored-by: Erik Montnemery <erik@montnemery.com>
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
Co-authored-by: Wendelin <w@pe8.at>

* Themeable badge icon size and badge font size (#25185)

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* Add context to config update entries (#25208)

* Add context to config update entries

* Add no area

* import fix

* import fix

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
Co-authored-by: Yosi Levy <37745463+yosilevy@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
Co-authored-by: Erik Montnemery <erik@montnemery.com>
Co-authored-by: Wendelin <w@pe8.at>
Co-authored-by: emufan <emufan@users.noreply.github.com>
2025-04-30 11:00:51 +03:00
J. Nick Koston
5d2d6dcd6c Make name a top level field for the SSDP panel (#25232)
* Make name a top level field for the SSDP panel

* Make name a top level field for the SSDP panel
2025-04-30 09:39:01 +02:00
karwosts
92353ebed5 Centralize energy usage calculations (#25197)
* Centralize energy usage calculations

* addl tests

* test organization

* Update src/data/energy.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Centralize more equations

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-04-30 06:57:26 +03:00
J. Nick Koston
bc582db7fc Add initial SSDP discovery panel (#25217)
* Add initial SSDP discovery panel
2025-04-29 21:46:56 +02:00
Jan-Philipp Benecke
ab415188ba Allow pasting YAML in automation/script editor directly (#24838)
* Allow pasting YAML in automation/script editor directly

* Highlight pasted items

* Change highlighting

* Also reset in script editor

* Show dialog when pasting to changed automation/script

* Add shortcuts to shortcuts dialog

* Use translated shortcut

* Change timeout and clear on save

* Fix imports

* Process code review

* Move paste logic to manual-*-editor
2025-04-29 18:28:07 +02:00
Wendelin
29c11978b3 Rename font-weight-semibold to medium (#25224) 2025-04-29 16:50:30 +02:00
Paul Bottein
574f9e8936 Add message when no entities found in the entity picker (#25222) 2025-04-29 12:34:09 +00:00
Wendelin
fddc00bfab Change --ha-font-weight-bold (#25221)
* Use font-weight vars in roboto

* Revert roboto usage of vars
2025-04-29 14:24:06 +02:00
Paul Bottein
ff5cbb0613 Revert "Add message in picker when no entities found"
This reverts commit 498d933c06.
2025-04-29 14:22:26 +02:00
Paul Bottein
498d933c06 Add message in picker when no entities found 2025-04-29 14:14:38 +02:00
Paul Bottein
f9fbb254bf Use list item for entity picker (#25176)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
Co-authored-by: Wendelin <w@pe8.at>
2025-04-29 13:30:32 +02:00
Paul Bottein
536602580d Remove duplicated context files (#25212) 2025-04-29 11:51:05 +02:00
Wendelin
c111bf1062 Add ha-badge docs to gallery (#25218) 2025-04-29 11:37:56 +02:00
Simon Lamon
0242fbc6f8 Guard against unknown entities in automation compare functions (#25213)
Guard against unknown entities
2025-04-29 08:24:49 +03:00
Wendelin
f65a0ef4f7 Add context to config update entries (#25208)
* Add context to config update entries

* Add no area
2025-04-28 18:43:10 +02:00
emufan
92521d4565 Themeable badge icon size and badge font size (#25185)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-04-28 14:20:05 +00:00
Bram Kragten
66dbafb5f5 Render todo items with no state, change look of read only items (#24529)
* Render todo items with no state, change look of read only items

Co-authored-by: Erik Montnemery <erik@montnemery.com>
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
Co-authored-by: Wendelin <w@pe8.at>
2025-04-28 16:06:02 +02:00
Yosi Levy
7c46d2d2f4 History tooltip RTL fix (#24917)
* History tooltip RTL fix

* Fix background color
2025-04-28 16:30:26 +03:00
Wendelin
ca642d46cc Add typography styles (#25171)
* Add typoghrapy styles

* Split styles

* Fix duplicated html

* remove unused paper vars

* Fix vars

* Add vars autocompletion extension

* Fix css syntax highlighting
2025-04-28 16:04:47 +03:00
renovate[bot]
9a52185e13 Update vaadinWebComponents monorepo to v24.7.4 (#25204)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-28 14:54:24 +03:00
renovate[bot]
39a73774b0 Update rspack monorepo to v1.3.7 (#25206)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-28 14:53:45 +03:00
Wendelin
b25b170539 Update ha cloud backup info translation (#25203)
* Update ha cloud backup info translation

* Update src/translations/en.json
2025-04-28 12:15:18 +02:00
Bram Kragten
6442606fc5 Wait for backup integration when doing a restore (#25188)
Co-authored-by: Wendelin <w@pe8.at>
2025-04-28 07:51:58 +00:00
Wendelin
1b79869c87 Backup retention by location (#25144) 2025-04-28 09:24:34 +02:00
Bram Kragten
672fbc6007 Fix storage decorator timing (#25199) 2025-04-28 08:46:13 +03:00
renovate[bot]
e1899836bf Update dependency marked to v15.0.11 (#25202)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-28 08:28:34 +03:00
Said Tahsin Dane
e90967d200 Scripts - Fix the run button to check if the script has fields (#25156)
* Fix the run button to check if the script has fields

* Used a more straightforward function to check fields instead of an async call
2025-04-27 16:17:55 +00:00
renovate[bot]
631bfe46ba Update dependency @codemirror/view to v6.36.6 (#25194)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-27 19:06:56 +03:00
Bram Kragten
a5762f07ac Rename entity ids when updating device name during config flow (#25186)
* Rename entity ids when updating device name during config flow

* simplify
2025-04-27 19:06:26 +03:00
renovate[bot]
bf7422e4c5 Update rspack monorepo to v1.3.6 (#25193)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-27 08:26:19 +02:00
renovate[bot]
45994e7989 Update dependency marked to v15.0.10 (#25191)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-27 08:21:50 +02:00
Simon Lamon
995e3f10ad Replace remaining mwc-tabs (#25179)
* Remaining mwc-tabs

* Apply suggestions from code review

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-04-26 20:12:03 +00:00
karwosts
6464c2b602 Share energy sum calculation across all cards (#25184) 2025-04-26 20:58:33 +03:00
renovate[bot]
8901c1fb31 Update dependency glob to v11.0.2 (#25183)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-26 19:38:54 +03:00
Simon Lamon
1f5f18f7e7 Align add-view button in edit dashboard (#25181)
Align button
2025-04-26 19:29:02 +03:00
Simon Lamon
51ca3e277c Fix wrong label selected when filtering labels (#25180)
Fix filtered labels
2025-04-26 19:27:15 +03:00
J. Nick Koston
ee495a432f Add initial zeroconf panel (#25151)
* Add initial zeroconf panel
2025-04-26 12:14:47 +02:00
Bram Kragten
d75ea3bb8d Replace mwc-tab -> sl-tab (#25166)
* Replace mwc-tab -> sl-tab
2025-04-25 17:05:04 +00:00
Paulus Schoutsen
40fbeaae1c render voice names for Cloud voices (#25164) 2025-04-25 09:43:04 -04:00
renovate[bot]
dc2c6cee21 Update dependency @codemirror/legacy-modes to v6.5.1 (#25177)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-25 13:24:29 +00:00
Petar Petrov
3b0cd9e3ae Improve handling of batteries in sankey chart (#25175) 2025-04-25 14:18:40 +02:00
ildar170975
834ece8547 Fix height & scroll in hui-dialog-create-card (#25042)
* set min/max height & fix margin for "search" field

* remove restoring height & width

* added scrollTo(top)

* compare _filter with _prevFilter

* use changedProps
2025-04-25 14:24:27 +03:00
Bram Kragten
b7aa296be7 remove wait for person in onboarding user (#25173) 2025-04-25 14:18:53 +03:00
Petar Petrov
0cab6c9e2e Use refactored Z-Wave reconfigure flow (#25174) 2025-04-25 11:18:22 +00:00
Bram Kragten
94c8665528 Improve sidebar styling (#25172) 2025-04-25 14:16:07 +03:00
Simon Lamon
c7ca654926 Clean up polymer paper item CSS variables (#24896)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-04-25 13:08:54 +02:00
Bram Kragten
488599905b Always use target ES2021 (#25170) 2025-04-25 09:04:05 +00:00
Bram Kragten
221e1d9ed8 Allow to change device names during config flow (#25142)
* Allow to change device names during config flow

* Update zha-device-card.ts

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2025-04-25 10:04:00 +03:00
Bram Kragten
0229f67751 Replace clickable list item (#25165) 2025-04-25 10:01:19 +03:00
Bram Kragten
3a0c367f76 Add a drag-scroll controller (#25159)
* Add a drag-scroll controller

* simplify and fix
2025-04-25 08:51:35 +03:00
renovate[bot]
af0854e480 Update dependency marked to v15.0.9 (#25168)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-25 06:18:46 +02:00
Simon Lamon
14f4120926 Fix menu not opening options (#25162) 2025-04-24 20:20:11 +02:00
renovate[bot]
e2bd464001 Update dependency typescript-eslint to v8.31.0 (#25161)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-24 20:09:48 +02:00
renovate[bot]
eb9f81d9a1 Update dependency eslint to v9.25.1 (#25160)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-24 19:32:07 +02:00
Johannes Hager
078209d154 Add Option to wrap or scroll section header badges (#24709) 2025-04-24 15:04:09 +00:00
Wendelin
7a617600ad Add unit tests and docs for common/context (#25158) 2025-04-24 16:57:29 +02:00
Wendelin
ae74e3496c Add typography tokens (#25084) 2025-04-24 16:52:03 +02:00
Petar Petrov
c0f304ad40 Use numeric prefix for IPv6 mask (#25130) 2025-04-24 16:45:37 +02:00
renovate[bot]
c794a2734b Update dependency @lit/context to v1.1.5 (#25157)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-24 12:21:10 +00:00
Bram Kragten
e156dd36f4 Use SWC for typescript, update to Lit 3, migrate decorators (#25150)
Co-authored-by: Wendelin <w@pe8.at>
2025-04-24 14:10:35 +02:00
Wendelin
c40bf8f3cd Add prevent restart when backup is ongoing (#25010)
* Add prevent restart when backup is ongoing

* Fix types

* Add error handling

* Improve review issues
2025-04-24 13:45:42 +03:00
renovate[bot]
93485d8b57 Update vitest monorepo to v3.1.2 (#25155)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-24 13:10:44 +03:00
Paul Bottein
ce5cdaa496 Add badges section on the areas strategy editor (#25154) 2025-04-24 12:36:54 +03:00
Wendelin
dcbaa31c96 Add system-managed addon info (#25132)
* Add system managed addon info dialog

* Add system managed alert

* Fix translation

* Update hassio/src/addon-view/info/hassio-addon-info.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-04-24 11:12:34 +03:00
Wendelin
71b2e5f827 Improve onboarding styling (#25147) 2025-04-24 10:54:43 +03:00
Wendelin
d58590b534 Add automation loading indicator (#25146) 2025-04-24 08:01:25 +02:00
Wendelin
b2044e88b6 Improve landingpage translation loading (#25148) 2025-04-24 08:33:14 +03:00
Paul Bottein
94b5ed97c6 Refactor multi term fuse search to reuse it (#25143)
* Refactor multi term fuse search to re-use

* Do not create filter when not open

* Update fuse options

* Use fuse options
2025-04-24 08:31:02 +03:00
Zhephyr
11b8f6210f Extend usage of Data Entry Flow forms description_placeholders to field labels (#25115) 2025-04-23 12:46:15 +03:00
Paul Bottein
8e778cfc32 Use new entity naming in statistic picker (#25137) 2025-04-23 08:37:03 +03:00
karwosts
4c6a5ed2e3 convert-color: color names should be case insensitive (#25140)
convert-color: colornames should be case insensitive
2025-04-23 08:14:53 +03:00
Simon Lamon
48c90267df Fix stuck onboarding when no devices are discovered (#25106)
* Broken onboarding

* Introduce a boolean var and return previous code

* Remove import
2025-04-23 08:14:03 +03:00
Simon Lamon
fcab356639 Change netlify actions (#24815)
* Netlify fix

* Fix missing \

* Prettier

* PR review

* npx

* npx
2025-04-22 13:22:03 +02:00
Paul Bottein
a70a0d4b4a Fix event propagation in generic entity row (#25134) 2025-04-22 13:15:20 +02:00
Simon Lamon
5a34560381 Delete entity/device to Remove entity/device in scene editor (#25116)
Delete entity/device to Remove entity/device
2025-04-22 08:57:47 +03:00
renovate[bot]
f71245893a Update dependency eslint to v9.25.0 (#25126) 2025-04-21 21:06:12 +02:00
renovate[bot]
1e7bfd59f2 Update dependency @lokalise/node-api to v14.4.0 (#25123)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-21 20:43:27 +02:00
J. Nick Koston
1c15116052 Add initial DHCP discovery panel (#25086) 2025-04-21 08:09:58 -10:00
Simon Lamon
3647722824 Camera view options translated (#25119)
* Camera view options translated

* Swap around changes

* Clean up

* Clean up
2025-04-21 14:21:32 +03:00
Simon Lamon
713dd68089 Sensor card: Graph types options translated (#25118)
* Sensor card: Graph types options translated

* Clean up
2025-04-21 14:18:41 +03:00
karwosts
53dd0cbaa8 Fix some min/mean/max issues with statistics line charts (#25107)
* Fix some min/mean/max issues with statistics line charts

* minor simplification
2025-04-21 14:09:07 +03:00
Simon Lamon
6bf8faa96a Translation for number of occurrences (#25117)
* Translation for number of occurrences

* Update src/translations/en.json
2025-04-21 11:47:43 +03:00
dependabot[bot]
09a17131ab Bump softprops/action-gh-release from 2.2.1 to 2.2.2 (#25120)
Bumps [softprops/action-gh-release](https://github.com/softprops/action-gh-release) from 2.2.1 to 2.2.2.
- [Release notes](https://github.com/softprops/action-gh-release/releases)
- [Changelog](https://github.com/softprops/action-gh-release/blob/master/CHANGELOG.md)
- [Commits](https://github.com/softprops/action-gh-release/compare/v2.2.1...v2.2.2)

---
updated-dependencies:
- dependency-name: softprops/action-gh-release
  dependency-version: 2.2.2
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-04-21 11:46:14 +03:00
renovate[bot]
7f20b2d6d2 Update dependency @rsdoctor/rspack-plugin to v1.0.2 (#25112)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-20 12:29:35 +02:00
renovate[bot]
fa05cd0c90 Update dependency eslint-plugin-lit to v2.1.1 (#25110)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-19 17:33:34 +02:00
renovate[bot]
0b7fc330b3 Update dependency element-internals-polyfill to v3.0.2 (#25109)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-19 17:32:33 +02:00
Simon Lamon
6aa78794a7 Area strategy: Translate no entities in this area (#25101)
No entities in this area
2025-04-19 12:32:02 +02:00
renovate[bot]
3f17548582 Lock file maintenance (#25108)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-19 09:23:46 +02:00
renovate[bot]
0cee3c2882 Update rspack monorepo to v1.3.5 (#25104)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-18 14:56:02 +02:00
renovate[bot]
5753b3e166 Update dependency typescript-eslint to v8.30.1 (#25103)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-18 07:55:50 +02:00
Paul Bottein
7b78d821f9 Fix spinner in quick bar (#25097) 2025-04-17 20:23:59 +02:00
renovate[bot]
9a4469588c Update dependency typescript-eslint to v8.30.0 (#25099)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-17 17:57:40 +00:00
renovate[bot]
f9eadf08fd Update vaadinWebComponents monorepo to v24.7.3 (#25087)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-17 19:47:50 +02:00
dependabot[bot]
c630176fcf Bump http-proxy-middleware from 2.0.7 to 2.0.9 (#25092)
Bumps [http-proxy-middleware](https://github.com/chimurai/http-proxy-middleware) from 2.0.7 to 2.0.9.
- [Release notes](https://github.com/chimurai/http-proxy-middleware/releases)
- [Changelog](https://github.com/chimurai/http-proxy-middleware/blob/v2.0.9/CHANGELOG.md)
- [Commits](https://github.com/chimurai/http-proxy-middleware/compare/v2.0.7...v2.0.9)

---
updated-dependencies:
- dependency-name: http-proxy-middleware
  dependency-version: 2.0.9
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-04-17 19:46:20 +02:00
Paul Bottein
0389fbba52 Use ha-combox-box-list-item in all combo box components (#25096) 2025-04-17 17:13:19 +02:00
Paul Bottein
d56c7c41e2 Update entity naming in entity picker (#24971) 2025-04-17 16:43:47 +02:00
Paul Bottein
e74cac697e Add fit mode support to picture glance card and picture entity card (#25005)
Co-authored-by: karwosts <karwosts@gmail.com>
2025-04-17 13:36:34 +00:00
renovate[bot]
77216e8e76 Update Yarn to v4.9.1 (#25089)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-17 15:28:28 +02:00
Bram Kragten
02a8924f63 Fix max height of video in more info (#25091) 2025-04-17 15:27:57 +02:00
Petar Petrov
9fc28e5abb ZwaveJS controller migration flow (#25003)
* ZwaveJS migration flow

* Show exact progress in options flow

* progress fix

* Apply suggestions from code review

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* remove unused string

* import fix

* fix selectedDomain

* entryId -> handler

* Update src/translations/en.json

Co-authored-by: Martin Hjelmare <marhje52@gmail.com>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
Co-authored-by: Martin Hjelmare <marhje52@gmail.com>
2025-04-17 13:32:33 +02:00
Wendelin
933fb1327a Implement new Z-Wave add device flow (#24667)
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-04-17 13:12:04 +02:00
Petar Petrov
c73a9fccb8 Add support for exact % progress reports in options flow (#25082)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-04-17 09:42:52 +02:00
Wendelin
38c11e738e Improve ha cloud info buttons (#25079) 2025-04-16 17:42:51 +02:00
renovate[bot]
93c5632ee0 Update dependency jsdom to v26.1.0 (#25081)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-16 13:50:29 +03:00
Wendelin
5459eaff30 Fix and improve remove z-wave node (#25078)
* Fix and improve remove zwave node

* Improve error

* Fix lint
2025-04-16 13:48:26 +03:00
Wendelin
b02f1037fb Translate "Unnamed view" (#25080)
Add unnamed view translation
2025-04-16 11:01:13 +03:00
Paul Bottein
3d130b790c Create covers section in area strategy dashboard (#25073)
* Move cover domain and garage, door, window binary sensor to opening section in area strategy

* Rename to cover and add input boolean and select
2025-04-15 23:10:40 +02:00
renovate[bot]
e23d2392d8 Update dependency @lokalise/node-api to v14.3.0 (#25077)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-15 21:51:24 +02:00
Bram Kragten
d5a6e16bf8 Fix safe area inset in sidebar (#25074) 2025-04-15 15:32:57 +02:00
ildar170975
91a5497c60 fix ha-textfield (max-width, text-overflow, padding) (#25043)
* fix max-width, text-overflow, padding

* simmetrical padding
2025-04-15 15:41:08 +03:00
Paul Bottein
65dae09a49 Avoid generic entity row with control to open more info (#25068) 2025-04-15 13:12:49 +02:00
Wendelin
7e0f293d1f Add cloud info to backup locations (#25065)
* Add cloud info to backup agents

* Add ha cloud translation
2025-04-15 12:01:04 +02:00
0xEF
2682011ae6 Add padding back to weather forecast card for non-masonry layout (#25035) 2025-04-15 09:31:41 +00:00
Paul Bottein
1bba103a3d Fix theme variables for ha-tabs (#25066) 2025-04-15 11:08:41 +02:00
renovate[bot]
e425375d55 Update dependency lint-staged to v15.5.1 (#25057)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-14 21:05:13 +02:00
Bram Kragten
a2689eee63 Add suffix to addon copies setting (#25055) 2025-04-14 13:52:35 +00:00
Bram Kragten
74741c5d69 Don't use advanced mode in hardware dialog (#25051) 2025-04-14 15:14:44 +02:00
Bram Kragten
53426d647a Remove advanced mode from scenes editor (#25054) 2025-04-14 12:41:24 +00:00
Bram Kragten
f6e4f4c0d6 Remove advanced mode from dashboard creation (#25053) 2025-04-14 12:35:45 +00:00
Bram Kragten
2f086f4d00 Use expandable instead of advanced mode toggle (#25052) 2025-04-14 14:35:30 +02:00
ildar170975
cd91e8c07c Use codemirror in dialog-import-blueprint (#25034)
* use codemirror

* hass not needed for codemirror

* fix uom for css var
2025-04-14 10:28:28 +03:00
dependabot[bot]
b3a5ea2893 Bump actions/setup-node from 4.3.0 to 4.4.0 (#25047)
Bumps [actions/setup-node](https://github.com/actions/setup-node) from 4.3.0 to 4.4.0.
- [Release notes](https://github.com/actions/setup-node/releases)
- [Commits](https://github.com/actions/setup-node/compare/v4.3.0...v4.4.0)

---
updated-dependencies:
- dependency-name: actions/setup-node
  dependency-version: 4.4.0
  dependency-type: direct:production
  update-type: version-update:semver-minor
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-04-14 09:23:24 +03:00
ildar170975
98ae0295b4 Do not show tips for shortcuts on a client with a touch screen (#25020)
* check isTouch

* check isTouch

* check isTouch

* restored lost line

* isTouch -> isMobileClient

* isTouch -> isMobileClient

* isTouch -> isMobileClient

* Create is_mobile.ts
2025-04-14 09:22:33 +03:00
ildar170975
43bb9d3401 codemirror: set cursor color to "--primary-color", set indent marker color to "--divider-color" (#25045)
* set cursor color to "--primary-color"

* indent markers' color
2025-04-14 09:15:29 +03:00
J. Nick Koston
8ad4385d67 Link the device info BLE address to the Advertisement Monitor (#25044)
* Link the device info BLE address to the Advertisement Monitor

* Link the device info BLE address to the Advertisement Monitor

* preen
2025-04-14 09:13:27 +03:00
renovate[bot]
8fb7c1594a Update dependency eslint-config-prettier to v10.1.2 (#25036)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-14 09:10:19 +03:00
ildar170975
4fca09f9ae If entity has "entity_picture" - allow using a CSS theme var for border-radius (#24248)
* added CSS theme var for border-radius

* prettier

* moved "50%" out of "styles"

* small refactoring

* lint

* lint

* lint

* revert to this.style.borderRadius

* prettier

* adding classes

* fixed styles + setting a class

* clean-up

* remove old classes in render()

* "!important" not needed

* using map
2025-04-14 09:09:52 +03:00
ildar170975
6793753755 more-info-camera: disable "download_snapshot" if idle (#25027)
* disable download_snapshot if idle

* prettier
2025-04-13 09:02:36 +02:00
ildar170975
f4e3fdb98e ha-map-card: fit_zones tiny fix (#25031)
fit_zones fix
2025-04-13 08:57:53 +02:00
karwosts
63f4cc456c No particles when prefers-reduced-motion (#25029) 2025-04-13 08:56:02 +02:00
renovate[bot]
33735abfb0 Update octokit monorepo (#25032)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-13 08:42:27 +02:00
renovate[bot]
22b59b247e Update Yarn to v4.9.0 (#25025)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-12 18:13:27 +02:00
karwosts
6d7a40368c Support more templates in action visual editor (#25015)
* Support more templates in action visual editor

* Make selector sticky

* typing
2025-04-12 15:03:44 +03:00
renovate[bot]
fbeb457c25 Update rspack monorepo to v1.3.4 (#25021)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-12 08:52:32 +02:00
dependabot[bot]
4a6834f0d9 Bump vite from 6.2.5 to 6.2.6 (#25014)
Bumps [vite](https://github.com/vitejs/vite/tree/HEAD/packages/vite) from 6.2.5 to 6.2.6.
- [Release notes](https://github.com/vitejs/vite/releases)
- [Changelog](https://github.com/vitejs/vite/blob/v6.2.6/packages/vite/CHANGELOG.md)
- [Commits](https://github.com/vitejs/vite/commits/v6.2.6/packages/vite)

---
updated-dependencies:
- dependency-name: vite
  dependency-version: 6.2.6
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-04-11 18:19:46 +03:00
Bram Kragten
add417a166 Wait for backup integration to setup before subscribing (#25012) 2025-04-11 16:50:23 +02:00
Pierre
ae4f43496e Add reconnection information when an instance is already connected (#25013) 2025-04-11 16:08:02 +02:00
renovate[bot]
4ce792e5bf Update rspack monorepo to v1.3.3 (#25007)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-11 16:20:55 +03:00
Bram Kragten
b9433b96dc Wait for person before creating user in onboarding (#25011) 2025-04-11 16:19:22 +03:00
Wendelin
1dfd937c94 Add automatic backup toggle to OS update (#24995) 2025-04-11 15:10:43 +02:00
Bram Kragten
6a333a4774 Bumped version to 20250411.0 2025-04-11 14:45:42 +02:00
Paul Bottein
7742ccf631 Only ask to refresh dashboard if necessary (#24993) 2025-04-11 14:45:07 +02:00
Paul Bottein
20f2a8d53e Fix refresh strategy config on HA start-up (#24984) 2025-04-11 14:45:07 +02:00
Bram Kragten
ec9fbe7d77 fix dropdown behind datatable (#24981) 2025-04-11 14:45:06 +02:00
Wendelin
6fa226d30a Fix submit spinner in config-flow-form (#24969) 2025-04-11 14:45:04 +02:00
Bram Kragten
b76a723fd9 fix voice wizard bugs (#24950) 2025-04-11 14:44:09 +02:00
Paul Bottein
5237cc72b7 Restore default hold action for some cards (#24947) 2025-04-11 14:42:20 +02:00
Jan-Philipp Benecke
63d2718f67 Import missing ha-tip in quick bar dialog (#24929) 2025-04-11 14:42:19 +02:00
Paul Bottein
14e0666c3a Only ask to refresh dashboard if necessary (#24993) 2025-04-11 14:41:12 +02:00
Bram Kragten
929a0b9cd4 Wait for cloud and backup in onboarding (#24997) 2025-04-11 13:43:45 +02:00
Bram Kragten
0541270695 Also show hardware integration if it has options (#25006)
also show hardware integration if it has options
2025-04-11 11:39:54 +02:00
Paul Bottein
20d357fb13 Add tests for get duplicates function (#24994) 2025-04-11 08:47:42 +02:00
renovate[bot]
6658c10b94 Update dependency typescript-eslint to v8.29.1 (#25000)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-11 06:41:13 +02:00
karwosts
c2ce02652b Fix automation action row describing template targets (#25002) 2025-04-11 06:40:20 +02:00
Bram Kragten
634db1944f Fix dragging in tab bar (#24998) 2025-04-10 19:12:29 +02:00
Bram Kragten
21b3177f95 Replace paper item in sidebar (#24883)
* replace paper item in sidebar

* make items same height as before

* remove polymer refs

* fix user badge

* replace removed styles (and remove unused)
2025-04-10 18:32:38 +02:00
renovate[bot]
7383e3247b Update dependency marked to v15.0.8 (#24996)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-10 16:12:09 +00:00
karwosts
b33e4bf305 Render low carbon gauge when only solar consumption (#24992)
* Render low carbon gauge when only solar consumption

* no null check
2025-04-10 18:01:49 +02:00
Bram Kragten
9d9522cade Use subscription for config flows in progress (#24985) 2025-04-10 16:59:20 +02:00
Bram Kragten
430e47c0fc Replace paper tabs by shoelace tabs (#24909) 2025-04-10 14:20:24 +00:00
Paul Bottein
a6c9702ab2 Update entity naming in entities config page (#24966)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-04-10 12:43:08 +00:00
Wendelin
e3122e8e4d Supervisor backup update config (#24990) 2025-04-10 11:55:20 +02:00
Paul Bottein
c8e46bd239 Fix refresh strategy config on HA start-up (#24984) 2025-04-10 11:04:43 +03:00
Bram Kragten
4fd87a1d7c Hide hardware integrations without entities (#24986) 2025-04-10 08:12:21 +03:00
karwosts
80151ff759 Fix now-7d history to include today (#24989) 2025-04-10 08:10:04 +03:00
Paul Bottein
5f187c1bb3 Fix data-table group by unknown column (#24987) 2025-04-09 15:51:02 +00:00
Stefan Agner
ddc04dd48a Allow to copy IP address of Matter devices to clipboard (#24983)
Often when debugging it is actually helpful to copy the IP address
for further investigation. This PR changes the list to allow
interaction and copies the IP address when clicked on a list item.
2025-04-09 17:44:13 +02:00
Jan-Philipp Benecke
228acf1fae Add shortcuts item to command quick bar (#24952)
* Add shortcuts item to command quick bar

* Remove
2025-04-09 16:46:08 +02:00
Bram Kragten
74acd7ec38 fix dropdown behind datatable (#24981) 2025-04-09 16:16:47 +02:00
Paul Bottein
9bc867d0dc Restore no grouping from local storage from datatable (#24979)
* Restore no grouping from localstorage

* Fix collapse/expand button
2025-04-09 14:15:27 +00:00
Bram Kragten
590df8dd1a Restore media browser to browser when entity is not in state machine (#24982)
restore media browser to browser when entity is not in state machine
2025-04-09 15:49:16 +02:00
Wendelin
ccee57f4a5 Improve background settings and fix save button (#24978) 2025-04-09 13:04:07 +03:00
Jan-Philipp Benecke
828bf977b2 Migrate icon overflow menu to ha-md-button-menu (#24973)
Migrate icon overflow menu to `ha-md-button-menut`
2025-04-09 09:24:58 +03:00
Jan-Philipp Benecke
a2b3ea2ac6 Align automation trace tab order with script tab order (#24974) 2025-04-09 09:05:34 +03:00
Paul Bottein
9c3f77532c Make the full generic entity row clickable (#24968)
* Make the full generic entity row clickable

* Apply suggestions from code review

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-04-08 15:17:05 +02:00
Paul Bottein
4a1cf250c4 Update datatable in devices config page (#24967) 2025-04-08 14:21:10 +02:00
Paul Bottein
9df5141aac Fix data-table sort by unknown column (#24965)
Fix database sort by unknown column
2025-04-08 13:05:22 +02:00
Wendelin
13aeb02b53 Fix submit spinner in config-flow-form (#24969) 2025-04-08 12:39:42 +02:00
Jan-Philipp Benecke
f0f60bae78 Make some parts of shortcuts in dialog translatable (#24955)
* Make some parts of shortcuts in dialog translatable

* Adjust translations
2025-04-08 08:43:54 +03:00
renovate[bot]
d1465a79ae Update dependency typescript to v5.8.3 (#24964)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-08 08:42:09 +03:00
renovate[bot]
6fe8af7c75 Update dependency eslint to v9.24.0 (#24962)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-08 08:41:47 +03:00
Bram Kragten
21180d066e Allow to turn of debugConnection in dev (#24956) 2025-04-07 15:52:06 +02:00
Paul Bottein
dec968af54 Restore default hold action for some cards (#24947) 2025-04-07 13:18:05 +02:00
Bram Kragten
2ccc5355c4 fix voice wizard bugs (#24950) 2025-04-07 10:41:29 +00:00
Jan-Philipp Benecke
316c3f4e1f Use --outline-color in shortcuts dialog (#24949) 2025-04-07 12:37:19 +02:00
renovate[bot]
f88d0ca613 Update dependency @types/luxon to v3.6.2 (#24946)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-07 12:35:37 +02:00
renovate[bot]
edd4a3c31f Update vaadinWebComponents monorepo to v24.7.2 (#24941)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-06 20:57:57 +02:00
renovate[bot]
a7ee98e7de Update dependency @types/luxon to v3.6.1 (#24944)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-06 20:57:43 +02:00
renovate[bot]
1b6ed8cdc3 Update rspack monorepo to v1.3.2 (#24942)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-06 17:17:33 +03:00
Jan-Philipp Benecke
671049beb2 Add dialog to show keyboard shortcuts (#24918)
* Add dialog to show keyboard shortcuts we have

* Add missing translation

* No need for function anymore

* Run updated prettier

* Replace translation keys

* Replace translation keys

* Remove automations for now

* Check whether shortcuts are enabled

* Use plain css for shortcuts
2025-04-06 09:02:52 +02:00
renovate[bot]
daf4158fa0 Update dependency @lokalise/node-api to v14.2.1 (#24933)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-05 20:03:38 +02:00
renovate[bot]
848713858f Update fullcalendar monorepo to v6.1.17 (#24934)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-05 20:03:24 +02:00
Jan-Philipp Benecke
f0ef7e0c53 Import missing ha-tip in quick bar dialog (#24929) 2025-04-05 16:39:34 +02:00
renovate[bot]
e10b0fad95 Update rspack monorepo to v1.3.1 (#24925)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-04 18:18:14 +02:00
dependabot[bot]
8d50bb1d2b Bump vite from 6.2.4 to 6.2.5 (#24928)
Bumps [vite](https://github.com/vitejs/vite/tree/HEAD/packages/vite) from 6.2.4 to 6.2.5.
- [Release notes](https://github.com/vitejs/vite/releases)
- [Changelog](https://github.com/vitejs/vite/blob/v6.2.5/packages/vite/CHANGELOG.md)
- [Commits](https://github.com/vitejs/vite/commits/v6.2.5/packages/vite)

---
updated-dependencies:
- dependency-name: vite
  dependency-version: 6.2.5
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-04-04 18:16:24 +02:00
Bram Kragten
1e26f155a7 Bumped version to 20250404.0 2025-04-04 15:10:56 +02:00
Simon Lamon
27e13017c3 Show the correct area icon in entity breadcrumb (#24913) 2025-04-04 15:10:37 +02:00
Paul Bottein
88f1dc9c16 Add missing translations for areas strategy (#24905) 2025-04-04 15:10:36 +02:00
Paul Bottein
825e707a80 Refresh dashboard strategy when registries changed (#24902)
* Refresh dashboard strategy when registries changed

* Display toast before refreshing dashboard

* Apply suggestions
2025-04-04 15:10:35 +02:00
Simon Lamon
a15f0c7814 Show the correct area icon in entity breadcrumb (#24913) 2025-04-04 15:09:36 +02:00
renovate[bot]
e37f7219c2 Update dependency typescript-eslint to v8.29.0 (#24916)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-04 08:58:50 +02:00
renovate[bot]
570076c539 Update dependency luxon to v3.6.1 (#24915)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-04 08:46:19 +02:00
renovate[bot]
cfeb0336d1 Update vitest monorepo to v3.1.1 (#24907)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-03 18:30:18 +02:00
renovate[bot]
b18cc4dcfb Update dependency @codemirror/commands to v6.8.1 (#24906)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-03 18:30:12 +02:00
Paul Bottein
e271989cee Add missing translations for areas strategy (#24905) 2025-04-03 14:02:27 +02:00
Paul Bottein
ca223f9d73 Refresh dashboard strategy when registries changed (#24902)
* Refresh dashboard strategy when registries changed

* Display toast before refreshing dashboard

* Apply suggestions
2025-04-03 10:10:11 +00:00
renovate[bot]
8fb1cf35ad Update Yarn to v4.8.1 (#24894)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-02 15:14:30 +03:00
karwosts
9f59be492e Render autogenerated step descriptions in trace path viewer (#24886) 2025-04-02 14:04:34 +03:00
Alex Gustafsson
8429d114a8 Improve toggle button for disabled combo boxes (#24843) 2025-04-01 19:07:34 +02:00
Bram Kragten
4fbc155f8b Use md list in config navigation (#24885) 2025-04-01 18:11:29 +02:00
Bram Kragten
0bcaa104e7 Bumped version to 20250401.0 2025-04-01 17:30:31 +02:00
Bram Kragten
6b3f807129 Developer tools action fixes (#24876) 2025-04-01 17:30:16 +02:00
Paul Bottein
c464d344db Add ellipsis for more info breadcrumb (#24882) 2025-04-01 17:29:14 +02:00
karwosts
69f0a4a728 Fix condition rendering in trace choose node (#24878) 2025-04-01 17:29:13 +02:00
Bram Kragten
cd39e2d0f2 Developer tools action fixes (#24876) 2025-04-01 13:18:04 +03:00
Paul Bottein
a23f57256c Add ellipsis for more info breadcrumb (#24882) 2025-04-01 13:11:13 +03:00
renovate[bot]
c279efaa99 Update dependency @codemirror/view to v6.36.5 (#24881)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-04-01 13:08:04 +03:00
karwosts
c4389ec119 Fix condition rendering in trace choose node (#24878) 2025-04-01 10:07:25 +02:00
Clemens Brauers
50d632f8d4 Add area and category as columns in automation, scenes and scripts (#24874)
Add area and category as optional columns in automation, scenes and scripts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-04-01 06:56:02 +00:00
Petar Petrov
dba2fba828 Revert "Update rspack monorepo to v1.3.0" (#24879)
Revert "Update rspack monorepo to v1.3.0 (#24862)"

This reverts commit 8a2ab2eab4.
2025-04-01 06:29:14 +00:00
dependabot[bot]
3890afddb9 Bump vite from 6.2.3 to 6.2.4 (#24873)
Bumps [vite](https://github.com/vitejs/vite/tree/HEAD/packages/vite) from 6.2.3 to 6.2.4.
- [Release notes](https://github.com/vitejs/vite/releases)
- [Changelog](https://github.com/vitejs/vite/blob/v6.2.4/packages/vite/CHANGELOG.md)
- [Commits](https://github.com/vitejs/vite/commits/v6.2.4/packages/vite)

---
updated-dependencies:
- dependency-name: vite
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-03-31 20:51:13 +02:00
Bram Kragten
2ba8f9f99d Bumped version to 20250331.0 2025-03-31 20:43:31 +02:00
Bram Kragten
7e06bbc467 Fix add zwave device my link (#24871) 2025-03-31 20:42:38 +02:00
Paul Bottein
6017d82c21 Handle date range shift during daylight saving time days (#24868) 2025-03-31 20:42:37 +02:00
Bram Kragten
40c200a172 fix spinner in tts try dialog (#24867) 2025-03-31 20:42:36 +02:00
Bram Kragten
a2f70f682f Take lang into account when search existing pipeline (#24866)
* Take lang into account when search existing pipeline

* Simplify logic
2025-03-31 20:42:36 +02:00
Paul Bottein
c42a899b52 Force clock card to display time LTR (#24865) 2025-03-31 20:42:35 +02:00
Paul Bottein
706f43e99e Add interactions for weather card editor (#24864) 2025-03-31 20:42:34 +02:00
karwosts
f5496c21e8 Bar charts start from 0 (#24854) 2025-03-31 20:42:33 +02:00
Paul Bottein
34dce5b279 Only use button for breadcrumb for admin users (#24836) 2025-03-31 20:42:32 +02:00
Bram Kragten
a4f07423ec Name local pipeline based on local or full choice (#24835) 2025-03-31 20:42:31 +02:00
Bram Kragten
9e32c24f3c Update lang support text in voice wizard (#24834) 2025-03-31 20:42:30 +02:00
Paul Bottein
b281d095cd Remove add-on word in satellite wizard translations for state (#24832) 2025-03-31 20:42:29 +02:00
Norbert Rittel
76f187ee2c Properly sentence-case "assistant" / "pipeline" (#24872) 2025-03-31 19:31:00 +02:00
Bram Kragten
488b54cf19 Fix add zwave device my link (#24871) 2025-03-31 17:01:15 +03:00
Bram Kragten
29d2c29af3 fix spinner in tts try dialog (#24867) 2025-03-31 15:06:15 +02:00
renovate[bot]
a2f9101a9f Update Yarn to v4.8.0 (#24863)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-31 16:04:51 +03:00
Paul Bottein
7893eba7a7 Handle date range shift during daylight saving time days (#24868) 2025-03-31 14:58:26 +02:00
Paul Bottein
94ced8af32 Add interactions for weather card editor (#24864) 2025-03-31 14:19:00 +02:00
Paul Bottein
c4b5882b2d Force clock card to display time LTR (#24865) 2025-03-31 14:18:39 +02:00
Bram Kragten
6e8bac2e58 Take lang into account when search existing pipeline (#24866)
* Take lang into account when search existing pipeline

* Simplify logic
2025-03-31 14:18:20 +02:00
renovate[bot]
8a2ab2eab4 Update rspack monorepo to v1.3.0 (#24862)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-31 13:14:34 +02:00
karwosts
c7e5be185d Bar charts start from 0 (#24854) 2025-03-31 12:13:03 +02:00
dependabot[bot]
e98721aa76 Bump home-assistant/wheels from 2025.02.0 to 2025.03.0 (#24860)
Bumps [home-assistant/wheels](https://github.com/home-assistant/wheels) from 2025.02.0 to 2025.03.0.
- [Release notes](https://github.com/home-assistant/wheels/releases)
- [Commits](https://github.com/home-assistant/wheels/compare/2025.02.0...2025.03.0)

---
updated-dependencies:
- dependency-name: home-assistant/wheels
  dependency-type: direct:production
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-03-31 09:10:57 +02:00
renovate[bot]
4c8d661c63 Update dependency @rsdoctor/rspack-plugin to v1.0.1 (#24853)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-30 15:57:18 +02:00
renovate[bot]
b7c60ffc74 Update dependency @material/web to v2.3.0 (#24850)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-30 09:08:38 +02:00
Jan-Philipp Benecke
db6c728cd6 Fix inner border radius for disabled bar in automation/script rows (#24840) 2025-03-29 09:54:09 +01:00
renovate[bot]
34f8335a9d Update dependency @formatjs/intl-datetimeformat to v6.18.0 (#24841)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-29 08:23:21 +01:00
renovate[bot]
ecf5068bd0 Update dependency luxon to v3.6.0 (#24837)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-28 23:48:40 +01:00
Bram Kragten
0a2a2b8a70 Name local pipeline based on local or full choice (#24835) 2025-03-28 18:29:47 +01:00
Paul Bottein
52f4fe6bc0 Only use button for breadcrumb for admin users (#24836) 2025-03-28 13:03:56 -04:00
Bram Kragten
a781bca94b Update lang support text in voice wizard (#24834) 2025-03-28 16:04:48 +00:00
Paul Bottein
63b44c25f8 Remove add-on word in satellite wizard translations for state (#24832) 2025-03-28 15:01:09 +00:00
Paul Bottein
fe7e8e17ae More info breadcrumb clickable (#24830)
* Make more info breadcrum clickable

* css adjustements
2025-03-28 15:37:27 +01:00
Eloy Rodriguez
2161357226 Add title and time zone to clock card (#24818)
* Add title and time zone to clock card

* Small changes to the spacing and text sizing of the clock card

* Update translations to use dropdown labels from profile configuration

* Use similar approach as #24819 for setting automatic time zone

* Update hui-clock-card.ts

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-03-28 15:37:02 +01:00
Darren Griffin
e8e65a4293 Fix default time_format option. Fixes #24798 (#24819)
* Fix default time_format option. Fixes #24798

* Update en.json

* Update src/translations/en.json

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-03-28 15:36:29 +01:00
Eloy Rodriguez
b96319703a Add title and time zone to clock card (#24818)
* Add title and time zone to clock card

* Small changes to the spacing and text sizing of the clock card

* Update translations to use dropdown labels from profile configuration

* Use similar approach as #24819 for setting automatic time zone

* Update hui-clock-card.ts

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-03-28 14:32:50 +00:00
Paul Bottein
9e686190f6 More info breadcrumb clickable (#24830)
* Make more info breadcrum clickable

* css adjustements
2025-03-28 15:26:09 +01:00
Darren Griffin
5ca7b1d508 Fix default time_format option. Fixes #24798 (#24819)
* Fix default time_format option. Fixes #24798

* Update en.json

* Update src/translations/en.json

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-03-28 14:13:50 +00:00
Bram Kragten
724adab2d6 Bumped version to 20250328.0 2025-03-28 15:02:51 +01:00
Bram Kragten
345ad6c9c5 Update voice-assistant-setup-step-local.ts 2025-03-28 15:02:37 +01:00
Bram Kragten
a88d066d7e Update text voice wizard install addons step (#24829) 2025-03-28 15:02:15 +01:00
Paulus Schoutsen
a8e5c8482b Hide backup from default dashboard (#24828) 2025-03-28 15:02:14 +01:00
Paulus Schoutsen
d5ff8ab1e1 Do not play pre-announce sound when testing voice on satellite (#24827) 2025-03-28 15:02:13 +01:00
Bram Kragten
e765cc10fb Fix voice flow (#24825)
* Fix voice flow

* Apply suggestions from code review

---------

Co-authored-by: Paulus Schoutsen <balloob@gmail.com>
2025-03-28 15:02:12 +01:00
Paul Bottein
916dec101f Add hold and double tap action in the UI for every card that supports it. (#24824)
* Add double tap action to button card UI editor

* Add double tap action to light card UI editor

* Add hold action and double tap action to gauge card UI editor

* Add hold action and double tap action to picture glance card UI editor

* Add hold action and double tap action to picture card UI editor

* Add hold action and double tap action to entity card UI editor

* Add hold action and double tap action to elements
2025-03-28 15:02:11 +01:00
Paul Bottein
909fc119b7 Add scroll restoration when using back navigation in dashboard (#24822)
Add scroll restoration when using back navigation with subviews
2025-03-28 15:02:10 +01:00
puddly
8751dc46f4 Show hardware integrations in the integration list (#24820)
Show hardware integrations in the frontend
2025-03-28 15:02:09 +01:00
Bram Kragten
7c1d74c6c3 Update voice-assistant-setup-step-local.ts 2025-03-28 15:01:08 +01:00
Bram Kragten
d257f667c1 Update text voice wizard install addons step (#24829) 2025-03-28 13:06:54 +00:00
Paulus Schoutsen
842a064682 Hide backup from default dashboard (#24828) 2025-03-28 12:55:39 +00:00
Bram Kragten
3d8e146582 Fix voice flow (#24825)
* Fix voice flow

* Apply suggestions from code review

---------

Co-authored-by: Paulus Schoutsen <balloob@gmail.com>
2025-03-28 12:53:08 +00:00
Paulus Schoutsen
78e8bd4305 Do not play pre-announce sound when testing voice on satellite (#24827) 2025-03-28 08:40:57 -04:00
Paul Bottein
0152a79bd5 Add hold and double tap action in the UI for every card that supports it. (#24824)
* Add double tap action to button card UI editor

* Add double tap action to light card UI editor

* Add hold action and double tap action to gauge card UI editor

* Add hold action and double tap action to picture glance card UI editor

* Add hold action and double tap action to picture card UI editor

* Add hold action and double tap action to entity card UI editor

* Add hold action and double tap action to elements
2025-03-28 13:12:07 +01:00
Paul Bottein
f5bb72f067 Add scroll restoration when using back navigation in dashboard (#24822)
Add scroll restoration when using back navigation with subviews
2025-03-28 12:07:42 +01:00
Alex Gustafsson
9ca6a886f5 Fix hide clear icon of entity picker (#24821) 2025-03-28 08:04:40 +00:00
renovate[bot]
f39011f8f4 Update dependency sinon to v20 (#24810)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-28 09:49:00 +02:00
puddly
8b190867e3 Show hardware integrations in the integration list (#24820)
Show hardware integrations in the frontend
2025-03-28 08:25:07 +02:00
renovate[bot]
321b15a270 Update dependency typescript-eslint to v8.28.0 (#24806)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-27 19:44:12 +01:00
renovate[bot]
6ba235d540 Update babel monorepo to v7.27.0 (#24807)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-27 19:43:54 +01:00
renovate[bot]
e34fd8161c Update dependency sinon to v19.0.5 (#24809)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-27 19:43:38 +01:00
Paul Bottein
118c25d25f Bumped version to 20250327.1 2025-03-27 19:12:22 +01:00
Paul Bottein
ae5427a75e Fix dashboard strategy (#24808) 2025-03-27 19:12:03 +01:00
Paul Bottein
3b6e267fb5 Fallback to state name when the entry doesn't have name (#24805) 2025-03-27 19:12:02 +01:00
Paul Bottein
084cda8218 Fix dashboard strategy (#24808) 2025-03-27 18:09:46 +00:00
Paul Bottein
f06a0fa34c Fallback to state name when the entry doesn't have name (#24805) 2025-03-27 18:51:08 +01:00
Bram Kragten
1770a51303 Bumped version to 20250327.0 2025-03-27 16:46:17 +01:00
Paul Bottein
534df3d378 Add loading state to area strategy (#24803) 2025-03-27 16:44:15 +01:00
Paul Bottein
23229b3e3b Set the max number of columns to 3 for area dashboard (#24802)
* Set the max number of columns to 4 for area dashboard

* Set it to 3
2025-03-27 16:44:14 +01:00
karwosts
94ee99160b Energy device settings fixes (#24801) 2025-03-27 16:44:13 +01:00
Paul Bottein
b009d71e8f Fix take control of the dashboard (#24800) 2025-03-27 16:44:12 +01:00
Bram Kragten
2ab8209622 Align behavior of template selector with text selector (#24796) 2025-03-27 16:44:11 +01:00
Paul Bottein
ed2940edc3 Revert "Restore scroll position when using back navigation in dashboard" (#24795)
Revert "Restore scroll position when using back navigation in dashboard (#24777)"

This reverts commit 9cfcd21a93.
2025-03-27 16:44:11 +01:00
Paul Bottein
e2b9a06242 Fix more info for disabled entities (#24789) 2025-03-27 16:44:10 +01:00
Paul Bottein
a7acee0438 Remove fixed height in ha tile info (#24787)
Remove unused height in ha tile info
2025-03-27 16:44:09 +01:00
Bram Kragten
1208af510c Fix typo in Arithmetic (#24786)
Fix type in Arithmetic
2025-03-27 16:44:08 +01:00
Paul Bottein
750c59399b Set the max number of columns to 3 for area dashboard (#24802)
* Set the max number of columns to 4 for area dashboard

* Set it to 3
2025-03-27 16:39:47 +01:00
Paul Bottein
a6a17cd70c Add loading state to area strategy (#24803) 2025-03-27 15:37:32 +00:00
karwosts
de1c6a5178 Energy device settings fixes (#24801) 2025-03-27 16:30:17 +01:00
Bram Kragten
04c3cd7d68 Align behavior of template selector with text selector (#24796) 2025-03-27 13:53:35 +01:00
Paul Bottein
17ef74d680 Fix take control of the dashboard (#24800) 2025-03-27 13:33:52 +01:00
Paul Bottein
098c6a2567 Remove fixed height in ha tile info (#24787)
Remove unused height in ha tile info
2025-03-27 11:10:45 +01:00
Paul Bottein
899288ae43 Revert "Restore scroll position when using back navigation in dashboard" (#24795)
Revert "Restore scroll position when using back navigation in dashboard (#24777)"

This reverts commit 9cfcd21a93.
2025-03-27 11:10:23 +01:00
Paul Bottein
a9823f30e3 Fix more info for disabled entities (#24789) 2025-03-27 08:49:25 +02:00
Bram Kragten
97966805fa Fix typo in Arithmetic (#24786)
Fix type in Arithmetic
2025-03-26 16:13:11 +01:00
Bram Kragten
615b228827 Merge branch 'rc' into dev 2025-03-26 15:46:47 +01:00
Bram Kragten
1819c04c27 Bumped version to 20250326.0 2025-03-26 15:46:00 +01:00
Darren Griffin
05e303d771 Add simple clock card (#24599)
* Initial clock card

* Tidy clock card and change stub config

* Change fallback to 'nothing'

* Update src/panels/lovelace/cards/types.ts

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* Update src/panels/lovelace/cards/hui-clock-card.ts

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* Update src/panels/lovelace/cards/hui-clock-card.ts

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* Added cardSize and gridOptions. Fixed invalid time type

* Improve font sizes

* Fix default case handling

* Move interval outside class

* WIP improvements

* Various improvements

* Improve date instantiation and display

* Reintroduce localized time format

* Swap to uusing key for time_format translation

* Add fallback for initial load

* Final fixes

* Update clock card description

* Update src/panels/lovelace/cards/types.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Tidy up

* Present css better

* Change default sizing to small

* Set default data

* Change to grid, rework typography alignment

* Update hui-clock-card.ts

* Update hui-clock-card.ts

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-03-26 14:45:36 +00:00
Paul Bottein
53bb8251fa Separate entity, device and area name in more info dialog header (#21951)
* Separate entity, device and area name in more info dialog header

* Use has_entity_name

* Separate entity, device and area name in entity picker

* Fix entity name with has entity name

* Fix compute entity name

* Add full name

* Add floor

* Improve code quality

* Use compute entity name in device entities card

* Use context functions

* Remove floor

* Use state name provided by backend

* Use breadcrumb for more info

* Revert entity picker changes

* Use new logic in device page

* Use breadcrumb

* Use join directive

* Add comments

* Use secondary text color

* Update compute_entity_name.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Remove html join

* Improve computeDeviceNameDisplay

* Fallback to original name

* Simplify more info logic

* Include breadcrumb for child view (voice assistant)

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-03-26 13:58:34 +00:00
Bram Kragten
f6467a35db Update voice wizard (#24750)
* Update pipeline step, add option for speech-to-phrase addon

* adjust to core changes

* Update conversation.ts

* Update voice-assistant-setup-step-pipeline.ts

* Update voice-assistant-setup-dialog.ts

* review
2025-03-26 14:05:51 +01:00
renovate[bot]
7cc6397324 Update dependency @types/leaflet to v1.9.17 (#24784)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-26 12:45:52 +00:00
renovate[bot]
f6e3e312bb Update dependency @rsdoctor/rspack-plugin to v1 (#24724)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-26 13:40:18 +01:00
Bram Kragten
be1e1ff9fc Statistics: Add support for mean type (#24758)
* Statistics: Add support for mean type

* update

* update enum

* Update en.json
2025-03-26 14:35:38 +02:00
ildar170975
2717e1e6cb Remove "filterable" from "created_at", "modified_at", "battery_entity" from data tables (#24766)
* remove "filterable" from "created_at" & "modified_at"

* remove "filterable" from "created_at", "modified_at", "battery"

* remove "filterable" from "created_at" & "modified_at"
2025-03-26 11:32:14 +01:00
ildar170975
2e9f72867f Add hidden "entity_id" column to "Settings -> Automations" (#24769)
* add hidden "entity_id" column

* Apply suggestions from code review

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-03-26 10:30:08 +00:00
Jonathan Hanson
ff6b318fc9 style changes to the zigbee graph, without touching the physics (#24697) 2025-03-26 11:08:44 +01:00
Bram Kragten
386b8ba747 Move compatibility to static polyfill handling (#24775)
* Move compatibility to static polyfill handling

* Move compatibility to static polyfill handling

* Prettier
2025-03-26 11:38:53 +02:00
Bram Kragten
e27b97abc0 Update ha-config-helpers.ts 2025-03-26 10:20:55 +01:00
karwosts
772a2658cb Allow passing data as template in devtools/action (#24737) 2025-03-26 10:13:06 +01:00
Paul Bottein
1a076061da Add optional interaction for cards (hold, double tap) in the UI (#24754) 2025-03-26 09:42:10 +01:00
Bram Kragten
1cb71ed379 Dont show quality scale for custom integrations (#24783) 2025-03-26 07:46:43 +00:00
Simon Lamon
fb11c21518 Fix device config tooltips (#24780)
* Device config tooltips

* Update src/panels/config/devices/ha-config-device-page.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-03-26 09:32:14 +02:00
Paul Bottein
9cfcd21a93 Restore scroll position when using back navigation in dashboard (#24777)
Restore scroll position when using backup navigation in dashboard
2025-03-26 09:21:04 +02:00
renovate[bot]
e3f5e921d6 Update formatjs monorepo (#24781)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-26 08:36:33 +02:00
dependabot[bot]
df4e81be75 Bump vite from 6.2.2 to 6.2.3 (#24776)
Bumps [vite](https://github.com/vitejs/vite/tree/HEAD/packages/vite) from 6.2.2 to 6.2.3.
- [Release notes](https://github.com/vitejs/vite/releases)
- [Changelog](https://github.com/vitejs/vite/blob/v6.2.3/packages/vite/CHANGELOG.md)
- [Commits](https://github.com/vitejs/vite/commits/v6.2.3/packages/vite)

---
updated-dependencies:
- dependency-name: vite
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-03-25 17:38:58 +02:00
ildar170975
1519e1b90c ha-dialog-import-blueprint: add "enlarge" (#24734)
* add enlarge

* removed unused "createCloseHeading"

* restore deleted "import" line

* import ha-dialog-header
2025-03-25 16:51:54 +02:00
Wendelin
4c8b7a30f4 fix cloud login mfa inProgress (#24773) 2025-03-25 14:56:30 +01:00
ildar170975
1e513281f4 dev-tools-template: allow "select" for whole right panel (except header) (#24713)
developer-tools-template: allow "select" for whole right panel (except header)
2025-03-25 15:32:30 +02:00
renovate[bot]
3c28764264 Update dependency eslint to v9.23.0 (#24764)
* Update dependency eslint to v9.23.0

* lint fix

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-03-25 13:19:53 +00:00
renovate[bot]
82be98dad6 Update dependency @bundle-stats/plugin-webpack-filter to v4.19.1 (#24763)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-25 14:58:53 +02:00
ildar170975
3320cf1880 Add "label_mode = attribute" for Map card (#24708)
* add "label_mode = attribute"

* add "label_mode = atribute"

* added "label_mode = attribute"

* add "attribute" property

* add "attribute" property to GeoLocationSourceConfig

* add "attribute" property

* add "attribute" in _getSourceEntities

* check for entity.attribute !== undefined

* prettier
2025-03-25 14:57:53 +02:00
ildar170975
f7cb83482a computeAttributeValueDisplay: process "undefined" like "null" (#24712)
treat "undefined" as "null"
2025-03-25 14:54:22 +02:00
ildar170975
a9ddaf1bd7 Dev tools -> yaml: use "pre" instead of "span" for "validate-log" (#24722)
* use "pre" instead of "span" for "validate-log"

* prettier

* prettier

* remove "Important" for margin

* remove line-breakes

* prettier

* prettier

* prettier-ignore

* prettier

* prettier
2025-03-25 12:18:19 +00:00
Bram Kragten
eb7923fa49 Fix selector filtering for entity not in state machine (#24772) 2025-03-25 10:26:34 +01:00
Paul Bottein
2ae70e9b54 Improve strategy editor (#24757)
* Add cancel and delete button

* Implement delete

* Reset gui mode when closing
2025-03-24 18:57:10 +01:00
Bram Kragten
3857c53b7f Use ha-md-button-menu in tabs subpage data table (#24738) 2025-03-24 18:56:58 +01:00
Bram Kragten
620fb6375e Save login after onboarding (#24759) 2025-03-24 17:58:07 +01:00
Bram Kragten
e18f853f7e Fix state display mixin (#24760) 2025-03-24 17:57:52 +01:00
Bram Kragten
bbe549fa86 Process expandable initial data also for none required expandables (#24733)
* Process expandable initial data also for none required expandables

* Update compute-initial-ha-form-data.ts

* check required fields of sections too when submitting
2025-03-24 17:31:06 +02:00
ildar170975
586a137037 Device page: use different prompts for "device = enabled" & "device = disabled" cases (#24739)
* prompts for enabled & disabled devices

* add different prompts for "device = enabled" & "device = disabled"

* prettier

* prettier

* prettier

* prettier

* prettier

* prettier
2025-03-24 17:25:28 +02:00
ildar170975
60010c82bd ha-config-devices-dashboard: add "disabled" column (#24730)
add "disabled" column
2025-03-24 15:36:44 +01:00
ildar170975
d77f962087 dialog-media-player-browse: fix height (#24731) 2025-03-24 15:21:49 +01:00
karwosts
4c952c191a Fix hui-energy-compare-card (#24711)
* Fix hui-energy-compare-card

* rename var
2025-03-24 15:14:18 +01:00
Clay Benson
e0fbd3cd1f Add hold and double tap actions in hui-entity-heading-badge (#24707)
* feat: Add support for hold and double tap actions in hui-entity-heading-badge

* fix: Add hold_action and double_tap_action to config struct and interactions to allow GUI editor to work for badge interactions

* chore: Remove hold and double_tap from UI editor schema on entity heading badge editor
2025-03-24 13:19:41 +00:00
karwosts
9f05f4df50 Short-format numbers in energy-distribution-card (#24716) 2025-03-24 12:43:11 +01:00
karwosts
6fbc7b2efe Support for hierarchy of individual energy devices (#23185)
* Support for hierarchy of individual energy devices

* better config ui

* replace parent_stat w included_in_stat

* semi-working

* update order suffix in id when hidden changes

* rollback some ordering changes, update strings

* Remove hidden tracking, add untracked label to name.

* Update dialog-energy-device-settings.ts

* Change sort algorithm
2025-03-24 13:39:19 +02:00
ildar170975
8dab7c598e Logbook card: fix height in Panel view (#24745)
* fix height in Panel

* Update src/panels/lovelace/cards/hui-logbook-card.ts

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* prettier

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2025-03-24 09:43:47 +00:00
Wendelin
b24f185d62 Update tsparticles to use new repo (#24688) 2025-03-24 09:26:51 +00:00
ildar170975
dc5bb899d2 fix validate-condition: unavailable -> unknown (#24749)
unavailable -> unknown
2025-03-24 09:36:05 +01:00
Paulus Schoutsen
420477e416 Show cameras on 2 rows in areas strategy (#24743)
Show cameras on 2 rows in areas
2025-03-24 08:38:53 +01:00
dependabot[bot]
cd9faf7d67 Bump actions/cache from 4.2.2 to 4.2.3 (#24748)
Bumps [actions/cache](https://github.com/actions/cache) from 4.2.2 to 4.2.3.
- [Release notes](https://github.com/actions/cache/releases)
- [Changelog](https://github.com/actions/cache/blob/main/RELEASES.md)
- [Commits](https://github.com/actions/cache/compare/v4.2.2...v4.2.3)

---
updated-dependencies:
- dependency-name: actions/cache
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-03-24 08:55:04 +02:00
dependabot[bot]
852207a5f5 Bump actions/upload-artifact from 4.6.1 to 4.6.2 (#24747)
Bumps [actions/upload-artifact](https://github.com/actions/upload-artifact) from 4.6.1 to 4.6.2.
- [Release notes](https://github.com/actions/upload-artifact/releases)
- [Commits](https://github.com/actions/upload-artifact/compare/v4.6.1...v4.6.2)

---
updated-dependencies:
- dependency-name: actions/upload-artifact
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-03-24 08:54:25 +02:00
renovate[bot]
1f705c07b2 Update dependency typescript-eslint to v8.27.0 (#24735)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-24 06:30:09 +01:00
renovate[bot]
39ee84b54e Update dependency @lokalise/node-api to v14.2.0 (#24741)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-24 06:29:46 +01:00
renovate[bot]
de402e7c1a Update dependency sinon to v19.0.4 (#24729)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-22 17:45:23 +01:00
renovate[bot]
9b74cdebc2 Update dependency sinon to v19.0.3 (#24727)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-22 17:22:42 +01:00
renovate[bot]
ebe8e54046 Update dependency @babel/helper-define-polyfill-provider to v0.6.4 (#24726)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-22 17:22:25 +01:00
renovate[bot]
2bac7455cc Update dependency eslint-plugin-lit to v2 (#24719)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-22 07:16:06 +01:00
renovate[bot]
3cbeef070a Update dependency eslint-plugin-wc to v3 (#24723)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-22 07:15:29 +01:00
renovate[bot]
bae0c232be Update octokit monorepo (#24718)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-22 07:14:54 +01:00
renovate[bot]
e65b5ae91e Lock file maintenance (#24684)
* Lock file maintenance

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-20 20:45:01 +01:00
Petar Petrov
4a166b6c23 Fix race condition when saving url config (#24687)
* Fix race condition when saving url config

* use SubscribeMixin
2025-03-20 19:54:02 +01:00
Paul Bottein
fe17bb89eb Area strategy fixes (#24700)
* Add missing water heater domain and change lights icon

* Rename areas view to areas overview view

* Use same max columns for area view and overview

* Use large section when only one section
2025-03-20 19:09:51 +01:00
Marc Mueller
888b2472df Remove old setuptools keys from metadata (#24702) 2025-03-20 19:07:26 +01:00
Marc Mueller
ef7f499364 Update project metadata for PEP 639 (#24701) 2025-03-20 17:43:44 +01:00
renovate[bot]
5d9a53dcd5 Update vitest monorepo to v3.0.9 (#24703)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-20 14:24:57 +01:00
Paul Bottein
7ce166e40f Area dashboard improvement (#24690)
* Add more domains in the areas dashboard and strip area name from the entity name

* Display cover without device classes

* Remove useless test
2025-03-19 23:19:58 +01:00
Paul Bottein
2c0c48106d Add entities filtering and reordering for areas strategy dashboard (#24677)
* Add entities editor

* Save entities per domain and area

* Use hidden and reorder logic in dashboard

* Add overview hidden logic

* Don't use icon for nav

* Remove overview hidden

* Change default text

* Fix icons

* Rename config properties
2025-03-19 21:11:46 +01:00
Wendelin
0e8be25a60 Rename last_non_idle_event to last_action_event (#24691) 2025-03-19 17:28:44 +01:00
ildar170975
27379c98df history-graph: do not set "max-width" for a single legend item (#24683)
* do not set "max-width" for a single legend item

* prettier
2025-03-19 08:46:14 +02:00
Wendelin
4076e5655a Add HA Cloud login to onboarding (#24485)
* Add ha cloud login to onboarding

* Add view for no cloud backup available

* Add logout and forgot pw

* Improve styling

* Fix bug to open cloud backup after login

* Remove callback from catch in transform methods

* Remove unused variable

* Fix lint

* Add new onboarding restore design

* Fix lint

* Change back button style

* Update header styles

* Style onboarding left aligned

* Remove unused imports

* Fix imports

* Fix multi factor cloud auth

* Fix prettier

* Edit onboarding translations

* Revert gulp change

* Improve cloud login component

* Fix no-cloud-backup naming

* fix types

* Use cloud login function directly

* Fix eslint

* Hide restore picker when there is nothing to select

* Fix eslint
2025-03-18 15:24:04 +01:00
ildar170975
858b8b90d8 integrations-startup-time: set "border-radius: 0" for "img" (#24679)
set "border-radius: 0" for "img"
2025-03-18 15:47:13 +02:00
Guy Taggar
d61c771e35 Add shoelace z-index value (#24669)
* Add shoelace z-index value

* Update src/components/ha-tooltip.ts

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-03-18 09:26:57 +01:00
ildar170975
ddbf57d541 developer-tools-template: allow "select" for ha-alert (#24674)
added "user-select: text" for ha-alert
2025-03-18 09:54:15 +02:00
karwosts
a5b7bb8391 Fix behavior of select dropdowns when options change (#24603)
* Fix behavior of select dropdowns when options change

* new approach

* memoize
2025-03-17 22:11:37 +01:00
Simon Lamon
5803ab68c2 Fix energy units (#24672) 2025-03-17 22:07:27 +01:00
Paul Bottein
64b9104199 Add area dashboard settings (#24619)
* Add hidden and order settings

* Share path logic

* Add editor to sort and filter areas

* Remove unused form

* Add areas strategy in the dashboard picker

* Move display editor

* Fix min width

* Add leading icon slot to expansion panel

* Fix left chevron icon with dynamic property

* Use area display in original state strategy

* Rename selector

* Rename to area_display

* Remove ha-expansion-panel changes

* Remove expanded

* Fix rebase

* Display all entities in the areas strategy overview (#24663)

* Don't use subgroup

* Add all entities in the overview

* Add tile card features for area view
2025-03-17 22:04:01 +01:00
renovate[bot]
7aaea37db7 Update dependency ua-parser-js to v2.0.3 (#24671)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-17 20:47:05 +01:00
Paul Bottein
3c11323ea4 Add leading icon slot to expansion panel and fix left-chevron property (#24635)
* Add leading icon slot to expansion panel and fix left chevron

* Update components
2025-03-17 20:23:20 +01:00
Paul Bottein
4f7d5053ec Add computeStateName fallback to tile card and badges (#24666) 2025-03-17 14:06:53 +00:00
Matěj 'Horm' Horák
7009482057 Show hide create option in todo card editor (#24643)
Show hide create option in todo editor
2025-03-17 15:00:35 +01:00
renovate[bot]
d1090e8ad3 Update vaadinWebComponents monorepo to v24.7.0 (#24664)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-17 14:50:15 +01:00
Wendelin
06b969f6b6 Fix translations transform build errors (#24631)
Let gulp handle transform errors
2025-03-17 14:02:41 +01:00
renovate[bot]
d8b6de2afd Update vaadinWebComponents monorepo to v24.6.7 (#24661)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-17 09:00:09 +00:00
Wendelin
dfd5e80436 Fix update list item spinner (#24660) 2025-03-17 09:50:55 +01:00
Petar Petrov
9d4df46d5f Fix for 0 values in line chart tooltip (#24658) 2025-03-17 09:49:31 +01:00
dependabot[bot]
5f4cb9e3c1 Bump actions/setup-node from 4.2.0 to 4.3.0 (#24656) 2025-03-17 08:27:41 +01:00
dependabot[bot]
96e6169b8d Bump relative-ci/agent-action from 2.1.14 to 2.2.0 (#24657) 2025-03-17 08:20:48 +01:00
renovate[bot]
0906d7aa5a Update CodeMirror (#24652)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-17 08:52:13 +02:00
karwosts
02fce1f40a Save preferred energy period in localStorage (#24654) 2025-03-17 08:36:31 +02:00
karwosts
05aa55bfb9 Fix describing device conditions in trace viewer (#24645) 2025-03-16 09:14:40 +01:00
karwosts
d4717f1293 Handle short form hex colors in conversion functions (#24642)
* Handle short form hex colors in conversion functions

* drop alpha codes
2025-03-16 09:13:13 +01:00
renovate[bot]
f6a7e40d4a Update dependency lint-staged to v15.5.0 (#24644)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-16 09:10:08 +01:00
renovate[bot]
d73e677bea Update dependency @lokalise/node-api to v14.1.0 (#24638)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-15 08:51:53 +01:00
renovate[bot]
356b74607a Update dependency @shoelace-style/shoelace to v2.20.1 (#24637)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-15 08:51:32 +01:00
renovate[bot]
8cb248223d Update babel monorepo to v7.26.10 (#24636)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-15 08:51:16 +01:00
renovate[bot]
24eed2e5fa Update rspack monorepo to v1.2.8 (#24632)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-14 17:49:15 +01:00
karwosts
c8a21a7a2f Restore +/- buttons on featureless thermostat (#24634)
* Restore +/- buttons on featureless thermostat

* Update hui-humidifier-card.ts

* Update hui-thermostat-card.ts
2025-03-14 16:30:19 +01:00
Petar Petrov
54cc096b1a Backup/Restore NVM in Z-WaveJS dashboard (#24277)
* Backup/Restore NVM in Z-WaveJS dashboard

* update API

* Handle file with HTTP

* MVP with 2 buttons

* format

* improve naming

* text tweak

* migrate to ha-progress-ring

* handle download errors

* fix restore progress
2025-03-14 15:17:29 +01:00
Jan-Philipp Benecke
49b1198cb7 Add yaml option to disable iFrame sandbox to embed PDFs (#24620)
* Add yaml option to disable iFrame sandbox to embed PDFs

* Apply suggestions from code review

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-03-14 13:45:22 +01:00
karwosts
91e9836423 Fix accessibility in add helper dialog (#24627) 2025-03-14 11:15:59 +01:00
Wendelin
6aa2a576b3 Revert "Unified safe area (insets) for Android and iOS" (#24629)
Revert "Unified safe area (insets) for Android and iOS (#23811)"

This reverts commit ee10f9080d.
2025-03-14 11:03:50 +01:00
Norbert Rittel
9712f04662 Fix short_weekdays::sun in Backup settings (#24628)
Fix short `short_weekdays::sun`

"So" is for us Germans, for English we better use "Su" here. :-)
2025-03-14 10:01:31 +01:00
renovate[bot]
731a9a2e07 Update dependency typescript-eslint to v8.26.1 (#24625)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-14 09:50:34 +01:00
Simon Lamon
d42bd36a3e Fix logbook keeps loading (#24351)
* Logbook loading

* Redo typing

* small fixes

* async/sync fixes
2025-03-13 17:18:24 +01:00
Wendelin
28c355812c Add shoelace loading spinner component (#24525)
* Add loading spinner component

* Update some spinners

* Update some spinners

* Update indeterminate to ha-spinner

* add ha-spinner-delayed

* Remove ha-circular-progress component

* Update demo/src/custom-cards/ha-demo-card.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Fix gallery

* Update set size

* Add ha-fade-in

* Remove wrong testing conditions

* Remove size number option

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-03-13 17:05:51 +01:00
Paul Bottein
e09dbb474b Add foundation for areas dashboard strategy (#24582)
* Add entity filter section strategy

* Rename parameters

* Add group support

* Add empty state

* Add area strategy

* Remove title

* Fix heading

* Add areas dashboard and views

* Use satisfies

* Remove unnecessary array copy

* Only define set if needed

* Sort area by name

* Fix sorting

* Use entity id

* Don't use section strategy in view

* Simplify view

* Remove section related changes
2025-03-13 17:03:35 +01:00
Grzegorz Libiszewski
ee10f9080d Unified safe area (insets) for Android and iOS (#23811)
* feat: Introduce new css variables for safe area

* feat: Replace all safe area env with variable

* fix: CR fix move from derived styles to styles and rename
2025-03-13 10:20:54 +02:00
renovate[bot]
4f9ec622bf Update dependency @babel/runtime to v7.26.10 [SECURITY] (#24615)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-13 07:40:28 +00:00
renovate[bot]
dba269f2a3 Update dependency @bundle-stats/plugin-webpack-filter to v4.19.0 (#24605)
* Update dependency @bundle-stats/plugin-webpack-filter to v4.19.0

* fix build

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-03-13 07:30:35 +00:00
Bram Kragten
46c9af75fd Bumped version to 20250312.0 2025-03-12 18:53:49 +01:00
karwosts
df934cfed9 Energy self sufficiency gauge needs grid consumption (#24606) 2025-03-12 18:53:22 +01:00
Wendelin
e871dc8151 Increase core start seconds (#24604) 2025-03-12 18:53:21 +01:00
karwosts
69026cbecf Energy self sufficiency gauge needs grid consumption (#24606) 2025-03-12 18:06:31 +01:00
Bram Kragten
dda7de3301 Fix issues with develop and serve (#24602)
* fix issues with develop and serve

* fix get image data, use hassUrl

* save picture-upload

* Update bundje.cjs

* Prettier

* Fix profile picture in dev serve mode

* person badge too

---------

Co-authored-by: Wendelin <w@pe8.at>
2025-03-12 16:59:40 +01:00
Wendelin
1e000d2740 Increase core start seconds (#24604) 2025-03-12 16:19:42 +01:00
Paulus Schoutsen
1d747c0901 Simplify CO2Signal check (#24566)
* Simplify CO2Signal check

* Remove more references.

* Update energy.ts
2025-03-12 08:31:12 +02:00
Norbert Rittel
8ef769559f Use proper capitalization for "WPA-PSK" (#24597)
This abbreviation is consistently referred to using upper-case letters (Wikipedia, e.g.)
2025-03-11 19:22:32 +01:00
karwosts
e141b4dbee Disable energy distribution animation if prefers-reduced-motion is set (#24581)
* Disable energy distribution animation if prefers-reduced-motion is set

* Move check to willUpdate. Remove circle circumference animation
2025-03-11 14:57:43 +01:00
puddly
d0545fe827 Update ZHA device websocket API types (#24087)
* Expose routing status from ZHA websocket API

* Clean up types a little bit

* Lint
2025-03-11 15:00:12 +02:00
renovate[bot]
4ef3a25479 Update dependency eslint to v9.22.0 (#24593)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-11 09:47:19 +02:00
Paul Bottein
616c1fda81 Rename entity filter to entity domain filter (#24587) 2025-03-10 13:34:15 -04:00
Paul Bottein
e8805be561 Perform action in slider and switch if it's a long press (#24579) 2025-03-10 15:30:29 +01:00
Darren Griffin
1b6d2ac08e Make element-preview sticky (#24580) 2025-03-10 14:07:29 +01:00
renovate[bot]
de4a8a0a72 Update dependency eslint-config-prettier to v10.1.1 (#24578)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-10 11:46:03 +01:00
Paulus Schoutsen
58dd778b3d Add some type checking to demo (#24567) 2025-03-10 11:24:57 +01:00
karwosts
a4cdb294b1 Fix some issues with energy period update scheduling (#24563) 2025-03-10 08:46:05 +02:00
karwosts
07c4296771 Show statistics in history card on first load (#24554)
* Show statistics in history card on first load

* unnecessary line
2025-03-10 08:36:17 +02:00
renovate[bot]
95a99c7857 Update dependency terser-webpack-plugin to v5.3.14 (#24571)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-10 08:33:11 +02:00
pisanvs
fee215fe96 Add missing margin to protection mode alert in addon info panel. (#24490)
* Add missing margin to protection mode alert in addon info panel.

* Only apply on the top level

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-03-10 06:29:17 +00:00
renovate[bot]
5e9341bf4e Update vitest monorepo to v3.0.8 (#24573)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-10 08:19:02 +02:00
renovate[bot]
58b7c76b90 Update dependency terser-webpack-plugin to v5.3.13 (#24564)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-08 21:32:23 +01:00
Paulus Schoutsen
6ed26407be Update country picker dialog in onboarding (#24551)
* Update country picker dialog in onboarding

* Handle if language has no locale

* Don't fall back to NL
2025-03-08 14:40:22 +00:00
dependabot[bot]
1ac0092d4e Bump axios from 1.7.9 to 1.8.2 (#24552)
Bumps [axios](https://github.com/axios/axios) from 1.7.9 to 1.8.2.
- [Release notes](https://github.com/axios/axios/releases)
- [Changelog](https://github.com/axios/axios/blob/v1.x/CHANGELOG.md)
- [Commits](https://github.com/axios/axios/compare/v1.7.9...v1.8.2)

---
updated-dependencies:
- dependency-name: axios
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-03-07 19:37:07 +01:00
renovate[bot]
a4e8ea366a Update dependency @lokalise/node-api to v14 (#24547)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-07 18:18:04 +01:00
renovate[bot]
fe70355dde Update dependency typescript-eslint to v8.26.0 (#24533)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-06 19:40:01 +01:00
renovate[bot]
01f07f6476 Update rspack monorepo to v1.2.7 (#24531)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-06 18:49:15 +01:00
Bram Kragten
9ef72e4afc Bumped version to 20250306.0 2025-03-06 15:57:06 +01:00
Paul Bottein
022ef982ca Only recreate stack editor when the type or index change (#24530) 2025-03-06 15:56:10 +01:00
Petar Petrov
f132a32fd4 Ignore excessive keydown events in charts (#24523)
* Ignore excessive keydown events in charts

* lint
2025-03-06 15:56:09 +01:00
Petar Petrov
782df0473c Fix height of chart legend (#24519) 2025-03-06 15:56:08 +01:00
Wendelin
690cd47945 Landingpage add core checks before show errors (#24493)
* Check core only if supervisor or observer is unresponsive

* Improve core check

* Revert test code

* Remove unused prop

* Combine network info with core check

* Combine ping and network info

* Add 30 sec timeout before show errors

* Update landing-page/src/ha-landing-page.ts

* Assume supervisor update on failed ping

* Fix typo
2025-03-06 15:56:07 +01:00
Paul Bottein
8fe55b9bc0 Only recreate stack editor when the type or index change (#24530) 2025-03-06 15:55:20 +01:00
renovate[bot]
913fdfd0eb Update dependency @codemirror/view to v6.36.4 (#24524)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-06 14:25:34 +02:00
Wendelin
c97916bea4 Landingpage add core checks before show errors (#24493)
* Check core only if supervisor or observer is unresponsive

* Improve core check

* Revert test code

* Remove unused prop

* Combine network info with core check

* Combine ping and network info

* Add 30 sec timeout before show errors

* Update landing-page/src/ha-landing-page.ts

* Assume supervisor update on failed ping

* Fix typo
2025-03-06 11:33:33 +01:00
Petar Petrov
cdfe4b53bf Ignore excessive keydown events in charts (#24523)
* Ignore excessive keydown events in charts

* lint
2025-03-06 11:30:17 +01:00
renovate[bot]
75edc5132b Update dependency prettier to v3.5.3 (#24521) 2025-03-06 07:37:43 +01:00
Petar Petrov
c79164992b Fix height of chart legend (#24519) 2025-03-05 14:05:01 +01:00
Bram Kragten
68960ba03d Bumped version to 20250305.0 2025-03-05 11:08:52 +01:00
Paul Bottein
c3a60a9c3f Remove touch action none for toggle feature (#24514) 2025-03-05 11:06:28 +01:00
karwosts
4783720aaa No integer validation on ha-form-float (#24501) 2025-03-05 11:06:27 +01:00
Petar Petrov
d55b806ce5 Set chart axis pointer line to --info-color (#24494) 2025-03-05 11:06:26 +01:00
Petar Petrov
e2ff8ce302 Tweak legend expand/collapse button (#24484)
* Tweak legend expand/collapse button

* Revert "Tweak legend expand/collapse button"

This reverts commit 5eafdad781.

* update UX
2025-03-05 11:06:25 +01:00
karwosts
b26bc1dcf0 Remember hidden energy devices from storage (#24470)
* Remember hidden devices from storage

* remove accidental

* typing fix
2025-03-05 11:06:24 +01:00
Paul Bottein
76b03d3a40 Correctly parse number state for numeric input card feature (#24453) 2025-03-05 11:06:23 +01:00
Petar Petrov
c581d6d028 Set chart axis pointer line to --info-color (#24494) 2025-03-05 11:04:56 +01:00
karwosts
d899711a48 Remember hidden energy devices from storage (#24470)
* Remember hidden devices from storage

* remove accidental

* typing fix
2025-03-05 11:38:13 +02:00
Paul Bottein
b7be74e722 Remove touch action none for toggle feature (#24514) 2025-03-05 10:25:00 +01:00
karwosts
e53961d395 No integer validation on ha-form-float (#24501) 2025-03-05 09:20:18 +01:00
Paulus Schoutsen
03b08fefb7 Support continue conversation in Assist dialog (#24511) 2025-03-05 09:11:29 +02:00
Jan-Philipp Benecke
79374f6052 Show script description in the more info dialog (#24507)
* Show script description in the more info dialog

* Use markdown
2025-03-05 09:07:47 +02:00
Stefan Agner
ba19849182 Avoid URL and email fields getting masked in add-on config view (#24509)
* Avoid URL and email fields getting masked in add-on config view

The backend will set "format" for add-on config options of type
"password", "url" and "email", to exactly these three values. Only
"password" fields should be masked though.

* lint

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-03-05 06:56:34 +00:00
renovate[bot]
48338e0886 Update Yarn to v4.7.0 (#24503)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-04 18:43:13 +01:00
renovate[bot]
3b87fc84a9 Update dependency core-js to v3.41.0 (#24504)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-04 18:42:43 +01:00
J. Nick Koston
61effc3f70 Add panel to show Bluetooth connection overview (#24463)
* Add panel to show Bluetooth connection overview

* tweak

* migrate to ha-button
2025-03-04 18:29:15 +01:00
Petar Petrov
e5b460c259 Tweak legend expand/collapse button (#24484)
* Tweak legend expand/collapse button

* Revert "Tweak legend expand/collapse button"

This reverts commit 5eafdad781.

* update UX
2025-03-04 14:51:54 +01:00
Joakim Sørensen
7a56731f56 Remove brackets (#24497) 2025-03-04 15:20:16 +02:00
Joakim Sørensen
bfe20d3760 Include name and version in already connected dialog if present (#24492)
* Include name and version in already connected dialog if present

* lint

* Apply suggestions from code review

* move
2025-03-04 11:39:29 +02:00
Paul Bottein
5a37087231 Use fire-event for copy, cut and duplicate (#24486)
* Add event for duplicate

* Update new events in card option and card edit mode

* Add copy event
2025-03-04 11:14:22 +02:00
renovate[bot]
dbe5bffe22 Update dependency babel-loader to v10 (#24472)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-04 09:05:30 +02:00
renovate[bot]
62da09d045 Update dependency typescript to v5.8.2 (#24487) 2025-03-03 18:11:07 +01:00
Wendelin
75d7676b36 No capitalization for quick bar commands (#24481)
Remove forces capitalization for quick bar commands
2025-03-03 12:53:36 +01:00
renovate[bot]
0bea89db91 Update vaadinWebComponents monorepo to v24.6.6 (#24482)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-03 12:53:17 +01:00
Logan Rosen
7ad759dd95 Fix inconsistent color picker height across browsers (#24476)
Closes #24475
2025-03-03 11:17:46 +01:00
Bram Kragten
5377c9e75d Update currency for Zambia (#24480) 2025-03-03 11:00:50 +01:00
dependabot[bot]
bf206aa12b Bump home-assistant/wheels from 2024.11.0 to 2025.02.0 (#24478) 2025-03-03 08:16:03 +01:00
dependabot[bot]
73669e27f4 Bump actions/cache from 4.2.1 to 4.2.2 (#24479) 2025-03-03 08:13:18 +01:00
karwosts
1b5f4d3432 Add model_id filter to device selector (#23746)
Co-authored-by: Franck Nijhof <git@frenck.dev>
2025-03-02 21:37:22 +01:00
renovate[bot]
49379b49d0 Update dependency terser-webpack-plugin to v5.3.12 (#24468)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-02 14:36:26 +01:00
renovate[bot]
2827421c9f Update dependency @webcomponents/scoped-custom-element-registry to v0.0.10 (#24465)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-02 09:39:12 +01:00
renovate[bot]
1a5a183410 Update dependency eslint-config-prettier to v10.0.2 (#24462)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-01 20:04:57 +01:00
renovate[bot]
88a1de9aaf Update dependency @codemirror/search to v6.5.10 (#24459)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-01 12:33:54 +01:00
renovate[bot]
4ad64ce2c8 Update dependency @bundle-stats/plugin-webpack-filter to v4.18.3 (#24458)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-03-01 12:10:05 +02:00
renovate[bot]
3f1ca32d13 Update dependency element-internals-polyfill to v3.0.1 (#24457)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-28 23:24:20 +01:00
renovate[bot]
a6f7ee6b28 Update rspack monorepo to v1.2.6 (#24448)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-28 20:17:13 +01:00
Paul Bottein
0294198fba Correctly parse number state for numeric input card feature (#24453) 2025-02-28 16:46:53 +01:00
Bram Kragten
7120200fd4 Bumped version to 20250228.0 2025-02-28 16:25:24 +01:00
Paul Bottein
209d0ae5f4 Add support for toggle card feature for automation domain (#24452) 2025-02-28 16:23:47 +01:00
Paul Bottein
81bafba4e4 Use card text align variable for header text alignment (#24451)
Use card text align variable for header text aligment
2025-02-28 16:23:47 +01:00
Bram Kragten
819225d32b Align common dialog translations (#24450) 2025-02-28 16:23:45 +01:00
Norbert Rittel
7f7575dcbc More info panel: Replace "Dismiss dialog" tooltip with "Close info" (#24449)
* More info panel: Replace "Dismiss dialog" tooltip with "Close info"

Dismiss should only be used for closing dialogs like notifications that cannot be reopened.

Therefore the "Dismiss dialog" tooltip for the More info dialog is misleading, especially in translations that might emphasize the destructive meaning of "dismiss".

Matching the "Back to info" tooltip shown to return to the initial view from the entity settings this is changed to "Close info".

* use common close

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-02-28 16:23:44 +01:00
Paul Bottein
56eef4bf31 Fix control number buttons height (#24441) 2025-02-28 16:23:43 +01:00
karwosts
a384bc2273 Change label on BT advertisement timestamp (#24439) 2025-02-28 16:23:43 +01:00
karwosts
9d5d0e448f More height fixes in devtools/statistics (#24438)
* More height fixes in devtools/statistics

* fix selection bar
2025-02-28 16:23:42 +01:00
J. Nick Koston
f020269447 Small fixes for Bluetooth device info (#24436)
* Add missing service uuids to Bluetooth device info

Service UUIDs are different from Service data because
they do not have any data attached to them. I only
discovered that they were missing in the UI because
of helping a user troubleshoot of device, and we could
not find the Service UUID

* fix mapping

* fix mapping

* fix mapping

* tweaks
2025-02-28 16:23:41 +01:00
Paul Bottein
99f86bb9cf Use border color for focus state of button and select in dashboard (#24429) 2025-02-28 16:23:40 +01:00
Paul Bottein
587751f5b4 Allow the card features buttons to be smaller if needed (#24431) 2025-02-28 16:23:06 +01:00
Bram Kragten
52b199c92b Don't show no config flow message when source = system (#24425)
dont show no config flow message when source = system
2025-02-28 16:21:22 +01:00
Norbert Rittel
ed6659ad8f More info panel: Replace "Dismiss dialog" tooltip with "Close info" (#24449)
* More info panel: Replace "Dismiss dialog" tooltip with "Close info"

Dismiss should only be used for closing dialogs like notifications that cannot be reopened.

Therefore the "Dismiss dialog" tooltip for the More info dialog is misleading, especially in translations that might emphasize the destructive meaning of "dismiss".

Matching the "Back to info" tooltip shown to return to the initial view from the entity settings this is changed to "Close info".

* use common close

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-02-28 15:06:03 +00:00
Paul Bottein
f1d04e5178 Add support for toggle card feature for automation domain (#24452) 2025-02-28 15:01:33 +00:00
Paul Bottein
807e87fce0 Use card text align variable for header text alignment (#24451)
Use card text align variable for header text aligment
2025-02-28 15:52:40 +01:00
Bram Kragten
cafab61727 Align common dialog translations (#24450) 2025-02-28 15:51:06 +01:00
karwosts
88e6906b6b More height fixes in devtools/statistics (#24438)
* More height fixes in devtools/statistics

* fix selection bar
2025-02-28 14:07:00 +01:00
Paul Bottein
ebc1259e39 Fix control number buttons height (#24441) 2025-02-28 14:05:14 +01:00
J. Nick Koston
c1f2e6d82b Small fixes for Bluetooth device info (#24436)
* Add missing service uuids to Bluetooth device info

Service UUIDs are different from Service data because
they do not have any data attached to them. I only
discovered that they were missing in the UI because
of helping a user troubleshoot of device, and we could
not find the Service UUID

* fix mapping

* fix mapping

* fix mapping

* tweaks
2025-02-28 10:03:15 +02:00
karwosts
ef964fd23e Change label on BT advertisement timestamp (#24439) 2025-02-28 08:04:02 +01:00
renovate[bot]
13105c2d6f Update dependency typescript-eslint to v8.25.0 (#24434)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-27 20:43:33 +01:00
renovate[bot]
5b9262487d Update vitest monorepo to v3.0.7 (#24433)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-27 20:43:04 +01:00
renovate[bot]
4ec6e324f8 Update dependency element-internals-polyfill to v3 (#24364)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-27 20:42:16 +01:00
Paul Bottein
20f385e053 Use border color for focus state of button and select in dashboard (#24429) 2025-02-27 20:36:41 +01:00
Paul Bottein
dd441f882b Allow the card features buttons to be smaller if needed (#24431) 2025-02-27 19:30:15 +01:00
Bram Kragten
3a1d371b0b Don't show no config flow message when source = system (#24425)
dont show no config flow message when source = system
2025-02-27 16:15:42 +01:00
Bram Kragten
5caa47acc1 Bumped version to 20250227.0 2025-02-27 15:45:32 +01:00
Paul Bottein
7833a680a9 Use switch and add support for light, fan and valve (#24426)
* Use switch and add support for light and fan

* Add icon per domains
2025-02-27 15:45:16 +01:00
Paul Bottein
92681e7036 Fix header hidden when no badges (#24423) 2025-02-27 15:45:16 +01:00
Paul Bottein
ac18c6c018 Fix select box radio click on firefox (#24422) 2025-02-27 15:45:15 +01:00
Paul Bottein
7e0cd35ea8 Add features position description in tile card editor (#24421) 2025-02-27 15:45:14 +01:00
Paul Bottein
45dee566b7 Reverse the order of all modes features and toggle (#24420)
Reverse the order of all modes features
2025-02-27 15:45:13 +01:00
Paul Bottein
71a4dceedc Don't show features settings if none is compatible (#24419) 2025-02-27 15:45:12 +01:00
Jan-Philipp Benecke
27d883c1f6 Swap default positions of increment and decrement in counter actions feature (#24418) 2025-02-27 15:45:11 +01:00
Wendelin
014db0e60f Translate state in entity table (#24417) 2025-02-27 15:45:10 +01:00
Jan-Philipp Benecke
c80247d992 Swap button positions of toggle feature (#24416) 2025-02-27 15:45:09 +01:00
Wendelin
df33e97996 Fix energy gauge tooltip (#24404) 2025-02-27 15:45:08 +01:00
Paul Bottein
8848911b34 Use switch and add support for light, fan and valve (#24426)
* Use switch and add support for light and fan

* Add icon per domains
2025-02-27 15:35:12 +01:00
Paul Bottein
51193cf441 Reverse the order of all modes features and toggle (#24420)
Reverse the order of all modes features
2025-02-27 13:08:42 +01:00
Paul Bottein
a5b7f2466e Fix select box radio click on firefox (#24422) 2025-02-27 13:08:16 +01:00
Paul Bottein
3d9bde548d Don't show features settings if none is compatible (#24419) 2025-02-27 13:07:50 +01:00
Wendelin
dfa98a4ba8 Translate state in entity table (#24417) 2025-02-27 12:20:38 +01:00
Paul Bottein
20fe5b1b71 Fix header hidden when no badges (#24423) 2025-02-27 12:09:12 +01:00
Paul Bottein
9250ecb16f Add features position description in tile card editor (#24421) 2025-02-27 12:08:36 +01:00
Jan-Philipp Benecke
e21d1399ea Swap button positions of toggle feature (#24416) 2025-02-27 10:46:29 +01:00
Jan-Philipp Benecke
5dded38ccc Swap default positions of increment and decrement in counter actions feature (#24418) 2025-02-27 10:46:01 +01:00
renovate[bot]
54cc8f025c Update dependency barcode-detector to v3.0.1 (#24407)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-27 07:54:00 +02:00
karwosts
0d215e65cd Remove duplicate translation key (#24414)
Update en.json
2025-02-27 07:46:54 +02:00
Paulus Schoutsen
f9824a3b3b Remove unused domain in history check (#24406) 2025-02-26 17:59:02 +01:00
Wendelin
197c9219bd Fix energy gauge tooltip (#24404) 2025-02-26 15:27:09 +01:00
Bram Kragten
4974a12221 Merge branch 'rc' into dev 2025-02-26 14:11:39 +01:00
Bram Kragten
a13bcac0aa Bumped version to 20250226.0 2025-02-26 14:10:36 +01:00
Bram Kragten
cf288f7cd1 Don't allow history to be picked for backup when db is not in default … (#24402) 2025-02-26 14:09:46 +01:00
Bram Kragten
1c8284609f Update translation keys for sub entry flows (#24400) 2025-02-26 13:38:21 +01:00
Petar Petrov
1fdadbf1b8 Add drag to zoom & double click in echarts (#24401) 2025-02-26 12:33:39 +01:00
karwosts
3b272ae411 Allow entity-filter-card to filter on other entity (#24396) 2025-02-25 22:37:31 +01:00
ildar170975
a048c36861 ha-tabs: adapt _affectScroll() to RTL (#24018)
* adapt _affectScroll for RTL

* eslint

* import "property"

* prettier

* Update ha-tabs.ts

This makes this work...

* Lint

---------

Co-authored-by: Yosi Levy <37745463+yosilevy@users.noreply.github.com>
2025-02-25 22:20:57 +01:00
Paul Bottein
2a6c1773f3 Update responsive layout svg (#24391) 2025-02-25 18:58:46 +01:00
Paul Bottein
bf17012753 Fix select box svg icon in dark mode (#24389) 2025-02-25 16:52:02 +01:00
Wendelin
bbaf23e049 Add lovelace bg opacity preview (#24387)
* Add lovelace bg opacity preview

* Add yaml preview

* Simplify logic with css var

* Clean up

* Remove important

* Add opacity default to 100
2025-02-25 16:21:32 +01:00
Jan Bouwhuis
34b7929165 Improve labels when there no mqtt entities or triggers debug info yet (#24383)
* Improve labels when there no mqtt entities or triggers debug info yet

* Update src/panels/config/devices/device-detail/integration-elements/mqtt/dialog-mqtt-device-debug-info.ts

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-02-25 15:11:19 +01:00
Paul Bottein
8f06e70a11 Add view top margin option for section view (#24386) 2025-02-25 15:06:13 +01:00
Jan-Philipp Benecke
50ac60b35e Improve area registry dialog user experience (#24086)
* Improve area registry dialog user experience

* Simplify expanded

* Improve heading and description

* Fix padding and remove secondary

* Process code review

* Remove more unused imports

* Re-add alias description
2025-02-25 15:04:30 +01:00
Petar Petrov
4caca19e32 Migrate sankey chart to echarts (#24185)
* Migrate sankey chart to echarts

* don't memoize options

* Dynamically load echart sankey component

* load Sankey component with the card

* load the sankey component in ha-chart-base
2025-02-25 15:02:41 +01:00
Wendelin
a7b1c45c00 Replace simple-tooltip with ha-tooltip (#24384)
* Start with simple-tooltip migration

* Remove simple-tooltip

* Fix tooltip in hassio-repositories

* Remove space

* Update hassio/src/dialogs/repositories/dialog-hassio-repositories.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update src/components/ha-icon-overflow-menu.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update src/components/ha-target-picker.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update src/components/media-player/ha-media-player-browse.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update src/components/ha-target-picker.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Fix content props

* Use ha-tooltip in data-table-icon

* Update src/panels/config/areas/ha-config-area-page.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update src/panels/config/devices/ha-config-device-page.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update src/panels/config/integrations/ha-integration-card.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update src/panels/config/integrations/ha-integration-card.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update src/panels/config/integrations/ha-integration-list-item.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update src/panels/config/integrations/ha-integration-list-item.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-02-25 14:58:38 +01:00
Paul Bottein
10c3e4c6f8 Rename appearance section to content in card/badge editors (#24385) 2025-02-25 14:56:54 +01:00
Petar Petrov
1f50c359dc Fix history Y axis with tiny values (#24342)
* Fix history Y axis with tiny values

* set min fractions to 2

* handle negative values
2025-02-25 12:00:33 +01:00
Paul Bottein
a3e24a3dc0 Add view header (#24237)
* Create basic section heading

* Update badge position

* Don't allow to move card

* Remove view badges in section

* Improve heading section UX

* Add basic editor for heading section

* Add badges position option

* Add layout and badge position

* Improve button

* Use layout

* Simplify edit mode

* Fix CSS

* Fix add heading button

* Improve badges

* Rename to extra space

* Fix add top badge position

* Add migration

* Fix delete section confirmation

* Add translations

* Update comment

* Add header config to view

* Add edit card overlay

* Remove badge support for sections

* Remove section badges

* Clean section

* Fix header visibility

* Update translations

* Add view header editor

* Use new markdown card option

* Revert useless changes

* Add options translations

* Use edit dialog

* Unify font

* Update default text

* Share default between editor and view

* Update src/panels/lovelace/editor/view-header/hui-dialog-edit-view-header.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update src/panels/lovelace/editor/view-header/hui-dialog-edit-view-header.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Fix comment

* Use select box for view header editor

* Remove extra space option

* Update select box

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-02-25 11:43:54 +01:00
Bram Kragten
a906285a03 Use automatic_backups_configured flag to signal if backup onboardin… (#24367)
* Use `automatic_backups_configured` flag to signal if backup onboarding was done

* fix

* dont show a newly created password without showing it
2025-02-25 11:42:46 +01:00
Petar Petrov
5c933a43b2 Custom chart legend (#24227)
* Custom chart legend

* limit legend label length

* fade long legends

* tweak margin

* new design

* fix margins

* lighter background

* fix variable height charts

* tweak legend button

* lint

* switch to secondary-text-color

* Card option to expand legend

* Update src/components/chart/ha-chart-base.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* pr comments

* use ha-assist-chip

* pr comments

* Apply suggestions from code review

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-02-25 12:00:50 +02:00
Petar Petrov
151a7fbc40 Z-WaveJS: Delay fetching new config values after addition (#24317) 2025-02-25 10:44:45 +01:00
Petar Petrov
4fa915c869 Z-WaveJS: stop inclusion subscription while dialog is open (#24294)
* Z-WaveJS: stop inclusion subscription while dialog is open and handling it

* Don't pass dsk to core

* PR comments
2025-02-25 10:43:56 +01:00
Paul Bottein
d47e5c847b Add RTL and dark mode support for select box image (#24374)
Add rtl and dark for select box
2025-02-25 10:38:02 +01:00
Flo Edelmann
db5036aed3 Support limits in sensor card editor (#24358)
* Support `limits` in sensor card editor

* Add new translation keys for limit min/max
2025-02-25 09:19:13 +00:00
renovate[bot]
bb672d0272 Update dependency prettier to v3.5.2 (#24382)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-25 08:36:20 +02:00
renovate[bot]
e26d3d39f0 Update dependency eslint to v9.21.0 (#24381)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-25 01:36:23 +01:00
renovate[bot]
e54c3a69af Update dependency @lokalise/node-api to v13.2.1 (#24377)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-24 19:59:53 +01:00
karwosts
cc04457d72 Add 'last seen' to BT advertisement montior (#24361)
* Add 'last seen' to BT advertisement montior

* use ha-relative-time
2025-02-24 17:29:34 +02:00
Wendelin
9e1d64e728 shoelace tooltip (#24337)
* Add shoelace based ha-tooltip

* Use shoelace component

* Improve styles

* Add docs

* Fix tooltip docs

* Revert new global styles
2025-02-24 15:37:59 +01:00
Paul Bottein
0cfe7f8d12 Tile card editor improvements (#24373)
* Add selector support

* Feedbacks

* Use select box fields in tile card editor
2025-02-24 14:26:55 +00:00
karwosts
2b1f301db6 Push map strategy logic down into map card (#24303) 2025-02-24 15:13:52 +01:00
Paul Bottein
fc4996412e Add select box component (#24370)
* Add select box component

* Add selector support

* Use it in markdown card

* Add select box to gallery

* Feedbacks
2025-02-24 15:07:51 +01:00
Jan-Philipp Benecke
ece4a6345f Use custom styling for cluster marker (#24371)
* Use custom styling for cluster marker

* Process code review
2025-02-24 13:11:06 +00:00
Bram Kragten
a4c08a78b9 Check for updated frontend on connect too (#24368) 2025-02-24 13:16:54 +02:00
Joakim Sørensen
a438fc5e41 Add connection check and dialog with results for cloud login (#24301) 2025-02-24 09:37:17 +01:00
karwosts
783132ae46 Fix solar order in compare stack for usage graph (#24360)
* Fix solar order in compare stack for usage graph

* remove accidental commit
2025-02-24 09:08:55 +02:00
renovate[bot]
680d81001c Update rspack monorepo to v1.2.5 (#24353)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-24 09:00:19 +02:00
dependabot[bot]
a917383d7a Bump actions/cache from 4.2.0 to 4.2.1 (#24366)
Bumps [actions/cache](https://github.com/actions/cache) from 4.2.0 to 4.2.1.
- [Release notes](https://github.com/actions/cache/releases)
- [Changelog](https://github.com/actions/cache/blob/main/RELEASES.md)
- [Commits](https://github.com/actions/cache/compare/v4.2.0...v4.2.1)

---
updated-dependencies:
- dependency-name: actions/cache
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-02-24 08:59:27 +02:00
dependabot[bot]
455a6761cd Bump actions/upload-artifact from 4.6.0 to 4.6.1 (#24365)
Bumps [actions/upload-artifact](https://github.com/actions/upload-artifact) from 4.6.0 to 4.6.1.
- [Release notes](https://github.com/actions/upload-artifact/releases)
- [Commits](https://github.com/actions/upload-artifact/compare/v4.6.0...v4.6.1)

---
updated-dependencies:
- dependency-name: actions/upload-artifact
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-02-24 08:58:42 +02:00
renovate[bot]
acf42d7637 Update dependency globals to v16 (#24359)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-24 08:56:48 +02:00
renovate[bot]
3857c7321a Update dependency eslint-plugin-wc to v2.2.1 (#24362)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-24 07:08:27 +01:00
puddly
5eec814988 Hide hardware integrations from the "add integration" dialog (#24345) 2025-02-22 08:43:18 +02:00
Bram Kragten
4a1b7d46ca Merge branch 'rc' 2025-02-21 19:31:20 +01:00
Bram Kragten
75fadcca42 Bumped version to 20250221.0 2025-02-21 19:31:09 +01:00
Wendelin
41c93f5f7e Fix hassio backup restore url (#24313) 2025-02-21 19:30:04 +01:00
Petar Petrov
99559ff716 Enable downsampling in echarts (#24311)
* Enable downsampling in echarts

* remove unneeded symbol set
2025-02-21 19:27:32 +01:00
Wendelin
753fe719e3 Fix backup forever retention settings (#24299)
Fix forever retention settings
2025-02-21 19:27:31 +01:00
karwosts
5c14afd944 Fix duplicate id in energy-devices-detail-graph-card (#24261)
* Fix duplicate id in energy-devices-detail-graph-card

* address compare

* Update src/panels/lovelace/cards/energy/hui-energy-devices-detail-graph-card.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* prettier

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-02-21 19:27:31 +01:00
Petar Petrov
23f1925c84 Make part of the chart rendering async for large datasets (#24260) 2025-02-21 19:27:30 +01:00
renovate[bot]
edd37565a6 Update vitest monorepo to v3.0.6 (#24344)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-21 19:03:37 +01:00
renovate[bot]
fb3f779121 Update rspack monorepo to v1.2.4 (#24343)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-21 19:03:00 +01:00
Wendelin
4d7634ac67 Landing-page: ping supervisor before get network infos (#24330)
* Ping supervisor before get network infos

* Rename supervisor proxy prefix
2025-02-21 08:14:10 +02:00
renovate[bot]
ba5c1133c6 Lock file maintenance (#24306)
* Lock file maintenance

* Bump codemirror view to 6.36.3

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2025-02-20 19:36:32 +00:00
Wendelin
0a05dd8f71 Add more tests for common/entity (#24336)
* Use substring instead of deprecated substr

* Add more common entity tests
2025-02-20 20:11:53 +01:00
J. Nick Koston
400106ec09 Adjust WebSocket ping timeout to 15 seconds (#24339)
* Adjust WebSocket ping timeout to 15 seconds

5 seconds was too low to prevent the UI from reloading
when connecting the WebSocket during startup or on
a high latancy connection

This problem presented as the UI reloading over
and over again because it could never respond
to the ping in time on high latancy connections.

At startup it usually only did this once so it
went unnoticed in most cases.

This ping was added in #18934

* Update connection-mixin.ts

Co-authored-by: Jan-Philipp Benecke <jan-philipp@bnck.me>

---------

Co-authored-by: Jan-Philipp Benecke <jan-philipp@bnck.me>
2025-02-20 20:09:51 +01:00
Jan-Philipp Benecke
a7a4194e09 Add tile card feature for counter actions (#24340)
* Add tile card feature for counter actions

* Format

* Change icon

* Disable buttons when hit limit

* Change increment/decrement icons
2025-02-20 19:09:44 +00:00
renovate[bot]
0bd7d27c57 Update dependency @lokalise/node-api to v13.2.0 (#24335)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-20 16:14:54 +01:00
Jan-Philipp Benecke
8175e45921 Rename switch-toggle feature to toggle and improve (#24333)
* Rename `switch-toggle` feature to `toggle` and improve

* Format
2025-02-20 14:51:49 +01:00
Jan-Philipp Benecke
cae36b393b Focus alarm control panel PIN input on wider screens (#24324)
* Focus alarm control panel PIN input on wider screens

* Also apply on textfield
2025-02-20 15:20:28 +02:00
Paul Bottein
f84ad92356 Extract saving card config from card editor (#24319)
* Extract saving card config from card editor

* Await

* Add try/catch

* Remove unused translations

* Remove duration
2025-02-20 12:27:39 +01:00
Wendelin
fb1ee2ed1d Remove toggles from ha-icon-button (#24331) 2025-02-20 12:14:40 +01:00
Paul Bottein
9073282174 Add text only style to markdown card (#24329) 2025-02-20 11:40:39 +01:00
Jan-Philipp Benecke
91bd5cba08 Add switch toggle feature to tile card (#24325)
* Add tile switch toggle feature

* Remove _currentState
2025-02-20 10:16:14 +02:00
karwosts
a68bdbfe08 Fix siren advanced controls (#24318) 2025-02-20 08:50:00 +01:00
Jan-Philipp Benecke
f3d614b0d3 Make quick bar more keyboard accessible (#24321) 2025-02-20 08:44:49 +01:00
karwosts
f3c9e4a4a0 Fix catching errors in alarm-control-panel more-info (#24328) 2025-02-20 08:42:17 +01:00
karwosts
d22a82c4a6 Teardown and rebuild element editor when switching stack cards (#24065) 2025-02-20 07:57:34 +01:00
Jan-Philipp Benecke
5cddc6e5c6 Decrease max cluster radius (#24322) 2025-02-19 21:34:49 +02:00
Jan-Philipp Benecke
c5c067ef19 Create copyable textfield component (#24247) 2025-02-19 15:56:29 +01:00
Paul Bottein
694bb3088c Improve margin for inline tile card feature (#24316) 2025-02-19 16:07:27 +02:00
Petar Petrov
ad487470fd Enable downsampling in echarts (#24311)
* Enable downsampling in echarts

* remove unneeded symbol set
2025-02-19 16:05:32 +02:00
Wendelin
2801d071ba Fix custom retention label (#24304) 2025-02-19 10:32:41 +01:00
Wendelin
71b65f208f Fix hassio backup restore url (#24313) 2025-02-19 10:32:15 +01:00
Paul Bottein
ab4efb7412 Fix cursor jump in light color pickers (#24312) 2025-02-19 10:30:24 +01:00
Logan Rosen
c7a46ec25b Improve ESLint config (#24290)
* Improve ESLint config
2025-02-18 17:30:36 +00:00
Jan-Philipp Benecke
83d4a408f6 Improve large maps with marker clustering (#24244)
* Improve large maps with marker clustering

* Pin leaflet.markercluster

* Remove custom icon

* Display whether marker are clustered or not
2025-02-18 15:45:39 +02:00
Bram Kragten
06932d1479 Prevent navigate when opening voice flow (#24300)
prevent navigate when opening voice flow
2025-02-18 14:27:59 +01:00
Wendelin
24211d5f25 Fix backup forever retention settings (#24299)
Fix forever retention settings
2025-02-18 14:05:04 +01:00
Bram Kragten
d387f19a31 Backup tweaks (#24165)
* Backup tweaks

* Show progress in fab

* Revert unused changes

---------

Co-authored-by: Wendelin <w@pe8.at>
2025-02-18 15:02:53 +02:00
Wendelin
347ee2a4c3 Improve-dev-container (#24296)
* Add gh cli to dev container

* Add develop and serve vscode task
2025-02-18 11:51:56 +02:00
karwosts
1363884773 Fix error handling/flickering in markdown card (#24280) 2025-02-18 08:16:10 +01:00
Adam Kapos
0256da511d Fix theme2hex with custom theme colors (#24282) 2025-02-18 08:04:46 +01:00
Petar Petrov
c52217c1ce Make part of the chart rendering async for large datasets (#24260) 2025-02-18 07:57:07 +01:00
karwosts
cdd17eed2e Fix untracked energy rendering at the base of the bar stack (#24288) 2025-02-18 06:36:53 +01:00
renovate[bot]
4546c6f624 Update babel monorepo to v7.26.9 (#24278)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-18 06:35:47 +01:00
renovate[bot]
2c34760204 Update vaadinWebComponents monorepo to v24.6.5 (#24279)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-18 06:35:25 +01:00
Paul Bottein
0b64861297 Add inline features position for tile card (#24199)
* Add side features position for tile card

* Add translations

* Rename to inline

* Simplify editor with 2 dropdowns

* Use 50% width

* Update src/translations/en.json

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-02-18 06:33:17 +01:00
renovate[bot]
94a5e737cc Update dependency @lit-labs/observers to v2.0.5 (#24286)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-18 05:32:41 +00:00
renovate[bot]
05163588fc Update dependency @lit-labs/virtualizer to v2.1.0 (#24287)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-18 06:21:23 +01:00
renovate[bot]
ee64536862 Update dependency @lit-labs/motion to v1.0.8 (#24289)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-18 06:20:42 +01:00
renovate[bot]
695a6a506e Update octokit monorepo (#24292)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-18 06:20:22 +01:00
Paul Bottein
3ee3cfa6cb Add cache for markdown card and markdown element (#24217)
* Add cache for markdown card and markdown element

* Rename to expiration

* Only use cache logic for markdown card

* Add tests

* Improve tests
2025-02-17 09:01:44 +01:00
renovate[bot]
00d0cb7afa Update dependency @octokit/auth-oauth-device to v7.1.3 (#24273)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-17 08:39:01 +01:00
karwosts
3ae34403bd Fix duplicate id in energy-devices-detail-graph-card (#24261)
* Fix duplicate id in energy-devices-detail-graph-card

* address compare

* Update src/panels/lovelace/cards/energy/hui-energy-devices-detail-graph-card.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* prettier

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-02-16 13:06:01 +00:00
renovate[bot]
1434966170 Update dependency globals to v15.15.0 (#24262)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-16 12:36:03 +01:00
renovate[bot]
8dd70f7017 Update dependency @codemirror/autocomplete to v6.18.6 (#24256)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-16 12:35:58 +01:00
karwosts
84a0289e1b Use ha-md-button-menu in automation triggers/conditions (#24258) 2025-02-16 12:35:49 +01:00
renovate[bot]
a25e1d3f7f Update CodeMirror (#24255)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-15 16:53:21 +01:00
libe.net
f53ac41eee Add timespans to history and energy (#23362)
* add Last 24h, 30d, 1y and overflow

* added Energy-Dashboard

* mobile style css

* added yesterday and min-height; changed overflow; new timespans to end;

* conflict resolve trial

* changed energy timespan order

* min for logbook

* seperated overflow calc for energy and logbook / history

* rename to header-position

* prettier format

* date-fns types

* added 1h, 12 h, 7d and removed 365d for history, added 7d to energy

* remove 7d for energy

* use calcdate and for energy whole hours / days / months

* fix calc
2025-02-15 09:52:32 +01:00
karwosts
b9acd40b0f Add zones to state picker for person/device_tracker (#24201)
* Add zones to state picker for person/device_tracker

* not for attributes
2025-02-14 22:44:05 +01:00
ildar170975
7524dc8709 Settings -> Helpers: make "Editable" columns sortable (#23976)
* "Editable" in "Helpers"

* prettier
2025-02-14 22:27:28 +01:00
renovate[bot]
cbedf62c39 Update dependency @codemirror/autocomplete to v6.18.5 (#24249)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-14 22:16:15 +01:00
Wendelin
63a98155cd Add more unit tests for common/entity (#24182)
* Add new entity tests

* Improve canToggleDomain test
2025-02-14 21:55:23 +01:00
renovate[bot]
7369b7e0d5 Update dependency prettier to v3.5.1 (#24203)
* Update dependency prettier to v3.5.0

* Prettier 3.5.1

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2025-02-14 20:27:21 +00:00
dependabot[bot]
922abafabf Bump @octokit/plugin-paginate-rest from 11.4.0 to 11.4.2 (#24245)
Bumps [@octokit/plugin-paginate-rest](https://github.com/octokit/plugin-paginate-rest.js) from 11.4.0 to 11.4.2.
- [Release notes](https://github.com/octokit/plugin-paginate-rest.js/releases)
- [Commits](https://github.com/octokit/plugin-paginate-rest.js/compare/v11.4.0...v11.4.2)

---
updated-dependencies:
- dependency-name: "@octokit/plugin-paginate-rest"
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-02-14 21:08:23 +01:00
Wendelin
f1bb4a5694 Add title attribute to data-table column header (#24231) 2025-02-14 21:07:48 +01:00
dependabot[bot]
e0b9cb8ccb Bump @octokit/request-error from 6.1.6 to 6.1.7 (#24243)
Bumps [@octokit/request-error](https://github.com/octokit/request-error.js) from 6.1.6 to 6.1.7.
- [Release notes](https://github.com/octokit/request-error.js/releases)
- [Commits](https://github.com/octokit/request-error.js/compare/v6.1.6...v6.1.7)

---
updated-dependencies:
- dependency-name: "@octokit/request-error"
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-02-14 19:59:24 +00:00
dependabot[bot]
06f27650da Bump @octokit/request from 9.1.4 to 9.2.1 (#24242)
Bumps [@octokit/request](https://github.com/octokit/request.js) from 9.1.4 to 9.2.1.
- [Release notes](https://github.com/octokit/request.js/releases)
- [Commits](https://github.com/octokit/request.js/compare/v9.1.4...v9.2.1)

---
updated-dependencies:
- dependency-name: "@octokit/request"
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-02-14 20:38:18 +01:00
renovate[bot]
a772eaffd7 Update dependency eslint to v9.20.1 (#24241)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-14 19:23:05 +00:00
dependabot[bot]
c39be4a9b8 Bump @octokit/endpoint from 10.1.1 to 10.1.3 (#24239)
Bumps [@octokit/endpoint](https://github.com/octokit/endpoint.js) from 10.1.1 to 10.1.3.
- [Release notes](https://github.com/octokit/endpoint.js/releases)
- [Commits](https://github.com/octokit/endpoint.js/compare/v10.1.1...v10.1.3)

---
updated-dependencies:
- dependency-name: "@octokit/endpoint"
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-02-14 20:12:57 +01:00
Bram Kragten
c68002214f Merge branch 'rc' 2025-02-14 13:33:47 +01:00
Bram Kragten
8dbc203130 Bumped version to 20250214.0 2025-02-14 13:33:35 +01:00
Petar Petrov
64274d7355 Fix inclusion dialog in ZwaveJS panel (#24234) 2025-02-14 13:33:22 +01:00
Petar Petrov
c07f4de39d Fix endTime of statistics-chart (#24233) 2025-02-14 13:33:21 +01:00
Paulus Schoutsen
37ee2bf308 Fix config flow URLs linking to device (#24223) 2025-02-14 13:33:20 +01:00
Petar Petrov
d9559b7f07 Optimize chart performance (#24215)
* Stop listening to chart scroll events to improve performance

* only set visualmap when needed

* Reduce statistics detail for long periods

* reduce calls to `setOption`

* tweak zoom modifier code

* always replace series

* revert statistics detail change
2025-02-14 13:33:20 +01:00
Paul Bottein
fce07daa20 Fix section border radius (#24159) 2025-02-14 13:33:19 +01:00
Brynley McDonald
5d6fcaf6bb Add Mastodon and Bluesky to help tip (#24099)
Add Mastodon and Bluesky to socials tip
2025-02-14 13:33:18 +01:00
Petar Petrov
0abccb88d6 Fix inclusion dialog in ZwaveJS panel (#24234) 2025-02-14 13:32:09 +01:00
renovate[bot]
5dc5879773 Update rspack monorepo to v1.2.3 (#24235)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-14 13:10:38 +01:00
karwosts
41df7a3f4a Keyboard accessibility for automation-action-row (convert M2->M3) (#24121) 2025-02-14 13:02:16 +01:00
Petar Petrov
920ec035c5 Fix endTime of statistics-chart (#24233) 2025-02-14 12:53:48 +01:00
Petar Petrov
043e8d6e2e Optimize chart performance (#24215)
* Stop listening to chart scroll events to improve performance

* only set visualmap when needed

* Reduce statistics detail for long periods

* reduce calls to `setOption`

* tweak zoom modifier code

* always replace series

* revert statistics detail change
2025-02-14 12:46:55 +01:00
ildar170975
d8e36894a0 Fix for "Increase generic entity row touch target (4): iOS troubles (#24224)
restoring pre-2025.2 height
2025-02-14 09:45:56 +01:00
ildar170975
65b6a3c6a3 developer-tools-statistics: fix height of ha-data-table to avoid a double scrollbar (#24226)
height fix
2025-02-14 09:30:46 +01:00
ildar170975
b16f82cedb Settings->Entities: set width for "Status" (#23975)
* min-width for "Status"

* max-width for "Status"
2025-02-14 09:17:58 +01:00
Paul Bottein
02deeb4ce7 Increase target zone for tile card icon click (#24219) 2025-02-14 08:52:13 +02:00
renovate[bot]
0c6651c2c2 Update typescript-eslint monorepo to v8.24.0 (#24230)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-14 08:47:20 +02:00
Paulus Schoutsen
abbf56db1d Fix config flow URLs linking to device (#24223) 2025-02-13 13:47:03 +00:00
Norbert Rittel
bc0cc8b387 Fix sentence-casing of running_parallel state for scripts (#24218)
Fix sentence-casing of running_parallel state of scripts
2025-02-13 12:54:52 +01:00
Abílio Costa
b66f41db7d Improve last backup status string (#24206) 2025-02-13 07:50:59 +01:00
renovate[bot]
05fbe204c5 Update dependency ua-parser-js to v2.0.2 (#24205)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-13 07:47:40 +01:00
renovate[bot]
ee199fbbc0 Update dependency marked to v15.0.7 (#24210)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-13 07:46:37 +01:00
renovate[bot]
56ab29da81 Update formatjs monorepo (#24195)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-12 18:59:29 +01:00
Paul Bottein
10abaa538d Improve tile card interactions (#24175)
* Use none instead of more info for icon

* Improve tile icon accessibility

* Remove background shape for tile card icon when no action

* Add hover opacity

* Fix wrong type

* Remove padding around icon and increase hover opacity
2025-02-12 10:49:31 +01:00
ildar170975
f25dac7f68 Settings -> Automations: show a title for "State" column (#23977)
show a title for "State" column
2025-02-12 09:46:40 +01:00
karwosts
99065a689f Retry subscribing to weather forecast if it fails (#24188) 2025-02-12 08:39:46 +02:00
renovate[bot]
ac88d5993a Update dependency @lokalise/node-api to v13.1.0 (#24191)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-11 23:04:02 +01:00
Paul Bottein
b09ce45d31 Display hold and double tap actions in tile card editor if they are set (#24178) 2025-02-11 16:45:48 +01:00
Paul Bottein
78e2809fe7 Fix default value for color in entity badge editor (#24186) 2025-02-11 16:14:04 +02:00
renovate[bot]
a631bf9854 Update babel monorepo to v7.26.8 (#24183)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-11 13:53:07 +01:00
ildar170975
1349c8520c developer-tools-template: allow "select all" for "rendered" (2) (#24171)
removed a harmful user-select
2025-02-11 13:26:46 +01:00
renovate[bot]
6d1a55cc3a Update vaadinWebComponents monorepo to v24.6.4 (#24153)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-11 09:48:10 +01:00
Wendelin
23a9ae6835 Onboarding restore use error code (#24172)
Use error code for incorrect password
2025-02-11 09:47:18 +01:00
Wendelin
dbd1e928de Make restore button destructive (#24173) 2025-02-11 09:37:56 +01:00
renovate[bot]
e86ad21ce2 Update dependency eslint to v9.20.0 (#24169)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-11 09:12:21 +01:00
Bram Kragten
0d97afb3f2 Add base support for sub entries (#23160)
* Add base support for sub entries

* add demo types

* fix translations

* Use sub entry name when deleting

* Update show-dialog-sub-config-flow.ts

* adjust for multiple sub types

* WIP, not functional

* add subentry_type

* rename to supported_subentry_types

* config_subentries -> config_entries_subentries

* Add localized sub flow title

* use Record

* rename

* more rename
2025-02-10 21:24:05 +01:00
Bram Kragten
0ab9098f23 Merge branch 'rc' 2025-02-10 19:39:11 +01:00
Bram Kragten
4498747fb1 Bumped version to 20250210.0 2025-02-10 19:38:30 +01:00
Petar Petrov
76977b64fa Bring back energy usage graph order (#24156) 2025-02-10 19:36:43 +01:00
Petar Petrov
2ca7395733 Limit max label width of hui-energy-devices-graph-card (#24152) 2025-02-10 19:36:42 +01:00
Petar Petrov
0900869957 Round log scale limits (#24151) 2025-02-10 19:36:41 +01:00
Petar Petrov
91e8750f44 Fix device energy card with max_devices (#24150) 2025-02-10 19:36:40 +01:00
karwosts
936f66c41c Stack solar forecasts (#24113) 2025-02-10 19:36:39 +01:00
Petar Petrov
9ab5be4730 Fix energy dashboard data formatting (#24101) 2025-02-10 19:36:38 +01:00
Petar Petrov
a30e501031 Set charts font to Roboto (#24097) 2025-02-10 19:36:37 +01:00
Wendelin
dcb04067b8 Add network adapter translations (#24096) 2025-02-10 19:36:37 +01:00
Petar Petrov
bf962b29af Reduce padding in energy charts and align unit (#24095) 2025-02-10 19:36:36 +01:00
Jan-Philipp Benecke
0ae6fa0763 Fix area registry dialog field (#24090) 2025-02-10 19:36:35 +01:00
Wendelin
03a415beff Onboarding restore use core api (#23920)
* Fix type issues

* Extract backup-upload

* Add onboarding upload section

* Extract and use ha-backup-details

* Implement backup details and restore

* remove unused hassio onboarding calls

* Require hass in dialog-hassio-backup

* Add restore view

* Add formatDateTime without locale and config

* Add restore status

* Fix prettier

* Fix styles of backup details

* Remove unused localize

* Fix onboarding restore translations

* Hide data-picker on core only instance

* Split uploadBackup into 2 separate funcs

* Add formatDateTimeWithBrowserDefaults

* Fix selected data for core only

* Show error reasons on status page

* Use new backup info agents

* Add mem function for formatDateTimeWithBrowserDefaults

* Fix overflow on mobile

* Handle errors when in hassio mode

* Fix cancel restore texts

* Fix hassio localize type issue

* Remove unused onboarding localize in hassio backup restore

* improve format_date_time

* Fix tests

* Fix and simplify backup upload issues

* Use foreach instead of reduce

* Fix attributes, unused styles and properties

* Simplify supervisor warning

* Fix language type issues

* Fix ha-backup-data-picker

* Improve backup-details-restore

* Fix onboarding-restore issues

* Improve loadBackupInfo

* Revert uploadBackup changes

* Improve cancel restore

* Use destructive

* Update src/panels/config/backup/dialogs/dialog-upload-backup.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Show backup type not at onboarding

* Only show backup type in correct translationPanel

* Fix quotes

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-02-10 16:40:08 +01:00
Paulus Schoutsen
44cc75afbc Require opt-in config flow navigateToResult (#24120) 2025-02-10 15:58:10 +01:00
Petar Petrov
748642a8d6 Limit max label width of hui-energy-devices-graph-card (#24152) 2025-02-10 15:54:20 +01:00
Petar Petrov
3d5c65d652 Bring back energy usage graph order (#24156) 2025-02-10 15:53:36 +01:00
Paul Bottein
a26bf80b13 Fix section border radius (#24159) 2025-02-10 15:53:05 +01:00
Petar Petrov
497c6c35f1 Fix device energy card with max_devices (#24150) 2025-02-10 10:12:42 +01:00
Petar Petrov
b0b06a2787 Round log scale limits (#24151) 2025-02-10 10:12:12 +01:00
Paulus Schoutsen
f3d55447ca Add support for intent-progress assist events (#24143) 2025-02-09 23:36:56 -05:00
renovate[bot]
1b3d4b77d3 Update dependency ua-parser-js to v2.0.1 (#24125)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-08 21:14:11 +02:00
Paulus Schoutsen
6ec4041c4c Navigate to newly created config entry (#24109) 2025-02-07 08:32:21 +02:00
karwosts
d919e8d333 Integrate Statistic Card with Energy Date Picker (#23794)
* Support energy-date-selection for statistic card

* reuse period key
2025-02-07 08:29:28 +02:00
karwosts
af7bb85667 Stack solar forecasts (#24113) 2025-02-07 06:44:39 +01:00
renovate[bot]
9061e2039b Update dependency @vitest/coverage-v8 to v3.0.5 (#24106)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-06 19:40:41 +01:00
renovate[bot]
906e6f4a88 Update dependency @codemirror/state to v6.5.2 (#24105)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-06 19:26:48 +01:00
renovate[bot]
73fbe9a69d Update typescript-eslint monorepo to v8.23.0 (#24108)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-06 19:26:16 +01:00
Petar Petrov
2a0f69a629 Fix energy dashboard data formatting (#24101) 2025-02-06 12:38:22 +01:00
Petar Petrov
9411a77f14 Set charts font to Roboto (#24097) 2025-02-06 13:16:35 +02:00
Petar Petrov
de3bf2e088 Show energy-self-sufficiency-gauge card without grid return (#24098)
Show energy-self-sufficiency-gauge card if solar is defined
2025-02-06 10:07:06 +00:00
Brynley McDonald
16181b48ae Add Mastodon and Bluesky to help tip (#24099)
Add Mastodon and Bluesky to socials tip
2025-02-06 10:59:58 +01:00
Curt Grimes
8682debe61 Fix punctuation in some toast and warning messages (#24093)
There are some toast messages that are comma splices (two independent
clauses joined by a comma), which is not correct grammar. This commit
fixes the punctuation in these messages.
2025-02-06 09:37:54 +01:00
Petar Petrov
bdbc9bc1b4 Reduce padding in energy charts and align unit (#24095) 2025-02-06 09:36:58 +01:00
renovate[bot]
79b9f8d083 Update dependency barcode-detector to v3 (#24015)
* Update dependency barcode-detector to v3

* fix breaking changes

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-02-06 07:53:26 +00:00
Wendelin
3918194d2d Add network adapter translations (#24096) 2025-02-06 09:49:05 +02:00
Charles Garwood
e9fef1f873 Update more-info dialog layout for weather entities (#22818)
* Update weather more-info style

* Cleanup unused var

* Use badges for attributes

* Remove unnecessary flex class

* CSS cleanup

* Wrap badges

* Revert "Cleanup unused var"

This reverts commit 89ab0f6ad05e1e669b84e69f4c263e3d302794f2.

* Revert badges for attributes

* Scroll long forecasts

* Use nothing instead of empty strings

* Cleanup
2025-02-06 07:11:30 +01:00
Jan-Philipp Benecke
35face602b Fix area registry dialog field (#24090) 2025-02-05 18:33:00 +01:00
Bram Kragten
9d7d332790 20250205.0 (#24088) 2025-02-05 16:38:06 +01:00
Bram Kragten
803ac496f6 Merge branch 'rc' into dev 2025-02-05 16:32:25 +01:00
Bram Kragten
f1173dd84b Bumped version to 20250205.0 2025-02-05 16:27:17 +01:00
Petar Petrov
44dcca9923 Fix chart height (#24028) 2025-02-05 16:25:44 +01:00
Bram Kragten
bd74d39dd8 Use max of width and actualBoundingBox to get text width (#24085) 2025-02-05 16:20:22 +01:00
Petar Petrov
172d6c3079 Disable chart update animation (#24084) 2025-02-05 16:20:21 +01:00
Bram Kragten
56539e8065 Charts: set tooltip triggerOn to click on mobile (#24083)
set tooltip triggerOn to click on mobile
2025-02-05 16:20:20 +01:00
Bram Kragten
8f6867f142 Chart: Add tooltip styling to theme (#24082) 2025-02-05 16:20:19 +01:00
Bram Kragten
d51f8995dd Charts: add styles for legend page controls (#24081) 2025-02-05 16:20:19 +01:00
Petar Petrov
f2e35dc70a Fix chart preview (#24080)
* Fix chart preview

* Revert change to timeline-chart labels
2025-02-05 16:20:18 +01:00
Petar Petrov
6487b9b7ea Fix device energy bar chart (#24079) 2025-02-05 16:20:17 +01:00
Bram Kragten
e50b658db7 Set min height for graphs, adjust margins (#24078)
* Set min height for graphs, adjust margins

* stats + header adjustments

* set min to 200
2025-02-05 16:19:29 +01:00
Bram Kragten
6efe237639 Fix label truncated timeline chart (#24077) 2025-02-05 16:15:00 +01:00
Bram Kragten
4a94cfc05b Set list color of update more info to dialog background (#24076) 2025-02-05 16:15:00 +01:00
Bram Kragten
7cbdb1dcfd Fix condition in tracing graph (#24075) 2025-02-05 16:14:59 +01:00
Paul Bottein
553bb61db7 Fix statistic chart tooltip values (#24074) 2025-02-05 16:14:58 +01:00
Petar Petrov
786ff787d1 Fix spacing & colors in statistics-graph chart (#24068)
* Fix statistic chart colors

* Fix spacing in statistics-graph

* set start time based on data
2025-02-05 16:14:57 +01:00
Bram Kragten
28b3f2970a Use max of width and actualBoundingBox to get text width (#24085) 2025-02-05 17:12:48 +02:00
Petar Petrov
7d170a710e Disable chart update animation (#24084) 2025-02-05 15:04:03 +00:00
Bram Kragten
cc40b50675 Charts: set tooltip triggerOn to click on mobile (#24083)
set tooltip triggerOn to click on mobile
2025-02-05 15:02:43 +00:00
Bram Kragten
b6eaff46e9 Chart: Add tooltip styling to theme (#24082) 2025-02-05 16:37:13 +02:00
Bram Kragten
674bb0d16a Set min height for graphs, adjust margins (#24078)
* Set min height for graphs, adjust margins

* stats + header adjustments

* set min to 200
2025-02-05 15:16:33 +01:00
Petar Petrov
6ff018afc9 Fix chart preview (#24080)
* Fix chart preview

* Revert change to timeline-chart labels
2025-02-05 15:16:16 +01:00
Bram Kragten
ad48732bb7 Charts: add styles for legend page controls (#24081) 2025-02-05 16:04:14 +02:00
Bram Kragten
fef162346a Set list color of update more info to dialog background (#24076) 2025-02-05 12:48:13 +01:00
Bram Kragten
72d208d1ac Fix label truncated timeline chart (#24077) 2025-02-05 12:47:39 +01:00
Petar Petrov
5a8b1b0fd4 Fix device energy bar chart (#24079) 2025-02-05 12:47:21 +01:00
Bram Kragten
4cfc651799 Fix condition in tracing graph (#24075) 2025-02-05 10:04:39 +00:00
Petar Petrov
b4a3f4cb2c Fix spacing & colors in statistics-graph chart (#24068)
* Fix statistic chart colors

* Fix spacing in statistics-graph

* set start time based on data
2025-02-05 11:22:31 +02:00
Paul Bottein
f0507a88a6 Fix statistic chart tooltip values (#24074) 2025-02-05 11:18:29 +02:00
renovate[bot]
fe041e442d Update dependency vitest to v3.0.5 [SECURITY] (#24066)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-04 19:28:01 +01:00
Bram Kragten
e5fea98460 Bumped version to 20250204.0 2025-02-04 18:22:43 +01:00
Petar Petrov
31180e3a9e Fix energy charts with leap years (#24059)
* Fix energy charts with leap years

* handle quarters
2025-02-04 18:21:27 +01:00
Paul Bottein
ce0f02a45b Display unavailable backups locations (#24058)
Display anavailable backups locations
2025-02-04 18:21:27 +01:00
Paul Bottein
53f090356e Improve value formatting inside backup tooltip (#24057) 2025-02-04 18:21:26 +01:00
Bram Kragten
776c4da688 Add support package download to cloud (#24051) 2025-02-04 18:21:25 +01:00
Bram Kragten
849922f7be Dont show voice wizard for voip (#24050)
dont show voice wizard for voip
2025-02-04 18:21:24 +01:00
Paul Bottein
a26701808f Add support for add-on update type for backups in the UI (#24044)
* Add support for add-on update type for backups in the UI

* Add type to backup detail page

* Use new model

* Fix detail page

* Fix type
2025-02-04 18:21:23 +01:00
Bram Kragten
904ee2e418 Add support package download to cloud (#24051) 2025-02-04 18:06:41 +01:00
Paul Bottein
11ae3a77e8 Add support for add-on update type for backups in the UI (#24044)
* Add support for add-on update type for backups in the UI

* Add type to backup detail page

* Use new model

* Fix detail page

* Fix type
2025-02-04 16:04:11 +01:00
Paul Bottein
3a12019b64 Display unavailable backups locations (#24058)
Display anavailable backups locations
2025-02-04 14:45:38 +01:00
Bram Kragten
6c2cf1ff60 Dont show voice wizard for voip (#24050)
dont show voice wizard for voip
2025-02-04 14:38:03 +02:00
Petar Petrov
02ae0b5864 Fix energy charts with leap years (#24059)
* Fix energy charts with leap years

* handle quarters
2025-02-04 12:28:31 +00:00
Jan-Philipp Benecke
85fe2213c1 Align view mount dialog with design guidelines (#24060)
Align view mount dialog with design requirements
2025-02-04 13:25:59 +01:00
Paul Bottein
7dbc78f1d6 Improve value formatting inside backup tooltip (#24057) 2025-02-04 13:47:24 +02:00
Ingolf Becker
f965a3504f Improve weather forecast card layout (#23704)
* Improve weather forecast card layout

* fix units and improve naming

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-02-04 06:32:30 +00:00
karwosts
077f5efe7e Fix menus in Todo list for Keyboard (#24054) 2025-02-04 08:30:45 +02:00
Bram Kragten
ef3bea71a0 Bumped version to 20250203.0 2025-02-03 18:20:20 +01:00
Petar Petrov
fcf655b0ec FIx console errors in charts (#24048)
* FIx console errors in charts

* handle undefined unit_of_measurement
2025-02-03 18:20:17 +01:00
Paul Bottein
b263b74916 Increase margin to avoid fab overlap on backup overview page (#24047) 2025-02-03 18:20:16 +01:00
Paul Bottein
0f4b6b423a Improve chart height and narrow option in grid section (#24046)
* Fix chart size in grid

* Set minimal height to 2 for history chart

* Update history chart
2025-02-03 18:20:15 +01:00
Paul Bottein
72df585c5e Fix download unencrypted backup logic (#24045) 2025-02-03 18:20:15 +01:00
Petar Petrov
4698a63642 Show seconds on x axis when chart is zoomed a lot (#24043)
Show seconds on x axis when charts is zoomed a lot
2025-02-03 18:20:14 +01:00
Petar Petrov
6eb43a7d61 Workaround for chart size bug in editor preview (#24040) 2025-02-03 18:20:13 +01:00
Petar Petrov
af35b15400 Fix click action for timeline chart labels (#24039)
* Fix click action for timeline chart labels

* Use id in line charts
2025-02-03 18:20:12 +01:00
Petar Petrov
0d50d2664f Fix legend in charts (#24025)
* Fix legend in line charts

* fix statistics graph legend
2025-02-03 18:20:11 +01:00
Philipp
ff1159402e Fix browser media player showing more info dialog (#24021) 2025-02-03 18:20:11 +01:00
Jan-Philipp Benecke
f8742ae690 Display year conditionally when script was last triggered on script list (#24012)
Display year conditionally when script was last triggered in script list
2025-02-03 18:20:10 +01:00
ildar170975
c786d26542 Fix for "Increase generic entity row touch target (3): climate entities (#24002)
return to max-height + set vertical alignment
2025-02-03 18:20:09 +01:00
Bram Kragten
3f8ff94002 Make date period picker respect timezone settings (#23996) 2025-02-03 18:20:08 +01:00
Petar Petrov
64a968543b FIx console errors in charts (#24048)
* FIx console errors in charts

* handle undefined unit_of_measurement
2025-02-03 18:13:35 +01:00
karwosts
aea98f702b Prioritize local image over entity_picture in picture-entity card (#24032)
* Prioritize local image over entity_picture in picture-entity

* Remove the default stub image if we switch to an entity with a picture

* minor cleanup
2025-02-03 16:01:16 +01:00
Paul Bottein
863ff622be Increase margin to avoid fab overlap on backup overview page (#24047) 2025-02-03 16:00:08 +01:00
Petar Petrov
730cea6646 Workaround for chart size bug in editor preview (#24040) 2025-02-03 15:59:43 +01:00
karwosts
7d1f8d618a Fix more keyboard menus (devices/helpers/scenes/scripts) (#24037)
* Fix more keyboard menus (devices/helpers/scenes/scripts)

* Apply suggestions from code review

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* less async

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-02-03 16:13:20 +02:00
Paul Bottein
67b970fcaa Improve chart height and narrow option in grid section (#24046)
* Fix chart size in grid

* Set minimal height to 2 for history chart

* Update history chart
2025-02-03 14:12:28 +00:00
Paul Bottein
38bcdaa6f6 Revert "Fix chart size in grid"
This reverts commit 8f1389de66.
2025-02-03 14:55:17 +01:00
Paul Bottein
8f1389de66 Fix chart size in grid 2025-02-03 14:51:19 +01:00
Paul Bottein
37ac796c8f Fix download unencrypted backup logic (#24045) 2025-02-03 14:40:49 +01:00
Petar Petrov
716cd19d41 Show seconds on x axis when chart is zoomed a lot (#24043)
Show seconds on x axis when charts is zoomed a lot
2025-02-03 13:27:33 +01:00
Paul Bottein
173725f011 Use ignoreDiacritics in fuse library (#24041) 2025-02-03 12:53:34 +01:00
Petar Petrov
ad561b885b Fix click action for timeline chart labels (#24039)
* Fix click action for timeline chart labels

* Use id in line charts
2025-02-03 10:36:59 +00:00
Philipp
d77bdf4ac6 Fix browser media player showing more info dialog (#24021) 2025-02-03 11:36:19 +01:00
Petar Petrov
ac3796ec31 Fix chart height (#24028) 2025-02-03 11:21:30 +01:00
Petar Petrov
8c3fdfb6fb Fix legend in charts (#24025)
* Fix legend in line charts

* fix statistics graph legend
2025-02-03 11:09:59 +01:00
karwosts
b7c7d0b4b5 Scroll todo list if it overflows grid_layout (#24000) 2025-02-03 09:09:01 +02:00
ildar170975
8b0e6eed3a Fix for "Increase generic entity row touch target (3): climate entities (#24002)
return to max-height + set vertical alignment
2025-02-03 09:07:11 +02:00
renovate[bot]
603f884e8c Update dependency @types/chromecast-caf-receiver to v6.0.21 (#24038)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-02-03 08:09:55 +02:00
Bram Kragten
97dfccf4c7 Make date period picker respect timezone settings (#23996) 2025-02-01 17:32:07 +01:00
Jan-Philipp Benecke
fd1e31c0cc Display year conditionally when script was last triggered on script list (#24012)
Display year conditionally when script was last triggered in script list
2025-02-01 17:16:43 +01:00
Bram Kragten
1de740e7b5 Bumped version to 20250131.0 2025-01-31 18:20:12 +01:00
Bram Kragten
5abfb90b16 fix time input width (#23998) 2025-01-31 18:19:45 +01:00
Petar Petrov
6b691063a8 Hide "heating" data from climate charts (#23997) 2025-01-31 18:19:44 +01:00
Paul Bottein
d1d746e7e6 Remove name from the chart series when using showNames = false (#23995)
* Remove name from the chart series when using showNames = false

* Remove translations
2025-01-31 18:19:43 +01:00
Petar Petrov
2fcb64d4a1 Echarts: auto scale Y in log charts (#23994)
* Echarts: auto scale Y in log charts

* fix statistics chart log scale
2025-01-31 18:19:42 +01:00
Petar Petrov
3769f8c7c0 Hide irrelevant errors from echarts zoom (#23992) 2025-01-31 18:19:41 +01:00
Paul Bottein
f0a56e75f5 Improve encrypted backup dialog (#23991)
* Improve encrypted backup dialog

* Remove unused code
2025-01-31 18:19:40 +01:00
Petar Petrov
15f33e1f19 Echarts: show all series in tooltip (#23989)
* Echarts: show all series in tooltip

* fix typo

* remove duplicate tooltip entries in statistics chart

* take last valid point instead of first
2025-01-31 18:19:40 +01:00
Petar Petrov
181122177b Echarts: fix Y scaling (#23988)
* Echarts: fix scaling of Y axis

* fix fit logic to only extend the limits

* handle invalid min for log scale
2025-01-31 18:19:39 +01:00
Petar Petrov
684cd0f627 Fix legend resetting on zoom (#23985) 2025-01-31 18:19:38 +01:00
Paul Bottein
277202e363 Use smooth line for statistic line chart (#23984)
* Use smooth line for statistic line chart

* Use same smooth options as chartjs
2025-01-31 18:19:37 +01:00
Petar Petrov
b388d1fd42 Fix statistics echarts with negative values (#23983)
* Fix statistics echarts with negative values

* fix border-radius of negative bar values

* revert timeline label width to previous max values
2025-01-31 18:19:37 +01:00
Paul Bottein
251e6399f5 Reduce chart height to 300px (#23979) 2025-01-31 18:19:36 +01:00
karwosts
f44c5d7a63 Improve statistics graph axis when using energy_date_selection (#23974) 2025-01-31 18:19:35 +01:00
ildar170975
cae1ca52f0 Fix for "Increase generic entity row touch target (2) (#23973)
* Revert "Fix for "Increase generic entity row touch target" (#23953)"

This reverts commit 028472fc7b.

* conditional style
2025-01-31 18:19:34 +01:00
Petar Petrov
f8de2c64a5 Hide "heating" data from climate charts (#23997) 2025-01-31 17:13:13 +00:00
Bram Kragten
34ef5be720 fix time input width (#23998) 2025-01-31 17:12:49 +00:00
Petar Petrov
1402802031 Echarts: auto scale Y in log charts (#23994)
* Echarts: auto scale Y in log charts

* fix statistics chart log scale
2025-01-31 17:42:51 +01:00
Paul Bottein
816989ab4d Remove name from the chart series when using showNames = false (#23995)
* Remove name from the chart series when using showNames = false

* Remove translations
2025-01-31 17:38:50 +01:00
Paul Bottein
d4497ca39c Improve encrypted backup dialog (#23991)
* Improve encrypted backup dialog

* Remove unused code
2025-01-31 16:10:43 +00:00
Petar Petrov
6e39242ca3 Echarts: fix Y scaling (#23988)
* Echarts: fix scaling of Y axis

* fix fit logic to only extend the limits

* handle invalid min for log scale
2025-01-31 15:44:22 +01:00
Petar Petrov
0197e32783 Echarts: show all series in tooltip (#23989)
* Echarts: show all series in tooltip

* fix typo

* remove duplicate tooltip entries in statistics chart

* take last valid point instead of first
2025-01-31 15:42:46 +01:00
Petar Petrov
87dfed4beb Hide irrelevant errors from echarts zoom (#23992) 2025-01-31 15:37:47 +01:00
Wendelin
dae991dc89 Improve develop and serve (#23990) 2025-01-31 15:50:15 +02:00
Paul Bottein
6197e3483b Use smooth line for statistic line chart (#23984)
* Use smooth line for statistic line chart

* Use same smooth options as chartjs
2025-01-31 11:46:01 +01:00
Petar Petrov
b2a6c8bd36 Fix legend resetting on zoom (#23985) 2025-01-31 11:13:46 +01:00
Petar Petrov
938855e13c Fix statistics echarts with negative values (#23983)
* Fix statistics echarts with negative values

* fix border-radius of negative bar values

* revert timeline label width to previous max values
2025-01-31 12:02:39 +02:00
renovate[bot]
a8712e3b8e Update vaadinWebComponents monorepo to v24.6.3 (#23981)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-31 10:31:11 +01:00
Paul Bottein
b15b577057 Reduce chart height to 300px (#23979) 2025-01-31 10:42:51 +02:00
karwosts
653aeae3d8 Improve statistics graph axis when using energy_date_selection (#23974) 2025-01-31 08:45:37 +02:00
ildar170975
0aea6141ad Fix for "Increase generic entity row touch target (2) (#23973)
* Revert "Fix for "Increase generic entity row touch target" (#23953)"

This reverts commit 028472fc7b.

* conditional style
2025-01-31 08:41:38 +02:00
renovate[bot]
5243c1d871 Update typescript-eslint monorepo to v8.22.0 (#23972)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-31 08:39:18 +02:00
Bram Kragten
9449f5ad0a Bumped version to 20250130.0 2025-01-30 18:08:13 +01:00
Paul Bottein
c337bc5f97 Improve backup settings display on mobile (#23967) 2025-01-30 18:07:52 +01:00
Petar Petrov
6aab60cf45 Dynamically reorder energy devices (echarts) (#23966)
* Dynamically reorder energy devices (echarts)

* fix initial sorting in hui-energy-devices-detail-graph-card

* fix dynamic reordering in devices detail
2025-01-30 18:07:51 +01:00
Paul Bottein
52e9bc3213 Fix backup location config not updated (#23965) 2025-01-30 18:07:50 +01:00
Paul Bottein
e48b2383cf Fix location icon when many locations in backup datatable (#23964)
* Fix location icon when many locations in backup datatable

* Reuse data

* Don't copy twice

* Improve naming
2025-01-30 18:07:50 +01:00
Petar Petrov
002a249777 Use CSS variables to theme echarts (#23963)
* Use CSS variables to theme echarts

* fix styles
2025-01-30 18:07:49 +01:00
Paul Bottein
10498ce18d Display device name in bluetooth panel (#23960) 2025-01-30 18:07:48 +01:00
Wendelin
6a5936b2b2 Add correct link to backup.create_automatic (#23959) 2025-01-30 18:07:47 +01:00
Norbert Rittel
dc68aaa803 Add localizable "Actions" label to OAuth credentials picker (#23958)
* Add localizable "Actions" label to OAuth credentials picker

* Prettier
2025-01-30 18:07:46 +01:00
Paul Bottein
e7931ce049 Restore scroll position go back to backup settings page (#23955) 2025-01-30 18:07:46 +01:00
ildar170975
59b2582fe3 Fix for "Increase generic entity row touch target" (#23953)
fix for "touch target"
2025-01-30 18:07:45 +01:00
karwosts
8577b0721c Fix untracked energy in compare (#23949) 2025-01-30 18:07:44 +01:00
J. Nick Koston
91319be855 Reduce size of address column on Bluetooth Advertisement monitor (#23942) 2025-01-30 18:07:43 +01:00
Simon Lamon
0dff538298 Backup location translations improvements (#23940)
* Backup location translations improvements

* Apply better translations
2025-01-30 18:07:42 +01:00
Simon Lamon
6ac6d9c6eb Backup location translations improvements (#23940)
* Backup location translations improvements

* Apply better translations
2025-01-30 18:06:57 +01:00
Norbert Rittel
6ba0071296 Add localizable "Actions" label to OAuth credentials picker (#23958)
* Add localizable "Actions" label to OAuth credentials picker

* Prettier
2025-01-30 18:05:18 +01:00
Paul Bottein
fef5dc4232 Fix location icon when many locations in backup datatable (#23964)
* Fix location icon when many locations in backup datatable

* Reuse data

* Don't copy twice

* Improve naming
2025-01-30 17:02:56 +00:00
Paul Bottein
ce58962dbb Fix backup location config not updated (#23965) 2025-01-30 17:43:39 +01:00
Petar Petrov
9fb1e1d2ed Dynamically reorder energy devices (echarts) (#23966)
* Dynamically reorder energy devices (echarts)

* fix initial sorting in hui-energy-devices-detail-graph-card

* fix dynamic reordering in devices detail
2025-01-30 17:43:06 +01:00
Paul Bottein
a29544c1e6 Improve backup settings display on mobile (#23967) 2025-01-30 17:49:05 +02:00
Petar Petrov
b2b71edd04 Use CSS variables to theme echarts (#23963)
* Use CSS variables to theme echarts

* fix styles
2025-01-30 14:39:59 +01:00
ildar170975
028472fc7b Fix for "Increase generic entity row touch target" (#23953)
fix for "touch target"
2025-01-30 13:26:11 +01:00
Paul Bottein
b056ce228b Display device name in bluetooth panel (#23960) 2025-01-30 12:36:10 +01:00
Wendelin
0cd4256c0e Add correct link to backup.create_automatic (#23959) 2025-01-30 11:05:33 +00:00
Yosi Levy
e274c5b23f Add node memory to allow commit (#23954) 2025-01-30 11:06:50 +02:00
karwosts
ea57846465 Fix untracked energy in compare (#23949) 2025-01-30 09:57:54 +01:00
Paul Bottein
3f2e2bc659 Restore scroll position go back to backup settings page (#23955) 2025-01-30 09:56:52 +01:00
J. Nick Koston
e3f2f66206 Reduce size of address column on Bluetooth Advertisement monitor (#23942) 2025-01-29 19:01:47 +00:00
Bram Kragten
b95e87845f Merge branch 'rc' into dev 2025-01-29 16:46:26 +01:00
Bram Kragten
bc49ebc489 Bumped version to 20250129.0 2025-01-29 16:38:25 +01:00
Wendelin
c97d0ce68a Add translations for backup agents encryption (#23938)
* Add translations for backup agents encryption

* Update src/translations/en.json

* Split class map

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2025-01-29 15:31:55 +00:00
renovate[bot]
a0e7d6f1c6 Update dependency lint-staged to v15.4.3 (#23937)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-29 16:23:04 +01:00
Petar Petrov
25d2a5ddac Open more-info on label click in echarts (#23921)
* Open more-info on label click in echarts

* check isExternalStatistic in energy devices click
2025-01-29 15:44:21 +01:00
Paul Bottein
a2f2d64f5c Allow to change encryption for each backup location (#23861)
* Add backup location settings page

* Add encryption settings

* Display unencrypted locations and backups

* Improve cloud detail page

* Fix encryption flag

* Fix restore backup

* Fix lint

* Fix translations

* Add warning

* Use agents in backup locations

* Feedback

* Use updated

* Improve encrypted/unencrypted status

* Improve code quality

* Remove hardcoded failed id

* Extend agent interface

* Use willupdate
2025-01-29 14:23:47 +01:00
Petar Petrov
fcdcbbda05 Fix statistics chart stacking and colors (#23922) 2025-01-29 12:46:59 +01:00
Paul Bottein
4b5c7fc2de Only restore config and database for core install (#23935) 2025-01-29 12:46:30 +01:00
Paul Bottein
dd64d88afe Use handle icon for drag and drop in energy devices settings (#23933)
* Use handle icon for drag and drop in energy devices settings

* Remove import
2025-01-29 11:04:09 +00:00
Wendelin
5feffd08ff Fix backup time supporting-text (#23931) 2025-01-29 09:08:26 +01:00
karwosts
543c7df3e0 Keyboard accessible menus in hass-tabs-subpage-data-table (#23927) 2025-01-29 08:23:27 +02:00
ildar170975
167f859f2a fix padding for error-log-card (#23923)
make padding similar to system-log-card
2025-01-29 08:22:24 +02:00
J. Nick Koston
c7d9699a24 Include addresses of Bluetooth devices in the connection slots tooltip (#23928) 2025-01-29 08:21:34 +02:00
ildar170975
a638cf443d fix overflow for ha-map (#23929) 2025-01-29 08:19:00 +02:00
Patrick Kortendick
438d1c13ef Fix misspelling for humidifier card description (#23924) 2025-01-29 05:20:01 +00:00
J. Nick Koston
cc8869b9f9 Show scanner name in the Bluetooth Advertisement Monitor (#23926) 2025-01-28 13:07:16 -10:00
J. Nick Koston
cbdb7406ad Add support for showing Bluetooth connection slot allocations (#23899) 2025-01-28 06:52:21 -10:00
Wendelin
f8d2560104 Revert "Add shortcut hint to assist dialog" (#23918)
Revert "Add shortcut hint to assist dialog (#23739)"

This reverts commit d121b33263.
2025-01-28 10:53:57 -05:00
Petar Petrov
cc48ae82d6 Fixes for echarts (#23906)
* show negative untracked energy again

* fix chart cards height

* fix timeline label width

* fix statistics chart legend

* fix layout of chart cards

* tweak timeline chart labels

* timeline label tweak

* css tweak

* fix legend colors in statistics chart

* dark mode fix

* fix for y axis with a long name

* listen for darkMode changes and update charts

* legend tweak for darkMode

* dark mode tweak

* hide insignificant echarts errors for now
2025-01-28 14:20:34 +00:00
karwosts
e1bda9b57d Use fixed positioning for ha-form-multi_select (#23781) 2025-01-28 15:13:19 +01:00
ildar170975
89e9316a40 Fix typo & layout in ha-assist-chip (#23785)
* fix typo fot slot name

* make font-size same as for label

* remove unneeded margin-top
2025-01-28 15:04:12 +01:00
Paul Bottein
85e4975206 Use name property when formatting backup location (#23916) 2025-01-28 13:53:02 +01:00
Ben Randall
142faba04d Update settings button icon on tables to mdi-table-cog. (#23915)
Update settings button icon on tables to mdi-table-cog.

The cog icon is used in a lot of places to indicate settings and it's generally clear what it's intent is.  However, the cog icon used by tables very often appears very close by the triple dots menu or just in the top right corner so it's very easy to mistakenly press that button intending to press the menu button, or to press it when looking for the appropriate settings button.

This changes the icon used by these buttons from mdi-code to mdi-table-cog to help clarify the intent of the button.
2025-01-28 11:24:08 +02:00
karwosts
c1c6d71ccf Fix keyboard in automation-picker menus (#23867) 2025-01-28 09:39:03 +02:00
renovate[bot]
5204a565cf Update dependency eslint to v9.19.0 (#23914)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-28 09:37:55 +02:00
Petar Petrov
05b8a48ba8 Looser layout limits for graph cards (#23910) 2025-01-28 09:36:20 +02:00
renovate[bot]
41770a89b4 Update dependency element-internals-polyfill to v1.3.13 (#23912)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-27 16:46:14 +00:00
renovate[bot]
b7d14d7950 Update babel monorepo to v7.26.7 (#23911)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-27 17:34:34 +01:00
karwosts
4ccef6f28b Fix millisecond attributes (#23909)
fix millisecond attributes
2025-01-27 17:25:37 +02:00
karwosts
d1be441455 Re-remove time picker for Energy (#23891)
* Re-remove time picker for Energy

* flip polarity
2025-01-27 14:11:08 +00:00
Philipp
b3391b34e4 Increase generic entity row touch target (#23894) 2025-01-27 15:52:32 +02:00
Abílio Costa
9359e9d475 Reword incompatible media message (#23887) 2025-01-27 09:26:03 +02:00
Paul Bottein
5453da75ea Reintroduce backup switch when updating core and addons (#23814) 2025-01-27 08:25:28 +01:00
dependabot[bot]
bc21877008 Bump actions/stale from 9.0.0 to 9.1.0 (#23903)
Bumps [actions/stale](https://github.com/actions/stale) from 9.0.0 to 9.1.0.
- [Release notes](https://github.com/actions/stale/releases)
- [Changelog](https://github.com/actions/stale/blob/main/CHANGELOG.md)
- [Commits](https://github.com/actions/stale/compare/v9.0.0...v9.1.0)

---
updated-dependencies:
- dependency-name: actions/stale
  dependency-type: direct:production
  update-type: version-update:semver-minor
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-01-27 09:24:34 +02:00
dependabot[bot]
c9956c65e9 Bump actions/setup-node from 4.1.0 to 4.2.0 (#23902)
Bumps [actions/setup-node](https://github.com/actions/setup-node) from 4.1.0 to 4.2.0.
- [Release notes](https://github.com/actions/setup-node/releases)
- [Commits](https://github.com/actions/setup-node/compare/v4.1.0...v4.2.0)

---
updated-dependencies:
- dependency-name: actions/setup-node
  dependency-type: direct:production
  update-type: version-update:semver-minor
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-01-27 09:24:01 +02:00
renovate[bot]
74814cc305 Update dependency @bundle-stats/plugin-webpack-filter to v4.18.2 (#23898)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-26 18:42:16 +00:00
renovate[bot]
8f231d7b3e Update rspack monorepo to v1.2.2 (#23896)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-26 19:33:12 +01:00
renovate[bot]
5b6818d72d Update dependency lint-staged to v15.4.2 (#23889)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-26 19:32:59 +01:00
renovate[bot]
8c75865a02 Update vitest monorepo to v3.0.4 (#23897)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-26 19:32:39 +01:00
J. Nick Koston
99d832ac77 Restore Bluetooth configuration panel (#23877)
* Restore Bluetooth configuration panel

* cleanup copypasta

* Apply suggestions from code review

* Update src/panels/config/integrations/integration-panels/bluetooth/bluetooth-config-dashboard-router.ts

* preen

* trim down updatePageEl
2025-01-26 08:11:21 +01:00
Simon Lamon
240e48f5c1 Include query params in url when default page is added (#23880)
Include query params if exists
2025-01-25 20:02:26 +01:00
Jan-Philipp Benecke
77fc11cda6 Use new improved save dialog when leaving script editor dirty (#23862)
* Use new improved save dialog when leaving script editor dirty

* Fix url
2025-01-25 19:14:47 +01:00
karwosts
f8f152f118 Add button filter to energy devices sortable (#23881)
Add filter to energy devices sortable
2025-01-25 18:42:05 +01:00
renovate[bot]
20a67cf73c Update rspack monorepo to v1.2.1 (#23884)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-25 17:45:34 +01:00
ocrease
dd11b3092e Preheating support in History Chart (#23878)
Use CLIMATE_HVAC_ACTION_TO_MODE to map hvac action to heat or cool so that history chart correctly shows preheating and defrosting as heat
2025-01-25 12:25:08 +01:00
renovate[bot]
7f3363621e Update dependency @bundle-stats/plugin-webpack-filter to v4.18.0 (#23879)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-25 12:20:46 +01:00
Jan-Philipp Benecke
edce1901d7 Display year when automation was last triggered in automation list (#23864)
* Display year when automation was last triggered in automation list

* Use function
2025-01-24 17:13:01 +00:00
Jan-Philipp Benecke
546087066a Display year in entities list only when last year (#23865)
* Display year in entities list only when last year

* Make function

* Revert hyphen
2025-01-24 18:03:21 +01:00
renovate[bot]
a95c589a06 Update vitest monorepo to v3.0.3 (#23870)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-24 17:59:35 +01:00
renovate[bot]
5f6da9d959 Update rspack monorepo to v1.2.0 (#23871)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-24 17:59:00 +01:00
renovate[bot]
bc94ca0a0a Pin dependency tslib to 2.8.1 (#23860)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-24 08:32:09 +02:00
Eric Stern
dc8d483e8b Logbook card loading fix (#23853)
* the call to unsubscribe will never do anything

* await the subscription when subscribing to logbook

* removed unneeded if
wrapped call to subscribeLogbook in try/catch
remove return values from _subscribeLogbookPeriod
2025-01-24 08:31:30 +02:00
renovate[bot]
a329553ce1 Update typescript-eslint monorepo to v8.21.0 (#23863)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-23 22:10:20 +01:00
Petar Petrov
1f8cfdd0de Migrate from chart.js to echarts (#23809) 2025-01-23 15:51:48 +00:00
Paul Bottein
fd1f966216 20250109.2 (#23859) 2025-01-23 16:18:56 +01:00
Paul Bottein
243a2ce0e2 Bumped version to 20250109.2 2025-01-23 16:16:42 +01:00
Paul Bottein
77c1786171 Fix delete button for state content in iOS and Android (#23847) 2025-01-23 16:15:49 +01:00
Paul Bottein
7a7c204d74 Fix delete button for state content in iOS (#23839) 2025-01-23 16:15:48 +01:00
Paul Bottein
dcb74ad2ee Fix backup data picker translations (#23826) 2025-01-23 16:15:47 +01:00
Paul Bottein
fd4c62a852 20250109.1 (#23858) 2025-01-23 14:26:04 +01:00
Paul Bottein
bf1b0ac949 Bumped version to 20250109.1 2025-01-23 14:17:53 +01:00
Bram Kragten
c6f0c62fd6 Prevent race in dialog box (#23758)
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-01-23 14:15:23 +01:00
Wendelin
ac98672cb7 Fix background (#23736) 2025-01-23 14:15:22 +01:00
Bram Kragten
6b471ba6e7 Fix background on cast devices (#23731) 2025-01-23 14:15:21 +01:00
Petar Petrov
b28e7d2f06 Fix navigation from stacked dialogs with the same name (#23698)
* Fix navigation from stacked dialogs

* lint fix

* Keep only 1 instance per dialog tag in the stack
2025-01-23 14:15:20 +01:00
Simon Lamon
bf471eb8c3 Minor fixes for backup translations (#23691) 2025-01-23 14:15:19 +01:00
Petar Petrov
8c52bc3ffb Fix more-info chart rendering (#23619)
* Fix more-info chart rendering

* lint fix

* remove animation-container & _chartHeight

* don't change height on resize

* handle default height in ha-chart-base

* fix chart height in energy panel

* lint

* lint
2025-01-23 14:12:54 +01:00
Bram Kragten
54b328648a Match UI with core and don't allow restore config without db and vice … (#23553)
Match UI with core and dont allow restore config without db and vice versa
2025-01-23 13:59:37 +01:00
Jan-Philipp Benecke
62a9da2de2 Display year for created_at and modified_at of entities (#23772) 2025-01-23 13:36:23 +02:00
renovate[bot]
25ff96b9bf Update dependency eslint-config-prettier to v10 (#23764)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-23 13:31:03 +02:00
Matthias Alphart
caeb616dc6 Don't check for promise when processing DataEntryFlowStep (#23759) 2025-01-23 13:27:19 +02:00
karwosts
fb79e2cfb2 Fix keyboard for ha-config-entities bulk menus (#23776)
Fix keyboard for ha-config-entities menus
2025-01-23 13:15:23 +02:00
Paul Bottein
666316e44a Use area entities in area card for temperature and humidity (#23842)
Use area entities in area card for temperature and humidity instead of average
2025-01-23 12:26:58 +02:00
karwosts
1532093426 Support offset on input_datetime time trigger (#23855)
* Support offset on input_datetime time trigger

* no time entities
2025-01-23 12:23:27 +02:00
Jan-Philipp Benecke
2effb0935c Add helper text to inputs of time pattern trigger (#23844) 2025-01-23 09:40:13 +02:00
renovate[bot]
06a08bb4f2 Update dependency intl-messageformat to v10.7.14 (#23854)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-23 09:04:21 +02:00
Jan-Philipp Benecke
09102d34d6 Improve automation save dialog when leaving editor dirty (#23589)
* Improve automation save dialog when leaving editor dirty

* Make CI happy
2025-01-23 09:03:39 +02:00
Wendelin
27d683f6e8 Add additional backup schedule description (#23843)
* Add additional backup schedule description

* Use ha-icon-button for description

* Remove tip style

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2025-01-22 20:17:50 +01:00
Paul Bottein
b89bd0be3b Fix delete button for state content in iOS and Android (#23847) 2025-01-22 14:25:06 +00:00
Paul Bottein
51e6e6d230 Fix delete button for state content in iOS (#23839) 2025-01-22 08:16:35 -05:00
Norbert Rittel
9005f8faa9 Update hidden_explanation to include labels (#23473) 2025-01-22 09:52:53 +01:00
Jan-Philipp Benecke
7aa2abc9c2 Make add integration dialog keyboard accessible (#23829)
Make add integration keyboard accessible
2025-01-22 10:06:05 +02:00
dependabot[bot]
898fd51c7d Bump vite from 6.0.7 to 6.0.11 (#23834)
Bumps [vite](https://github.com/vitejs/vite/tree/HEAD/packages/vite) from 6.0.7 to 6.0.11.
- [Release notes](https://github.com/vitejs/vite/releases)
- [Changelog](https://github.com/vitejs/vite/blob/main/packages/vite/CHANGELOG.md)
- [Commits](https://github.com/vitejs/vite/commits/v6.0.11/packages/vite)

---
updated-dependencies:
- dependency-name: vite
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-01-22 10:04:27 +02:00
karwosts
b3141a0653 Remember selection "Don't Group" in data-tables (#23836) 2025-01-22 10:03:23 +02:00
Jan-Philipp Benecke
1025f73c36 Clear filter in add helper dialog when closing (#23832) 2025-01-21 21:40:52 +01:00
Simon Lamon
1cd44728df Temporarily disable Bluetooth panel to restore access to options flow, additional fixes (#23830) 2025-01-21 09:45:47 -10:00
Sören Beye
eaab19fb8c Don't hide location entities that are "home" in the MapViewStrategy (#23462) 2025-01-21 20:14:04 +02:00
Paul Bottein
c4b2896fac Add label for add badge button in masonry and sidebar view (#23827)
Add label for add badge button in mansonry and sidebar view
2025-01-21 19:45:06 +02:00
Simon Lamon
ca2a9f9171 Initial bluetooth integration panel (#23531)
* Initial bluetooth device page

* Update src/panels/config/integrations/integration-panels/bluetooth/bluetooth-device-page.ts

Co-authored-by: J. Nick Koston <nick@koston.org>

* Update src/panels/config/integrations/integration-panels/bluetooth/bluetooth-device-page.ts

* Apply suggestions from code review

* Apply suggestions and implement dialog

* memoize

* Apply suggestions

* Clean up and fixes

* Adjust store usage

* Implement hassdialog

* Apply comments

---------

Co-authored-by: J. Nick Koston <nick@koston.org>
2025-01-21 19:43:33 +02:00
Paulus Schoutsen
9e868e144d Allow storing temperature/humidity entities on an area (#23822)
* Allow storing temperature/humidity entities on an area

* Update objects after improved types
2025-01-21 17:37:51 +01:00
Bram Kragten
fcb6da55d8 Check if we can decrypt backup on download (#23756)
Co-authored-by: Kevin Cathcart <kevincathcart@gmail.com>
Co-authored-by: Wendelin <w@pe8.at>
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-01-21 14:48:38 +01:00
Paul Bottein
87907b98bd Fix backup data picker translations (#23826) 2025-01-21 13:17:33 +01:00
Bram Kragten
7535d66373 Add time option for backup schedule (#23757)
Co-authored-by: Wendelin <w@pe8.at>
2025-01-21 11:58:07 +01:00
Jan-Philipp Benecke
e994e3565d Improve add cards dialog user experience (#23773)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-01-21 09:53:28 +01:00
Jan-Philipp Benecke
562589a6cb Fix flickering media play button (#23778) 2025-01-21 09:09:15 +01:00
renovate[bot]
e87f6d6d5e Update vitest monorepo to v3.0.2 (#23812)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-21 09:07:51 +01:00
karwosts
3feedb792a Multi textfield helper (#23649)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2025-01-20 12:20:36 +01:00
Douwe
fc290028c6 Update ha-assist-chat.ts (#23790)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-01-20 09:20:14 +01:00
Jan-Philipp Benecke
2f5fd6f0c7 Use destructive attribute from ha-button (#23786)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-01-20 08:54:22 +01:00
ildar170975
9a3ca59d77 Picture glance alignment fix (#23793) 2025-01-20 08:35:29 +01:00
ildar170975
f76c22cb5b system-log-card: make a header & card-content similar to error-log-card (#23799)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-01-20 08:26:18 +01:00
dependabot[bot]
aad94624e2 Bump release-drafter/release-drafter from 6.0.0 to 6.1.0 (#23806) 2025-01-20 08:15:29 +01:00
renovate[bot]
076ab91199 Update dependency intl-messageformat to v10.7.12 (#23807) 2025-01-20 08:12:59 +01:00
Jan-Philipp Benecke
d121b33263 Add shortcut hint to assist dialog (#23739)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-01-20 08:12:52 +01:00
renovate[bot]
dbfcf310c3 Update vitest monorepo to v3 (major) (#23803)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-20 08:05:24 +01:00
renovate[bot]
25ea6c2c55 Update dependency lint-staged to v15.4.1 (#23802)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-19 21:05:58 +01:00
renovate[bot]
b2b2c21477 Update dependency fs-extra to v11.3.0 (#23798)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-19 16:41:25 +01:00
renovate[bot]
09777db549 Update dependency lint-staged to v15.4.0 (#23800)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-19 16:41:13 +01:00
renovate[bot]
f108f65e39 Update dependency node-vibrant to v4.0.3 (#23797)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-19 16:41:04 +01:00
renovate[bot]
2ee9824bcc Update dependency node-vibrant to v4.0.2 (#23789)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-18 10:44:52 +00:00
Norbert Rittel
812461ea00 Add translatable string for "Learn how it works" (#23788)
* Add translatable string for "Learn how it works"

* Update assist-pref.ts adding localizable key
2025-01-18 11:37:22 +01:00
Jan-Philipp Benecke
c430c28c2a Add missing localization on info page (#23787) 2025-01-18 11:36:00 +01:00
Jan-Philipp Benecke
d67c463b98 Add clear button to Assist debug page (#23774)
* Add clear button to Assist debug page

* Move destructive to ha-button
2025-01-18 09:27:30 +02:00
renovate[bot]
8efaf2b031 Update typescript-eslint monorepo to v8.20.0 (#23771)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-17 08:30:15 +01:00
karwosts
5b038a4fef Add missing localize (#23770) 2025-01-17 08:10:53 +01:00
karwosts
2105793355 Don't close 2 dialogs from 1 escape keydown (more-info) (#23702) 2025-01-16 16:44:50 +01:00
Wendelin
21c2351137 Remove unused b64ToBlob (#23763) 2025-01-16 16:25:16 +01:00
renovate[bot]
ebd1bdd686 Update vaadinWebComponents monorepo to v24.6.2 (#23762)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-16 14:01:44 +01:00
Bram Kragten
05bd70dd64 Prevent race in dialog box (#23758)
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-01-16 12:46:10 +01:00
Jan-Philipp Benecke
e5d2f2d94b Make media play button in media browser more visible when hovering (#23760) 2025-01-16 10:53:16 +01:00
karwosts
57edb86c5c Option to sort todo lists (#23579)
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2025-01-16 08:40:00 +00:00
Paulus Schoutsen
173d60b913 Externalize ha-assist-chat styling (#23713) 2025-01-16 08:49:34 +01:00
Wendelin
c17c1e4217 Use-consume-scene-editor (#23754)
* Add fullDevicesContext provider

* Use consume in ha-scene-editor

* Remove not needed device context and generate category
2025-01-15 17:06:59 +01:00
Paulus Schoutsen
d112872eb2 Add more info dialog for conversation agent (#23682)
* Add more info dialog for conversation agent

* Fixes

* Disable speech option for LLM testing

* Address comments

* New style more info

* Also reset errors on loading pipeline
2025-01-15 10:57:49 +01:00
Wendelin
e54f178b02 Fix-ha-form-float-validate (#23751)
* Use autoCaseNoun for domainName

* Fix ha-form-float validate

* Revert "Use autoCaseNoun for domainName"

This reverts commit ff6855149b.
2025-01-15 09:54:38 +00:00
Wendelin
7960da1872 Use autoCaseNoun for domainName (#23748) 2025-01-15 10:52:03 +01:00
Simon Lamon
6288154c53 Fix cast views not showing a background (#23724) 2025-01-15 10:48:05 +01:00
Yosi Levy
52d8e98cdb Overflow fix (#23652) 2025-01-15 08:52:20 +01:00
Jan-Philipp Benecke
1043db29be Add search to add helper dialog (#23728)
* Add search to add helper dialog

* Add missing scrollbar style

* Fix string

* Remove virtualizer & add alias
2025-01-15 09:13:08 +02:00
Jan-Philipp Benecke
e6cc920781 Use ha-formfield in ha-form-boolean (#23737) 2025-01-14 20:11:55 +00:00
Jan-Philipp Benecke
8bc78ba793 Focus search input on dev tools statistics page when using search shortcut (#23738) 2025-01-14 21:05:01 +01:00
Wendelin
e703750136 Add and fix stylistic eslint rules (#23735)
* Fix stylistic eslint rules

* Fix eslint issues
2025-01-14 21:00:14 +01:00
Wendelin
69a93ddb6e Fix background (#23736) 2025-01-14 14:41:43 +00:00
Mimi
630b48218b Make the title fonts consistent across different pages (#23688) 2025-01-14 11:30:41 +01:00
Mimi
54c78ecc4d Fix ERR_REQUIRE_ASYNC_MODULE error when executing gulp (#23687) 2025-01-14 11:29:34 +01:00
Bram Kragten
57a17b8663 Fix background on cast devices (#23731) 2025-01-14 12:28:32 +02:00
Petar Petrov
d3e832c09b Fix more-info chart rendering (#23619)
* Fix more-info chart rendering

* lint fix

* remove animation-container & _chartHeight

* don't change height on resize

* handle default height in ha-chart-base

* fix chart height in energy panel

* lint

* lint
2025-01-14 11:24:52 +01:00
Wendelin
abe8899f9b Update ts-eslint (#23723)
* Update ts-eslint

* Remove comments

* Remove unused ts-ignore

* Add undefined generic type instead of unknown

* Remove unused undefined type

* Fix type issues

* Use undefined instead of void for subscribed return type
2025-01-14 11:24:02 +01:00
renovate[bot]
922cd72be4 Update dependency eslint to v9.18.0 (#23730)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-14 10:50:55 +02:00
renovate[bot]
3f4ee97ede Update dependency @lit-labs/virtualizer to v2.0.15 (#23729)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-14 10:50:02 +02:00
Petar Petrov
6f9a385619 Fix navigation from stacked dialogs with the same name (#23698)
* Fix navigation from stacked dialogs

* lint fix

* Keep only 1 instance per dialog tag in the stack
2025-01-14 09:25:01 +01:00
karwosts
eda0ea077c Show yaml parsing errors in hui-element-editor (#23690) 2025-01-14 08:49:09 +02:00
Jan Bouwhuis
9934ea4b4f Replace label on refactored MQTT option flow button (#23317) 2025-01-13 20:47:26 +02:00
Wendelin
cc42d958ce Update node-vibrant to v4 (#23718) 2025-01-13 14:18:04 +01:00
renovate[bot]
2e1efecdf7 Update dependency ua-parser-js to v2 (#22926)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-13 09:25:34 +01:00
dependabot[bot]
5fead1b03a Bump actions/upload-artifact from 4.5.0 to 4.6.0 (#23714)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-01-13 09:19:48 +01:00
renovate[bot]
730da177ef Update dependency jsdom to v26 (#23697)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-13 09:18:36 +01:00
renovate[bot]
bd53d1076f Update dependency @codemirror/state to v6.5.1 (#23715)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-13 09:12:30 +01:00
renovate[bot]
e012a9e929 Update dependency glob to v11.0.1 (#23716)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-13 09:12:00 +01:00
Norbert Rittel
95ac8eb5ab Use consistent "More info" for To-do-lists and automations etc. (#23459) 2025-01-13 09:11:11 +01:00
libe.net
6dbc04455f Newline behavior for date-range-picker history and logbook (#23710) 2025-01-13 08:45:38 +01:00
renovate[bot]
2b8fc04fdc Update dependency @codemirror/view to v6.36.2 (#23703)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-13 08:54:27 +02:00
ildar170975
3baeb22423 Add outline for ha-color-picker (#23696)
Update ha-color-picker.ts
2025-01-13 08:53:44 +02:00
Simon Lamon
aae4ba7341 No matching link found for developer-tools/action (#23700) 2025-01-12 15:37:30 +02:00
Simon Lamon
46d62d55a3 Fix history translation in backup (#23701) 2025-01-12 15:35:38 +02:00
Simon Lamon
de027b6d93 Minor fixes for backup translations (#23691) 2025-01-12 09:24:35 +02:00
renovate[bot]
f1cc02b40f Update dependency @octokit/rest to v21.1.0 (#23695)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-12 09:22:48 +02:00
renovate[bot]
23c6155f9b Update dependency typescript to v5.7.3 (#23692)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-12 09:21:05 +02:00
renovate[bot]
b0e6c5dbaf Update dependency @codemirror/commands to v6.8.0 (#23689)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-11 20:59:37 +01:00
renovate[bot]
8cb4452126 Update dependency @octokit/plugin-retry to v7.1.3 (#23680)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-11 11:30:11 +01:00
renovate[bot]
0cd0f65d51 Update dependency core-js to v3.40.0 (#23681)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-11 11:30:06 +01:00
dependabot[bot]
3479879bd0 Bump softprops/action-gh-release from 2.1.0 to 2.2.1 (#23679)
Bumps [softprops/action-gh-release](https://github.com/softprops/action-gh-release) from 2.1.0 to 2.2.1.
- [Release notes](https://github.com/softprops/action-gh-release/releases)
- [Changelog](https://github.com/softprops/action-gh-release/blob/master/CHANGELOG.md)
- [Commits](https://github.com/softprops/action-gh-release/compare/v2.1.0...v2.2.1)

---
updated-dependencies:
- dependency-name: softprops/action-gh-release
  dependency-type: direct:production
  update-type: version-update:semver-minor
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2025-01-10 21:19:36 +00:00
renovate[bot]
60b9fbced7 Update dependency @types/leaflet to v1.9.16 (#23675)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-10 18:21:37 +01:00
renovate[bot]
7496998a69 Update dependency @rsdoctor/rspack-plugin to v0.4.13 (#23672)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-10 18:21:32 +01:00
renovate[bot]
c9db02ba2e Update vaadinWebComponents monorepo to v24.6.1 (#23673)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-10 18:21:26 +01:00
renovate[bot]
08737366fc Update dependency marked to v15.0.6 (#23660)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-10 09:20:35 +02:00
Petar Petrov
707192feac Use statistics data in History graph card to fill gaps (#23612)
* Use statistics data in History graph card to fill gaps

* add convertStatisticsToHistory utility
2025-01-10 09:19:33 +02:00
Bram Kragten
4b03caa01a Make timeout for save automation/script longer (#23665) 2025-01-09 16:39:19 -08:00
Bram Kragten
3ffbd435e0 Merge branch 'rc' 2025-01-09 21:02:43 +01:00
Bram Kragten
2e2f39adbd Bumped version to 20250109.0 2025-01-09 21:02:30 +01:00
Paul Bottein
5e7f356707 Fix preferred agent for backup download (#23659) 2025-01-09 21:02:09 +01:00
Gord
b02d0e58b1 Backup text changes for the english translation (#23656)
* Update backup text in en.json

* fix missing quote en.json
2025-01-09 21:02:08 +01:00
Wendelin
c01d3aee41 Fix backup summary label position (#23655) 2025-01-09 21:02:07 +01:00
Paul Bottein
6dde7d6945 Fix backup translations key issues (#23654)
Co-authored-by: Wendelin <w@pe8.at>
2025-01-09 21:02:06 +01:00
Paul Bottein
14c71f436e Remove ! from backup translation (#23648) 2025-01-09 21:02:06 +01:00
Wendelin
9acdd9f903 Voice assistants config: Filter unavailable assists (#23637)
Filter unavailable assists from num of assist devices.
2025-01-09 21:02:05 +01:00
karwosts
12b2edaa65 Retain event data when moving/resizing schedule item (#23621)
* Retain event data when moving/resizing schedule item

* update from suggestion
2025-01-09 21:02:04 +01:00
Jan-Philipp Benecke
d55d388046 Set fixed width for automation save dialog (#23618) 2025-01-09 21:02:03 +01:00
Petar Petrov
ec1dedcb6b Fix tooltip scrolling (#23616) 2025-01-09 21:02:02 +01:00
Wendelin
d0fbba5063 Improve background-editor background-attachment alignment (#23615) 2025-01-09 21:02:01 +01:00
karwosts
344e083ac6 Restore attributes removed from ha-entity-marker in ha-map (#23603)
* Restore attributes removed from ha-entity-marker in ha-map

* Use Reflect
2025-01-09 21:02:00 +01:00
Wendelin
0ee6548650 Add backup translations (#23365)
* Add translations

* Add summary and progress translations

* Add backups and settings translations

* Add backups page translations

* Add onboarding card translations

* Add settings translations

* Add details translations

* Translate delete

* Add data picker translations

* Use local add-ons

* Add encryption key translations

* Add new, generate and upload translations

* Add translations for restore backup

* Fix ts issue

* Add missing keys

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2025-01-09 21:01:03 +01:00
Paul Bottein
166633cfa8 Fix preferred agent for backup download (#23659) 2025-01-09 17:26:42 +01:00
Wendelin
853059ac73 Add tests for common/datetime (#23658) 2025-01-09 15:47:32 +01:00
Wendelin
31ed0f7bea Fix backup summary label position (#23655) 2025-01-09 14:49:49 +01:00
Gord
57388ae429 Backup text changes for the english translation (#23656)
* Update backup text in en.json

* fix missing quote en.json
2025-01-09 11:46:58 +00:00
Paul Bottein
20203a3cef Fix backup translations key issues (#23654)
Co-authored-by: Wendelin <w@pe8.at>
2025-01-09 09:26:34 +01:00
Wendelin
9ec9c7e56b Simplify dashboard background upload (#23633) 2025-01-09 09:25:09 +01:00
Paul Bottein
788441499a Remove ! from backup translation (#23648) 2025-01-08 20:56:06 +00:00
Jan-Philipp Benecke
712817df65 Focus search input on integrations dashboard when using search shotcut (#23647)
Focus search input on integrations dashboard when using search shortcut
2025-01-08 20:29:51 +00:00
Wendelin
f8264e4500 Add backup translations (#23365)
* Add translations

* Add summary and progress translations

* Add backups and settings translations

* Add backups page translations

* Add onboarding card translations

* Add settings translations

* Add details translations

* Translate delete

* Add data picker translations

* Use local add-ons

* Add encryption key translations

* Add new, generate and upload translations

* Add translations for restore backup

* Fix ts issue

* Add missing keys

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2025-01-08 21:05:28 +01:00
Norbert Rittel
50fa8dd269 Use ICU string for proper countdown via "1 minute" (#23636) 2025-01-08 17:41:02 +01:00
Petar Petrov
fc20716ff2 Decrease min_columns to 8 for hui-statistics-graph-card (#23639)
Increase min_columns to 8 for hui-statistics-graph-card
2025-01-08 17:39:19 +01:00
Wendelin
c6aec2db7d Voice assistants config: Filter unavailable assists (#23637)
Filter unavailable assists from num of assist devices.
2025-01-08 17:22:43 +02:00
karwosts
f75f4b9733 Retain event data when moving/resizing schedule item (#23621)
* Retain event data when moving/resizing schedule item

* update from suggestion
2025-01-08 14:08:16 +00:00
karwosts
b1acf9a057 Enable Statistics Graph card to integrate with Energy Dashboard (V2) (#23478)
* Simplify date subtraction

* Enable Statistics Graph card to integrate with Energy Dashboard

Adds boolean option `energy_date_selection` to Statistics Graph card. If
true, the graph will set its time range to that specified by an Energy
Date Picker card on the same dashboard, similar to the plots on the
Energy Dashboard.

* Revert UI addition

PR reviewer suggested it was too confusing, especially without
dynamically hiding the overridden days_to_show option.

* Remove boolean param energy_date_selection

and instead activate when collection_key is specified

* Revert "Remove boolean param energy_date_selection"

This reverts commit 95cebdbbe3.

* Don't assume !20903 has merged

* updates

* refresh when collection_key changes

---------

Co-authored-by: Andrew Reiter <reiterandrew@gmail.com>
2025-01-08 15:36:19 +02:00
Norbert Rittel
221b3932ed Fix typo in "unprovison" key name and string for zwave (#23634)
* Fix typo in "unprovison" key name and string

* Fix "unprovison" in zwave_js-provisioned.ts
2025-01-08 15:35:07 +02:00
libe.net
c50f701160 Show logbook component in more info for non-numeric values (#22997)
* if isNumeric ignore CONTINUOUS_DOMAINS

* use isNumeric  logic from history.ts

* removed check for stateObj.attributes.unit_of_measurement

* pass numericDevicesClasses to computeShowLogBookComponent

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2025-01-08 08:17:39 +00:00
Norbert Rittel
85bebfc309 Fix two occurrences of lowercase "id" and two wrong uses of "an" (#23624)
Fix two lowercase "id" and two wrong uses of "an"
2025-01-07 21:04:05 +01:00
Wendelin
6e90afc5bd Improve background-editor background-attachment alignment (#23615) 2025-01-07 14:48:28 +01:00
Jan-Philipp Benecke
e137e695ec Set fixed width for automation save dialog (#23618) 2025-01-07 14:13:19 +01:00
Petar Petrov
7133dc5688 Fix tooltip scrolling (#23616) 2025-01-07 13:44:56 +01:00
Yosi Levy
617480472e Minor RTL Fix (#23611)
Fixes
2025-01-07 11:59:25 +01:00
karwosts
6ef799be60 Restore attributes removed from ha-entity-marker in ha-map (#23603)
* Restore attributes removed from ha-entity-marker in ha-map

* Use Reflect
2025-01-07 10:10:26 +02:00
Bram Kragten
9ff1ce3c96 Merge branch 'rc' 2025-01-06 18:13:49 +01:00
Norbert Rittel
f53ac94e76 Add missing ui.panel.config.labels.headers.description (#23517)
The header "Description" for the Labels list only shows up as optional in a narrow view like on mobile.

This commit adds the missing string for proper localization.
2025-01-06 18:13:32 +01:00
Norbert Rittel
6d084813d5 Add missing localizations for Voice Assistants > Expose headers (#23452)
* Add missing localizations for Voice Assistants > Expose headers

* Add localizable labels to Icon and Remove columns

* Variant with all changes on a single line

* Prettier?

* Revert

* Line length limited to 80 chars
2025-01-06 18:13:31 +01:00
Bram Kragten
926f5e3cd8 Merge branch 'rc' 2025-01-06 18:10:30 +01:00
Bram Kragten
befc650f81 Bumped version to 20250106.0 2025-01-06 18:10:12 +01:00
Bram Kragten
2019b8992e Fix tooltip more info (#23605) 2025-01-06 18:09:56 +01:00
Paul Bottein
4d2e9f203f Improve error handling in backup status banner (#23604)
* Improve error handling in backup status banner

* Fix completion

* Fix loading

* Check attempt and completion date first
2025-01-06 18:09:55 +01:00
Bram Kragten
760d898de7 Remove backup toggle from supervisor addon page when update available (#23602) 2025-01-06 18:09:06 +01:00
Ville Skyttä
a755af96a6 Spelling and grammar fixes (#23598) 2025-01-06 18:06:42 +01:00
Norbert Rittel
046b90ae25 Add localizable "Filtering by config entry" for Entities and Devices (#23544)
* Add localizable "Filtering by config entry" to en.json

This commit adds two strings for localizing "Filtering by config entry" to the Entities panel and, referenced from there, to the Devices panel.

* Replace "Filtering by config entry" with localizable key

* Replace "Filtering by config entry" with localizable key

* Add missing comma

* Add missing }

* Add missing }
2025-01-06 18:06:41 +01:00
Norbert Rittel
a3e8bcf848 Add ICU strings for proper singular / plural in Search fields (#23530)
It does not happen that often that the lists of devices, entities, helpers etc. are filtered down to a single item.

But in that case the labels currently use incorrect plural which is more irritating in some languages but also wrong in English.

This commit fixes this by adding ICU syntax to all six strings so these work properly in English and all derived translations.

For languages that need a different wording for `zero` this also helps translators in extending the ICU syntax for that case.
2025-01-06 18:05:49 +01:00
renovate[bot]
2cf1b7b6e6 Update dependency @octokit/auth-oauth-device to v7.1.2 (#23601)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-06 18:03:13 +01:00
Petar Petrov
4b13dde92e Rename base sankey chart tag so it doesn't conflict with the custom card (#23600) 2025-01-06 18:00:38 +01:00
Bram Kragten
ebcee7680a Fix tooltip more info (#23605) 2025-01-06 17:56:38 +01:00
Paul Bottein
ffff7970f5 Improve error handling in backup status banner (#23604)
* Improve error handling in backup status banner

* Fix completion

* Fix loading

* Check attempt and completion date first
2025-01-06 17:30:37 +01:00
Bram Kragten
2a2b6d33b8 Update bug_report.yml 2025-01-06 17:15:59 +01:00
Norbert Rittel
61ed889370 Add ICU strings for proper singular / plural in Search fields (#23530)
It does not happen that often that the lists of devices, entities, helpers etc. are filtered down to a single item.

But in that case the labels currently use incorrect plural which is more irritating in some languages but also wrong in English.

This commit fixes this by adding ICU syntax to all six strings so these work properly in English and all derived translations.

For languages that need a different wording for `zero` this also helps translators in extending the ICU syntax for that case.
2025-01-06 16:06:44 +01:00
Bram Kragten
4cc95938c8 Remove backup toggle from supervisor addon page when update available (#23602) 2025-01-06 14:13:07 +01:00
Petar Petrov
63c658e5b9 Rename base sankey chart tag so it doesn't conflict with the custom card (#23600) 2025-01-06 12:42:43 +00:00
Ville Skyttä
3d1817a6b9 Spelling and grammar fixes (#23598) 2025-01-06 12:10:34 +01:00
Simon Lamon
8be2ca5392 Move python 3.12 to python 3.13 (#23585) 2025-01-06 09:31:13 +01:00
Norbert Rittel
f043886273 Add localizable "Filtering by config entry" for Entities and Devices (#23544)
* Add localizable "Filtering by config entry" to en.json

This commit adds two strings for localizing "Filtering by config entry" to the Entities panel and, referenced from there, to the Devices panel.

* Replace "Filtering by config entry" with localizable key

* Replace "Filtering by config entry" with localizable key

* Add missing comma

* Add missing }

* Add missing }
2025-01-06 09:54:07 +02:00
Norbert Rittel
ff75c89ed4 Add missing localizations for Voice Assistants > Expose headers (#23452)
* Add missing localizations for Voice Assistants > Expose headers

* Add localizable labels to Icon and Remove columns

* Variant with all changes on a single line

* Prettier?

* Revert

* Line length limited to 80 chars
2025-01-06 08:49:22 +02:00
Norbert Rittel
a8803de6e3 Add missing ui.panel.config.labels.headers.description (#23517)
The header "Description" for the Labels list only shows up as optional in a narrow view like on mobile.

This commit adds the missing string for proper localization.
2025-01-06 08:47:37 +02:00
karwosts
e9f3f71be1 Option to hide create box on todo card (#23571) 2025-01-06 08:45:53 +02:00
renovate[bot]
334c87b194 Update formatjs monorepo (#23592)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-05 21:02:31 +01:00
renovate[bot]
8db4a76bb9 Update dependency marked to v15.0.5 (#23591)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-05 20:59:42 +01:00
Bram Kragten
7aa2136c21 Merge branch 'rc' 2025-01-03 15:52:04 +01:00
Bram Kragten
47308e7b46 Add change of encryption key warning (#23570) 2025-01-03 15:51:39 +01:00
Bram Kragten
87884ac747 Add change of encryption key warning (#23570) 2025-01-03 15:48:20 +01:00
Bram Kragten
ec1fc09140 Bumped version to 20250103.0 2025-01-03 15:42:39 +01:00
Bram Kragten
e2ad94469a Fix restoring backup during onboarding (#23569) 2025-01-03 15:41:56 +01:00
Bram Kragten
70541ec966 Fix restore progress check logic (#23568) 2025-01-03 15:41:55 +01:00
Bram Kragten
0bf64ee7f4 Backup onboarding: Show close button when welcome is skipped (#23567) 2025-01-03 15:41:54 +01:00
Bram Kragten
4ea0c83fbe Close restore dialog if done (#23566) 2025-01-03 15:41:53 +01:00
Bram Kragten
d126e02747 fix error display upload backup (#23565) 2025-01-03 15:41:53 +01:00
Bram Kragten
102a9eeb61 Fix tabs subpage height on desktop (#23564)
fix tabs subpage height on desktop
2025-01-03 15:41:52 +01:00
Bram Kragten
fc3e99e794 Update and add backup my links (#23556)
* Update and add backup my links
2025-01-03 15:41:51 +01:00
Bram Kragten
70953788cc Add back zopfli compression (#23555) 2025-01-03 15:41:50 +01:00
Bram Kragten
4ffec51a5e Fix restoring backup during onboarding (#23569) 2025-01-03 15:26:50 +01:00
Bram Kragten
71e10d5d8e Fix restore progress check logic (#23568) 2025-01-03 15:02:59 +01:00
Bram Kragten
cfbcb74ac2 Backup onboarding: Show close button when welcome is skipped (#23567) 2025-01-03 11:29:03 +01:00
Bram Kragten
3ff5b832bc Close restore dialog if done (#23566) 2025-01-03 11:17:40 +01:00
Bram Kragten
1faf024c5b fix error display upload backup (#23565) 2025-01-03 11:17:27 +01:00
Bram Kragten
6d48e725c7 Fix tabs subpage height on desktop (#23564)
fix tabs subpage height on desktop
2025-01-03 11:08:00 +01:00
Bram Kragten
052744e3d1 Update and add backup my links (#23556)
* Update and add backup my links
2025-01-02 16:18:34 +00:00
Bram Kragten
2945a7b701 Add back zopfli compression (#23555) 2025-01-02 16:54:35 +01:00
Bram Kragten
6c9df587e7 Bumped version to 20250102.0 2025-01-02 16:18:11 +01:00
Bram Kragten
8f58681d83 always zoom timeline charts on x axis (#23554) 2025-01-02 16:17:04 +01:00
Bram Kragten
4a16d9bd44 Add show encryption key dialog (#23552) 2025-01-02 16:17:03 +01:00
Bram Kragten
fcc9da6d85 Backup with db requires config, disabled next if no data is selected (#23549) 2025-01-02 16:17:02 +01:00
Bram Kragten
e03dc2c382 Move local location backup setting (#23548) 2025-01-02 16:17:01 +01:00
Bram Kragten
be967940a2 Add warning when no backup location is selected (#23550)
* Add warning when no backup location is selected

* Move to bottom
2025-01-02 16:16:04 +01:00
Bram Kragten
64ad37ed6a Update change encryption key dialog (#23551) 2025-01-02 16:15:35 +01:00
Bram Kragten
01bc45c78b Backup text updates (#23547) 2025-01-02 16:13:39 +01:00
Marcin
2206644c47 Fix copy on button to clear the selected background image (#23546) 2025-01-02 16:13:38 +01:00
Bram Kragten
486038c426 Add space for the fab on datatable without tabs (#23545)
Add space for the fab on backups datatable
2025-01-02 16:13:38 +01:00
Sören Beye
711f721007 Changes to the valueText should also rescale ha-gauge text (#23536)
Changes to the valueText should also recenter ha-gauge text
2025-01-02 16:13:37 +01:00
Philipp
3b8bc242fe Fix media management delete button misalignment (#23534) 2025-01-02 16:13:36 +01:00
karwosts
7e80eed003 Display an error if saving new script times out (#23527)
* Display an error if saving new automation times out

* changes

* update

* string tweak

* Fix save failed for scripts
2025-01-02 16:13:35 +01:00
Bram Kragten
a7ef498d75 Handle no cloud subscription better in backups (#23523) 2025-01-02 16:13:34 +01:00
Bram Kragten
caf8fdf4c7 Add show encryption key dialog (#23552) 2025-01-02 16:12:31 +01:00
Bram Kragten
f19ca78b89 always zoom timeline charts on x axis (#23554) 2025-01-02 16:11:50 +01:00
Bram Kragten
0fba0e2850 Move local location backup setting (#23548) 2025-01-02 16:04:17 +01:00
Philipp
15606a5a90 Fix media management delete button misalignment (#23534) 2025-01-02 15:03:04 +00:00
Sören Beye
c7df147908 Changes to the valueText should also rescale ha-gauge text (#23536)
Changes to the valueText should also recenter ha-gauge text
2025-01-02 15:56:03 +01:00
Bram Kragten
031658eef4 Match UI with core and don't allow restore config without db and vice … (#23553)
Match UI with core and dont allow restore config without db and vice versa
2025-01-02 15:53:57 +01:00
Bram Kragten
fa672ffbba Backup with db requires config, disabled next if no data is selected (#23549) 2025-01-02 15:38:11 +01:00
Bram Kragten
34bcd5e71c Backup text updates (#23547) 2025-01-02 15:35:22 +01:00
Bram Kragten
73854efa57 Update change encryption key dialog (#23551) 2025-01-02 15:13:53 +01:00
Bram Kragten
a371b842da Add warning when no backup location is selected (#23550)
* Add warning when no backup location is selected

* Move to bottom
2025-01-02 15:13:42 +01:00
karwosts
b439c5d213 Display an error if saving new script times out (#23527)
* Display an error if saving new automation times out

* changes

* update

* string tweak

* Fix save failed for scripts
2025-01-02 13:46:36 +01:00
Marcin
04a9c67112 Fix copy on button to clear the selected background image (#23546) 2025-01-02 13:44:34 +01:00
Bram Kragten
012bd0714c Add space for the fab on datatable without tabs (#23545)
Add space for the fab on backups datatable
2025-01-02 13:44:04 +01:00
renovate[bot]
4e10d140d9 Update Yarn to v4.6.0 (#23532)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2025-01-01 15:46:25 +01:00
Norbert Rittel
8df67b8eb1 Device info: Add localizable string for "Set up voice assistant" (#23533)
* Add localizable string for "Set up voice assistant" to en.json

* Replace "Set up voice assistant" with localizable string
2025-01-01 15:45:31 +01:00
Bram Kragten
fb09eba831 Handle no cloud subscription better in backups (#23523) 2024-12-31 22:39:50 +01:00
Bram Kragten
a5de6ff3af Bumped version to 20241231.0 2024-12-31 20:23:30 +01:00
Bram Kragten
806cc2c608 Fix automation traces (#23524) 2024-12-31 20:21:41 +01:00
Bram Kragten
48a160f057 Use last completed automatic backup time instead of last available ba… (#23522)
* Use last completed automatic backup time instead of last available backup

* Update ha-backup-overview-summary.ts

* Update src/panels/config/backup/components/overview/ha-backup-overview-summary.ts

* Update ha-config-backup-overview.ts
2024-12-31 20:21:40 +01:00
Bram Kragten
c697843c34 Update ha-backup-overview-summary.ts 2024-12-31 20:21:06 +01:00
Bram Kragten
317a2f5b21 Fix password incorrect check when restoring backup (#23525) 2024-12-31 20:18:15 +01:00
karwosts
220011f15f Display an error if saving new automation times out (#23518) 2024-12-31 20:16:53 +01:00
karwosts
35faeb651b Display an error if saving new automation times out (#23518) 2024-12-31 19:49:45 +01:00
Bram Kragten
8daea5b565 Use last completed automatic backup time instead of last available ba… (#23522)
* Use last completed automatic backup time instead of last available backup

* Update ha-backup-overview-summary.ts

* Update src/panels/config/backup/components/overview/ha-backup-overview-summary.ts

* Update ha-config-backup-overview.ts
2024-12-31 18:14:16 +01:00
Bram Kragten
cd69c4c361 Fix password incorrect check when restoring backup (#23525) 2024-12-31 17:48:34 +01:00
Bram Kragten
eaab47a667 Fix automation traces (#23524) 2024-12-31 17:02:57 +01:00
renovate[bot]
d08a28ab9e Update dependency lint-staged to v15.3.0 (#23521)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-31 14:36:01 +01:00
Bram Kragten
e8af454705 Bumped version to 20241230.0 2024-12-30 19:44:56 +01:00
Petar Petrov
713b5c7cf7 Add default border-radius values to .disabled-bar 2024-12-30 19:42:54 +01:00
Petar Petrov
8b17286fb6 Revert "Automation/Script editor border-radius fix (#23267)"
This reverts commit e9b2a83411.
2024-12-30 19:42:40 +01:00
Bram Kragten
f3705a7e1d Fix copy encryption key (#23515) 2024-12-30 19:41:01 +01:00
Bram Kragten
d0123b2cce Fix overflow of backup agents (#23514) 2024-12-30 19:41:00 +01:00
Bram Kragten
884c22f92b Add fallback for devices without name (#23513) 2024-12-30 19:40:59 +01:00
Simon Lamon
700690474c Add script hide picker again (#23512) 2024-12-30 19:40:58 +01:00
Simon Lamon
4686808e53 Fix manual backup disabled with all backup locations (#23511) 2024-12-30 19:40:57 +01:00
Jan-Philipp Benecke
cf1df712e4 Fix dialog header (#23507) 2024-12-30 19:40:56 +01:00
Timothy Kist
c338e9cb30 Remove space at end of link from HAOS storage tip (#23492) 2024-12-30 19:40:55 +01:00
Petar Petrov
8e8fd89d56 Fix custom DNS saving (#23477) 2024-12-30 19:40:55 +01:00
Petar Petrov
f1c360c550 Add getGridOptions to history and statistics graph cards (#23476) 2024-12-30 19:40:54 +01:00
Simon Lamon
b429ecc376 Calendar trigger: Handle optional offset better (#23474)
Calendar empty offset
2024-12-30 19:39:50 +01:00
Petar Petrov
6d8422513a Button to reset chart zoom (#23469) 2024-12-30 19:39:49 +01:00
Petar Petrov
cb0a48265a Fix helper dialog close and add failsafe for similar cases (#23468) 2024-12-30 19:39:48 +01:00
Simon Lamon
c9082724a8 View background settings: Change transparancy to opacity (#23450) 2024-12-30 19:39:47 +01:00
Bram Kragten
455cd0485e Fix overflow of backup agents (#23514) 2024-12-30 17:43:05 +01:00
Bram Kragten
f5ec2dcbe2 Fix copy encryption key (#23515) 2024-12-30 17:42:31 +01:00
Bram Kragten
6b039a1073 Add fallback for devices without name (#23513) 2024-12-30 17:06:26 +01:00
Simon Lamon
94c03be7ae Add script hide picker again (#23512) 2024-12-30 16:21:22 +01:00
Simon Lamon
4bf0a23513 Fix manual backup disabled with all backup locations (#23511) 2024-12-30 11:05:00 +00:00
Bram Kragten
f01388473a Revert "Automation/Script editor border-radius fix (#23267)" (#23475) 2024-12-30 11:55:44 +01:00
Petar Petrov
1d0c3da294 Add getGridOptions to history and statistics graph cards (#23476) 2024-12-30 11:54:00 +01:00
Petar Petrov
be849887a1 Button to reset chart zoom (#23469) 2024-12-30 11:52:52 +01:00
Petar Petrov
e1a6f6f0e3 Fix helper dialog close and add failsafe for similar cases (#23468) 2024-12-30 11:51:21 +01:00
Simon Lamon
d0327915db View background settings: Change transparancy to opacity (#23450) 2024-12-30 11:49:08 +01:00
Jan-Philipp Benecke
351d318c89 Fix dialog header (#23507) 2024-12-30 11:12:31 +01:00
Timothy Kist
7d1ca2acf0 Remove space at end of link from HAOS storage tip (#23492) 2024-12-29 19:36:24 +01:00
Paulus Schoutsen
fea83c0873 Bumped version to 20241229.0 2024-12-29 18:20:14 +00:00
karwosts
d3b4014182 Fix backups fab spacer (#23490) 2024-12-29 18:19:07 +00:00
Jan-Philipp Benecke
5c7fe04562 Fix header of config entry system options dialog (#23455)
Fix config entry system options dialog header
2024-12-29 18:19:06 +00:00
karwosts
44e26c925b Fix dialog-person-detail tracker selection (#23454) 2024-12-29 18:19:05 +00:00
Jan-Philipp Benecke
205dd3f968 Fix chip spacing in automation/script save dialog (#23451) 2024-12-29 18:19:04 +00:00
Paulus Schoutsen
86133a0696 Fix typo in backups overview (#23446) 2024-12-29 18:19:03 +00:00
Bram Kragten
2105db9104 change default of backup actions card feature to no backup (#23444) 2024-12-29 18:19:02 +00:00
karwosts
49c377b1c4 Fix backups fab spacer (#23490) 2024-12-28 17:00:28 +00:00
Norbert Rittel
3fd3c8003a History: Improve explanation of selections by including labels as 4th option (#23479)
Improve explanation of selections by including labels as 4th option

This commit adds labels as the 4th option for data sources in history and the error message when you select 'Add current view as card' in that state from the overflow menu.
2024-12-27 20:03:18 +01:00
Petar Petrov
ccbb2704d1 Fix custom DNS saving (#23477) 2024-12-27 13:50:55 +00:00
Norbert Rittel
34218f08ef Replace most occurrences of "click" for touch-friendly wording (#23471)
* Replace most occurrences of "click" for touch-friendly wording

Home Assistant should avoid the term "click" or "clicking" as it can be used on (mobile) touch screen devices or with non-mechanical touch pads as well.

This commit changes most occurrences in en.json to either use "select" or "press" depending on context.

For "when you click on log out" it can be dropped completely.

* Change "select" to "press" for two more
2024-12-27 14:42:38 +01:00
Simon Lamon
cf91e6a2a3 Calendar trigger: Handle optional offset better (#23474)
Calendar empty offset
2024-12-27 15:29:02 +02:00
Petar Petrov
ab9759c6dd Add default border-radius values to .disabled-bar 2024-12-27 13:47:10 +01:00
Petar Petrov
95adbfcc12 Revert "Automation/Script editor border-radius fix (#23267)"
This reverts commit e9b2a83411.
2024-12-27 13:44:05 +01:00
renovate[bot]
1b9cbe434d Update dependency rspack-manifest-plugin to v5.0.3 (#23472)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-27 14:18:50 +02:00
Norbert Rittel
918aa562c5 Improve description of Suspend connection option (#23470)
* Improve description of Suspend connection option

This removes the use of "we" which is kind of off as no person is involved in the process.

It also moves the word "suspend" in the headline and better explains the purpose.

* add comma

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2024-12-27 11:27:06 +00:00
libe.net
2ff0cb58bc Fix Energy-Dashboard unexpected Period Calculation (#23458)
* if not whole month, better use days for the period

* fix Type undefined error

* Update src/data/energy.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2024-12-27 11:35:00 +02:00
Norbert Rittel
a94460a0c7 Replace "Show settings" with just "Settings" for automations (#23466)
For automations / scenes / scripts the menu item to open the settings dialog is currently "Show settings".

The use of "Show" is misleading here as this usually pairs with "Hide". It's also inconsistent as for all other settings in Home Assistant the menu items, buttons or tooltips don't use "show".

Also note that it's just "Information" or "Traces" for similar other items in the same menu.
2024-12-27 10:40:23 +02:00
ildar170975
60e57748f7 developer-tools-template: allow "select all" for "rendered" (#23456)
* Update developer-tools-template.ts

* Update developer-tools-template.ts

* remove extensions
2024-12-27 08:49:31 +02:00
renovate[bot]
0ecb8a6866 Update dependency @codemirror/language to v6.10.8 (#23461)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-27 08:41:42 +02:00
Jan-Philipp Benecke
d9dfea938e Fix header of config entry system options dialog (#23455)
Fix config entry system options dialog header
2024-12-26 16:18:54 +02:00
Norbert Rittel
6fe4f94d55 Fix misleading use of "hidden" and "not shown" for disabled entities (#23449)
* Fix misleading use of "hidden" for disabled entities

Entities can be either hidden (by turning off "Visible") or disabled (by turning off "Enabled"),

The stings file uses the very misleading key "hidden_entities" for the count of disabled entities plus the words "not shown" which also pair with "hidden" instead of "disabled".

This commit fixes this by using "disabled" for both the key and in the link shown here.

* Replace "hidden_entities" with "disabled_entities"

Entities can be either hidden (by turning off "Visible") or disabled (by turning off "Enabled"),

The strings file uses the very misleading key "hidden_entities" for the count of disabled entities plus the words "not shown" which also pair with "hidden" instead of "disabled".

This commit fixes this by using "disabled" for the key name as well.

* Re-add accidentally deleted comma
2024-12-26 16:16:50 +02:00
Norbert Rittel
01bec32fd6 Improve explanation of passive zones (#23443)
Currently the explanation for passive zones says that they "are not used as location for device trackers" which is misleading and does not fit the second sentence that says: "This is useful if you just want to use it for automations.

This commit clarifies that by changing to "not shown as" and fixes the plural / singular mismatch between the two sentences.
2024-12-26 16:14:53 +02:00
karwosts
5453d6f7f5 Fix dialog-person-detail tracker selection (#23454) 2024-12-25 18:26:57 +00:00
Jan-Philipp Benecke
a0799a409b Fix chip spacing in automation/script save dialog (#23451) 2024-12-25 11:56:26 +01:00
Bram Kragten
704e7f279f change default of backup actions card feature to no backup (#23444) 2024-12-25 01:57:05 +01:00
Norbert Rittel
1daaf50773 Add missing localization for "Deselect all" button in (#23448)
* Add missing localization for "Deselect all" button to en.json

* Add code for localizing "Deselect all" to dialog-media-manage.ts
2024-12-25 01:56:26 +01:00
Paulus Schoutsen
54eb7d169c Fix typo in backups overview (#23446) 2024-12-24 19:39:33 +01:00
Bram Kragten
33b410dea0 Update ha-backup-overview-summary.ts 2024-12-24 17:31:02 +01:00
Bram Kragten
c05054e4ff Merge branch 'rc' 2024-12-24 16:24:59 +01:00
Bram Kragten
f416b1b5da Merge branch 'dev' into rc 2024-12-24 16:23:46 +01:00
Bram Kragten
6a345d86a6 Bumped version to 20241224.0 2024-12-24 16:23:30 +01:00
Bram Kragten
a04e9b68bd Fixes for device quick bar (#23441)
Fixes #23432 and Fixes #23431
2024-12-24 17:22:06 +02:00
Bram Kragten
f7dbd38c2e Sort addons in backup by name (#23442)
* Sort addons in backup by name

* Update ha-backup-addons-picker.ts
2024-12-24 14:44:27 +00:00
Bram Kragten
7150016375 fix missing credentials step (#23440) 2024-12-24 15:26:43 +01:00
Bram Kragten
c3507abd9c Guard for cloud integration not loaded (#23439) 2024-12-24 15:17:40 +01:00
Bram Kragten
fc8a8b28c2 await copy clipboard (#23438) 2024-12-24 15:15:17 +01:00
Bram Kragten
637fe37ef4 Change emergency kit format (#23428)
* Change emergency kit format

* Update src/panels/config/backup/ha-config-backup-settings.ts

* review
2024-12-24 13:55:38 +00:00
Bram Kragten
657bfc82ca Backup text updates (#23437)
* Backup text updates

* Update ha-config-backup-backups.ts
2024-12-24 13:50:03 +00:00
Bram Kragten
44423812f4 Set defaults for background settings, restore old behavior (#23436)
Fixes https://github.com/home-assistant/frontend/issues/23421
2024-12-24 14:48:28 +01:00
Bram Kragten
a6a76155e5 Fix chart tooltips (#23435) 2024-12-24 08:47:40 -05:00
Bram Kragten
8c18d816b6 Fix banner when first backup was unsuccessful (#23430)
* Fix banner when first backup was unsuccesful

* Update ha-backup-config-agents.ts

* remove fix widths
2024-12-24 08:45:43 -05:00
Bram Kragten
361caafab9 fix saving new automation/script (#23433) 2024-12-24 08:44:23 -05:00
Jan-Philipp Benecke
94f679e387 Add area to automation/script save dialog (#23416)
Add area chip to automation/script save dialog
2024-12-24 11:21:03 +01:00
Bram Kragten
85bd6432a9 Update hui-generic-entity-row.ts 2024-12-24 10:19:38 +01:00
Norbert Rittel
00c1dfa1d2 Add missing localizations to ha-script-trace.ts (#23418)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-12-24 09:55:09 +01:00
Norbert Rittel
fb72e1fb9c Wrong lowercase and adjacent space in dialog-media-manage.ts (#23372) 2024-12-24 09:54:26 +01:00
Yosi Levy
152d2d0bdf Rtl fixes (#23425) 2024-12-24 09:42:26 +01:00
renovate[bot]
e06aa52a21 Update dependency ua-parser-js to v1.0.40 (#23427)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-24 10:17:47 +02:00
renovate[bot]
49aa935490 Update dependency @braintree/sanitize-url to v7.1.1 (#23417)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-24 10:07:34 +02:00
Norbert Rittel
cead1e355d Fix missing localization of "Message" field in Cloud > Try text-to-speech dialog (#23422)
* Add missing "Message" string for cloud tts dialog to en.json

The field label for the Message field in the Cloud > Try text-to-speech dialog is missing localization.

This commit adds the necessary localizable string.

* Update dialog-cloud-tts-try.ts to include localizable string
2024-12-24 10:05:31 +02:00
Norbert Rittel
edc99b5d6c Lovelace - Resources: Add localizable string for "Delete" column header (#23404) 2024-12-23 21:39:10 +01:00
Simon Lamon
b38963b214 Fix allow-svg attribute (#23415) 2024-12-23 21:37:24 +01:00
Charles Garwood
0d99531855 Grammar fix for assign category dialog (#23412) 2024-12-23 21:36:41 +01:00
Simon Lamon
9cde7637ca Weekly backup on tuesday: spelling mistake (#23410) 2024-12-23 21:36:17 +01:00
Paul Bottein
edc08994b3 Format scheduled backup time using locale settings (#23407) 2024-12-23 17:40:12 +01:00
Paul Bottein
fc0907ef72 Fix skeleton in dark mode (#23406)
* Fix skeleton in dark mode

* Fix
2024-12-23 15:23:44 +00:00
Bram Kragten
bdb28246fc Update ha-config-backup-overview.ts 2024-12-23 16:16:22 +01:00
Bram Kragten
0582798cde Fix backup summary content not centered (#23405) 2024-12-23 15:07:07 +00:00
Bram Kragten
e7d9032cc4 20241223.1 (#23402) 2024-12-23 15:38:28 +01:00
Simon Lamon
331385794c View background settings: Change radio buttons to dropdowns (#23403) 2024-12-23 15:30:46 +01:00
Simon Lamon
8e71bd7e82 View background settings: Change radio buttons to dropdowns (#23403) 2024-12-23 15:30:17 +01:00
Bram Kragten
664cc9b33d Bumped version to 20241223.1 2024-12-23 15:26:30 +01:00
Bram Kragten
6757cda7f0 Text changes backups (#23397)
* Text changes backups

* Update dialog-change-backup-encryption-key.ts

* Update ha-backup-config-agents.ts

* Update header margin

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-12-23 14:26:18 +00:00
Bram Kragten
97e6313890 Min height list items backups detail smaller (#23398) 2024-12-23 15:08:00 +01:00
Norbert Rittel
3cfba7b960 Replace "State" with "Status" for consistency with Entity picker (#23399)
The Filters pane for entities contains a "Status" section which gives several options to narrow down the list of entities, including "Disabled".

For devices, however, the matching selector is currently labelled "State", although it has "Disabled" as the only choice.

This conflicts with the device / entity state definition in HA and is inconsistent, getting worse in translations.
2024-12-23 15:06:50 +01:00
Paul Bottein
5fb384ad31 Backup status banner improvement (#23400)
* Improve overdue backups and don't consider backup with failed agents as success

* Improve margin and loader

* Improve margin

* Show agent name if only one off site location is configured
2024-12-23 15:06:36 +01:00
Bram Kragten
76cb9ce807 Change sidebar header color (#23401) 2024-12-23 14:04:19 +00:00
Norbert Rittel
0e61596f5c Replace "Add" button with "Create" in Create floor / area dialogs (#23395) 2024-12-23 14:25:14 +01:00
Bram Kragten
061b6af812 Fix search bar styling (#23396) 2024-12-23 14:23:51 +01:00
Bram Kragten
fd95ab5518 Revert "Bump softprops/action-gh-release from 2.1.0 to 2.2.0" (#23393)
Revert "Bump softprops/action-gh-release from 2.1.0 to 2.2.0 (#23300)"

This reverts commit 65458538a7.
2024-12-23 11:59:05 +00:00
Bram Kragten
a7cacbbbe6 20241223.0 (#23392) 2024-12-23 12:23:14 +01:00
Bram Kragten
5a0225b86a fix merge 2024-12-23 12:07:28 +01:00
Bram Kragten
8b79fc5848 Merge branch 'master' into dev 2024-12-23 12:00:53 +01:00
Bram Kragten
5513da51a8 Bumped version to 20241223.0 2024-12-23 11:58:57 +01:00
Bram Kragten
56f9165323 Move order of restore around (#23391) 2024-12-23 10:56:54 +00:00
Paul Bottein
6afcd4d770 Add icon and description for network mount locations (#23390)
* Use custom icon and name for network storage

* Add note to local backup location dialog
2024-12-23 11:53:31 +01:00
Bram Kragten
52e1f9315e Fix selection mode backups on mobile (#23389)
* Fix selection mode backups on mobile

* Update ha-config-backup-details.ts

* unselect when deleting
2024-12-23 11:45:23 +01:00
Steve Repsher
a00f645921 Revert "Add node_modules cache in ci (#22826)" (#23370)
This reverts commit 4655929fed.
2024-12-23 11:27:04 +01:00
Bram Kragten
faf3bb2644 Swap setup python and verfify version (#23388) 2024-12-23 10:09:38 +01:00
Bram Kragten
31d98ec935 Always show HA toggle in backup data settings (#23387) 2024-12-23 09:37:50 +01:00
Mark Steward
7d0a269f1b Use null instead of default, to avoid stomping on netmask (#23382) 2024-12-23 09:22:11 +01:00
karwosts
147098f0fd ha-form-multi_select accessibility improvements (#21023) 2024-12-23 09:21:27 +01:00
dependabot[bot]
d4cbfd9583 Bump actions/upload-artifact from 4.4.3 to 4.5.0 (#23386) 2024-12-23 08:33:48 +01:00
Norbert Rittel
a35ba38a2d Make quotation marks localizable in Add badge dialog (#23383)
* Add quotation and question marks to en.json for localization

Currently the quotation marks are hard-coded. This commit puts them into the strings file and adds the missing question mark at the end.

* Remove hard-coded quotation marks from hui-dialog-create-badge.ts
2024-12-23 06:38:18 +01:00
Dave T
8fa36c8226 Add stream preview element to generic camera (#21463)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-12-22 17:14:29 +00:00
karwosts
5ccc3365fe Show all disabled helpers in config/helpers (#23377) 2024-12-22 18:04:16 +01:00
renovate[bot]
dcf97d4667 Update dependency @codemirror/view to v6.36.1 (#23381)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-22 17:25:32 +01:00
Petar Petrov
4b7acbb766 Energy Sankey chart card (#23002)
* WIP: sankey chart

* basic sankey chart

* dynamic size of last section

* basic energy-sankey card

* add floors, areas & passthrough

* order by floor level, add colors & exess energy nodes

* tweak nodes

* add tooltips and better layout and responsiveness

* WIP vertical layout

* fix height when not in sections

* handle labels in vertical mode

* remove from energy dashboard for now

* lint fix

* PR comments

* use ResizeController instead of ResizeObserver

* look up device area

* code clarity improvement
2024-12-22 17:25:13 +01:00
Simon Lamon
7900eb4054 View background settings (#23133)
Co-authored-by: karwosts <karwosts@gmail.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-12-22 16:19:54 +00:00
Bram Kragten
53caef8f92 Update developer-tools-statistics.ts 2024-12-22 17:06:46 +01:00
Jan-Philipp Benecke
14bebc76b0 Add toggle switch for exposing of new entities to Assist (#23127) 2024-12-22 16:06:13 +00:00
Norbert Rittel
8b6382448f Use "limit" instead of "mode" for Numeric state trigger and condition (#23360) 2024-12-22 17:00:48 +01:00
Jan-Philipp Benecke
5cd6f22e99 Add category and labels to automation/script save and rename dialog (#23240)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-12-22 16:59:04 +01:00
Wendelin
523c38a83e Add tests for common/config (#23349)
* Add tests for common/config

* Revert version dev hook
2024-12-22 16:05:17 +01:00
Wendelin
0a28bbdd72 Improve picture select crop error handling (#23352)
* Improve crop editor error handling

* Add tests for data/image_upload

* Fix tests imports
2024-12-22 15:45:37 +01:00
renovate[bot]
e58bef7795 Update dependency globals to v15.14.0 (#23375)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-21 15:36:45 +00:00
Bram Kragten
d403532fc1 Fix link on all backups button (#23374) 2024-12-21 16:35:00 +01:00
karwosts
4de8b562bd Ability to show map icons for geolocation sources (#23247) 2024-12-21 16:29:53 +01:00
renovate[bot]
31e85836f0 Update CodeMirror (#23369)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-21 16:29:06 +01:00
Franck Nijhof
e1359781a5 Add state completion support for Assist Satellite entities (#23371) 2024-12-21 10:17:59 +01:00
Paul Bottein
379bc3a4e3 Add links to backup overview settings (#23368) 2024-12-20 21:12:05 +01:00
Bram Kragten
b3b0006ba3 Filter backups by type (#23366)
* filter backups by type

* Add filter pane

* Make sure we show all when you click show all
2024-12-20 20:52:11 +01:00
Bram Kragten
cd44b33201 Merge branch 'rc' 2024-12-20 18:50:55 +01:00
Paul Bottein
33df805168 Revert "Add overview settings link to backup settings sections"
This reverts commit fad435ea10.
2024-12-20 18:21:24 +01:00
Paul Bottein
fad435ea10 Add overview settings link to backup settings sections 2024-12-20 18:20:20 +01:00
Bram Kragten
b35f9944ea Change backup restore flow (#23354)
* Change backup restore flow

* adapt and finish

* Update dialog-restore-backup.ts
2024-12-20 16:39:44 +01:00
Paul Bottein
dc799bf691 Don't allow user to choose cloud if ha settings is not set (#23364) 2024-12-20 16:39:35 +01:00
Simon Lamon
1f7929bb3d Rspack v1.1.8 (#23363) 2024-12-20 16:20:25 +01:00
Paul Bottein
fb228dc918 Multiple backup adjustments (#23361)
* Always show welcome screen during onboarding

* Fix content overflow in dialog

* Rename copies to backups, drop 7 days

* Remove including new and learn more button

* Some other fixes

* Allow changing default local location from new backup page

* Dont show addon version in settings and onboarding

* Add margin for ios

* Display old encryption key before change

* Refactor descriptipn
2024-12-20 15:52:55 +01:00
Wendelin
c66f5e2d8a Fix spacing of markdown textfield helpers (#23359) 2024-12-20 15:41:09 +01:00
ildar170975
d71b29d089 border-radius fixes for state-badge (#23212) 2024-12-20 15:06:03 +01:00
renovate[bot]
6b230b6142 Lock file maintenance (#23337)
* Lock file maintenance

* Resolve codemirror in current version

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-12-20 13:16:23 +00:00
Paul Bottein
c532a9023a Revert remove hass debug connection in dev (#23356) 2024-12-20 14:05:33 +01:00
Paul Bottein
ecc704e6ac Fix duplicate agents ids during onboarding (#23357)
Fix duplicate agents ids during onboardind
2024-12-20 13:04:32 +00:00
Bram Kragten
5470c8f250 Bumped version to 20241127.9 2024-12-20 13:54:18 +01:00
Bram Kragten
d21f249aac Only use pipelines that have the default coversation agent (#23320)
only use pipelines that have the default coversation agent
2024-12-20 13:53:31 +01:00
renovate[bot]
907299b139 Update dependency @codemirror/language to v6.10.7 (#23350)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-20 13:02:03 +01:00
Wendelin
37aa2bd869 Improve onboarding backup restore (#23340)
* Improve onboarding backup restore

* Fix onboarding backup restore

* Fix restoring value in onboarding-restore-backup
2024-12-20 12:13:16 +01:00
Petar Petrov
f1f53b9f24 Set default netmask when parsing an address (#23348) 2024-12-20 11:28:12 +01:00
Paul Bottein
49d9c7f392 Update icons for backups (#23351) 2024-12-20 11:27:49 +01:00
karwosts
65860a3142 Allow selecting previously uploaded image for picture upload (#23072) 2024-12-20 10:55:24 +01:00
ildar170975
3b52d3d302 Fix visibility for shown entities on device card (2) (#23198) 2024-12-20 10:44:57 +01:00
Steve Repsher
2fe6203eae Remove leftover packages from Rollup builds (#23344) 2024-12-19 15:16:08 -05:00
Paul Bottein
92b02e39c9 Add overview summary for backups (#23343) 2024-12-19 19:54:50 +01:00
renovate[bot]
b693fd1edc Update dependency @rsdoctor/rspack-plugin to v0.4.12 (#23341)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-19 17:21:23 +02:00
libe.net
b84e00b312 Unit Test for shiftDateRange (#23324)
Unit Test for Pull 23228

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2024-12-19 15:42:31 +01:00
karwosts
973fd51639 Sortable energy individual devices (#23330)
* Sortable energy individual devices

* change key fn
2024-12-19 15:51:56 +02:00
Simon Lamon
e0494ccb57 Introduce a target picker for the logbook card (#23007)
* target picker logbookcard wip

* migration

* fixes

* change property

* Update src/panels/lovelace/cards/hui-logbook-card.ts

* prettier
2024-12-19 14:41:32 +01:00
Paul Bottein
95559cbc2a Setup backup overview page (#23331)
* Add overview page

* Remove configure button

* Reorganize files

* Add backups summary

* Add settings overview

* Fixes

* Update wording

* Setup onboarding before creating a backup
2024-12-19 13:37:05 +00:00
Paul Bottein
3da13b823a Only show local addons folder settings if at least one addon is local (#23333)
Only show local addons folder settings if an addon is local
2024-12-19 14:29:35 +01:00
Paul Bottein
c022871ead Add none option for backup addons (#23335) 2024-12-19 11:26:17 +01:00
Mimi
c4fcbf0613 Optimize the style of hui-energy-period-selector (#23332) 2024-12-19 07:29:32 +00:00
renovate[bot]
79921745a8 Update dependency magic-string to v0.30.17 (#23339)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-19 09:09:24 +02:00
Paul Bottein
40a4255045 Rename backup strategy (#23329)
* Rename backup strategy

* Feedback
2024-12-18 18:02:42 +01:00
Petar Petrov
2d902a0688 Fix integrations dialog (#23328)
* Fix integrations dialog

* tweak comments
2024-12-18 15:53:30 +01:00
Petar Petrov
8a46ef6168 Improve chart zoom (#23326) 2024-12-18 15:50:34 +01:00
karwosts
ba3d37b550 Fix costs in energy csv download (#23322) 2024-12-18 08:46:55 +02:00
renovate[bot]
88d0247217 Update dependency marked to v15.0.4 (#23323)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-18 08:33:06 +02:00
Krisjanis Lejejs
1c076d22a6 Add MFA login flow support for cloud component (#23188)
* Add MFA login flow support for cloud component

* Update MFA login in voice assistant setup flow

* Sync errors with core

* Add translations to the TOTP dialog
2024-12-17 20:55:07 +01:00
Julian
0ecdae2551 Fix inconsistency in Thermostat and Humidifier card names (#22416) 2024-12-17 19:15:35 +01:00
libe.net
6f8ba6afac Date-range-picker Design to use Prev and Next Buttons in History and Logbook on mobiles (#23228)
* date-range-picker prev and next design

* correct width and margins

* logbook width correction

* Update src/components/ha-date-range-picker.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* Update src/components/ha-date-range-picker.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* Update src/components/ha-date-range-picker.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* changes from comments

* share date-range logic for energy and history / logbook

* switch to energy-dashboard timespan-function

* changed shiftDateRange to differenceInMilliseconds

* used gap instead margin-right

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2024-12-17 17:40:32 +01:00
Bram Kragten
ad1c32a880 Only use pipelines that have the default coversation agent (#23320)
only use pipelines that have the default coversation agent
2024-12-17 17:50:29 +02:00
Petar Petrov
48819a59e7 Fix new automation dialog in Firefox (#23319) 2024-12-17 15:00:00 +01:00
Bram Kragten
2718801c69 Update light-color-rgb-picker.ts 2024-12-17 14:47:38 +01:00
renovate[bot]
2b43f5f8c8 Update dependency eslint to v9.17.0 (#23316)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-17 09:18:31 +02:00
Paul Bottein
0ef23cd712 Remove backup toggle on the update more info dialog (#23314) 2024-12-16 15:47:19 +00:00
Petar Petrov
7370d1e0dd Fix touch control of chart zoom (#23302)
* Fix touch control of chart zoom

* fix
2024-12-16 16:03:32 +01:00
karwosts
da7d3e118c Allow for deleting image_upload images in media panel (#23086) 2024-12-16 16:36:50 +02:00
renovate[bot]
d4188d9aee Update dependency terser-webpack-plugin to v5.3.11 (#23313)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-16 16:27:27 +02:00
Marcin
8722157623 Focus on card search input when adding new card (#23309)
* Focus on card search input when adding new card

* Update src/panels/lovelace/editor/card-editor/hui-card-picker.ts

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

* update and fix

* not on mobile

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-12-16 15:54:29 +02:00
Petar Petrov
6e2f0d8c9b Enable chart animations (#23311) 2024-12-16 14:37:31 +01:00
Paul Bottein
08459394a6 Add backup sync status in detail page (#23312) 2024-12-16 14:36:59 +01:00
Jan-Philipp Benecke
ee292f900f For consistency align close button to the left in ha-dialog (#23284) 2024-12-16 15:35:06 +02:00
Steve Repsher
3aaf08ac03 Defer loading of fallback domain icons (#23298) 2024-12-16 15:22:53 +02:00
Paul Bottein
d31f4a5f1d Improve backup onboarding (#23282)
* Sort agents, enable cloud and local by default

* Enable cloud by default

* Improve wording

* Hide fab if onboarding is not complete

* Add recommended settings

* Use one step encryption key during onboarding

* Add description for cloud

* Update change encryption key dialog
2024-12-16 14:08:51 +01:00
Bram Kragten
875ab0cb97 Cloud login: Wait with navigate until confirm action is done (#23310)
Wait with navigate until confirm action is done
2024-12-16 13:08:30 +00:00
renovate[bot]
678af025ac Update vaadinWebComponents monorepo to v24.6.0 (#23306)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-16 13:41:31 +01:00
renovate[bot]
1fd38d085f Update dependency @lokalise/node-api to v13 (#23299)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-16 13:39:35 +01:00
Paul Bottein
ec324ab09f Disable backup by default for update more info (#23307) 2024-12-16 12:24:09 +01:00
Paul Bottein
efcd57934a Improve backup data-table on mobile (#23283)
* Improve backup data-table on mobile

* Group by default

* Fix top-header slot on mobile
2024-12-16 12:23:17 +01:00
Norbert Rittel
1efe61445f Fix typo "dasboard" and missing hyphen in en.json (#23303)
Add the missing "h" to "Choose a dasboard"
Add the missing hyphen to "auto generated"
2024-12-16 09:44:17 +01:00
Wendelin
6db9bf800a Fix ha-button-menu menuCorner attribute (#23301)
Fix menuCorner attribute
2024-12-16 09:47:36 +02:00
dependabot[bot]
65458538a7 Bump softprops/action-gh-release from 2.1.0 to 2.2.0 (#23300)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-12-16 08:04:32 +01:00
Norbert Rittel
9ddeb3734f Fix grammar mismatch in OAuth description (#23297) 2024-12-15 21:45:40 +01:00
Steve Repsher
c89fc188a5 Remove fixed device class icons (#23291) 2024-12-14 16:15:10 +01:00
Norbert Rittel
d366471058 Make Device Condition description consistent with Trigger and Action (#23293)
Make device Condition description consistent with Trigger and Action

The first item in the lists of the triggers, conditions and actions is always the device type:

- When something happens to a device. Great way to start.
- Set of conditions provided by your device. Great way to start
- Do something on a device. Great way to start.

The condition does use "your" instead of "a" which is inconsistent and sounds irritating. As there are usually many different devices in a setup the use of "a" is much preferred as the actual device is picked up at the next step.

This commit makes the condition string consistent by replacing "your" with "a".
2024-12-14 16:14:24 +01:00
renovate[bot]
9951c162a1 Update dependency eslint-import-resolver-webpack to v0.13.10 (#23292)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-14 09:23:38 +01:00
renovate[bot]
0c7d689b5a Update dependency lint-staged to v15.2.11 (#23289)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-13 20:23:43 +01:00
renovate[bot]
655ce05efe Update dependency magic-string to v0.30.15 (#23287)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-13 08:44:33 +01:00
renovate[bot]
2a6e562d37 Update rspack monorepo to v1.1.6 (#23288)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-13 08:44:10 +01:00
renovate[bot]
98d1954812 Update formatjs monorepo (#23269)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-12 17:49:02 +01:00
renovate[bot]
72a2f54598 Update dependency @codemirror/view to v6.35.3 (#23280)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-12 17:47:25 +01:00
Bram Kragten
9364ea060a Merge branch 'rc' 2024-12-12 17:44:28 +01:00
Bram Kragten
f8dfdcb090 Bumped version to 20241127.8 2024-12-12 17:43:43 +01:00
Paulus Schoutsen
3d78a7821a Improve piper audio generation (#23281)
* Improve piper audio generation

* update logic

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-12-12 17:43:26 +01:00
Bram Kragten
e923d610ce Add missing translations to voice wizard (#23278) 2024-12-12 17:43:25 +01:00
Paul Bottein
8b25fe88a4 Use list item for integration quality scale (#23236) 2024-12-12 17:43:24 +01:00
Wendelin
3768be55ff Fix landingpage, supervisor release permission (#23223) 2024-12-12 17:43:23 +01:00
Paulus Schoutsen
47cf17ab50 Improve piper audio generation (#23281)
* Improve piper audio generation

* update logic

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-12-12 17:41:11 +01:00
Wendelin
d2ec24f32a Automation/Script editor add settings,category overflow actions (#23272)
* Add settings, category actions

* Add script category and settings actions

* Correct overflow actions order

* Use consume instead of subscribe
2024-12-12 17:40:52 +01:00
Bram Kragten
69ed736080 Add missing translations to voice wizard (#23278) 2024-12-12 17:38:53 +01:00
Wendelin
7d3c77008d Mobile styles for backup summary (#23276)
* Add mobile backup summary styles

* revert padding
2024-12-12 17:02:51 +01:00
Wendelin
27dbabc6bf Fix create custom backup twice on dialog-new-backup (#23279) 2024-12-12 15:55:07 +00:00
Wendelin
27ce395d68 Common-color-tests (#23258) 2024-12-12 14:44:17 +01:00
Steve Repsher
145a536156 Remove unused polyfills and adjust support for Intl.getCanonicalLocales (#23264) 2024-12-12 15:07:50 +02:00
ildar170975
e9b2a83411 Automation/Script editor border-radius fix (#23267)
* Update ha-automation-action-row.ts

* Update ha-automation-condition-row.ts

* Update ha-automation-trigger-row.ts

* Update ha-script-field-row.ts

* Update ha-script-field-row.ts

* Update ha-automation-condition-row.ts

* Update ha-automation-trigger-row.ts

* Update ha-automation-action-row.ts

* Update ha-automation-trigger-row.ts

* Update ha-automation-condition-row.ts

* Update ha-automation-action-row.ts

* Update ha-script-field-row.ts
2024-12-12 15:03:19 +02:00
Petar Petrov
784b7e4d04 Add zoom & pan to charts (#23183)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-12-12 13:40:47 +01:00
renovate[bot]
f4bf999ae2 Update dependency @codemirror/state to v6.5.0 (#23277)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-12 12:37:43 +00:00
Petar Petrov
9c04f57e35 Fix getting custom config parameters for Z-Wave JS (#23244) 2024-12-12 13:37:22 +01:00
Petar Petrov
f0ddc408e8 Remove custom TimeLineScale for chartjs (#23270) 2024-12-12 12:43:22 +01:00
Petar Petrov
df4d5a4567 Simplify dialog history logic (#23271) 2024-12-12 12:41:57 +01:00
Bram Kragten
0a413cba03 Fix more dialogs (#23273)
* Remove unneeded close dialog calls

* more
2024-12-12 09:00:38 +00:00
Bram Kragten
7e2217b542 Fix navigate timing when dialogs where opened (#23261)
* Fix navigate timing when dialogs where opened

* Revert navigate changes
2024-12-12 08:35:34 +00:00
Petar Petrov
93947d76a2 Fix navigate with replace when there are open dialogs (#23268) 2024-12-12 09:25:33 +01:00
Petar Petrov
18cce45b88 Fix for auto closing dialogs on navigate (#23262) 2024-12-11 22:47:23 +01:00
Paul Bottein
86f1af6682 Merge feature branch with backup changes to dev (#23239)
* Add dialog to upload a backup file (#22405)

* Add dialog to upload a backup file

* Prosess feedback

* Remoe unused definition

* Early pushout of changes to the backup panel (#22321)

* Eary pushout of changes to the backup panel

* Add location icons

* Path is optional

* Set backupSlug from route

* No need for subscription mixin

* update

* Reorder

* init details

* Fix import

* Improve backup screen and navigation (#22827)

* Add location page

* Start dashboard

* Move list to dashboard

* Add mocked config page

* Fix hardcoded boolean

* Add summary card

* Use new format for BackupAgent

* Use new API

* Rename to ha-backup-summary-card

* Use new api

* Fix backup agents

* Rename backup slug to backup id (#22876)

* Add delete backup action to datatable (#22867)

* Create generate backup dialog (#22866)

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Add backup details page (#22884)

* Add new backup dialog to choose between automatic and manual (#22895)

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

* Improve download backup (#22905)

* Rename remove to delete in backup websocket type (#22902)

* Use bytes for backup size (#22909)

* Use default backup instead of automatic backup (#22915)

* Update generate backup api (#22943)

Use new backup api for generate backup

* Improve details page for new backup (#22946)

* Add content of backup in detail page

* Add restore button

* Add note

* Use disabled

* Fix backup generate

* Use options to WS command backup/restore (#22950)

* Add addons picker in generate backup dialog (#22951)

* Add addons picker in generate backup dialog

* Change condition

* Fix label

* Fix local addons

* Review

* Add local addon in addon mode is all

* Fix local addon folder

* Use addon picker inside data picker

* Fetch addons info in detail page

* Fetch addon inside component

* Rename agents picker

* Restrict generate backup content for core backup (#22958)

* Fix addon mode all

* Use event to check if a backup is in progress (#22960)

* Use event to check if a backup is in progress

* Update src/panels/config/backup/ha-config-backup-dashboard.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Force enable home assistant settings when history is selected in backup (#22961)

* Backup default config (#22954)

* WIP default config

* Add addons

* save data

* add icon

* basics of change encryption key

* Update dialog-change-backup-password.ts

* use default config when manually triggering default backup

* limit to hassio

* enforce encryption key, manual use manual one

* Update ha-config-backup-dashboard.ts

* Add suggested password and copy buttons

* Add download emergency kit button

* review

* fix

* Update ha-config-backup-default-config.ts

* Update ha-config-backup-default-config.ts

* Update default backup settings (#23109)

* Only display addons and folder for hassio (#23118)

* Use new backup dashboard page for hassio backup (#23161)

* Add support for copies and days for backup retention (#23128)

* Add upload dialog for backup (#23139)

* Improve generate backup dialog (#23167)

* Propose to use encryption key if available when restoring a backup (#23164)

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Add encryption key onboarding (#23180)

* Fix attributes broken by the warning fixes (#23182)

* Don't allow any more eslint warnings (#23181)

* Use dedicated endpoint to generate backup with default settings (#23224)

* Add onboarding dialog for backups (#23225)

* Add onboarding flow for backups

* Add welcome screen

* Add progress and status for backup dashboard (#23222)

* Handle backup state

* Add summary card

* Use difference in days

* Rename local backups and show icon (#23238)

* Improve backup onboarding (#23241)

* Do not navigate to config page after onboarding

* Use casita image and center text

* fix lint

* Rename stored and default to strategy backup

* Update

* Fix icon and add type in datatable

* Use strategy in more places

* Fix list item overflow

---------

Co-authored-by: Joakim Sørensen <ludeeus@ludeeus.dev>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2024-12-11 15:52:37 -05:00
Bram Kragten
c8f58c7bc9 Prevent leaving the editor if there are unsaved changes (#23170)
* Prevent leaving the editor if there are unsaved changes

* Process code review

* use first composePath target

* fix function calls

* Use query instead

* Remove id on sidebar

* suggestions

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-12-11 16:58:25 +01:00
Wendelin
e5e168803a Remove not needed admin checks (#23259) 2024-12-11 16:50:35 +01:00
Bram Kragten
3436a023f6 suggestions 2024-12-11 16:08:03 +01:00
Jan-Philipp Benecke
84322a21fe Remove id on sidebar 2024-12-11 15:59:46 +01:00
Jan-Philipp Benecke
ec20f7e2c4 Use query instead 2024-12-11 15:59:46 +01:00
Jan-Philipp Benecke
3579d82e8e fix function calls 2024-12-11 15:59:46 +01:00
Jan-Philipp Benecke
70532ac3bf use first composePath target 2024-12-11 15:59:46 +01:00
Jan-Philipp Benecke
96b9d25bc5 Process code review 2024-12-11 15:59:46 +01:00
Jan-Philipp Benecke
91777d45b0 Prevent leaving the editor if there are unsaved changes 2024-12-11 15:59:46 +01:00
ildar170975
0582b8430d Update developer-tools-template.ts: add independent scrollbars for left & right panels for large screens (#23242)
* Update developer-tools-template.ts

* whitespace in pre

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* prettier

* Update developer-tools-template.ts

* Update developer-tools-template.ts

* prettier

* prettier!!!!

* prettier again

* prettier fight

* prettier

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* prettier

* prettier

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2024-12-11 15:25:39 +02:00
Bram Kragten
63d97398c1 Fix dialog navigation by making navigate() async (#23254)
* Fix dialog navigation by making `navigate()` async

* close all dialogs on `navigate`

* log warning when navigation is blocked

* fix
2024-12-11 14:13:20 +01:00
Steve Repsher
3552417b39 Compress legacy build and shared static files using Brotli (#23233)
* Revert "Remove Zopfli compression (#23157)"

This reverts commit 4092f56ea5.

* Revert "Fix compression of hassio builds (#21869)"

This reverts commit b69f0964c9.

* Compress legacy build and shared static files using Brotli
2024-12-11 15:05:17 +02:00
Petar Petrov
a6cbbfe1a4 fix 2024-12-11 13:59:47 +02:00
Petar Petrov
48f5d17060 log warning when navigation is blocked 2024-12-11 13:36:47 +02:00
Petar Petrov
c713106948 close all dialogs on navigate 2024-12-11 13:35:09 +02:00
Petar Petrov
142e674020 Fix dialog navigation by making navigate() async 2024-12-11 11:56:32 +02:00
Wendelin
e4fc21c991 Move view to another dashboard (#23245)
* Add move view to dashboard

* Remove unneeded return in error flow

* Update src/panels/lovelace/editor/select-dashboard/hui-dialog-select-dashboard.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Update src/panels/lovelace/editor/select-dashboard/hui-dialog-select-dashboard.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Use ha-list-item for button-menu

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2024-12-11 10:30:57 +02:00
Simon Lamon
f688780677 Combine Edit in yaml and Edit in visual editor (2/2) (#23143)
* yaml / visual part 2

* clean up

* ci
2024-12-11 09:49:15 +02:00
Simon Lamon
0ce98a86e6 Combine Edit in yaml and Edit in visual editor (1/2) (#23142)
* yaml / visual part 1

* clean up

* clean up
2024-12-11 09:48:10 +02:00
Jan-Philipp Benecke
bf624f5ca7 Intercept default search shortcut and focus our search input on data table pages (#23209)
Intercept default search shortcut on data table pages
2024-12-11 09:34:27 +02:00
renovate[bot]
ce5ce37de7 Update formatjs monorepo (#23250)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-11 07:36:33 +01:00
Simon Zumbrunnen
da727d3a3a Added "Media player volume slider" card feature. (#23199)
* Added "Media player volume" card feature.

* Make sure the feature is not displayed on unsupported players

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Renamed to Media player volume *slider*

* Missed one rename.

---------

Co-authored-by: Simon Zumbrunnen <simon-zumbrunnen@users.noreply.github.com>
Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2024-12-10 13:36:56 +00:00
Paul Bottein
9d83cc6988 Use list item for integration quality scale (#23236) 2024-12-10 13:33:21 +02:00
Petar Petrov
ed625d4e0b Simplify dialog navigation to fix back button (#23220)
* Simplify dialog navigation to fix back btn

* add back comment

* manage dialog stack in the manager instead of history

* handle dialogs that refuse to close
2024-12-10 13:26:57 +02:00
Wendelin
84157c8ea5 Extract assist-chat out of voice-command-dialog (#23184) 2024-12-10 13:23:48 +02:00
Wendelin
8f19c0abb0 Use localStorage with Web Storage API (#23172) 2024-12-10 11:14:15 +01:00
Wendelin
008647aa7a Fix landingpage, supervisor release permission (#23223) 2024-12-10 10:51:25 +01:00
Wendelin
b86d6021da Revert "Update developer-tools-template.ts: add independent scrollbars for left & right panels for large screens" (#23237)
Revert "Update developer-tools-template.ts: add independent scrollbars for le…"

This reverts commit d1c981bc19.
2024-12-10 09:47:40 +00:00
Steve Repsher
98af479fd3 Drop support for IE 11 and Samsung 4 (#23234) 2024-12-10 10:35:33 +01:00
ildar170975
d1c981bc19 Update developer-tools-template.ts: add independent scrollbars for left & right panels for large screens (#17765)
* Update developer-tools-template.ts

* Update developer-tools-template.ts

* fix overflow

* Update src/panels/developer-tools/template/developer-tools-template.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* Update src/panels/developer-tools/template/developer-tools-template.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* Update developer-tools-template.ts

* Update src/panels/developer-tools/template/developer-tools-template.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* Update developer-tools-template.ts

* prettier

* Update developer-tools-template.ts

* Update developer-tools-template.ts

* prettier

* Update developer-tools-template.ts

* prettier

* prettier

* Update developer-tools-template.ts

* prettier

* prettier

* prettier

* Update developer-tools-template.ts

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2024-12-10 10:11:48 +01:00
dependabot[bot]
1b0e53d3d9 Bump nanoid from 3.3.7 to 3.3.8 (#23235)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-12-10 09:21:23 +01:00
renovate[bot]
0d49927541 Update dependency @codemirror/view to v6.35.2 (#23232)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-10 08:30:36 +01:00
Charles Garwood
9e8d452438 Fix typo in translations build script (#23227)
* Fix typo in build script
2024-12-09 18:23:23 +00:00
renovate[bot]
ddd646007e Update dependency @codemirror/view to v6.35.1 (#23221)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-09 17:18:38 +01:00
Bram Kragten
f9844e8e58 Merge branch 'rc' 2024-12-09 15:59:29 +01:00
Bram Kragten
86f9909ac9 Bumped version to 20241127.7 2024-12-09 15:59:07 +01:00
Paulus Schoutsen
629ae3fbf3 Fix voice debug link (#23214) 2024-12-09 15:58:46 +01:00
Christopher Fenner
ddd2c177b5 Correct overwriting integration labelling on integrations page (#23206)
* Update ha-config-integration-page.ts

fixes #22776

* update icon color

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2024-12-09 15:58:45 +01:00
ildar170975
829de4a073 Fix "Integration entries" page for yaml-based integrations (#23201)
* Update ha-config-integration-page.ts

* prettier
2024-12-09 15:58:44 +01:00
karwosts
0df8b96133 No script entities in scenes (#23192) 2024-12-09 15:58:43 +01:00
Wendelin
443921a97c Automate supervisor & landing-page release (#22959)
* Automate supervisor & landing-page release

* Add no prerelease condition to supervisor/landing-page release

* Prepare release workflow for testing

* Add release permissions to create PR

* Add supervisor, landingpage release to assets

* Create test draft release to test

* Fix hassio release path

* Fix workflow permission for test reasons

* Revert test settings
2024-12-09 15:58:43 +01:00
Norbert Rittel
787fba82bd Improve "Restore?" option for Timer helpers (#23213)
When creating or editing a Timer helper the option "Restore?" can be ticked by the user.

This should not be a question but rather just the option itself and in addition this should better explain its purpose as there is a full line of text possible.

This commit fixes this by adding a similar explanation as for a Counter helpers, following the explanation in the online docs.
2024-12-09 16:43:48 +02:00
renovate[bot]
1393a3ade8 Update vaadinWebComponents monorepo to v24.5.5 (#23219)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-09 11:37:34 +01:00
ildar170975
bf24d67066 Fix "Integration entries" page for yaml-based integrations (#23201)
* Update ha-config-integration-page.ts

* prettier
2024-12-09 09:06:18 +02:00
dependabot[bot]
9774deef6d Bump actions/cache from 4.1.2 to 4.2.0 (#23217)
Bumps [actions/cache](https://github.com/actions/cache) from 4.1.2 to 4.2.0.
- [Release notes](https://github.com/actions/cache/releases)
- [Changelog](https://github.com/actions/cache/blob/main/RELEASES.md)
- [Commits](https://github.com/actions/cache/compare/v4.1.2...v4.2.0)

---
updated-dependencies:
- dependency-name: actions/cache
  dependency-type: direct:production
  update-type: version-update:semver-minor
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-12-09 08:52:56 +02:00
Paulus Schoutsen
8390c6e29b Fix voice debug link (#23214) 2024-12-08 22:32:43 +01:00
Christopher Fenner
c78d371a9c Correct overwriting integration labelling on integrations page (#23206)
* Update ha-config-integration-page.ts

fixes #22776

* update icon color

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2024-12-08 17:21:34 +00:00
renovate[bot]
7750299a66 Update dependency @types/leaflet to v1.9.15 (#23202)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-07 22:33:51 +01:00
renovate[bot]
43f31dd455 Update dependency prettier to v3.4.2 (#23195)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-07 09:54:27 +01:00
karwosts
df21900341 No script entities in scenes (#23192) 2024-12-07 02:45:25 +01:00
Paul Bottein
6934f0626c Fix boolean attributes (#23189) 2024-12-06 18:39:34 +01:00
Bram Kragten
54bc0525f7 Merge branch 'rc' 2024-12-06 16:18:55 +01:00
Bram Kragten
72f8f020fc Bumped version to 20241127.6 2024-12-06 16:18:37 +01:00
Bram Kragten
7f31acf764 Fix label selector when required (#23186) 2024-12-06 16:18:21 +01:00
Paul Bottein
ea5bf17780 Fix has-secondary attribute (#23187) 2024-12-06 15:16:33 +00:00
Bram Kragten
0b7af715a8 Fix label selector when required (#23186) 2024-12-06 15:14:30 +00:00
Petar Petrov
8579bee053 Don't allow any more eslint warnings (#23181) 2024-12-06 14:58:04 +01:00
Petar Petrov
400ddbf625 Fix attributes broken by the warning fixes (#23182) 2024-12-06 14:56:42 +01:00
renovate[bot]
5fdefc0c20 Update dependency @rsdoctor/rspack-plugin to v0.4.11 (#23175)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-06 12:57:02 +02:00
renovate[bot]
c72c74828e Update rspack monorepo to v1.1.5 (#23176)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-06 11:23:31 +01:00
Petar Petrov
e0b157d280 Remove @web/dev-server (#23179) 2024-12-06 09:54:28 +00:00
Bram Kragten
8c5862e4ce 20241127.5 (#23178) 2024-12-06 10:45:15 +01:00
Bram Kragten
f3e0df93b5 Bumped version to 20241127.5 2024-12-06 10:37:14 +01:00
Paul Bottein
c6c5ea34d3 Fix text color in ha-md-select in dark mode (#23174) 2024-12-06 10:36:53 +01:00
Bram Kragten
287a068ada Add localisation to voice wizard (#23169)
* Add localization to voice wizard

* more
2024-12-06 10:36:52 +01:00
karwosts
8ca52820b1 Missing horiz swing mode import (#23168) 2024-12-06 10:36:51 +01:00
Bram Kragten
cd8900dd26 Voice addon install: try to find discovered flow (#23146) 2024-12-06 10:36:51 +01:00
Paul Bottein
6d2e7f9fbd Improve trigger and action description for conversation (#23141) 2024-12-06 10:36:50 +01:00
Petar Petrov
e02736b4e2 ZwaveJS: Handle S2 inclusion via Inclusion Controller (#23100) 2024-12-06 11:32:45 +02:00
Petar Petrov
af049274d9 Cleanup unused WDS deps and config (#23155)
* Cleanup unused WDS deps and config

* fix
2024-12-06 09:57:46 +01:00
Petar Petrov
7a12fd2853 Fix ALL the eslint warnings (#23165)
* Fix many lint warnings

* Fix ALL lint warnings

* small fix

* type fixes
2024-12-06 09:55:07 +01:00
Paul Bottein
f724d8e7a9 Fix text color in ha-md-select in dark mode (#23174) 2024-12-06 09:19:56 +01:00
Bram Kragten
0d7e0df194 Add localisation to voice wizard (#23169)
* Add localization to voice wizard

* more
2024-12-06 09:11:17 +02:00
renovate[bot]
7d567bc386 Update vitest monorepo to v2.1.8 (#23166)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-05 17:33:14 +01:00
karwosts
ad52386ae0 Missing horiz swing mode import (#23168) 2024-12-05 16:02:55 +00:00
Paul Bottein
512fee47b6 Improve trigger and action description for conversation (#23141) 2024-12-05 17:01:04 +01:00
Petar Petrov
4092f56ea5 Remove Zopfli compression (#23157) 2024-12-05 14:01:25 +01:00
renovate[bot]
926972cce6 Update vitest monorepo to v2.1.7 (#23156)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-05 12:58:37 +02:00
Bram Kragten
d51eea7bb6 Voice addon install: try to find discovered flow (#23146) 2024-12-05 10:14:06 +01:00
karwosts
a3ca889ca3 Location selector: Move location on map click (#22198)
* Add button to location-selector to move marker to current view

* move on click

* double-click handling
2024-12-05 08:55:53 +02:00
renovate[bot]
a7406b3201 Update dependency globals to v15.13.0 (#23148)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-05 08:20:38 +02:00
renovate[bot]
b54057cc4b Update dependency chart.js to v4.4.7 (#23145)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-05 08:20:09 +02:00
Petar Petrov
d77dd5300e Require underscore for private methods (#23138) 2024-12-04 15:05:49 +01:00
Wendelin
9396d5cf8c Automate supervisor & landing-page release (#22959)
* Automate supervisor & landing-page release

* Add no prerelease condition to supervisor/landing-page release

* Prepare release workflow for testing

* Add release permissions to create PR

* Add supervisor, landingpage release to assets

* Create test draft release to test

* Fix hassio release path

* Fix workflow permission for test reasons

* Revert test settings
2024-12-04 14:41:21 +01:00
Wendelin
a78ddb50fd Fix time input with helper text width (#23134)
* Fix time input with helper text width

* Make time input help text always newline

* Put helper text out of base-time-input
2024-12-04 13:25:31 +00:00
Bram Kragten
1016c87c60 20241127.4 (#23137) 2024-12-04 14:20:32 +01:00
Bram Kragten
dbda1d75f9 Bumped version to 20241127.4 2024-12-04 14:12:49 +01:00
Wendelin
a9c25b49b9 Add red delete button to delete zone confirmation dialog (#23136) 2024-12-04 14:12:25 +01:00
Bram Kragten
fbff95345c Use action instead of selected for select entity row (#23135) 2024-12-04 14:12:24 +01:00
Paul Bottein
8f4e65d392 Don't use duration formatting for second unit (#23132)
Don't use duration formatting for sec unit
2024-12-04 14:12:23 +01:00
Paul Bottein
3a2cb51f8d Reduce button target zone in media player more info (#23130) 2024-12-04 14:12:22 +01:00
Jan-Philipp Benecke
6c9cfed49f Explicitly set file name for camera snapshot (#23124)
* Explicitly set file name for camera snapshot

* Process code review
2024-12-04 14:12:21 +01:00
Paul Bottein
257cab1061 Fix create section on iOS (#23123) 2024-12-04 14:12:21 +01:00
Wendelin
5f6577a24c Remove static font from ha-badge (#23120) 2024-12-04 14:12:20 +01:00
Jan-Philipp Benecke
f8d6f0fae4 Show in assist pipeline debug when intent is preferred and processed locally (#23115) 2024-12-04 14:12:19 +01:00
renovate[bot]
5b7eeb6ac1 Update dependency marked to v15.0.3 (#23088)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-04 14:12:18 +01:00
Bram Kragten
64e8b636b9 Use action instead of selected for select entity row (#23135) 2024-12-04 13:57:55 +01:00
Wendelin
2c604ff946 Add red delete button to delete zone confirmation dialog (#23136) 2024-12-04 12:55:12 +00:00
Paul Bottein
f8ce7c2ce1 Don't use duration formatting for second unit (#23132)
Don't use duration formatting for sec unit
2024-12-04 13:17:47 +01:00
Abílio Costa
af1622e306 Show unit for number domains (#23101)
* Show unit for number domains

* Remove duplicated code

* Allow monetary formatting

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Update src/common/entity/compute_state_display.ts

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2024-12-04 11:25:29 +00:00
Jan-Philipp Benecke
3c03dfb322 Revert translation change for device quick bar (#23131) 2024-12-04 11:43:50 +01:00
Jan-Philipp Benecke
697a99f913 Show in assist pipeline debug when intent is preferred and processed locally (#23115) 2024-12-04 09:52:48 +01:00
Paul Bottein
06925f0716 Reduce button target zone in media player more info (#23130) 2024-12-04 09:40:41 +01:00
Jan-Philipp Benecke
afcfdb5140 Explicitly set file name for camera snapshot (#23124)
* Explicitly set file name for camera snapshot

* Process code review
2024-12-04 08:52:53 +02:00
Jan Čermák
6126280f2d Fix Markdown cards in Grid not taking full height (#23121)
The implementation of show_empty property in #21379 introduced
regression which causes Markdown cards rendered within a Grid card to
not take full height of its space. This is because a visible card is now
forced to have "display: block", while without that it's rendered as
"display: inline".

As the CSSStyleDeclaration.style mandates string type, it's not possible
to delete or null the value. Setting it to an empty string seems to do
the trick as well and the linter is happy too.

Fixes #23119
2024-12-03 17:33:59 +01:00
Paul Bottein
8e6f4886e8 Fix create section on iOS (#23123) 2024-12-03 17:16:52 +02:00
Wendelin
480de9ef03 Remove static font from ha-badge (#23120) 2024-12-03 14:15:59 +00:00
Bram Kragten
191feed920 Merge branch 'rc' 2024-12-03 14:44:05 +01:00
Bram Kragten
13c1763277 Bumped version to 20241127.3 2024-12-03 14:43:51 +01:00
Wendelin
ac9085c7a4 Fix ha-target-picker hideTitle (#23116) 2024-12-03 14:43:40 +01:00
Bram Kragten
8beb93b695 Voice local: Small refactor and return when local already exists (#23113) 2024-12-03 14:43:39 +01:00
Marcin
4f76e66cc0 Updated English translations for scene editor. (#23110) 2024-12-03 14:43:38 +01:00
renovate[bot]
614c4ec404 Update dependency @rsdoctor/rspack-plugin to v0.4.10 (#23108)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-03 15:07:54 +02:00
Wendelin
d43291ae52 Fix ha-target-picker hideTitle (#23116) 2024-12-03 13:05:05 +00:00
Petar Petrov
7c486ec969 ZWaveJS: abort S2 bootstrapping when inclusion is canceled (#23106) 2024-12-03 13:56:17 +01:00
Bram Kragten
19f54b6ba2 Voice local: Small refactor and return when local already exists (#23113) 2024-12-03 12:01:54 +01:00
Wendelin
97cc9f9ab9 Simplify mediaBrowserPreferredLayout @storage (#23107) 2024-12-03 11:37:23 +01:00
Marcin
a104d38fc9 Updated English translations for scene editor. (#23110) 2024-12-03 10:25:56 +01:00
renovate[bot]
2582023ab2 Update dependency eslint to v9.16.0 (#23105)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-03 08:50:48 +02:00
Jan-Philipp Benecke
e731f060f1 Add device search to quick bar (#23095)
* Add device search to quick bar

* Process code review
2024-12-03 08:50:07 +02:00
Bram Kragten
1ebd13027c 20241127.2 (#23104) 2024-12-02 21:39:46 +01:00
Bram Kragten
04beef5e36 Bumped version to 20241127.2 2024-12-02 21:31:47 +01:00
Bram Kragten
0a578c5847 Voice wizard local: Add error message, fix hostname (#23103)
Add error message, fix hostname
2024-12-02 21:31:29 +01:00
Wendelin
41924d8ec6 Add automatic retry to stream logs (#23098) 2024-12-02 21:31:29 +01:00
Paul Bottein
6ff1a6fecc Don't show alert in voice assistant dialog (#23097) 2024-12-02 21:31:28 +01:00
Wendelin
05eb6e15a5 Save scene before switching to live edit (#23094)
Save scene changes before live edit, align delete icons for entities.
2024-12-02 21:31:27 +01:00
Alex Jurkiewicz
6d01728d54 history-graph-card-editor: Correct hours_to_show validation (#23090)
history-graph-card-editor: Correct hours_to_show validation

Allow all floating point numbers from 0 up.

Fixes #15933.
2024-12-02 21:31:26 +01:00
karwosts
2550bff4e9 Init new scenes in live edit mode (#23051)
* Init new scenes in live edit mode

* Update src/panels/config/scene/ha-scene-editor.ts

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

* imports

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-12-02 21:31:25 +01:00
Wendelin
c3942d244d Add automatic retry to stream logs (#23098) 2024-12-02 21:30:51 +01:00
Bram Kragten
f4ef4c628a Voice wizard local: Add error message, fix hostname (#23103)
Add error message, fix hostname
2024-12-02 14:48:24 -05:00
Simon Lamon
a0f3e4f785 Add a label filter (#23081)
* Label filter

* adjust height

* ci

* Update src/components/ha-filter-labels.ts

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2024-12-02 15:41:41 +00:00
Norbert Rittel
2c13c5a18c Change "Low-carbon energy consumed" to "… electricity …" (#23096)
The Energy card allows the user to monitor the "Grid carbon footprint" which is visualized by the "Low-carbon energy consumed" gauge.

But this does not cover the carbon emissions of the gas consumption that might be shown right next to it, just the electrical energy from the grid.

So the labeling is very misleading in that context – not even considering energy consumed by oil or wood burned in addition.

Therefore this needs to be changed to use "electricity" just like the description already does.
2024-12-02 17:32:56 +02:00
Paul Bottein
22cfd40ccc Don't show alert in voice assistant dialog (#23097) 2024-12-02 14:35:41 +01:00
martetassyns
5c7d9b3fa3 Made it easier to test the frontend against an existing core instance. (#23062)
* Made it easier to test the frontend against an existing core instance.

* Ensured that script works regardless of current working dir

* Use consistent quote style

* Also allow using variables in hassUrl override

* Improved the default behavior of the script

* more consistent variable naming

* don't install a global dependency

* documented caching wierdness where if you switch core endpoints the old one remains in use

* Simplified some code

* improved documentation

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2024-12-02 13:27:36 +00:00
Wendelin
55b6aa09d9 Save scene before switching to live edit (#23094)
Save scene changes before live edit, align delete icons for entities.
2024-12-02 15:24:03 +02:00
Robert MacWha
96395dd5e1 Store Media Browser view in localStorage (#23061)
feat: store preferredLayout in localStorage
2024-12-02 14:02:13 +01:00
renovate[bot]
7191edd3c6 Update dependency marked to v15.0.3 (#23088)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-02 11:58:59 +01:00
dependabot[bot]
6169379f4c Bump relative-ci/agent-action from 2.1.13 to 2.1.14 (#23089)
Bumps [relative-ci/agent-action](https://github.com/relative-ci/agent-action) from 2.1.13 to 2.1.14.
- [Release notes](https://github.com/relative-ci/agent-action/releases)
- [Commits](https://github.com/relative-ci/agent-action/compare/v2.1.13...v2.1.14)

---
updated-dependencies:
- dependency-name: relative-ci/agent-action
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-12-02 11:57:33 +01:00
Alex Jurkiewicz
5500dd1332 history-graph-card-editor: Correct hours_to_show validation (#23090)
history-graph-card-editor: Correct hours_to_show validation

Allow all floating point numbers from 0 up.

Fixes #15933.
2024-12-02 12:48:12 +02:00
renovate[bot]
5c681896f3 Update dependency @codemirror/language to v6.10.6 (#23092)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-02 12:45:19 +02:00
Norbert Rittel
d826113319 Change "Energy usage" to "Electricity usage" (#23091)
The energy dashboard tracks the total energy of a home, including the gas consumption in a separate graph (if configured).

The topmost graph is currently labeled "Energy usage" but it does only cover the electricity consumption and production. Also note the "Energy distribution" next to it includes gas, too.

Thus the title is misleading and needs to be changed to "Electricity usage" to make this clearer.
2024-12-02 12:30:56 +02:00
karwosts
f72b298f97 Init new scenes in live edit mode (#23051)
* Init new scenes in live edit mode

* Update src/panels/config/scene/ha-scene-editor.ts

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

* imports

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-12-02 11:18:03 +01:00
Jan-Philipp Benecke
90b7cad7ac Add shortcut to open the voice assist dialog (#23082)
* Add shortcut to open the voice assist dialog

* Add tip

* Only show dialog when enabled

* Update src/translations/en.json

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2024-12-02 09:26:27 +00:00
renovate[bot]
e0239486bc Update dependency element-internals-polyfill to v1.3.12 (#23077)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-12-01 12:13:29 +01:00
Norbert Rittel
e10fb3c168 Fix inconsistent "remove" in description of refresh tokens (#23073)
As Refresh tokens are created in HA the corresponding verb is "delete", not "remove".

All buttons and menu items in this context use the correct verb, except for the description which contains "remove", twice.

This commit fixes that.
2024-11-30 22:32:00 +01:00
Norbert Rittel
5ee8bee6dc Remove the misleading word "updates" from system options (#23069)
Remove the misleading word "update" from system options

The second option in the system options dialog for integrations uses the word "updates" in both the headline and the explanation.

This is highly misleading as it sounds like polling for firmware updates for many device integrations.

Therefore the words "(state) changes" should be used instead.
2024-11-30 17:07:37 +01:00
renovate[bot]
4b678ffb41 Update dependency @codemirror/language to v6.10.5 (#23070)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-30 16:44:46 +01:00
Norbert Rittel
82c23026b3 Correctly match "Remove" to "Add" within Energy dashboard (#23068)
In Home Assistant the action "Add" should always pair with "Remove", like "Create" does with "Delete".
This commit addresses all mismatched pairs in the Energy dashboard.

In addition the grammar of device_consumption_energy is fixed by using the consistent "energy consumption" word pair.
2024-11-30 16:44:09 +01:00
renovate[bot]
94b7b60fe0 Update dependency prettier to v3.4.1 (#23053)
* Update dependency prettier to v3.4.1

* Prettier rule

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-11-29 16:55:54 +00:00
renovate[bot]
e1553a7ccf Update dependency magic-string to v0.30.14 (#23052)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-29 17:40:33 +01:00
renovate[bot]
fb0ca49742 Update vitest monorepo to v2.1.6 (#23060)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-29 16:55:18 +02:00
Norbert Rittel
97015788a2 Correctly pair 'remove' with 'add' in description of To-do list card (#23044)
When using 'Add' in HA this should always pair with 'Remove', like 'Create' with 'Delete'.

The To-do list card introduces an inconsistent third word by using 'clear' instead of 'remove'.

This fixes this and also properly capitalizes "To-do list" as it's name like in all other Dashboard card types.
2024-11-29 08:35:45 +02:00
renovate[bot]
0cf05ea2cc Update dependency @types/chromecast-caf-receiver to v6.0.20 (#23049)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-28 21:11:24 +01:00
renovate[bot]
acbe77c0d6 Update Yarn to v4.5.3 (#23046)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-28 18:57:25 +01:00
Bram Kragten
6e003907fb 20241127.1 (#23045) 2024-11-28 17:01:24 +01:00
Bram Kragten
f6c15dc990 Bumped version to 20241127.1 2024-11-28 16:53:58 +01:00
Wendelin
1061769144 Simplify depends_on_cloud translation (#23042) 2024-11-28 16:52:56 +01:00
Wendelin
1edfec08e1 Add internal, legacy to IQS (#23040) 2024-11-28 16:52:55 +01:00
Wendelin
239cad9b47 Fix iqs naming and docs link anchor (#23036) 2024-11-28 16:52:54 +01:00
Paul Bottein
8d7c175d70 Only use duration poly-fill when necessary (#23030) 2024-11-28 16:52:43 +01:00
Wendelin
795bbefba6 Fix platinum color and spacing of integration logo (#23029) 2024-11-28 16:51:57 +01:00
karwosts
e1b34eaa33 Dont floor duration for milliseconds (#23028)
* Dont floor duration for milliseconds

* remove ms
2024-11-28 16:51:22 +01:00
renovate[bot]
bede8c66c5 Update dependency @rsdoctor/rspack-plugin to v0.4.9 (#23043)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-28 13:58:28 +01:00
Norbert Rittel
de87aee15b Replace add_zone with create_zone in ha-config-zone.ts (#23041)
* Replace add_zone with create_zone in ha-config-zone.ts

The action button is the only inconsistent item here now.

* Remove orphaned "add_zone" string
2024-11-28 14:46:29 +02:00
Wendelin
36312cc273 Simplify depends_on_cloud translation (#23042) 2024-11-28 13:24:44 +02:00
Wendelin
3120184d63 Add internal, legacy to IQS (#23040) 2024-11-28 13:23:53 +02:00
Wendelin
a1be9d923e Fix iqs naming and docs link anchor (#23036) 2024-11-28 09:58:34 +02:00
renovate[bot]
7dee34ca75 Update dependency @codemirror/language to v6.10.4 (#23031)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-28 06:19:06 +01:00
karwosts
f7c8c6e3e8 Dont floor duration for milliseconds (#23028)
* Dont floor duration for milliseconds

* remove ms
2024-11-27 17:27:03 +00:00
Paul Bottein
3411967fd9 Only use duration poly-fill when necessary (#23030) 2024-11-27 17:13:29 +01:00
Wendelin
125805d6d1 Fix platinum color and spacing of integration logo (#23029) 2024-11-27 16:27:53 +01:00
Bram Kragten
91d5d2f1eb 20241127.0 (#23027) 2024-11-27 15:28:49 +01:00
Bram Kragten
e0e158b64c Merge branch 'master' into dev 2024-11-27 15:19:46 +01:00
Bram Kragten
078095db3f Bumped version to 20241127.0 2024-11-27 15:17:35 +01:00
Wendelin
8c7fcc725c Limit iqs indicator to colors only (#23026) 2024-11-27 15:16:52 +01:00
G Johansson
988fa3e4e4 Add horizontal swing to climate (#22043) 2024-11-27 15:10:11 +01:00
Bram Kragten
f9118a4b87 Add alt to img, fix styling issue voice (#23024) 2024-11-27 15:04:09 +01:00
Paul Bottein
164944ceff Improve duration formatting (#23025) 2024-11-27 15:00:29 +01:00
Wendelin
bc195c61cc Integration Quality Scale indicator (#23015) 2024-11-27 14:45:44 +01:00
Bram Kragten
f54bb20fef Fix error on hardware page (#23021)
* fix error on hardware page

* Update ha-config-hardware.ts
2024-11-27 15:44:24 +02:00
Bram Kragten
71214351ca Fix timeout error handling local voice (#23023)
fix timeout error handling local voice
2024-11-27 14:36:30 +01:00
Bram Kragten
0a954cf1c7 Add add-on installation to voice setup flow (#23018) 2024-11-27 14:12:36 +01:00
Simon Lamon
2782b2fb1b Use DurationFormat for calendar trigger (#23020)
duration long
2024-11-27 13:47:14 +01:00
Paul Bottein
a532b4461d Use explicit duration format for state formatting (#23017) 2024-11-27 12:49:21 +01:00
Wendelin
dd7987e199 Add unit tests for common/array files (#23006)
* add vitest coverage

* Add js doc to functions

* Add tests for common/array
2024-11-27 10:02:24 +02:00
Jan-Philipp Benecke
81cc73ece3 Make missed strings translatable in ha-script-trace and ha-automation-trace (#23013) 2024-11-27 07:49:58 +01:00
Jan-Philipp Benecke
f9701b2363 Use "No traces found" automation translation in ha-script-trace (#23010) 2024-11-27 07:26:48 +01:00
Jan-Philipp Benecke
adb22abd7d Mark reset addon options dialog as destructive (#23009) 2024-11-26 21:16:13 +01:00
Jan-Philipp Benecke
4df90ebbc3 Mark delete backup dialog as destructive (#23008) 2024-11-26 19:54:10 +00:00
Wendelin
4655929fed Add node_modules cache in ci (#22826)
* Add reusable node_modules to ci

* Use node_modules cache

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Add yarn version to cache

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-11-26 19:08:28 +01:00
Mark Bergsma
39b00f1063 Support time entities in automation time conditions/triggers selectors (#21069)
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-11-26 15:41:59 +01:00
Wendelin
bd0bfc1fbe Rspack (#22807)
* Add rspack

* Remove TransformAsyncModulesPlugin from rspack

* Migrate all webpack usage to rspack

* Migrate tests to vitest

* Fix test suites

* Remove chai dependency

* Fix compute_state_display tests

* Fix resolveTimeZone

* Reduces test pipeline

* Revert test ci

* optimize chunk filtering

* Migrate landing-page to rspack

* Update rspack dependencies

* Add rsdoctor

* Fix prod build bundle size

* Use rsdoctor for demo stats

* Remove unused webpack configs

* Update build-scripts/rspack.cjs

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Fix eslint

* Update rspack

* Remove unused code

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2024-11-26 14:49:13 +01:00
Paul Bottein
09c5dab69f Improve tags datatable (#23003)
* Improve tags datatable

* Update translations
2024-11-26 12:19:00 +01:00
ildar170975
25a7f6ebf7 Fix padding top for logbook panel (#22999) 2024-11-26 11:46:06 +01:00
renovate[bot]
a5e12cb558 Update dependency typescript to v5.7.2 (#22998)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-26 09:08:42 +01:00
renovate[bot]
a2927f281d Update dependency @types/chromecast-caf-receiver to v6.0.19 (#23000)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-26 09:05:33 +01:00
renovate[bot]
3c23c18faf Update dependency @types/chromecast-caf-sender to v1.0.11 (#23001)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-26 08:45:36 +01:00
renovate[bot]
616bd065e0 Update vaadinWebComponents monorepo to v24.5.4 (#22990)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-25 17:17:13 +01:00
Ruben van Dijk
a525c44794 Cancels page retry loop with negative intervals. (#22983)
* Cancels page retry loop with negative intervals.
This shouldn't be required, but sometimes, which I can't easily reproduce, it fails to reload.
Fixes #20052

* Clear interval before reload.
2024-11-25 14:43:27 +02:00
Wendelin
2d3579c08a Add workflow_dispatch to release workflow (#22993) 2024-11-25 13:34:25 +01:00
renovate[bot]
6ef36dce3e Update dependency @codemirror/search to v6.5.8 (#22989)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-25 11:07:42 +02:00
Norbert Rittel
74bf1d2a82 Use consistent name "Field key" for entry field (#22985)
Both error messages just refer to the "field key" as such.

Therefore the label in the dialog should be consistent.
2024-11-25 08:21:50 +02:00
renovate[bot]
8ea2e3f471 Update Yarn to v4.5.2 (#22986)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-25 08:19:52 +02:00
arthanoss
1b74e94f14 Remove redundant action handler and wrapper from sensor entity row (#22975) 2024-11-24 17:04:01 +02:00
renovate[bot]
536d2e0ab0 Update dependency @codemirror/view to v6.35.0 (#22982)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-24 16:49:53 +02:00
Norbert Rittel
c610778b0f Fix inconsistent capitalization in Device info (#22979) 2024-11-24 11:42:12 +01:00
renovate[bot]
0791b1bc71 Update dependency marked to v15.0.2 (#22974)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-24 11:11:47 +01:00
renovate[bot]
c93f6f683a Update dependency @types/mocha to v10.0.10 (#22972)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-24 11:11:06 +01:00
Norbert Rittel
999969b78d Make key_c_hint strings consistent (#22971)
Make ui::dialogs::quick-bar::key_c_hint consistent with ui::tips::key_c_hint
2024-11-23 20:50:49 +02:00
Steven B.
10b8627f51 Webrtc use RTCIceCandidateInit messages with backend (#22667)
* Add sdp m line index to ICE Candidates

* Remove ? from candidate

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Send full candidate in message

* Revert launch.json change

* Use RTCIceCandidate for messaging

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-11-23 14:56:19 +02:00
Wendelin
528fcecd16 Ha-alert-narrow-action (#22956)
* Add ha-alert narrow option

* Use ha-alert narrow in ha-scene-editor
2024-11-22 18:37:05 +02:00
Bram Kragten
f8fb5d7bf2 Add cloud signup to voice flow (#22941) 2024-11-22 08:55:37 +01:00
renovate[bot]
3e02d95e01 Update dependency magic-string to v0.30.13 (#22949)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-21 20:33:13 +01:00
renovate[bot]
4ef6661532 Update dependency husky to v9.1.7 (#22945)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-21 18:56:28 +01:00
Wendelin
6cc6d9fb45 Tolerant env vars (#22948) 2024-11-21 18:26:51 +01:00
Wendelin
43911ef3be Fix disable ha-progress button (#22939)
* Fix disable ha-progress button

* Simplify ha-progress disabled fix

* Fix ha-progress-button click handler

* fix ha-progress-button pointer-events
2024-11-21 15:30:28 +00:00
Wendelin
6b0afe6ebb Add inline-arrow option to ha-select & ha-language-picker (#22935)
* Add inline-arrow option to ha-select & use it in some language pickers

* Update src/components/ha-language-picker.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-11-21 16:44:11 +02:00
Wendelin
811977b366 Fix disable fields in general config (#22938) 2024-11-21 15:58:26 +02:00
Wendelin
fc2e3b7bcf Disable devices/entities click in scene review mode (#22940) 2024-11-21 15:57:02 +02:00
Bram Kragten
6b8068a22a Improv external flow (#22878)
* WIP improv external flow

* Update external_messaging.ts

* use name instead, start flow

* make copy

* Update ha-config-integrations-dashboard.ts

* Update

* rename command

* Use a map instead of array for deduping
2024-11-21 14:45:49 +01:00
Norbert Rittel
2899388395 Change "Add" to "Create" for Labels and Zones following HA Design guidelines (#22942) 2024-11-21 14:23:46 +01:00
Bram Kragten
4e63eacb79 Improve message for yaml core settings (#22936) 2024-11-21 11:38:04 +01:00
Wendelin
881ff13832 Fix landing-page dns update request (#22932)
* Fix landing-page dns update request

* clear  _dnsPrimaryInterface
2024-11-21 11:10:20 +01:00
Bram Kragten
79c7cf59ee Add warning for muted voice assistant or when not heard wakeword in 1… (#22934)
Add warning for muted voice assistant or when not heard wakeword in 15 secs
2024-11-21 10:07:56 +00:00
renovate[bot]
b82d880bfd Update formatjs monorepo (#22930)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-21 11:54:25 +02:00
Bram Kragten
64374a4fcb Voice wizard: prevent flash of hardware screen when cloud is active (#22933) 2024-11-21 08:59:43 +00:00
Norbert Rittel
0e0be279ea Fix broken grammar in confirm_unsaved_comments alert (#22928) 2024-11-21 09:37:06 +01:00
renovate[bot]
08a8e053d3 Update dependency marked to v15.0.1 (#22929)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-21 09:36:35 +01:00
Norbert Rittel
7d9752abdf Dev Tools: Replace "Current entities" with "Current entity states" (#22924) 2024-11-20 23:09:23 +01:00
Norbert Rittel
0c382f1967 Change "Add script" and "Add scene" to "Create …" (#22922) 2024-11-20 19:39:05 +00:00
Norbert Rittel
7833a31eea Change "Elevation" to "Elevation above sea level" for clarity (#22919) 2024-11-20 20:19:27 +01:00
Norbert Rittel
8e796e013a Change "Find my value" to "Find my ISO Code" for the currency field (#22917)
Under Settings > System > General the user can set the currency for the system.

To enter the correct ISO code there is a link to the respective Wikipedia page.

The link is currently labeled "Find my value" which makes no real sense.
2024-11-20 20:28:14 +02:00
Paulus Schoutsen
757ed2e80c Add local processing option to pipeline for LLM conversation agents (#22561)
* Add local processing field to pipeline

* update

* Update wording

* handle current pipelines

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-11-20 20:24:50 +02:00
Norbert Rittel
d2665f1349 Fix two strings for Settings > Tags (#22916)
The explanation for the QR code does not make sense right now.

The 'Create automation with tag' missing a 'this'.
2024-11-20 18:06:38 +00:00
Abílio Costa
84f7c62ee2 Add support for unit_of_measurement translation (#22868) 2024-11-20 18:44:44 +01:00
Norbert Rittel
a9d7082218 Add missing words in matter::ping_node::battery_device_warning (#22914) 2024-11-20 18:36:17 +01:00
Norbert Rittel
766de17ea3 Change "Run" command for automation to "Run actions" (#22913) 2024-11-20 18:35:43 +01:00
Norbert Rittel
8988bd519f No longer use "button" when referring to "Edit ID" menu item for triggers (#22892) 2024-11-20 18:34:14 +01:00
Simon Lamon
6ccd4fa431 Handle empty trigger or action in migration path (#22912)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-11-20 16:24:21 +00:00
Wendelin
5b8e63a213 Landing page (#22598) 2024-11-20 16:20:08 +00:00
Simon Lamon
6a337cc486 Remove activate scene in automation editor (#22258) 2024-11-20 17:02:15 +01:00
Norbert Rittel
f7f936cb54 Use consistent name "Entity search" for that part of "Quick Search" (#22907)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-11-20 16:17:55 +01:00
renovate[bot]
7252169325 Update dependency @lit-labs/observers to v2.0.4 (#21636)
* Update dependency @lit-labs/observers to v2.0.4

* Pin lit-html to 2.8.0

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-11-20 15:16:48 +00:00
Bram Kragten
b7ef633a3e Voice wizard: Use test message in tts language (#22882)
* Voice wizard: Use test message in tts language

* catch none existing lang
2024-11-20 15:09:48 +00:00
Wendelin
995155696f Improve scene editor UI (#22910) 2024-11-20 14:53:49 +00:00
Yosi Levy
7996f4e0b2 Picture elements card editor: Add title to secondary description for custom cards (#22908) 2024-11-20 15:45:29 +01:00
karwosts
ac6e61b9b8 Remove display of 'Current state' in ha-card-condition-state (#22887) 2024-11-20 14:43:21 +00:00
System Tester
b7f3e40340 Fixes #17769, #22503: Improved subscription handling (#22889)
* Fixes #17769, #22503: Improved subscription handling

Prevent multiple active subscriptions
Ensure a clean state when the component reconnects
Checking subscription status before processing

* Prettier issue resolved

* async methods referencing _unsubscribe are properly awaited

* Apply suggestions from code review

Thank you

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2024-11-20 15:41:59 +01:00
Norbert Rittel
39b4e85dcd Better explain the "Push notification" option in the browser settings (#22906) 2024-11-20 15:38:10 +01:00
karwosts
37d2c6844a Update Scene Editor (#22847)
* New scene editor design

* bugfixes

* reorder overflow menu, change label

* category support
2024-11-20 15:12:23 +01:00
Norbert Rittel
b8e2298cdd Update the explanation for setting up the Google Home integration (#22897) 2024-11-20 12:49:57 +01:00
Norbert Rittel
a3ff065c7a Update 'mqtt_device_debug_info' strings to use ICU syntax (#22899) 2024-11-20 12:49:11 +01:00
Norbert Rittel
a224d6c61b Fix grammar issue in remove_fabric_confirm_text (#22901) 2024-11-20 12:48:21 +01:00
Norbert Rittel
cd0980d13e Clarify 'updates_refreshed' message (#22904) 2024-11-20 12:46:59 +01:00
Norbert Rittel
13cb32a83f Entity settings for helpers: avoid repeating "options" in explanation (#22896) 2024-11-20 12:43:04 +01:00
Norbert Rittel
12a9cf4b32 Replace wrong uses of "energy" with "electricity" in Energy dashboard (#22893) 2024-11-20 12:41:54 +01:00
Norbert Rittel
8cce13163f Make sidebar (app) settings items consistent by replacing 'configuration' (#22890) 2024-11-20 12:39:42 +01:00
Petar Petrov
46a55630fa ZWaveJS: Support for Door Lock in Expert UI (#22775)
* ZWaveJS: Support for Door Lock in Expert UI

* make it dry

* Update src/panels/config/integrations/integration-panels/zwave_js/capability-controls/zwave_js-capability-control-door-lock.ts

Co-authored-by: AlCalzone <dominic.griesel@nabucasa.com>

* add validation

* fix booleans

* Update src/panels/config/integrations/integration-panels/zwave_js/capability-controls/zwave_js-capability-control-door-lock.ts

Co-authored-by: AlCalzone <dominic.griesel@nabucasa.com>

* handle ZWaveErrorCodes.CC_NotSupported for getCapabilities

* get/set mode

---------

Co-authored-by: AlCalzone <dominic.griesel@nabucasa.com>
2024-11-20 12:28:39 +01:00
Petar Petrov
c92bee4f1d Show ZwaveJS "Installer settings" based on installer_mode option (#22710)
Show "Installer settings" based on `installer_mode` option
2024-11-20 13:06:15 +02:00
Norbert Rittel
940cbd42c3 Dashboard: Fix description of the Tile card (#22894)
There are currently two grammar issues in the Tile card description: It should be "allows" and "trigger" needs to be added.
2024-11-20 10:31:46 +01:00
Norbert Rittel
39bf7c9ad4 Use ICU string for proper singular vs. plural of "listener(s)" (#22885)
Fix for the permanent plural in ({count}  listeners)
2024-11-20 09:52:30 +01:00
Norbert Rittel
64c260c1c4 Form correct headline for 'Delete backups?' alert, separate "Delete backup" menu item (#22891)
Create correct headline for 'Delete backups?' alert

Change 'Delete backup' to 'Delete backups?' to use correct plural and form a question the user has to confirm.

Separates the 'Delete backup' menu item that is currently referenced from this key.
2024-11-20 09:21:51 +01:00
Norbert Rittel
36f3ef9e86 Update en.json to make all automation conditions use "if", not "when" (#22883)
* Update en.json to make all automation conditions use "if", not "when"

Fixes the remaining inconsistencies in all conditions defined in HA Frontend.

Especially important as these are prefixed with "Test" in the condition building block of automations and scripts, so they currently result in "Test when …" instead of the correct "Test if …".

* Updated en.json to fix the two wrong lowercase if
2024-11-19 16:56:21 +00:00
Bram Kragten
42622fe21e Hide wake word in pipeline settings (#22879)
* hide wake word in pipeline settings

* move logic to pipeline-editor
2024-11-19 16:35:44 +02:00
Wendelin
64f7afd60f Fix lint-staged with eslint v9 (#22880) 2024-11-19 14:03:38 +01:00
Ivan Kara
3282785cf2 Fix media browser (#22875) 2024-11-19 11:24:36 +00:00
DominikBitzer
2c1931adb1 Add Y-Axis limits functionality from history graphs card to statistics graph card (#22771) 2024-11-19 12:19:35 +01:00
Petar Petrov
c9cad254d2 Add tone,volume & duration selector to more-info dialog for sirens (#22786)
* Add tone selector to more-info for sirens

* add selected tone to service call

* rework the tone into an advanced controls dialog

* tweaks from PR comments

* fix % conversion

* assume duration is in seconds
2024-11-19 11:56:52 +01:00
Wendelin
f4f2cce57e Fix logbook date range alignment (#22877) 2024-11-19 11:32:13 +02:00
renovate[bot]
556315b360 Update dependency eslint to v9.15.0 (#22870)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-19 09:12:20 +01:00
boern99
bed470f79d add previous and next button to History and Logbook (#22802)
* add previous and next button to History and Logbook

* used date-fns and changed media-query-resolution to fit on mobiles

* hide .prev and .next on small screens; optimized dateRange for ranges lower 1 day

* fixed Date type number
2024-11-19 08:57:08 +01:00
renovate[bot]
9acf946097 Update dependency @bundle-stats/plugin-webpack-filter to v4.17.0 (#22869)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-19 08:40:32 +01:00
renovate[bot]
231ef4b5b4 Lock file maintenance (#22873)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-19 06:25:02 +01:00
renovate[bot]
f8bcc6dde4 Pin dependency globals to 15.12.0 (#22858)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-18 16:55:18 +00:00
dependabot[bot]
11ed4600fd Bump http-proxy-middleware from 2.0.6 to 2.0.7 (#22865)
Bumps [http-proxy-middleware](https://github.com/chimurai/http-proxy-middleware) from 2.0.6 to 2.0.7.
- [Release notes](https://github.com/chimurai/http-proxy-middleware/releases)
- [Changelog](https://github.com/chimurai/http-proxy-middleware/blob/v2.0.7/CHANGELOG.md)
- [Commits](https://github.com/chimurai/http-proxy-middleware/compare/v2.0.6...v2.0.7)

---
updated-dependencies:
- dependency-name: http-proxy-middleware
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-11-18 16:42:37 +00:00
dependabot[bot]
c0e2d6fa23 Bump cross-spawn from 7.0.3 to 7.0.6 (#22864)
Bumps [cross-spawn](https://github.com/moxystudio/node-cross-spawn) from 7.0.3 to 7.0.6.
- [Changelog](https://github.com/moxystudio/node-cross-spawn/blob/master/CHANGELOG.md)
- [Commits](https://github.com/moxystudio/node-cross-spawn/compare/v7.0.3...v7.0.6)

---
updated-dependencies:
- dependency-name: cross-spawn
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-11-18 16:41:46 +00:00
renovate[bot]
942562161a Update dependency @codemirror/view to v6.34.3 (#22863)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-18 16:33:20 +00:00
renovate[bot]
d35c40b585 Update dependency globals to v15 (#22861)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-18 17:23:13 +01:00
renovate[bot]
8cd0ddceb8 Update dependency eslint to v9.14.0 (#22859)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-18 17:22:09 +01:00
dependabot[bot]
c3ee49298a Bump @eslint/plugin-kit from 0.2.0 to 0.2.3 (#22860)
Bumps [@eslint/plugin-kit](https://github.com/eslint/rewrite) from 0.2.0 to 0.2.3.
- [Release notes](https://github.com/eslint/rewrite/releases)
- [Changelog](https://github.com/eslint/rewrite/blob/main/release-please-config.json)
- [Commits](https://github.com/eslint/rewrite/compare/core-v0.2.0...plugin-kit-v0.2.3)

---
updated-dependencies:
- dependency-name: "@eslint/plugin-kit"
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-11-18 17:21:07 +01:00
Simon Lamon
89dc1a7ebc ESLint Flat Config (#22221)
* Flat config file

* Plugin

* prettier

* Set eslint to latest version (non dev)

* yarn dedupe

* push changes from eslint type pr

* dedupe
2024-11-18 15:49:59 +01:00
Wendelin
ced70fd9a1 Fix 2fa login validation, add autofocus to login (#22856) 2024-11-18 15:25:51 +02:00
Simon Lamon
253c8f358b Logbook target picker (#22851)
Logbook picker
2024-11-18 14:19:17 +01:00
Paul Bottein
23b55484c3 Improve grid size editor (#22697)
* Use table instead of grid

* Add animation

* Change size

* Simplify precideMode logic

* Add tooltip and improve slider style

* Improve size

* Back to default instead of min

* Limit number of cells for the grid when more than 24 cells
2024-11-18 09:43:52 +01:00
dependabot[bot]
1990b8fa84 Bump softprops/action-gh-release from 2.0.9 to 2.1.0 (#22854)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-11-18 08:54:58 +01:00
Paul Bottein
03ea08f98c Create a section when dropping card on the create section button (#22790)
* Create a section when dropping card on the create section button

* Add translations

* Add title by default

* And case when moving a heading card
2024-11-18 08:53:01 +02:00
Matt Way
1f5f6c5f8a Fix back gesture on Android activating buttons (#22852)
Touchcancel event cancels touch regardless of cancelled flag

Co-authored-by: Benjamin Paul <benjamin.ian.paul@gmail.com>
2024-11-17 16:55:43 +00:00
renovate[bot]
fa821b1c4f Update dependency @types/chromecast-caf-receiver to v6.0.18 (#22849)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-17 17:47:56 +01:00
karwosts
f51bc40203 Catch yaml errors in script editor (#22853) 2024-11-17 15:09:03 +00:00
renovate[bot]
c7dae49c42 Update dependency marked to v15 (#22782)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-16 18:23:45 +01:00
Joost Lekkerkerker
b056b71557 Only download verified translations (#22844) 2024-11-16 13:20:06 +01:00
dependabot[bot]
0db2b45cc3 Bump cross-spawn from 7.0.3 to 7.0.5 (#22843)
Bumps [cross-spawn](https://github.com/moxystudio/node-cross-spawn) from 7.0.3 to 7.0.5.
- [Changelog](https://github.com/moxystudio/node-cross-spawn/blob/master/CHANGELOG.md)
- [Commits](https://github.com/moxystudio/node-cross-spawn/compare/v7.0.3...v7.0.5)

---
updated-dependencies:
- dependency-name: cross-spawn
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-11-16 10:16:36 +01:00
renovate[bot]
1be1003549 Update dependency @codemirror/autocomplete to v6.18.3 (#22842)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-16 09:02:45 +01:00
Petar Petrov
b8a13dd6eb ZWaveJS: Add names to colors in Installer Settings (#22819) 2024-11-15 17:55:02 +01:00
Petar Petrov
cae5540c44 ZWaveJS: Configuration.resetAll is only supported on CC v4+ (#22823) 2024-11-15 17:40:38 +01:00
karwosts
d47966cdf7 Allow attaching additional data to schedule in UI (#22798)
* Allow attaching additional data to schedule in UI

* use expandable
2024-11-15 18:13:04 +02:00
renovate[bot]
991cf83ff3 Update dependency @babel/helper-define-polyfill-provider to v0.6.3 (#22829)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-15 12:00:34 +01:00
Simon Lamon
b83be38514 Introduce calendar trigger description (#22814) 2024-11-14 09:28:15 +02:00
Simon Lamon
17982e0bdc Fix swapped plural and singular match use in and condition (#22815)
* Fix swapped plural and singular match

* Test if => if
2024-11-14 09:11:20 +02:00
Simon Lamon
b918862bb1 Confirm uses to if for clarity (#22816) 2024-11-14 09:08:54 +02:00
ildar170975
6bdc7af09f Add outline to a label (3) - consistency (#22812)
Update ha-config-labels.ts
2024-11-14 09:05:01 +02:00
ildar170975
7cbebfd603 Add outline to a label (2) (#22803)
* Update ha-filter-labels.ts

* Update ha-automation-picker.ts

* Update ha-scene-dashboard.ts

* Update ha-script-picker.ts

* Update ha-config-devices-dashboard.ts

* Update ha-config-entities.ts

* Update ha-config-helpers.ts

* Update ha-filter-labels.ts

* Update ha-automation-picker.ts

* Update ha-config-devices-dashboard.ts

* Update ha-config-helpers.ts

* Update ha-script-picker.ts

* Update ha-scene-dashboard.ts

* Update ha-config-entities.ts

* Update ha-data-table-labels.ts

* Update ha-label.ts

* Update ha-label.ts
2024-11-13 16:05:03 +00:00
Petar Petrov
42b1f938d6 Increase ZwaveJS add device timeout to 5 mins (#22809) 2024-11-13 16:13:29 +01:00
boern99
311f221387 Add describeCondition and entity_ids as additional information to automation step details (#21965)
* Add describeCondition and entity_ids as additional information to automation step details

* Update src/components/trace/ha-trace-path-details.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* tested suggestions

* Update src/components/trace/ha-trace-path-details.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Update src/components/trace/ha-trace-path-details.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* code style fixes

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2024-11-13 14:30:29 +02:00
ildar170975
3c6be8cf99 Fix visibility for shown entities on device card (#22579)
* Update ha-device-entities-card.ts

* Update ha-device-entities-card.ts

* Update src/panels/config/devices/device-detail/ha-device-entities-card.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* Update ha-device-entities-card.ts

* Update src/panels/config/devices/device-detail/ha-device-entities-card.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* Update ha-device-entities-card.ts

* Update src/panels/config/devices/device-detail/ha-device-entities-card.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* Update ha-device-entities-card.ts

* Update ha-device-entities-card.ts

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2024-11-13 07:56:58 +01:00
karwosts
28703b39da Allow entities table to delete helpers (#22248)
* Allow deleting helpers in entities table

* Fix calling the right delete on restored legacy helpers
2024-11-12 18:16:24 +00:00
Petar Petrov
db03e271f5 ZWaveJS: Color Switch support fot the expert UI (#22722)
* ZWaveJS: Color Switch support fot the expert UI

* remove debug code

* fix stopTransition options

* fix options format
2024-11-12 18:21:45 +01:00
AlCalzone
7c851d4542 Z-Wave JS: Fix validation/parsing for custom config param UI (#22789)
* Z-Wave JS: Fix validation/parsing for custom config param UI

* Apply suggestions from code review

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-11-12 14:57:32 +00:00
Jan-Philipp Benecke
4d107f978c Add download snapshot button to camera more info dialog (#22704)
* Add take snapshot button to camera more info dialog

* Change to download

* Use camera proxy

* Remove filename to have right extension

* Add error handling and process indication

* Update src/dialogs/more-info/controls/more-info-camera.ts

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>

* Run prettier

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2024-11-12 12:59:29 +02:00
karwosts
de57b025e6 Warn on switching to automation UI mode with yaml errors (#22780) 2024-11-12 12:47:12 +02:00
renovate[bot]
3f4351476f Update vaadinWebComponents monorepo to v24.5.3 (#22779)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-11 17:06:31 +01:00
karwosts
d763a014ad Show YAML parsing errors in automation editor (#22753)
* Show YAML parsing errors in automation editor

* make dirty on error

* formatting
2024-11-11 15:40:20 +00:00
Petar Petrov
52a91d8403 Allow GET/SET custom config param in Z-Wave device configuration (#22364)
* Allow GET/SET custom config param in Z-Wave device configuration

* update api calls and validation

* update imports

* fix import

* PR review comments

* fix import

* fix merge error

* fix merge
2024-11-11 08:50:13 +01:00
Petar Petrov
f6cc435f86 More flexible translation keys for logbook binary sensors (#22696)
* Revert "Revert "More flexible translation keys for logbook binary sensors" (#22687)"

This reverts commit c3b7ce8dc4.

* fix type issue
2024-11-11 08:39:11 +01:00
dependabot[bot]
349b1ccaad Bump home-assistant/wheels from 2024.07.1 to 2024.11.0 (#22774) 2024-11-11 08:17:16 +01:00
Paulus Schoutsen
ca921be9d2 CSS Fixes for md-dialog (#22638)
* CSS Fixes for md-dialog

* Update src/components/ha-md-dialog.ts

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2024-11-11 07:11:58 +00:00
Simon Lamon
919932e414 Improve choose description in automation editor (#22769) 2024-11-10 21:11:48 +01:00
Simon Lamon
97a8b6da34 Fix calendar add/edit event dialogs not saving via keyboard (#22767) 2024-11-10 20:18:59 +01:00
renovate[bot]
1eceaa0d1b Update dependency marked to v14.1.4 (#22768)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-10 20:10:57 +01:00
renovate[bot]
ba3fae2577 Update dependency barcode-detector to v2.3.1 (#22763)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-10 15:51:14 +01:00
renovate[bot]
93ed1cae5e Update dependency comlink to v4.4.2 (#22761)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-10 15:34:45 +01:00
Adam Jež
d8618b4a25 Fix typo in Czech language for blank before percent (#22760) 2024-11-10 12:30:07 +01:00
Simon Lamon
1f6b0360de Collection of localization issues (2) (#22758)
* Clarify delay action

* Change order

* Add translations for "line" and "bar"
2024-11-10 10:58:04 +00:00
karwosts
e1830470b6 Better disabled/error handling on config/helpers page (#22237)
* Add a way to fix/remove broken helpers

* more disabled/sources fixes

* Update src/translations/en.json

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

* Update ha-config-helpers.ts

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-11-10 00:40:49 +01:00
renovate[bot]
9e002f7940 Update dependency webpackbar to v7 (#22752)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-09 16:43:33 +01:00
renovate[bot]
a1380e93ea Update dependency barcode-detector to v2.3.0 (#22743)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-08 20:16:20 +01:00
renovate[bot]
c511672b0d Update dependency barcode-detector to v2.2.12 (#22741)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-08 17:23:28 +00:00
renovate[bot]
d6d6d1d0b5 Update formatjs monorepo (#22728)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-08 18:10:48 +01:00
Wendelin
bee629f7ed Improve stream and iOS checks in error-log-card (#22738)
Improve stream and download checks in error-log-card
2024-11-08 12:59:35 +00:00
Bram Kragten
188fe44c2e Bumped version to 20241106.2 2024-11-08 13:01:19 +01:00
Wendelin
25c02b1219 Fix live-logs loading (#22737) 2024-11-08 13:00:40 +01:00
Wendelin
e5e84acd07 Fix join-beta text (#22733) 2024-11-08 13:00:40 +01:00
tzagim
722ccc017f Fix for RTL languages in logs (#22727)
Fix for RTL Languages (log)
2024-11-08 13:00:39 +01:00
Wendelin
d8df380edc Add reset to default to zwave node config (#21991)
* Add reset to default to zwave node config

* use invoke_cc_api instead of a new API

---------

Co-authored-by: Petar Petrov <MindFreeze@users.noreply.github.com>
2024-11-08 11:53:22 +00:00
Wendelin
cbfcad71d5 Fix live-logs loading (#22737) 2024-11-08 12:39:21 +01:00
renovate[bot]
327a9ff836 Update CodeMirror (#22732)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-08 13:05:04 +02:00
dependabot[bot]
ae2c389273 Bump http-proxy-middleware from 2.0.6 to 2.0.7 (#22731)
Bumps [http-proxy-middleware](https://github.com/chimurai/http-proxy-middleware) from 2.0.6 to 2.0.7.
- [Release notes](https://github.com/chimurai/http-proxy-middleware/releases)
- [Changelog](https://github.com/chimurai/http-proxy-middleware/blob/v2.0.7/CHANGELOG.md)
- [Commits](https://github.com/chimurai/http-proxy-middleware/compare/v2.0.6...v2.0.7)

---
updated-dependencies:
- dependency-name: http-proxy-middleware
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-11-08 11:01:31 +01:00
Wendelin
5ce75cea0d Fix join-beta text (#22733) 2024-11-08 11:00:54 +01:00
Simon Lamon
ee79c3a983 Remove rollup build configuration (#22181)
Rollup remove
2024-11-08 10:19:52 +02:00
tzagim
f396be2ed7 Fix for RTL languages in logs (#22727)
Fix for RTL Languages (log)
2024-11-08 10:16:42 +02:00
Bram Kragten
8a4b96f1ff Bumped version to 20241106.1 2024-11-07 21:40:38 +01:00
Paul Bottein
17b6bf0673 Enable auto-scroll for drag and drop (#22725) 2024-11-07 21:39:45 +01:00
Bram Kragten
387392713c move download logs button, switch between raw and normal logs (#22721) 2024-11-07 21:39:44 +01:00
Wendelin
125ad9c794 Fix logs live-indicator on older boots (#22719) 2024-11-07 21:39:43 +01:00
Bram Kragten
ae33b10cb2 Add support for helper text in form boolean (#22711) 2024-11-07 21:39:43 +01:00
Wendelin
1181ddcbbf Fix hassio logs for core < 2024.11 (#22708) 2024-11-07 21:39:42 +01:00
Paul Bottein
f7103febdf Fix typo for fixed background attribute (#22707) 2024-11-07 21:39:41 +01:00
Bram Kragten
6e8c1f1a63 Update value of password field on change event (#22706) 2024-11-07 21:39:40 +01:00
Bram Kragten
9f55ef811d move download logs button, switch between raw and normal logs (#22721) 2024-11-07 21:32:28 +01:00
Paul Bottein
4c898a2a5a Enable auto-scroll for drag and drop (#22725) 2024-11-07 17:33:18 +01:00
Wendelin
a56e22790d Fix logs live-indicator on older boots (#22719) 2024-11-07 14:50:24 +01:00
renovate[bot]
2d8fbc652f Update vaadinWebComponents monorepo to v24.5.2 (#22709)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-07 14:00:50 +02:00
Bram Kragten
46f0e0212d Add support for helper text in form boolean (#22711) 2024-11-07 09:09:24 +00:00
Bram Kragten
786b9ee8d6 Update value of password field on change event (#22706) 2024-11-07 09:53:34 +01:00
Wendelin
1e73cebda6 Fix hassio logs for core < 2024.11 (#22708) 2024-11-07 09:45:58 +01:00
Paul Bottein
9b9adf3c7a Fix typo for fixed background attribute (#22707) 2024-11-07 08:40:18 +00:00
renovate[bot]
a08c7a319f Update formatjs monorepo (#22681)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-07 08:52:53 +02:00
Petar Petrov
5e8868e4b1 Fix import type linter issues (#22702) 2024-11-07 06:39:30 +00:00
Bram Kragten
64285d5155 Add zwave expert UI / Installer settings (#21897)
* Add zwave expert UI / Installer settings

* Fix zwave invoceCC api function name

* Fix function calls of invokeZWaveCCApi

* Add zwave node-installer translations and endpoint separation

* Add zwave capability-control error handling, translations and thermostat setback

* Fix zwave capability thermostat setback

---------

Co-authored-by: Wendelin <w@pe8.at>
2024-11-07 08:00:51 +02:00
Bram Kragten
ce39b1a2c8 20241106.0 (#22695) 2024-11-06 14:05:23 +01:00
Bram Kragten
5247b74fd4 Bumped version to 20241106.0 2024-11-06 13:43:57 +01:00
Wendelin
26e914290d Fix hassio logs translations (#22693)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-11-06 12:33:45 +00:00
Wendelin
ed3096157c Fix logs overflow when there are 0 boots (#22694) 2024-11-06 13:19:17 +01:00
Simon Lamon
04a45a4361 Fix action descriptions switch to English when using search (#22689)
* var mistake

* Update src/panels/config/automation/add-automation-element-dialog.ts

* prettier
2024-11-06 11:17:36 +01:00
Paul Bottein
5430040b96 Fix update more info margin (#22691) 2024-11-06 11:17:14 +01:00
Wendelin
4bd70167ad Add overflow menu to error-log-card (#22684)
* Add overflow menu to error-log-card

* Add toggle line wrap icon-button in error-log-card
2024-11-06 09:59:01 +00:00
Wendelin
e908fbb48e Check for empty logs (#22675)
* Fix download logs default lines + translations + iOS, add live logs indicator

* Fix rtl in error-log-card

* Fix downloadFileSupported
2024-11-06 09:42:46 +00:00
Paul Bottein
38da01abfa Fix icon click in edit card overflow (#22686) 2024-11-06 09:42:38 +00:00
Paul Bottein
c3b7ce8dc4 Revert "More flexible translation keys for logbook binary sensors" (#22687)
Revert "More flexible translation keys for logbook binary sensors (#22257)"

This reverts commit df3e4576db.
2024-11-06 09:30:19 +00:00
Simon Lamon
0488d199ac Localize automation logbook text (#22685)
* localize automation text

* localize domain

* fixup

* split up

* fixup

* prettier
2024-11-06 09:03:41 +00:00
karwosts
df3e4576db More flexible translation keys for logbook binary sensors (#22257) 2024-11-06 10:55:17 +02:00
Paul Bottein
6bd7788815 Use grid options instead of layout options for all cards. (#22676)
* Use grid options for all cards

* Improve min columns for some cards

* Fix button and area card
2024-11-05 18:58:19 +01:00
Paul Bottein
a6971d61d1 20241105.0 (#22679) 2024-11-05 18:47:04 +01:00
Paul Bottein
9cdae4fea7 Bumped version to 20241105.0 2024-11-05 18:46:16 +01:00
Bram Kragten
7adf9f8526 fix height of header table rows (#22678) 2024-11-05 16:13:52 +00:00
Bram Kragten
35dcb46703 Group stream picking logic (#22674)
* Group stream picking logic

* MJPEG too

* handle errors when 1 stream type

* correct import

* change to array

* Update ha-camera-stream.ts

* Update ha-camera-stream.ts

* Update ha-camera-stream.ts

* rename
2024-11-05 14:33:34 +00:00
Bram Kragten
17db85ebad Migrate select in md-dialog to md-select (#22670)
* Migrate select in md-dialog to md-select

* Fix md-select in es5 md-dialogs

---------

Co-authored-by: Wendelin <w@pe8.at>
2024-11-05 15:24:09 +01:00
Petar Petrov
fa39595c37 Fix scanning of small QR codes with JS (#22651)
* Fix scanning of small QR codes with JS

* fix filename

* fix qr error and add device button

* fix yarn.lock
2024-11-05 16:00:05 +02:00
Bram Kragten
4db908171f Restrict webrtc logging to dev (#22671)
restrict webrtc logging to dev
2024-11-05 12:33:36 +01:00
Paulus Schoutsen
7306b8c102 Remove sections blog post link (#22663) 2024-11-05 06:07:27 +01:00
Bram Kragten
452cfee2cd Merge branch 'dev' 2024-11-04 19:04:13 +01:00
Bram Kragten
928bf3465e Bumped version to 20241104.0 2024-11-04 19:03:40 +01:00
Wendelin
0b38143765 Fix load older logs at boot 0 in error-log-card (#22657)
* Fix load older logs at boot 0 in error-log-card

* Refactor fetch boot logs in error-log-card

* Refactor download url boot logs in error-log-card
2024-11-04 16:36:25 +00:00
Bram Kragten
2f974078e0 Only show webrtc if it has video (#22659) 2024-11-04 16:34:08 +00:00
Bram Kragten
efe90fcc55 Show error when using wrong username format during onboarding (#22658) 2024-11-04 16:23:32 +00:00
renovate[bot]
01e33f5412 Update dependency webpack to v5.96.1 (#22655)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-04 14:35:51 +01:00
Bram Kragten
51fdc484c3 Update voice wizard animations (#22656) 2024-11-04 13:11:35 +01:00
Paul Bottein
3d9fa462a6 Improve imported card container style (#22653) 2024-11-04 12:31:22 +01:00
Paul Bottein
32b5d67806 Fix create backup toggle ignored (#22652) 2024-11-04 11:27:04 +01:00
Paulus Schoutsen
20d3681da3 Delay loading IndexedDB to when first icon is requested (#22637) 2024-11-04 11:26:45 +01:00
Paulus Schoutsen
9b97274bf6 CSS Fixes for hui-energy-date-selection-card (#22640)
* CSS Fixes for hui-energy-date-selection-card

* Remove unused class

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-11-04 09:46:21 +00:00
Paulus Schoutsen
ede0dff030 CSS Fixes for ha-toast (#22639) 2024-11-04 10:29:58 +01:00
Simon Lamon
4cd4635fa5 Collection of localization issues (#22615)
* Fix wrong use of 'zero' in ICU formatted string for condition headlines

* Matter: Use setup code consistently

* Matter: Share from Google Home dialog

* Remove question format for settings toggles

* Add translation for current add-on version:" in add-on details

* Missing space

* Localize integration name not localized in single_config_entry alert

* Reword start into restart to indicate that the addon restarts when it crashes

* Rephrase rename description

* localize migrate script / automation

* Fixup script translation
2024-11-04 08:00:27 +01:00
renovate[bot]
7832219749 Update dependency @codemirror/search to v6.5.7 (#22647)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-04 08:51:06 +02:00
dependabot[bot]
a8d4726caf Bump relative-ci/agent-action from 2.1.12 to 2.1.13 (#22648) 2024-11-04 07:26:16 +01:00
dependabot[bot]
4b3e20c6ca Bump softprops/action-gh-release from 2.0.8 to 2.0.9 (#22649) 2024-11-04 07:25:44 +01:00
karwosts
f9a53743ce Make duration input clearable (#22614) 2024-11-04 08:25:09 +02:00
G Johansson
89250c0c01 Render preview based of entity domain (#21926)
* Render preview based of entity domain

* Add some more

* More

* return string

* Final

* Add image

* Sort

* Missing format
2024-11-04 08:07:12 +02:00
karwosts
4ef944ea08 Fix map zone focus issues (#22623) 2024-11-04 07:58:13 +02:00
renovate[bot]
5f58c183f4 Update dependency webpack to v5.96.0 (#22645)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-04 07:44:41 +02:00
renovate[bot]
f71feff916 Update dependency core-js to v3.39.0 (#22636)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-03 07:12:27 +01:00
renovate[bot]
50fb3b314b Update dependency mocha to v10.8.2 (#22633)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-02 21:07:53 +01:00
renovate[bot]
06298562cd Update dependency @codemirror/autocomplete to v6.18.2 (#22632)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-02 21:07:25 +01:00
renovate[bot]
89e74f3f07 Update dependency mocha to v10.8.1 (#22629)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-01 22:12:25 +01:00
renovate[bot]
da96c27893 Update dependency mocha to v10.8.0 (#22627)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-01 21:41:09 +01:00
renovate[bot]
3321dd4ca7 Update workbox monorepo to v7.3.0 (#22626)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-11-01 20:21:23 +01:00
Josh McCarty
7106d56b33 Fix NFS proper name (#22620) 2024-11-01 08:53:00 +01:00
ildar170975
25cd8a9d9f Revert height=100% in horizontal-stack-card (#22617)
Update hui-horizontal-stack-card.ts
2024-10-31 20:12:32 +00:00
Paul Bottein
deb077b5e9 20241031.0 (#22613) 2024-10-31 15:14:02 +01:00
Paul Bottein
a4bb0e04ab Bumped version to 20241031.0 2024-10-31 15:13:21 +01:00
renovate[bot]
1df60056b2 Update dependency chart.js to v4.4.6 (#22612)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-31 13:57:45 +00:00
Paul Bottein
c4bc1f627f Remove get layout options warning in console (#22611) 2024-10-31 13:48:21 +00:00
Wendelin
f4df5852fb Fix hassio repositories tooltip (#22610) 2024-10-31 13:43:51 +00:00
Wendelin
152b665f2e Fix hassio backups translations (#22609)
* Fix hassio backup styling

* Add missing hassio backups data-table translations
2024-10-31 13:57:40 +01:00
Paul Bottein
f1d49aaeb1 Add theme variable for text in heading badge, fix font family (#22606) 2024-10-31 13:45:42 +01:00
Paul Bottein
5db293ce01 Use entity instead of entity_id for more info action (#22603) 2024-10-31 12:59:23 +01:00
Wendelin
744cda3974 Add fallback for missing logs boot result. (#22600)
* Add fallback for missing logs boot result.

* Add fallback for logs full download when boots are missing

* Fix function naming and single boot select in error-log-card
2024-10-31 08:57:27 +01:00
Paul Bottein
79e223cf8e 20241030.0 (#22599) 2024-10-30 16:35:54 +01:00
Paul Bottein
eb8d23320a Merge branch 'master' into dev 2024-10-30 16:23:21 +01:00
Bram Kragten
7bfa72e7ac Update voice wizard (#22472) 2024-10-30 16:19:35 +01:00
Wendelin
031548c155 Fix old safari but for relative time (#22457) 2024-10-30 16:18:22 +01:00
Bram Kragten
a7d3ab9d17 Fix and update step flow create (#22223)
* Fix and update step flow create

* cleanup
2024-10-30 16:17:48 +01:00
David F. Mulcahey
d2e00a0f0a Fix ZHA group dashboard display on mobile (#22279) 2024-10-30 16:16:58 +01:00
Paul Bottein
eea9e660ac Bumped version to 20241030.0 2024-10-30 15:58:05 +01:00
Krisjanis Lejejs
5644c78664 Add setting for enableing/disabling cloud ICE servers (#22527)
* Add setting for enable/disable cloud ICE servers

* Fix copytexts, feature URL, refactor variable

* imports

* Use toast instead of alert

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-10-30 14:05:41 +00:00
Bram Kragten
7677471dcc update gifs 2024-10-30 14:51:50 +01:00
Paul Bottein
c0ca7e425e Add precise resizing mode for card inside section (#22366)
* Allow to resize card in the grid with more precision

* Use 12 columns grid

* Fix cursor jump when dragging slider

* Remove precision mode

* Add precise mode switch

* Add switch between regular and precise mode

* Fix prettier

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-10-30 13:35:28 +00:00
Paul Bottein
29d9b61319 Allow to convert a view to sections view (#22594)
* Add imported cards in section view

* Add convert logic

* Improve editor

* Fix type

* Use imported container for individual card move

* Fix type import

* Add missing translations

* Feedback
2024-10-30 12:27:12 +00:00
Nicolas Graziano
3c8da03d66 Fix logbook search when live update is disabled (#22284)
When the logbook live update is in pause by scrolling allow to refresh anyway.
2024-10-30 12:19:42 +00:00
karwosts
9a9b2e3900 Don't push a duplicate entry to select selector when filtering (#22578) 2024-10-30 12:34:14 +01:00
Wendelin
830d8d2410 Add type import check to eslint (#22488)
* Add type import check to eslint

* Add type imports with eslint --fix
2024-10-30 11:12:30 +00:00
ildar170975
cda34a6ffd Remove ripple for disabled entities on a device card (#22589)
Update ha-device-entities-card.ts
2024-10-30 11:17:18 +01:00
Bram Kragten
76ee9ce202 update regex for check html (#22596) 2024-10-30 10:08:46 +00:00
Petar Petrov
00bd32acba ZwaveJS: Resume adding a device if the page is refreshed (#22519)
* ZwaveJS: Resume adding a device if the page is refreshed

* tweak code style
2024-10-30 08:59:23 +00:00
Paul Bottein
bc11c0b3ac Handle automation and dashboard drag and drop at the element level (#22300)
* Handle drag and drop at action, condition, trigger level

* Clean item path

* Clean item path

* Fix selectors

* Clean selector config

* Remove enhancedSelector

* Add option row component

* Fix DnD inside option sequence or condition

* Add comments

* Remove item path logic from the dashboard too

* Fix floor/area drag and drop

* Avoid UI jump in area dashboard

* Remove unused import

* Add comment
2024-10-30 08:44:38 +00:00
ildar170975
51f89b00c1 Fix height for horizontal-stack-card (#22593)
Update hui-horizontal-stack-card.ts
2024-10-30 09:47:03 +02:00
Bram Kragten
67852125e5 Try both HLS and webRTC and pick best stream (#22585) 2024-10-29 21:38:22 +01:00
karwosts
7a36cf67e3 Restore disabled entities to the statistics table (#22411) 2024-10-29 15:43:02 +01:00
karwosts
d175e84623 Fix an uncaught error in ha-config-entities (#22587) 2024-10-29 15:24:27 +01:00
karwosts
9fff3adbfb Fix an infinite loop in automation numeric_state (#22429) 2024-10-29 15:21:41 +01:00
Petar Petrov
5f6396b187 Show local network URL used in Home Assistant URL settings (#22379)
* Show local network URL used in Home Assistant URL settings

* full width alert

* always display both urls and add copy buttons

* remove mask button when editing

* fix typo

* type fix

* update styling based on comments

* fix bad copy/paste

* Update src/components/ha-settings-row.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* Update src/panels/config/network/ha-config-url-form.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* Update src/panels/config/network/ha-config-url-form.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* PR comment

* remove advanced flag

* make the value handling logic clearer

* move obfuscateUrl to a util function

* PR comments

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2024-10-29 14:07:18 +00:00
karwosts
42f2341e06 Add 'focus' option to geo_location_sources for map card (#22535)
* Add 'focus' option to geo_location_sources for map card

* visual editor compatibility
2024-10-29 15:32:30 +02:00
ildar170975
48dfa1163b Fix text-align in map marker (#22580)
* Update ha-entity-marker.ts

* Update ha-entity-marker.ts

* Update ha-entity-marker.ts
2024-10-29 14:22:05 +01:00
PukNgae Cryolitia
28e12f7fd1 fix(data-range-picker): select element is hard to read in dark mode (#22479) 2024-10-29 12:04:39 +01:00
Paul Bottein
5f58ac4fb6 Shrink title space on mobile if needed (#21878)
* Shrink title space on mobile if needed

* Add multiline ellipsis

* Update src/layouts/hass-subpage.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2024-10-29 09:38:31 +00:00
ildar170975
25e7c4f1b2 Fix a disabled entity row's height on a device card (#22577)
Update ha-device-entities-card.ts
2024-10-29 10:06:01 +01:00
ildar170975
00934f2183 Fix margins for disabled entities on a device card (#22576)
Update ha-device-entities-card.ts
2024-10-29 10:57:02 +02:00
Paul Bottein
d302eaffe6 Add fixed background support in iOS and improve the way we set view background (#22531)
* Add fixed background support in iOS and improve the way we set view background

* Fix cast
2024-10-29 09:17:06 +01:00
Paul Bottein
901f736d5f Improve more info update release note display (#22502)
* Fix ha-settings-row

* Improve update more info and update available card

* Set actions at the bottom on mobile

* Use update instead of install

* Improve markdown loaded
2024-10-29 09:16:02 +01:00
Wendelin
e55f32ae91 Fallback to formatjs pt for brazilian pt (#22570)
* Fallback to formatjs pt for brazilian pt

* Update build-scripts/gulp/locale-data.js

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-10-29 08:50:21 +01:00
Jan-Philipp Benecke
3e0c998e74 Show loading spinner when waiting for backups (re)load (#22485) 2024-10-29 09:38:13 +02:00
karwosts
597866ff4e Preserve device elements in automation when device is missing (#22521)
* Preserve device elements in automation when device is missing

* lint
2024-10-29 09:37:46 +02:00
karwosts
64e21e185c Add a geo_location selector to map editor (#22538)
* Add a geo_location selector to map editor

* delete unused
2024-10-29 09:36:58 +02:00
ildar170975
7a1838ee1a Fix misalignment on "create person" page (#22574)
Update ha-config-person.ts
2024-10-28 22:09:35 +01:00
ildar170975
4debac60ae Fix header title padding (#22568)
* Update ha-header-bar.ts

* Update ha-top-app-bar-fixed.ts

* Update ha-two-pane-top-app-bar-fixed.ts
2024-10-28 22:09:09 +01:00
renovate[bot]
4af231e62b Update babel monorepo to v7.26.0 (#22571)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-28 21:45:36 +01:00
ildar170975
432cf4a7ed Add outline to a labels (#22392)
* Update ha-data-table-labels.ts

* Update ha-labels-picker.ts

* Update ha-config-labels.ts

* Update ha-labels-picker.ts
2024-10-28 20:14:05 +02:00
karwosts
df064967ca Fix enable checkbox in service field subsections (#22299)
* Fix enable checkbox in service field subsections

* fix bug
2024-10-28 17:54:36 +01:00
Wendelin
dc0cab9307 Add select prev boots in error-log-card (#22528)
* Add select prev boots in error-log-card

* Fix boot selector style in error-log-card
2024-10-28 16:41:21 +01:00
Paul Bottein
3180747a0a Show buttons in cover and valve more info if it supports position (#22569)
* Show buttons in cover more info if the cover supports position

* Same for valve

* Refactor
2024-10-28 15:33:12 +00:00
Bram Kragten
1542095138 Make web rtc player ice resolving async (#22312)
* Make web rtc player ice resolving async

* rename getCandidatesUpfront

* dont send empty candidates, catch answer when signalingState is stable

* Update src/components/ha-web-rtc-player.ts

Co-authored-by: Paulus Schoutsen <balloob@gmail.com>

* review

* Update ha-web-rtc-player.ts

---------

Co-authored-by: Paulus Schoutsen <balloob@gmail.com>
2024-10-28 15:49:43 +01:00
Paul Bottein
6c1937f247 Allow to move card from other view to section view (#22399)
* Allow to move card from other view to section view

* Update src/panels/lovelace/components/hui-card-options.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* Move to dedicated section

* Feedbacks

* Update src/translations/en.json

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2024-10-28 14:43:47 +00:00
karwosts
9db1e52a55 Add confirmations to some interactive entity-rows (#21453) 2024-10-28 13:09:41 +01:00
renovate[bot]
f92c63135c Update formatjs monorepo (#22562)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-28 12:19:45 +01:00
dependabot[bot]
a3bf1a014b Bump actions/cache from 4.1.1 to 4.1.2 (#22564)
Bumps [actions/cache](https://github.com/actions/cache) from 4.1.1 to 4.1.2.
- [Release notes](https://github.com/actions/cache/releases)
- [Changelog](https://github.com/actions/cache/blob/main/RELEASES.md)
- [Commits](https://github.com/actions/cache/compare/v4.1.1...v4.1.2)

---
updated-dependencies:
- dependency-name: actions/cache
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-10-28 12:19:14 +01:00
dependabot[bot]
31fba48ad5 Bump actions/setup-node from 4.0.4 to 4.1.0 (#22565)
Bumps [actions/setup-node](https://github.com/actions/setup-node) from 4.0.4 to 4.1.0.
- [Release notes](https://github.com/actions/setup-node/releases)
- [Commits](https://github.com/actions/setup-node/compare/v4.0.4...v4.1.0)

---
updated-dependencies:
- dependency-name: actions/setup-node
  dependency-type: direct:production
  update-type: version-update:semver-minor
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-10-28 12:18:35 +01:00
Gabe Dunn
05dfa1bb1a Add hold_action to Tile card's visual config editor (#22042)
* Add hold_action to tile card's visual config editor

* Set hold_action default action to 'none'
2024-10-28 09:53:47 +01:00
dependabot[bot]
f0f47aac3b Bump actions/checkout from 4.2.1 to 4.2.2 (#22563) 2024-10-28 08:32:08 +01:00
karwosts
9b42494667 Fix configStruct for conditional entities row (#22543) 2024-10-28 08:25:03 +01:00
renovate[bot]
42df951f89 Update vaadinWebComponents monorepo to v24.5.1 (#22545)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-26 22:18:30 +02:00
renovate[bot]
f4996424a2 Update dependency chai to v5.1.2 (#22544)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-26 22:18:07 +02:00
karwosts
fd01302d9a Fix a crash in compute-unused-entities (#22549) 2024-10-26 22:17:20 +02:00
renovate[bot]
2daaa1cb9c Update dependency @types/leaflet to v1.9.14 (#22540)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-26 00:58:27 +02:00
Paul Bottein
9fde175c6b Set "add card" button width to 1 (#22532) 2024-10-25 18:11:51 +02:00
renovate[bot]
f1b24e847e Update babel monorepo to v7.25.9 (#22534)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-25 18:02:52 +02:00
Erik Montnemery
7a587de54e Add support for update entity's display_precision state attribute (#22470) 2024-10-25 16:56:31 +02:00
shodhan-rai
eb69f95f83 Streamline condition summary messages in automation editor (#22497)
Fix issue #22478: Changed as requested
2024-10-24 18:42:55 +02:00
shodhan-rai
359a3a4af9 Update picture glance card descriptions (#22501) 2024-10-24 18:23:48 +02:00
renovate[bot]
a8b75e7814 Update formatjs monorepo (#22520)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-24 17:53:04 +02:00
renovate[bot]
2b898822d1 Update dependency @codemirror/commands to v6.7.1 (#22516)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-24 15:09:51 +02:00
Petar Petrov
fc9a0958d4 Improve Wifi configuration UI (#22471)
* Improve Wifi configuration UI

* some UI tweaks based on comments

* change label and remove DNS on reset

* remove mock code
2024-10-24 10:33:56 +02:00
karwosts
5843877cc8 Fix zwave_js provisioned table for narrow (#22507) 2024-10-24 06:40:42 +02:00
shodhan-rai
913837f064 Fix issue #22495: Corrected the broken grammar (#22499) 2024-10-23 20:15:23 +02:00
shodhan-rai
386ac5d779 Fix issue #22473: Fixed the typo (#22500) 2024-10-23 17:31:59 +02:00
shodhan-rai
3a1a4ade68 Fix issue #22450: Corrected two inaccurate messages (#22496) 2024-10-23 14:08:01 +00:00
Bram Kragten
dd35112a04 update gifs 2024-10-23 15:46:00 +02:00
Bram Kragten
afcb4c56fa Bumped version to 20241002.4 2024-10-23 15:25:07 +02:00
Bram Kragten
58f210f45b Update voice wizard (#22472) 2024-10-23 15:24:11 +02:00
Wendelin
f4d9d55ecd Fix old safari but for relative time (#22457) 2024-10-23 15:21:17 +02:00
Paul Bottein
995955491f Place icon next to the text in control button (#22451) 2024-10-23 15:21:16 +02:00
Wendelin
2ab9aed5b4 Fix integration configure on failed setup (#22407)
* Fix integration configure button when setup failed

* Use ha-button instead of mwc-button in ha-config-integration-page
2024-10-23 15:21:15 +02:00
Bram Kragten
1693f5b5c9 Forward change event in password field (#22377) 2024-10-23 15:21:15 +02:00
karwosts
f096e1698c Update devtools/statistics for renamed issue type (#22371) 2024-10-23 15:21:14 +02:00
Wendelin
2f46caa806 Fix tooltip firefox bug in persistent-notification-item (#22363) 2024-10-23 15:21:13 +02:00
Paul Bottein
5c9b53ffb7 Use default font for heading card (#22322) 2024-10-23 15:21:12 +02:00
Bram Kragten
f6e00e7262 Fix entity id setting on newly created scripts, handle update of enti… (#22272)
Fix entity id setting on newly created scripts, handle update of entity id
2024-10-23 15:21:11 +02:00
Bram Kragten
5d49f4007e Update voice wizard (#22472) 2024-10-23 15:14:11 +02:00
Wendelin
ca20c2d292 Config logs streaming (#22172)
* Add logs follow for error-log-card WIP

* Add stream config logs

* Add new logs indicator to error-log-card

* Add number of lines select for error-log-card

* Add improvements and nr of lines to error-log-card

* Fix error-log-card linter issue

* Use error-log-card in addon views

* Remove unused hassio-addon-logs

* Add backwards compatibility for error-log-card

* Remove version test flag in error-log-card

* Add recovery mode support to error-log-card

* Add search highlight for error-log-card

* Add search, add additional lines to ha-ansi-to-html

* Add infinity load older logs in error-log-card

* Fix hassio-supervisor-log using fetchHassioLogs

* Fix colored lines in ha-ansi-to-html

* Fix search and prevent empty parts in ha-ansi-to-html

* Fix load old logs initially in error-log-card

* Add download log lines dialog

* Fix load logs without stream in error-log-card

* Fix ha-ansi-to-html search

* Add debounce scroll for core provider in error-log-card

* Add hass.callApiRaw

* Fix variable naming for dialog-download-logs

* Improve scroll down wording in error-log-card
2024-10-23 13:07:00 +02:00
Erik Montnemery
f1ab24da99 Add support for update entity's update_percentage state attribute (#22453)
* Add support for update entity's update_percentage state attribute

* Update voice assistant wizard
2024-10-23 11:40:21 +02:00
Simon Lamon
e16e851952 Fix invalid var references (#22482)
* var-fixes

* Prettier
2024-10-23 09:58:32 +02:00
Paulus Schoutsen
0b562a4b16 Migrate assist device count to satellite entity (#22486) 2024-10-23 09:23:27 +02:00
karwosts
7734922059 Fix a crash in energy csv export (#22476) 2024-10-22 20:10:30 +02:00
Petar Petrov
54320c3dbf Add option to delete add-on config on uninstall (#22268) 2024-10-22 18:30:32 +02:00
Simon Lamon
849cfed669 Reintroduce floor context (#22192) 2024-10-22 16:21:47 +02:00
G Johansson
8932dfd504 Fix Venezuela currency (VEF to VED) (#22475) 2024-10-22 15:27:39 +02:00
Paul Bottein
b9922b2f8e Use undo notification when deleting a card or badge (#22414)
* Use undo notification instead of confirmation dialog for cards and badges

* Fix notifications

* Improve deletion functions

* Fix errors

* Fix startup notifications

* Add translation and simplify delete method

* Apply suggestions from code review

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* Prettier

* Update src/panels/lovelace/editor/delete-badge.ts

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2024-10-22 13:17:01 +00:00
Wendelin
11fc5bc755 Fix old safari but for relative time (#22457) 2024-10-22 12:25:24 +02:00
karwosts
67ac4882f2 Dont attempt to add devices to disabled zwave config (#22461) 2024-10-22 13:02:29 +03:00
Paul Bottein
413171bb3c Use sections view when creating a new view (#22382)
* Use sections view when creating a new view

* Improve default

* Update src/panels/lovelace/views/default-section.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* Update src/panels/lovelace/views/get-view-type.ts

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2024-10-22 10:57:15 +02:00
renovate[bot]
b111eb2316 Update Yarn to v4.5.1 (#22463)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-21 17:08:12 +00:00
renovate[bot]
9bafabe3e9 Update dependency @types/leaflet to v1.9.13 (#22464)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-21 17:03:08 +00:00
Petar Petrov
202bc6440b Improve IP configuration UI (#22320)
* Split netmask from IP address

* handle ipv6 as well

* render fix

* improved UI for IP, mask & DNS

* remove ip detail dialog

* use `nothing`

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* use ha-list-item instead of mwc

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-10-21 18:49:43 +02:00
Paul Bottein
e2a89a55b7 Reduce margin between badges and cards (#22458) 2024-10-21 18:18:56 +02:00
Paul Bottein
1e05730ec7 Place icon next to the text in control button (#22451) 2024-10-21 17:01:00 +02:00
Petar Petrov
885a63d3f6 Improve warnings for insecure zwavejs inclusion (#22456)
* Improve warnings for insecure zwavejs inclusion

* is isNaN

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

* use `nothing`

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>

---------

Co-authored-by: Wendelin <12148533+wendevlin@users.noreply.github.com>
2024-10-21 14:05:44 +00:00
Wendelin
206fbac618 Fix integration configure on failed setup (#22407)
* Fix integration configure button when setup failed

* Use ha-button instead of mwc-button in ha-config-integration-page
2024-10-21 15:55:17 +02:00
Paul Bottein
4509661652 Center ha-toast (#22412)
* Center ha-toast

* Improve margin
2024-10-21 09:09:31 +02:00
karwosts
4669decfd0 Fix label filters from URL (#22447) 2024-10-21 08:56:46 +02:00
Julian
f05c204da3 Remove close_select_mode key from transladtions and corresponding code (#22434)
remove close_select_mode key from transladtions and corresponding code

fixes: #22425
2024-10-20 14:46:34 +02:00
karwosts
338692d2c3 Fix zwave node config toggle switch (#22443) 2024-10-20 09:03:23 +02:00
Simon Lamon
5415690585 Change triggered by service to triggered by action (#22438) 2024-10-19 14:36:37 +02:00
renovate[bot]
418315d20b Update dependency chart.js to v4.4.5 (#22435)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-19 09:27:25 +02:00
renovate[bot]
9bbffb6919 Lock file maintenance (#22436)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-19 09:26:50 +02:00
renovate[bot]
e338d63ec5 Update dependency @lokalise/node-api to v12.8.0 (#22433)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-18 19:31:56 +02:00
renovate[bot]
264aedbff3 Update vaadinWebComponents monorepo to v24.5.0 (#22426)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-18 19:18:28 +02:00
renovate[bot]
4103ef362c Update dependency serve-handler to v6.1.6 (#22432)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-18 19:17:58 +02:00
renovate[bot]
a04a449eb9 Update dependency marked to v14.1.3 (#22420)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-18 08:49:31 +02:00
Krzysztof Dąbrowski
08633c197b Hide integration logo on device page when load error occurs (#22357) 2024-10-17 16:26:26 +00:00
BlockyPenguin
f8b3a429c6 Improve accessibility for people with red-green colourblindness (#22365) 2024-10-17 18:24:26 +02:00
Julian
946c8a59b4 Fix translations for YAML-only alert when adding new integrations (#22383)
Change device to integration in the YAML-only warning

fixes: #22380
2024-10-17 16:17:14 +00:00
Paul Bottein
f93c7e1b6e Improve card and badge edit mode (#22413) 2024-10-17 18:16:30 +02:00
Julian
6298534b9c Fix small typographical issues in UI translations (#22402)
Remove dangling "point" in translations

fixes: #22401
2024-10-17 09:44:07 +02:00
renovate[bot]
5175b42069 Update dependency @polymer/polymer to v3.5.2 (#22325)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-16 21:42:17 +02:00
Paul Bottein
e01e31341b Revert "Allow to move card from other view to section view"
This reverts commit 203d900d16.
2024-10-16 16:20:41 +02:00
Paul Bottein
203d900d16 Allow to move card from other view to section view 2024-10-16 16:18:22 +02:00
Petar Petrov
4d9e9aaead Updated design for integration icons (#22393)
* Show if a custom integration overwrites a core integration

* use 1 icon and change tooltip and color

* Updated design for integration icons

* add color for `overwrites_built_in`
2024-10-16 10:17:36 +02:00
Petar Petrov
82ec308be0 Show if a custom integration overwrites a core integration (#22295) 2024-10-16 09:28:33 +02:00
renovate[bot]
dcafbcb06c Update dependency @bundle-stats/plugin-webpack-filter to v4.16.0 (#22386)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-16 09:16:28 +02:00
ildar170975
aa5f8dc082 Change background for collapsible rows in data tables (#22372)
Update ha-data-table.ts
2024-10-16 09:10:32 +02:00
renovate[bot]
4dcae9c69c Update formatjs monorepo (#22374)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-16 09:08:32 +02:00
ildar170975
13a1af97da box-shadow for stack in panel: fix typo (#22384)
Update hui-stack-card.ts
2024-10-16 09:07:37 +02:00
Julian
e3c435fd78 Fix type in matter integration translation "end_device" (#22390)
fixes: #22292
2024-10-16 09:06:46 +02:00
Paulus Schoutsen
a32dee7071 Discovered integration: configure -> add (#22387) 2024-10-15 21:35:16 +02:00
Paulus Schoutsen
c098858b73 Protocol integrations always link to devices page (#22388) 2024-10-15 21:34:47 +02:00
Paulus Schoutsen
9e509e3bc9 Update Assist config page (#22338) 2024-10-15 21:32:21 +02:00
Paulus Schoutsen
79ac2a72fa Protocol integrations always link to devices page 2024-10-15 18:12:14 +00:00
karwosts
b063840f46 Update devtools/statistics for renamed issue type (#22371) 2024-10-15 15:09:07 +02:00
renovate[bot]
4366308b2b Update dependency mocha to v10.7.3 (#21212)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-15 13:51:40 +02:00
renovate[bot]
126826e52c Update dependency instant-mocha to v1.5.3 (#22373)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-15 12:59:00 +02:00
Bram Kragten
e31af5d31b Forward change event in password field (#22377) 2024-10-15 12:07:12 +02:00
Stefan Agner
fca97cd734 Prefer Thread border router instance name (#22378)
Instead of using the model name (which is the same for all border
routers of the same make and model), use the instance name as the
border router name.

Builds on https://github.com/home-assistant/core/pull/127253.
2024-10-15 11:48:45 +02:00
Wendelin
ca94267c44 Fix tooltip firefox bug in persistent-notification-item (#22363) 2024-10-14 15:47:12 +02:00
renovate[bot]
df1f26cee7 Update dependency magic-string to v0.30.12 (#22362)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-14 12:00:18 +02:00
renovate[bot]
24a4e075e6 Update babel monorepo to v7.25.8 (#22355)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-14 11:48:23 +02:00
dependabot[bot]
43fcc6238e Bump actions/upload-artifact from 4.4.0 to 4.4.3 (#22359)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-10-14 09:29:29 +02:00
dependabot[bot]
b40b96248b Bump actions/cache from 4.1.0 to 4.1.1 (#22358)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-10-14 09:17:16 +02:00
dependabot[bot]
c7ac4c7490 Bump actions/checkout from 4.2.0 to 4.2.1 (#22360)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-10-14 09:17:03 +02:00
Abdulrasheed Abdulsalam
6cd8471b91 Fix: correct some typos in translation file (#22353) 2024-10-13 10:11:27 +00:00
Marc Mueller
940eaa26e0 Update build-system (#22348) 2024-10-13 07:41:03 +02:00
renovate[bot]
79e68ce125 Update dependency typescript to v5.6.3 (#22340)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-12 11:13:22 +02:00
renovate[bot]
e581d35432 Update formatjs monorepo (#22342)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-12 09:14:19 +02:00
Paul Bottein
d3d578e0f4 Hide fields section when all fields inside are filtered (#22277)
Hide field section when all fields inside are filtered
2024-10-11 21:52:44 +02:00
karwosts
79c71cbe48 Add sensor offset to time trigger UI (#21957)
* Add sensor offset to time trigger UI

* refactor long expression

* memoize data

* fix for trigger platform migration
2024-10-11 21:36:44 +02:00
karwosts
82b50a1c5d Refine automation action search with ignoreLocation (#22332) 2024-10-11 21:34:43 +02:00
karwosts
6cfda78aa1 Fix a case where developer-tools/action can get stuck in an error loop (#22334) 2024-10-11 20:37:49 +02:00
renovate[bot]
f9ff938775 Update dependency @formatjs/intl-datetimeformat to v6.12.6 (#22335)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-11 20:24:26 +02:00
Bram Kragten
778fcab90d Fix entity id setting on newly created scripts, handle update of enti… (#22272)
Fix entity id setting on newly created scripts, handle update of entity id
2024-10-11 13:13:17 +02:00
Wendelin
07e5aa30c6 Add hide completed option to hui-todo-list-card (#22323) 2024-10-11 08:58:40 +02:00
Paul Bottein
3f0ec03a14 Improve zigbee remove device dialog (#22276)
* Improve zigbee remove device dialog

* Fix translations
2024-10-11 06:40:15 +02:00
Alex Jurkiewicz
1bb871b9ac fix(script/bootstrap): Improve missing Yarn error (#22308) 2024-10-10 18:27:22 +03:00
Paul Bottein
0e8783fb01 Use default font for heading card (#22322) 2024-10-10 15:19:14 +00:00
Bram Kragten
1d88c4465b Bumped version to 20241010.0 2024-10-10 17:14:04 +02:00
Bram Kragten
1f0cfb5fd6 Bumped version to 20241002.3 2024-10-10 17:08:10 +02:00
Adam Kapos
a21e17fb23 Disable backdrop filter on Heading Card (#22204) 2024-10-10 17:07:51 +02:00
Paul Bottein
5de888c91a Update heading entity schema to allow empty entity id (#22211) 2024-10-10 17:07:34 +02:00
Paul Bottein
2dd4090db3 Fix potential undefined select element in color picker (#22212) 2024-10-10 17:07:16 +02:00
Bram Kragten
35aafd45dc Fix and update step flow create (#22223)
* Fix and update step flow create

* cleanup
2024-10-10 17:06:55 +02:00
Simon Lamon
c778b881ab Fixup service/action when entity is picked in activate scene (#22259)
Fixup service/action when entity is picked
2024-10-10 17:06:38 +02:00
Paul Bottein
04acecc832 Add minimal size for badges and cards in edit mode (#22271) 2024-10-10 17:06:15 +02:00
Wendelin
a10a9916be Fix unused entities view (#22274)
Fix compute-unused-entities when using sections
2024-10-10 17:05:52 +02:00
David F. Mulcahey
3604ffa64a Fix ZHA group dashboard display on mobile (#22279) 2024-10-10 17:04:29 +02:00
TJ Horner
a0724749d3 Fix erroneous addition of service: key in ha-automation-action-play_media element (#22294)
fix: no longer erroneously set 'service' in ha-automation-action-play_media
2024-10-10 17:04:13 +02:00
Bram Kragten
45a75c3a7c Update statistics issues from dev tools (#22286)
update statistics issues from dev tools
2024-10-10 17:03:52 +02:00
Stefan Agner
f0dcfa4aa3 Fix command selection for OTBRs without dataset (#22318)
Typically, the Home Assistant OTBR integration makes sure that we
either setup or read the current dataset. However, in some cases,
e.g. when reinstalling the add-on, deleting the dataset, and starting
the add-on while keeping the OTBR config entry, the dataset is not
available and a new one is not being created (since the config entry
is not recreated).

Just support this particular case as well.

Fixes: #22306
2024-10-10 17:03:31 +02:00
Wendelin
1c4b66cb1e Fix ha-selector-action drag and drop (#22273)
* Fix ha-selector-action with removing memoize-one

* Fix array-move to update parent reference.

* Fix array-move if item is no array
2024-10-10 17:03:15 +02:00
Wendelin
af2d575bf0 Fix ha-selector-action drag and drop (#22273)
* Fix ha-selector-action with removing memoize-one

* Fix array-move to update parent reference.

* Fix array-move if item is no array
2024-10-10 16:53:35 +02:00
Stefan Agner
92165d776a Fix command selection for OTBRs without dataset (#22318)
Typically, the Home Assistant OTBR integration makes sure that we
either setup or read the current dataset. However, in some cases,
e.g. when reinstalling the add-on, deleting the dataset, and starting
the add-on while keeping the OTBR config entry, the dataset is not
available and a new one is not being created (since the config entry
is not recreated).

Just support this particular case as well.

Fixes: #22306
2024-10-10 16:50:44 +02:00
renovate[bot]
a8bbd8ab90 Update dependency @codemirror/commands to v6.7.0 (#22316)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-10 10:21:29 +00:00
renovate[bot]
43ac9dbea7 Update vaadinWebComponents monorepo to v24.4.11 (#22315)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-10 10:20:33 +00:00
renovate[bot]
bba9eca4e9 Update dependency eslint-plugin-wc to v2.2.0 (#22310)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-10 10:04:10 +02:00
renovate[bot]
40f65b1980 Update dependency del to v8 (#22311)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-10 10:03:29 +02:00
karwosts
23a33b10a1 Allow override entity_id in more-info action (#22147) 2024-10-09 14:14:03 +02:00
Simon Lamon
67a93013c7 Revert "Fix drag and drop when using action and trigger selector" (#22296)
Revert "Fix drag and drop when using action and trigger selector (#22291)"

This reverts commit 99035cea8f.
2024-10-09 10:22:40 +00:00
Bram Kragten
1f838d7529 Update statistics issues from dev tools (#22286)
update statistics issues from dev tools
2024-10-09 09:29:30 +02:00
TJ Horner
ffc0435144 Fix erroneous addition of service: key in ha-automation-action-play_media element (#22294)
fix: no longer erroneously set 'service' in ha-automation-action-play_media
2024-10-08 21:07:38 +00:00
David F. Mulcahey
5877d69c87 Fix ZHA group dashboard display on mobile (#22279) 2024-10-08 21:20:07 +02:00
Paul Bottein
99035cea8f Fix drag and drop when using action and trigger selector (#22291)
* Fix drag and drop when using action selector

* Fix drag and drop when using trigger selector
2024-10-08 21:04:45 +02:00
__JosephAbbey
1b441a7eec Add support for relative start and end time displays in state-display (#22249)
* Add support for relative start and end time displays in state-display

* Add support for sun attributes as well

* Improve state-display code for relative-time

---------

Co-authored-by: Wendelin <w@pe8.at>
2024-10-08 10:04:16 +02:00
Paul Bottein
ad49e9f7b0 Add minimal size for badges and cards in edit mode (#22271) 2024-10-07 17:33:47 +02:00
Petar Petrov
e32b15ede2 Hide service dropdown for predefined actions in automations (#22275)
Hide service dropdown for predefined actions
2024-10-07 15:49:44 +02:00
Wendelin
a35b4376ea Fix unused entities view (#22274)
Fix compute-unused-entities when using sections
2024-10-07 15:28:14 +02:00
Simon Lamon
619f9f76ee Fixup service/action when entity is picked in activate scene (#22259)
Fixup service/action when entity is picked
2024-10-07 09:23:48 +02:00
dependabot[bot]
f771bc10db Bump actions/cache from 4.0.2 to 4.1.0 (#22270)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-10-07 08:44:00 +02:00
renovate[bot]
b8889a1183 Update dependency eslint-plugin-import to v2.31.0 (#22260)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-06 10:47:08 +00:00
renovate[bot]
eb6b45eaed Update babel monorepo to v7.25.7 (#22250)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-05 20:11:42 +02:00
renovate[bot]
31a748ed93 Update dependency date-fns-tz to v3.2.0 (#22209)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-04 21:38:25 +02:00
Bram Kragten
0110bdd24a Fix and update step flow create (#22223)
* Fix and update step flow create

* cleanup
2024-10-04 14:13:21 +02:00
Bram Kragten
365b712976 Add temporary logging to webrtc player (#22213)
* add temporary logging to webrtc player

* Update ha-web-rtc-player.ts

* Update ha-web-rtc-player.ts

* Update ha-web-rtc-player.ts
2024-10-03 21:01:21 +02:00
Paul Bottein
7d97dbe15b Fix potential undefined select element in color picker (#22212) 2024-10-03 11:31:36 +02:00
Paul Bottein
8bc0ea5a0b Update heading entity schema to allow empty entity id (#22211) 2024-10-03 11:15:13 +02:00
Adam Kapos
44948a3474 Disable backdrop filter on Heading Card (#22204) 2024-10-03 09:45:29 +02:00
Robert Resch
bc51b53b4a Use camera ws endpoint to get WebRTC config (#22009) 2024-10-03 09:19:49 +02:00
Bram Kragten
693dbfd050 20241002.2 (#22197) 2024-10-02 16:43:14 +02:00
Bram Kragten
67217b9dd0 Bumped version to 20241002.2 2024-10-02 16:42:46 +02:00
Bram Kragten
487795b7c4 handle unknown state for update voice assitant (#22196)
* handle unknown state for update voice assitant

* Update voice-assistant-setup-step-update.ts
2024-10-02 16:42:27 +02:00
Petar Petrov
a30e0d33f9 Handle exceptions when subscribing from the event dev tool (#22191)
* Handle exceptions when subscribing from the event dev tool

* use ha-alert for the error msg

* import ha-alert element

* use undefined instead of null to align with the rest of the code base
2024-10-02 16:34:28 +02:00
Bram Kragten
0c1b8abe03 Fix hassio entrypoint (#22194) 2024-10-02 14:20:53 +00:00
Paul Bottein
ce9c5149d5 Use heading card in demo dashboard (#22193) 2024-10-02 14:13:26 +00:00
Bram Kragten
adbcdc62eb Alert user when auto update is enabled instead of hiding the button (#22187) 2024-10-02 15:41:15 +02:00
Paul Bottein
faf872bfb8 Simplify create automation from device dialog (#22190)
* Simplify automation dialog

* Fix translations

* Auto expand trigger action and condition

* Improve wording

* Expand all

* Remove unused translations
2024-10-02 13:13:21 +00:00
Stefan Agner
fe0fb2382a Allow to transfer all Thread datasets with TLV (#22183)
* Allow to transfer all Thread datasets with TLV

This commit allows to transfer all Thread datasets with TLV. Since
PR #22022 the preferred dataset is transmitted when using Matter
external commissioning. This commit makes the Thread configuration
dialog to have feature parity.

* Drop preferred border agent id as additional metric for default router

We always have the extended address, so use this as primary and only
metric which router is the default. The preferred border agent id gets
updated best effort.

Also use isDefaultRouter consistently in the code.
2024-10-02 15:06:06 +02:00
Bram Kragten
e84c3a85db 20241002.1 (#22189) 2024-10-02 13:38:57 +02:00
Bram Kragten
cdd29295e5 Bumped version to 20241002.1 2024-10-02 13:37:47 +02:00
karwosts
f7532f3476 Devtools statistics - new style, multi-select, & multi-delete (#21813)
* feat: auto-fix statistics

* statistics multi-select and multi-fix

* unused css

* Change multi action to clear, fixes

* Update developer-tools-statistics.ts

* update translations

* Add select all issues option

* Update en.json

* Update developer-tools-statistics.ts

---------

Co-authored-by: Muka Schultze <samuelschultze@gmail.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-10-02 13:21:04 +02:00
Bram Kragten
fdf9fab709 20241002.0 (#22185) 2024-10-02 10:01:51 +02:00
Bram Kragten
c8930cec87 Bumped version to 20241002.0 2024-10-02 09:50:01 +02:00
Bram Kragten
f9c336890d Await removal of statistics when fixing (#22167)
* Await removal of statistics when fixing

* refactor

* translations
2024-10-02 09:24:46 +02:00
Bram Kragten
c721de109f Put rename entities in expandable when renaming device (#22182)
* Put rename entities in expandable when renaming device

* Update ha-config-device-page.ts

* Update src/panels/config/devices/ha-config-device-page.ts

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-10-02 07:19:05 +00:00
renovate[bot]
1c95e8d6ec Update vaadinWebComponents monorepo to v24.4.10 (#22180)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-01 16:34:51 +00:00
Bram Kragten
57cf2c1341 Update update entity in voice flow (#22178) 2024-10-01 18:34:18 +02:00
renovate[bot]
f7d5c5f850 Update dependency @codemirror/view to v6.34.1 (#22179)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-01 16:33:42 +00:00
renovate[bot]
470f5127f4 Update dependency @types/color-name to v2 (#22157)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-10-01 18:22:13 +02:00
Paul Bottein
34e361601a Fix display elements field in heading badge editor (#22177)
* Fix display elements field in heading badge editor

* Update src/panels/lovelace/editor/heading-badge-editor/hui-entity-heading-badge-editor.ts
2024-10-01 16:58:00 +02:00
Paul Bottein
70d6cce8f8 Add support for custom color display in color picker (#22174)
Add support for custom color in color picker
2024-10-01 15:43:31 +02:00
Paul Bottein
f9814f35d1 Don't handle UI editor event when using yaml editor (#22176) 2024-10-01 15:11:54 +02:00
Paul Bottein
f30603753e Use radio buttons for heading style (#22173) 2024-10-01 14:26:51 +02:00
karwosts
ce9993fd36 Use finishes_at in timer remaining calculation (#22169)
* Use finishes_at in timer remaining calculation

* lint

* fix test
2024-10-01 14:05:01 +02:00
Bram Kragten
268eb4317c 20240930.0 (#22166) 2024-09-30 17:38:30 +02:00
Bram Kragten
4c2044e70a Bumped version to 20240930.0 2024-09-30 17:11:52 +02:00
Darren Griffin
7f96c1fbe1 Add OHF logo to README (#22165) 2024-09-30 17:10:45 +02:00
Paul Bottein
75e24780c1 Use dash for unknown and unavailable state in heading entity (#22163)
* Use dash for unknown and unavailable state in heading entity

* Update src/state-display/state-display.ts

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-09-30 15:52:20 +02:00
Bram Kragten
95580bc4c0 Fix min width of checkbox column in data table (#22162)
fix min width of checkbox column in data table
2024-09-30 09:09:08 +00:00
Paul Bottein
175f68e0cf Allow to add name in heading entity badge state content (#22161) 2024-09-30 09:07:25 +00:00
Bart Mesuere
b6efedfc8d Improve the accessibility of the default colors used for graphs (#21839)
* Update the first 10 colors to match the Observable10 scheme

* Add darker and lighter variants
2024-09-30 10:59:13 +02:00
Wendelin
23c21a35d8 Fix script rename name placeholder (#22160) 2024-09-30 07:43:59 +00:00
Simon Lamon
9c7324298b Remove floor context (#22143)
* Remove floor context

* Fixup gallery
2024-09-30 09:33:08 +02:00
Matthias Alphart
e92be566a0 Handle falsy value in ha-yaml-editor (object selector) (#22142)
* Handle falsy value in ha-yaml-editor (object selector)

* handle explicit `null`
2024-09-30 09:28:17 +02:00
dependabot[bot]
4e96ad5f28 Bump actions/checkout from 4.1.7 to 4.2.0 (#22159)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-09-30 09:07:50 +02:00
renovate[bot]
f64a1500af Update dependency webpack to v5.95.0 (#22150)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-28 21:23:29 +02:00
renovate[bot]
c9e8619c04 Update dependency @codemirror/view to v6.34.0 (#22144)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-28 21:23:21 +02:00
Bram Kragten
7ab1133b45 Implement missing function for password field 2024-09-27 23:42:44 +02:00
Bram Kragten
77abfd3e61 voice setup tweaks 2024-09-27 23:42:09 +02:00
Bram Kragten
d7aaa41aa4 Add missing voice assistant select action logic (#22139) 2024-09-27 14:40:55 -04:00
Aindriú Mac Giolla Eoin
8223f6b155 Update translationMetadata.json - Added Irish language code (#21898)
Added language code for Irish, native name Gaeilge
2024-09-27 18:12:44 +02:00
renovate[bot]
435eae77fa Update dependency rollup to v2.79.2 [SECURITY] (#22071)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-27 15:29:29 +00:00
Bram Kragten
394d8ddd6c 20240927.0 (#22138) 2024-09-27 17:28:42 +02:00
Paul Bottein
ead54e445f Reuse flatten logic for trigger ids condition (#22136) 2024-09-27 17:18:06 +02:00
Bram Kragten
7ee5db2be5 Bumped version to 20240927.0 2024-09-27 17:15:57 +02:00
Bram Kragten
fef6f0ac94 migrate nested triggers too (#22135) 2024-09-27 15:13:05 +00:00
Bram Kragten
7a60763786 Voice setup feedback (#22134)
* Voice setup feedback

* Update voice-assistant-setup-step-check.ts
2024-09-27 16:56:38 +02:00
Paul Bottein
94e321a364 Add UI support for trigger list (#22133)
* Add UI support for trigger list

* Update gallery

* Fix gallery
2024-09-27 16:56:22 +02:00
Bram Kragten
1c12c2b714 Fix codemirror fold for empty lines (#22130) 2024-09-27 14:18:48 +02:00
Paul Bottein
442a8f11a7 Improve heading card style and add theme variables (#22129)
improve heading card style and add theme variables
2024-09-27 13:45:18 +02:00
Bram Kragten
4e8b58cd6c Add password field element (#22121)
* Add password field element

* Update ha-password-field.ts
2024-09-27 12:34:28 +02:00
Paul Bottein
a92dab46c2 Allow different types of heading badges (#22109)
* Allow different type of heading item

* Update editor

* Migrate entities to items

* Rename support for string entity

* Refactor

* Rename to badges and add error state

* Update font weight

* Feedback

* Feedback
2024-09-27 12:33:15 +02:00
Joakim Sørensen
468660d235 Adjust username handling in the cloud panel register and login flows (#22118)
* Use lowercase when registering

* Fallback to lowercase username if usernotfound is recieved

* Adjust resend

* handle reset password

* limit with else

* return early
2024-09-27 12:31:48 +02:00
Wendelin
c721afa137 Fix matter device actions (#22117)
* Fix matter device actions when matter integration loads forever

* Fix matter device-actions types path

* Move getMatterDeviceActions inside getDeviceActions in device page
2024-09-27 09:37:07 +00:00
Paul Bottein
ac9654c1de Add heading card when creating a new view (#22123) 2024-09-27 09:19:19 +00:00
Wendelin
570ad38bac Fix automation trigger condition and triggers description (#22122)
* Fix config.triggers in automation-contition-trigger

* Fix config.triggers for automation triggers description
2024-09-27 09:10:33 +00:00
Erik Montnemery
e778a9aa1d Improve statistics issues (#22110) 2024-09-27 11:05:30 +02:00
selvalt7
49576189af Use localizeValue in ha-form-expandable and ha-form-grid (#22114)
Pass localizeValue to ha-form-expandable and ha-form-grid
2024-09-27 10:00:36 +02:00
Bram Kragten
d4a5115a65 20240926.0 (#22107) 2024-09-26 18:30:57 +02:00
Bram Kragten
5d71d4c0a1 Bumped version to 20240926.0 2024-09-26 18:26:20 +02:00
Bram Kragten
d334b1ca7b Update voice-assistant-setup-step-update.ts 2024-09-26 18:25:30 +02:00
Wendelin
5551e98388 Add no IP found message to ping a matter device (#22103) 2024-09-26 18:22:28 +02:00
Bram Kragten
59945cb2f8 Add statistic id to statistic issue fix messages (#22104)
* Add statistic id to fix messages

* revert state class check, as it will be solved in another way
2024-09-26 18:07:54 +02:00
Erik Montnemery
500bc959f0 Improve translation strings for statistic issues (#22100) 2024-09-26 16:46:35 +02:00
Bram Kragten
deece20206 Include extended_pan_id when commissioning matter (#22099) 2024-09-26 16:46:15 +02:00
Bram Kragten
fc8945be60 Flatten fields in sections in developer tools actions (#22096)
* flatten fields in sections in developer tools actions

* Update src/panels/developer-tools/action/developer-tools-action.ts

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-09-26 12:31:53 +00:00
Bram Kragten
3fbd5f07a9 Fix dialog box callback order (#22097)
* Fix dialog box callback order

* Update dialog-box.ts
2024-09-26 14:17:28 +02:00
Wendelin
ff9af2f980 Fix delete appearance chip (#22098)
* Add filter option to ha-sortable

* Filter chips remove buttons from dragging in ha-entity-state-content-picker
2024-09-26 14:11:34 +02:00
Paul Bottein
62cba99491 Don't use ha-card in card-condition-editor (#22085) 2024-09-26 12:15:58 +02:00
Wendelin
5a5005c09c Fix matter commissioning wording and add prevent misuse alert (#22083)
* Fix matter commissioning wording and add prevent misuse alert

* Update src/translations/en.json

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Add small misuese prevent note for matter-commissioning dialog

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-09-26 12:15:03 +02:00
Wendelin
dd179e1f4e Add seperator to dialog-repairs-issue-subtitle (#22095) 2024-09-26 12:12:10 +02:00
Paul Bottein
27bdf80168 Fix automation drag and drop (#22093) 2024-09-26 07:59:48 +00:00
renovate[bot]
f70ce7491a Update dependency @rollup/plugin-node-resolve to v15.2.4 (#22092)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-26 09:48:41 +02:00
Jan Rieger
9f17f6a8cf Fix typo (#22086) 2024-09-25 18:02:34 +00:00
Bram Kragten
8890c7da17 20240925.0 (#22082) 2024-09-25 17:05:55 +02:00
Paul Bottein
4e51c7cf96 Use callback instead of changing nested config with sub editor (#22081)
Use callback instead of changing nested config
2024-09-25 16:47:38 +02:00
Bram Kragten
291c026da0 Bumped version to 20240925.0 2024-09-25 16:47:19 +02:00
Bram Kragten
dd88d8633f Optimize helpers filtering (#22080) 2024-09-25 16:41:12 +02:00
Wendelin
254ee8568b Add integration name information to repairs (#22006)
* Add integration name to repairs

* Improve dialog-repairs-issue aria and translations

* Fix type in dialog-repairs-issue

* Remove unused slots in dialog-repairs-issue

* Fix ha-config-repairs avoid nested css

* Fix ha-config-repairs to use ha-md-list

* Add subtitle slot to ha-dialog-header

* Move close icon to left in dialog-data-entry-flow

* Move severity and reportedBy to dialog subtitle in repair-dialog

* Add md buttons to dialog-repairs-issue

* Revert dialog-repairs-issue to use normal ha-buttons

* Revert dialog-entry-flow close icon position

* Improve buttons for dialog-repairs-issue

* Add subtitle to all show-dialog-repair-flow headers

* Fix integration names for repair dialogs

* Fix subtitle title repair dialogs

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-09-25 16:12:45 +02:00
Paul Bottein
cd631e8693 Move sub element editor inside hui-element-editor. (#22079)
* Move sub element editor into hui-element-editor

* Migrate feature editor

* Migrate feature editor

* Simplify context
2024-09-25 16:05:41 +02:00
Bram Kragten
765812331b Allow to fix statistic issue from repairs (#22055)
* Allow to fix statistic issue from repairs

* clean up, add names

* Update src/translations/en.json

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* address review

* Update src/translations/en.json

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-09-25 15:55:49 +02:00
Paul Bottein
7462f8fbe3 Fix entity row editor (#22078) 2024-09-25 15:42:29 +02:00
Bram Kragten
dc940f248c Migrate trigger platform key to trigger (#22054)
* Migrate trigger platform key to trigger

* fix gallery configs

* Update ha-automation-editor.ts

* migrate device automation triggers
2024-09-25 14:20:27 +02:00
Miguel Palhas
2793ca65cd Adds highlight on current indentation mark to code editor (#21972)
* Adds highlight on current indentation mark to code editor

* code review
2024-09-25 11:35:47 +00:00
Miguel Palhas
e687ddab21 Indent-based folds for YAML editor (#21966)
* Indent-based folds for YAML editor

* adding compartment

* code review
2024-09-25 13:15:02 +02:00
karwosts
4bd27e5055 Add detail to the device+entity_id rename dialog (#21952) 2024-09-25 13:08:39 +02:00
Paul Bottein
c6e2e07286 Use YAML editor in card/badge editor (#22075) 2024-09-25 10:59:39 +02:00
Paul Bottein
e77508b8a8 Create ha-divider and use it inside color picker (#22074)
* Create ha-divider and use it inside color picker

* rename divider
2024-09-25 08:59:00 +00:00
Bram Kragten
a5db44a167 Fix initial automation config (#22073) 2024-09-25 08:24:06 +00:00
Bram Kragten
265bbfc95d Triggers doesn't have to be an array, fix flattenTriggers (#22072)
Triggers doesnt have to be an array, fix flattenTriggers
2024-09-25 08:17:37 +00:00
Bram Kragten
305cecb213 Add MVP voice assist flow (#22061)
* Add MVP voice assist flow

* filter on supported features

* check for unavailable

* Update step-flow-create-entry.ts
2024-09-24 20:38:00 +02:00
Paul Bottein
813feff12e Add color option to heading entities (#22068)
* Add uncolored option

* Allow to color icon based on state or custom color

* Use text color for inactive color

* Rename uncolored to none

* Add helper

* Update wording
2024-09-24 20:14:03 +02:00
Bram Kragten
cbce6f633f Migrate base automation config to plurals (#22053)
* Migrate base automation config to plurals

* revert

* Update hat-script-graph.ts

* Make traces work with both new and old config

* Adjust validateConfig
2024-09-24 20:03:53 +02:00
Bram Kragten
1bbf45d35e Remove min width from alert dialog (#22069) 2024-09-24 16:16:07 +00:00
Paul Bottein
76e53e9738 Add more config option to heading entity element (#22063)
Add show state and show icon to heading entity
2024-09-24 18:15:36 +02:00
Paul Bottein
c30e4a6935 Add visibility option to heading entities (#22064)
* Add visibility option to heading entity

* Fix types
2024-09-24 17:12:04 +02:00
Paul Bottein
c4a700a55c Improve element editor and migrate heading-entity editor (#22034)
* Extract load config element

* Improve error by using ha-alert

* Create hui-hase-editor

* Migrate heading entity form to its own editor

* Rename editor

* Rename

* Rename

* Move heading entity to its own component

* Fix default action for heading entity
2024-09-24 11:17:29 +02:00
Raj Laud
a759767d79 Update media-player.ts to display artist name as backup secondary title (#22039)
* Update media-player.ts to display artist name for playlist if playlist name unavailable

* Run prettier
2024-09-23 16:08:18 +00:00
renovate[bot]
7f868c8140 Update dependency eslint to v8.57.1 (#22033)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-23 16:04:59 +00:00
Paul Bottein
f7f37c24e2 Filter selected entities in entities picker using includeEntities property (#22059)
* Filter selected entities in entities picker using includeEntities property

* Don't ignore other property when using include entities
2024-09-23 15:55:13 +00:00
Simon Lamon
be02a8869f Fix lint failures on CI (#21986)
Add ignore
2024-09-23 15:50:43 +00:00
Wendelin
3a9f09cb47 Migrate dialog restart to ha-md-dialog (#22032)
* Fix ha-md-dialog for iOS 12

* Fix ha-md-dialog polyfill loading

* Fix ha-md-dialog open prop

* Fix multiple polyfill loads in ha-md-dialog

* Migrate dialog-restart to ha-md-dialog

* Fix dialog-restart to use ha-md-list

* Fix dialog opens dialog for ha-md-dialog
2024-09-23 15:18:00 +00:00
karwosts
0c2a9d85e0 Better handling of multiple entities in numeric-state condition (#22021)
* Better handling of multiple entities in numeric-state condition

* update translations, fix infinite render loop in form
2024-09-23 15:35:45 +02:00
Simon Lamon
e72356033c Handle url error better when invalid blueprint url is provided (#21778)
* Encode spaces again

* Prettier

* Update src/panels/my/ha-panel-my.ts

* Remove the specific contents

* Remove the error keys, assign error immediately

* Revert "Remove the error keys, assign error immediately"

This reverts commit 27381ff250.
2024-09-23 15:28:57 +02:00
Simon Lamon
3c48559df6 Move patches in dependency section (#22050)
* Move patches in dependency section

* yarn lock
2024-09-23 15:27:46 +02:00
Wendelin
f36d68c677 Fix delete entity alias (#22058)
Fix aliasChanged to save deleted in entity-voice-settings
2024-09-23 15:18:50 +02:00
Yosi Levy
af46b8221e RTL fixes (#22060) 2024-09-23 13:16:58 +02:00
Paul Bottein
d25f72524b Migrate title section to heading (#22017)
* Remove title from UI

* Migrate section title to heading card

* Remove title from edit section dialog

* Update src/panels/lovelace/views/hui-sections-view.ts

* Simplify delete section dialog
2024-09-23 09:54:20 +02:00
dependabot[bot]
0840d8a10e Bump actions/setup-node from 4.0.3 to 4.0.4 (#22057)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-09-23 09:37:25 +02:00
renovate[bot]
597bf5def0 Update dependency @octokit/plugin-retry to v7.1.2 (#22047)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-22 18:35:14 +02:00
renovate[bot]
3478bd309b Update dependency date-fns to v4.1.0 (#22037)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-21 09:28:08 +02:00
renovate[bot]
64b8b7658d Update dependency @codemirror/commands to v6.6.2 (#22038)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-21 09:27:31 +02:00
renovate[bot]
a1af8718a0 Update dependency @material/web to v2.2.0 (#22041)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-21 09:25:24 +02:00
renovate[bot]
fd9e2b647d Lock file maintenance (#22027)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-19 20:48:19 +02:00
karwosts
caee4ba7bc Load defaults in script more-info (#22014) 2024-09-19 20:01:57 +02:00
karwosts
915036006d Fixes for trace viewer for nested triggers feature (#21765) 2024-09-19 19:48:20 +02:00
renovate[bot]
48887f2066 Update dependency sinon to v19 (#21988)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-19 19:27:41 +02:00
renovate[bot]
68d9ce7923 Update vaadinWebComponents monorepo to v24.4.9 (#21970)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-19 19:26:56 +02:00
renovate[bot]
a36f3c8fb1 Update dependency date-fns to v4 (#22028)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-19 19:25:15 +02:00
renovate[bot]
4dfadea9e9 Update dependency babel-loader to v9.2.1 (#22031)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-19 19:24:48 +02:00
Wendelin
71dc26edab Migrate dialog-light-color-favorite to ha-md-dialog (#22013)
* Migrate dialog-light-color-favorite to ha-md-dialog

* Add aria-label to dialog-light-color-favorite

* Add mobile dialog from bottom animation to dialog-light-color-favorite
2024-09-19 18:28:13 +02:00
Wendelin
f260c95add Add default value to zwave config params (#21990)
* Add default value to zwave config params

* Remove unused ha-switch from zwave node config

* Small fix of duplicate code in zwave node config
2024-09-19 13:17:45 +02:00
Paul Bottein
dc6f1efffb Add badges to section demo (#22029) 2024-09-19 12:01:59 +02:00
Paul Bottein
b7763882f4 Add Heading card (#22008)
* Add header card

* Rename to heading card

* Add heading entities

* Add editor for entities

* Remove unused property

* Fix margin and gap

* Improve content and entities container

* Fix no entities displayed

* Cache form to not loose state

* Use style

* Fix type

* Add support for string entities

* Add tap action support to entities

* Move expandable outside of entities editor

* Fix double processing
2024-09-19 10:46:20 +02:00
Paul Bottein
7de5c46f14 Improve card features editor (#22023)
* Move expansion panel outside of feature component

* Cache main form and feature form
2024-09-19 09:52:59 +02:00
Bram Kragten
5920efa2b2 Add preferred thread credentials to matter external commission (#22022) 2024-09-19 09:34:03 +02:00
Simon Lamon
d2194d55f9 Rename ha-button-menu-new into ha-md-button-menu (#22016)
* ha-button-menu-new => ha-md-button-menu

* linting
2024-09-18 12:02:15 +00:00
Simon Lamon
c0043af4c9 Rename ha-list-new into ha-md-list (#22015)
ha-list-new => ha-md-list
2024-09-18 08:28:05 +00:00
Bram Kragten
dcf763438b Use issue placeholders in issue repair flow, show break warning in re… (#21959)
Use issue placeholders in issue repair flow, show break warning in repair flow
2024-09-18 10:18:00 +02:00
Wendelin
858a00e28c Migrate dialog-box to ha-md-dialog (#22007)
* Migrate dialog-box to ha-md-dialog

* Add aria-labelby to dialog-box

* Add ids for dialog-box aria content
2024-09-18 09:24:27 +02:00
renovate[bot]
ab407e8274 Update Yarn to v4.5.0 (#22012)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-17 18:14:13 +02:00
renovate[bot]
14f96a6262 Update dependency @codemirror/autocomplete to v6.18.1 (#22011)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-17 17:50:01 +02:00
Paulus Schoutsen
2b33c70e04 Ensure device info categories notify, event and assist always show (#21994)
Currently we have the entity category always win. However, we have some functional categories on a device, notify, event, assist. It would be good to always show these togehter.
2024-09-17 09:37:45 +02:00
akloeckner
717443e2d6 Fix typo in ha-selector-color-rgb.ts (#22001) 2024-09-17 04:20:56 +00:00
renovate[bot]
2aba9099a0 Update dependency ua-parser-js to v1.0.39 (#22002)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-17 06:09:54 +02:00
karwosts
3079f126a8 Improve robustness of automation editor description error handling (#21993) 2024-09-16 17:55:16 +02:00
Bram Kragten
1cdfb746bf Optimize entities config performance (#21974)
* Optimize entities config performance

* review
2024-09-16 12:40:52 +00:00
renovate[bot]
39a1844991 Update dependency eslint-plugin-unused-imports to v4.1.4 (#21992)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-16 14:27:50 +02:00
Wendelin
9e4dc0d39e Migrate add/edit resources dialog to @material/web (#21933)
* Remove dashboard resources options from advanced mode

* Add ha-dialog-new, use it for dashboard resources

* Add ha-dialog-new shake; Move resources delete to table

* Improve ha-dialog-new, resource-detail

* Rename ha-dialog-new to ha-md-dialog

* Update src/panels/config/lovelace/resources/dialog-lovelace-resource-detail.ts

Fix dialogClosed method naming

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Add ha-md-dialog polyfill

* Fix ha-md-dialog for iOS 12

* Fix ha-md-dialog polyfill loading

* Fix ha-md-dialog open prop

* Fix ha-md-dialog legacy loading

* Improve ha-md-dialog legacy loading

* Fix multiple polyfill loads in ha-md-dialog

* Fix polyfill handleOpen in ha-md-dialog

* Improve polyfill handleOpen in ha-md-dialog

* Improve polyfill handleOpen ordering in ha-md-dialog

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-09-16 12:27:13 +00:00
Wendelin
ab91a4b814 Fix onboarding with 0 found integrations (#21977)
* Add onboarding 0 integrations fallback page

* Add translations to onboarding all set

* Migrate mwc to ha-button in onboarding-integrations
2024-09-16 13:19:25 +02:00
renovate[bot]
ca66c02fb3 Update dependency husky to v9.1.6 (#21983)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-15 20:18:08 +02:00
renovate[bot]
97bb052d71 Update dependency sinon to v18.0.1 (#21981)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-14 14:55:21 +02:00
Wendelin
137bb473c0 Fix user change password autofill (#21975)
* Fix user change password autofill

* Fix user change password new password input
2024-09-13 17:17:40 +02:00
Miguel Palhas
326b57f91b Fixes text input icons color in dark mode (#21971) 2024-09-13 11:43:59 +00:00
Paul Bottein
32feab6a70 Add floors to hass (#21960) 2024-09-13 11:07:04 +02:00
Martin Dybal
68a0d04f04 Added hold and double tap actions for tile card icon (#21947) 2024-09-13 09:59:04 +02:00
renovate[bot]
9078ab4026 Update dependency @bundle-stats/plugin-webpack-filter to v4.15.1 (#21968)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-13 06:24:57 +02:00
renovate[bot]
8605684906 Update dependency typescript to v5.6.2 (#21963)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-12 18:53:28 +02:00
AlCalzone
9f17d17d6e Z-Wave JS: Mention the ability to select which security keys to grant (#21958) 2024-09-12 18:51:22 +02:00
Reuben
ba5f176d52 Capitalise ha-relative-time in state-display (#21949)
This matches the capitalisation applied to hui-timestamp-display, and state-info displays
2024-09-12 18:51:15 +02:00
ildar170975
7115d14699 Add padding to bottom of logbook in device page (#21913)
Update ha-config-device-page.ts
2024-09-12 18:51:06 +02:00
dependabot[bot]
23e37daff3 Bump express from 4.19.2 to 4.20.0 (#21956)
Bumps [express](https://github.com/expressjs/express) from 4.19.2 to 4.20.0.
- [Release notes](https://github.com/expressjs/express/releases)
- [Changelog](https://github.com/expressjs/express/blob/master/History.md)
- [Commits](https://github.com/expressjs/express/compare/4.19.2...4.20.0)

---
updated-dependencies:
- dependency-name: express
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-09-11 18:39:36 +00:00
renovate[bot]
ed6c2dfe39 Update dependency marked to v14.1.2 (#21955)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-11 20:26:42 +02:00
Simon Lamon
b48a28f2a6 Fix "unknown" traces in design gallery (#21942) 2024-09-10 22:04:10 +02:00
renovate[bot]
3166fec7db Update dependency eslint-plugin-lit to v1.15.0 (#21940)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-10 17:29:25 +02:00
karwosts
1a67bd0414 Fix script more-info when entity_id != unique_id (#21880)
* Fix script more-info when entity_id != unique_id

* Update src/dialogs/more-info/controls/more-info-script.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-09-10 09:35:40 +02:00
Paulus Schoutsen
d34c43e292 Add assist_satellite to Assist entities array (#21795) 2024-09-10 06:22:54 +02:00
karwosts
c7cfbb5b6c Fix service advanced options UI (#21925) 2024-09-09 17:19:35 +02:00
Paul Bottein
05ad3137f1 20240909.1 (#21935) 2024-09-09 17:17:51 +02:00
Paul Bottein
bde2fd8202 Bumped version to 20240909.1 2024-09-09 17:17:04 +02:00
Paul Bottein
e5327c0903 Update patch for sortablejs 1.15.3 (#21934)
Update sortablejs patch
2024-09-09 15:15:53 +00:00
Yosi Levy
1a0ca1b78f RTL fixes sep 24 (#21893)
* Fix logs drop down

* Fix history arrow

* Icon direction fix
2024-09-09 17:13:23 +02:00
Paul Bottein
ed141b1d12 Bumped version to 20240909.0 2024-09-09 16:35:16 +02:00
Paul Bottein
5a7a71c551 Fix section view crashing on old iPads (#21932) 2024-09-09 10:30:27 +00:00
karwosts
f09e0d187b Restore localizeValue to ha-form (fix selector translations) (#21923) 2024-09-09 11:20:08 +02:00
karwosts
7f6325fa5e Fix sections item translation for config flow (#21924) 2024-09-08 15:24:59 +00:00
jonnynch
de292a8143 Fix WebRTC for Firefox by ignoring empty ice candidates (#21908)
* handle firefox empty string ice candidate

* use optional chaining as per comment
2024-09-08 17:23:47 +02:00
renovate[bot]
84b2005844 Update dependency marked to v14.1.1 (#21917)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-07 08:27:00 +02:00
renovate[bot]
0d93432a2c Update dependency eslint-import-resolver-webpack to v0.13.9 (#21909)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-06 22:46:05 +00:00
Bram Kragten
8bc9927ee2 Zwave JS display allowed range of config values (#21892)
* Zwave: Display allowed range of config values, catch wrong values

* allow min and max

* Update zwave_js-node-config.ts
2024-09-07 00:38:32 +02:00
Bram Kragten
484bed4dab Fix initial form data for action/condition/trigger selectors (#21899) 2024-09-07 00:34:59 +02:00
renovate[bot]
3d7e243707 Update dependency sortablejs to v1.15.3 (#21885)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-07 00:31:08 +02:00
renovate[bot]
f8a432c89e Update dependency eslint-plugin-import to v2.30.0 (#21910)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-07 00:29:53 +02:00
renovate[bot]
d484b2f63d Update dependency webpack-dev-server to v5.1.0 (#21914)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-07 00:28:06 +02:00
Paul Bottein
ba770f8e50 20240906.0 (#21911) 2024-09-06 13:47:49 +02:00
Paul Bottein
30d9186031 Bumped version to 20240906.0 2024-09-06 13:46:51 +02:00
Paul Bottein
cd74367acc Use primary config entry for device (#21903)
* Use primary config entry for device

* Fix types
2024-09-06 13:43:29 +02:00
Bram Kragten
618cd9d9e5 Remove device subscription from zwave node config (#21891)
remove device subscription from zwave node config
2024-09-05 13:40:10 +02:00
Paul Bottein
0ff2f1bf75 Hide top label for number selector using box mode (#21888) 2024-09-05 10:22:39 +02:00
renovate[bot]
d28f1f07e7 Update dependency lint-staged to v15.2.10 (#21881)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-05 10:05:06 +02:00
Bram Kragten
b457d27c4c 20240904.0 (#21876) 2024-09-04 10:59:24 +02:00
Bram Kragten
6aa5bc2d8b Bumped version to 20240904.0 2024-09-04 10:50:16 +02:00
Bram Kragten
76fc0c7ab1 Change update logic in ha-data-table (#21874)
* Change update logic in ha-data-table

* use time of last request
2024-09-04 10:49:32 +02:00
Paul Bottein
7aa7019386 Move badge styling into ha-badge component to reuse it (#21864)
* Move badge styling into ha-badge component to reuse it

* Fix error badge

* Update src/components/ha-badge.ts

Co-authored-by: Paulus Schoutsen <balloob@gmail.com>

---------

Co-authored-by: Paulus Schoutsen <balloob@gmail.com>
2024-09-04 10:48:55 +02:00
Joakim Sørensen
b69f0964c9 Fix compression of hassio builds (#21869) 2024-09-04 10:01:58 +02:00
renovate[bot]
2f9b6d000b Update dependency @codemirror/commands to v6.6.1 (#21863)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-04 07:48:35 +02:00
Paul Bottein
9c12ab9c6d 20240903.1 (#21867) 2024-09-03 19:02:36 +02:00
Paul Bottein
94f186c436 Bumped version to 20240903.1 2024-09-03 18:51:49 +02:00
Bram Kragten
449f858ac8 Merge branch 'master' into dev 2024-09-03 18:47:42 +02:00
Paul Bottein
91a2f2cf24 Bumped version to 20240903.0 2024-09-03 18:37:42 +02:00
Paul Bottein
2c975d4f41 Add advanced yaml only row_span option for sections (#21833) 2024-09-03 18:20:55 +02:00
renovate[bot]
ab534933fc Update dependency @babel/runtime to v7.25.6 (#21847)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-03 11:37:28 -04:00
renovate[bot]
e353aaa339 Update vaadinWebComponents monorepo to v24.4.7 (#21854)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-09-03 11:35:44 -04:00
Paul Bottein
020904f8f6 Hide section title when the section is hidden (#21862) 2024-09-03 10:41:15 +02:00
Wendelin
fa8b3f006d Fix autofill for ha-selector-text (#21861) 2024-09-03 09:35:17 +02:00
Paul Bottein
d9ce20992c 20240902.0 (#21857)
* Update dependency @bundle-stats/plugin-webpack-filter to v4.15.0 (#21837)

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>

* Update dependency marked to v14.1.0 (#21829)

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>

* Bump actions/upload-artifact from 4.3.6 to 4.4.0 (#21850)

Bumps [actions/upload-artifact](https://github.com/actions/upload-artifact) from 4.3.6 to 4.4.0.
- [Release notes](https://github.com/actions/upload-artifact/releases)
- [Commits](https://github.com/actions/upload-artifact/compare/v4.3.6...v4.4.0)

---
updated-dependencies:
- dependency-name: actions/upload-artifact
  dependency-type: direct:production
  update-type: version-update:semver-minor
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>

* Add padding to no info badge (#21844)

* Add padding to no info badge

* Update src/panels/lovelace/badges/hui-entity-badge.ts

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* Fix section not displayed when empty and string config (#21852)

* Move edit mode actions next to section block (#21840)

* Fix rendering of alerts in markdown when not breaking (#21856)

* Perform action on every entity (#21845)

* Bumped version to 20240902.0

---------

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
Co-authored-by: Joakim Sørensen <ludeeus@ludeeus.dev>
2024-09-02 17:30:17 +02:00
Paul Bottein
a09f44dcd2 Bumped version to 20240902.0 2024-09-02 17:29:27 +02:00
Simon Lamon
c709059c00 Perform action on every entity (#21845) 2024-09-02 17:23:46 +02:00
Joakim Sørensen
5613df1d01 Fix rendering of alerts in markdown when not breaking (#21856) 2024-09-02 17:21:58 +02:00
Paul Bottein
d8013a4db9 Move edit mode actions next to section block (#21840) 2024-09-02 13:21:24 +02:00
Paul Bottein
216dbc4d41 Fix section not displayed when empty and string config (#21852) 2024-09-02 13:21:13 +02:00
Simon Lamon
c40751dadd Add padding to no info badge (#21844)
* Add padding to no info badge

* Update src/panels/lovelace/badges/hui-entity-badge.ts

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-09-02 12:35:28 +02:00
dependabot[bot]
f58d3ad670 Bump actions/upload-artifact from 4.3.6 to 4.4.0 (#21850)
Bumps [actions/upload-artifact](https://github.com/actions/upload-artifact) from 4.3.6 to 4.4.0.
- [Release notes](https://github.com/actions/upload-artifact/releases)
- [Commits](https://github.com/actions/upload-artifact/compare/v4.3.6...v4.4.0)

---
updated-dependencies:
- dependency-name: actions/upload-artifact
  dependency-type: direct:production
  update-type: version-update:semver-minor
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-09-02 12:00:26 +02:00
renovate[bot]
682f5345cc Update dependency marked to v14.1.0 (#21829)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-29 22:35:42 -04:00
renovate[bot]
a69771c1f8 Update dependency @bundle-stats/plugin-webpack-filter to v4.15.0 (#21837)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-29 22:33:57 -04:00
Bram Kragten
22de449dda 20240829.0 (#21836) 2024-08-29 16:40:01 +02:00
Bram Kragten
05a27b9399 Bumped version to 20240829.0 2024-08-29 16:36:32 +02:00
Paul Bottein
32083ea13d Use dense layout for section view (#21830)
* Use dense layout for section view

* Make it an option in view settings

* Add expandable
2024-08-29 16:36:00 +02:00
Paul Bottein
18210f35b5 Put number selector label above the input (#21835) 2024-08-29 16:15:55 +02:00
Paul Bottein
362a6f46fe Don't use the word column in section view (#21834) 2024-08-29 15:30:25 +02:00
Paul Bottein
1c9d411d3a Put boolean selector helper inside field (#21831) 2024-08-29 14:24:59 +02:00
Bram Kragten
6d84523456 Revert "Adds throttler to config pages for state entity updates (#21646)"
This reverts commit 00eb820e36.
2024-08-29 12:18:26 +02:00
Paul Bottein
2a18706a13 Take column span into account to determine the max number of columns (#21827) 2024-08-29 09:58:17 +02:00
karwosts
87b58b0bbd Fix untracked consumption string (#21825) 2024-08-29 09:57:53 +02:00
Simon Lamon
3ebb268b57 Migrate polymer paper tab in badge card editor (#21627)
* paper tab badge

* Remove copy paste from card editor
2024-08-29 09:55:51 +02:00
Simon Lamon
2df097cd1b Add default config automation typings (#21657)
* typings

* fixes

* fixes

* Update more typings
2024-08-29 09:55:23 +02:00
Paul Bottein
8349e47c17 20240828.0 (#21822) 2024-08-28 16:02:54 +02:00
Paul Bottein
4913932c97 Bumped version to 20240828.0 2024-08-28 16:00:16 +02:00
Paul Bottein
19f057a51b Add title and description translation support to expandable form (#21745)
* Add title and description translation support to expandable form

* Fix type

* handle translations in sections

* Rename prefix to path + refactor

* Fix section name and description

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-08-28 13:49:38 +00:00
Paul Bottein
c556742ff4 Column span better editor (#21820)
* Add label, unit and max for column span option

* Display the right number of columns in the layout editor

* improve translations
2024-08-28 12:58:46 +00:00
Paul Bottein
8b5f731d0c Use right grid column count inside grid section (#21819) 2024-08-28 12:53:29 +00:00
Bram Kragten
9568677926 Add support for service section icons (#21806)
* Add support for service section icons

* remove backwards compatibility core handles it

* Update icons.ts
2024-08-28 14:44:08 +02:00
karwosts
93ee5de1b4 Plot 'untracked consumption' on devices detail energy graph (#21632)
* Plot 'untracked consumption' on devices detail energy graph

* skip when there are no energy sources

* rename variable
2024-08-28 14:24:19 +02:00
Paul Bottein
2f68ee0efc Allow a card to span the full width of a section (#21758)
* Limit card size with the grid size

* Set full option in YAML

* Export card grid size

* Add editor

* Set full column for map card and iframe by default

* Do not set string variable
2024-08-28 12:01:40 +02:00
Paul Bottein
5a229e3c88 Allow resizing section to span multiple columns (#21742)
* WIP: Allow to resize section

* Use listeners

* Rename variables

* Rename variables

* Remove column min width

* Make column breakpoints optional

* Use old logic to calculate the number of columns

* Remove breakpoints

* Simplify column span
2024-08-28 09:54:03 +02:00
Paul Bottein
7c5f947865 Change entity badge display type to 3 booleans : name, state and icon (#21798)
* Change display type to 3 boolean : name, state and icon for entity badge

* Fix image url

* Fix not found entity

* Update state-label badge migration
2024-08-28 09:53:07 +02:00
Douwe
e9cbd54979 Option to change new badge size (#21676)
* Update hui-entity-badge.ts

add option to chsnge badge size

* Update hui-entity-badge.ts

Co-authored-by: Damian Sypniewski <16312757+dsypniewski@users.noreply.github.com>

* Update hui-entity-badge.ts

prettier

* Update hui-entity-badge.ts

Fixed something strange

---------

Co-authored-by: Damian Sypniewski <16312757+dsypniewski@users.noreply.github.com>
2024-08-28 09:02:34 +02:00
karwosts
cf55824899 Add more-info click to energy table and detail device graph (#21737)
* feat: more info energy dashboard

* add more info to device details usage

* Add some more-info click to energy

---------

Co-authored-by: Muka Schultze <samuelschultze@gmail.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-08-28 08:43:53 +02:00
karwosts
395586ddeb Adjust schedule helper UI with minute granularity (#21073)
* Adjust schedule helper UI with minute granularity

* Update en.json

* ha-button
2024-08-28 08:41:53 +02:00
karwosts
9c48dbf232 Revert display_precision override for duration format (#21755)
Remove precision override for duration format
2024-08-28 08:35:11 +02:00
Simon Lamon
00eb820e36 Adds throttler to config pages for state entity updates (#21646)
throttler
2024-08-28 08:27:28 +02:00
Bram Kragten
6b99cda982 Hide deprecated stt/tts engines, use name provided by core (#21805)
* Hide deprecated stt/tts engines, use name provided by core

* Update ha-tts-picker.ts
2024-08-27 23:51:01 +02:00
renovate[bot]
9bde0e876d Update Yarn to v4.4.1 (#21809)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-27 13:39:32 -04:00
Denis Shulyaka
9482fcb04b Fallback data flow label translation (#21704) 2024-08-27 13:59:44 +02:00
renovate[bot]
883ad58f52 Update dependency @codemirror/view to v6.33.0 (#21804)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-27 12:17:41 +02:00
Paulus Schoutsen
11ace6002a Fix Assist pipeline defaults (#21796)
* Fix Assist pipeline defaults

* Always set to NONE if nothing

* Rewrite for readability
2024-08-26 23:51:37 +02:00
puddly
c416daeb92 Expand the ZHA channel selection dialog text (#21801)
* Expand the ZHA channel selection dialog text

* Drop unnecessary `It is recommended to`

* Update src/translations/en.json

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

* Replace `hui-warning` with just `ha-alert`

* Avoid creating translations for just channel numbers

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-08-26 20:30:35 +00:00
Eric Shtivelberg
061521a979 Fix duplicate and non lazy loading of hui-calendar-card (#21788)
* fix: hui-calendar-card is not lazy loaded

* reorder imports
2024-08-26 17:42:33 +02:00
renovate[bot]
d3f73baa36 Update vaadinWebComponents monorepo to v24.4.6 (#21794)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-26 11:06:02 -04:00
Paul Bottein
3037bf494c Add description to service translations (#21759) 2024-08-26 11:33:51 +02:00
Paulus Schoutsen
b4dd953128 Hide tag entities from default dashboard (#21793)
Tag integration now creates entities. They need to be hidden from the default dashboard.
2024-08-26 09:44:52 +02:00
renovate[bot]
430a28f350 Update dependency webpack to v5.94.0 (#21791)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-25 13:47:03 -04:00
Paul Bottein
0eacf3fdac Show error badge when an unknown entity is used in badges (#21757)
* Show error badge when wrong entity set in badges
2024-08-25 13:48:05 +02:00
karwosts
7f9bf69a08 Fix tile alarm modes when wrong code entered (#21779) 2024-08-25 13:22:19 +02:00
renovate[bot]
32cca9e30c Update babel monorepo to v7.25.4 (#21789)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-25 13:11:20 +02:00
renovate[bot]
d7d62307b8 Update dependency @material/web to v2.1.0 (#21785)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-25 08:13:34 +02:00
renovate[bot]
12bfa5dab2 Update dependency eslint-plugin-wc to v2.1.1 (#21784) 2024-08-24 23:04:00 -04:00
renovate[bot]
c0a728bc66 Update dependency tinykeys to v3 (#21773)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-24 14:17:27 +02:00
renovate[bot]
19e8667349 Update dependency chart.js to v4.4.4 (#21771)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-24 13:23:52 +02:00
dependabot[bot]
f3688b95d4 Bump micromatch from 4.0.7 to 4.0.8 (#21770)
Bumps [micromatch](https://github.com/micromatch/micromatch) from 4.0.7 to 4.0.8.
- [Release notes](https://github.com/micromatch/micromatch/releases)
- [Changelog](https://github.com/micromatch/micromatch/blob/4.0.8/CHANGELOG.md)
- [Commits](https://github.com/micromatch/micromatch/compare/4.0.7...4.0.8)

---
updated-dependencies:
- dependency-name: micromatch
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-08-23 22:07:45 +02:00
karwosts
01f692f05c Render the label on the target selector (#21769)
* Render the label on the target selector

* use label
2024-08-23 20:04:09 +00:00
renovate[bot]
d652f6382d Update dependency @bundle-stats/plugin-webpack-filter to v4.14.2 (#21768)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-23 21:53:31 +02:00
renovate[bot]
c0f96d9473 Update dependency husky to v9.1.5 (#21767)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-23 17:54:56 +02:00
renovate[bot]
f1a2af24b3 Update dependency core-js to v3.38.1 (#21764)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-23 17:54:17 +02:00
renovate[bot]
8501098bd1 Lock file maintenance (#21734)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-22 21:18:12 +02:00
Gourav Soni
a235f76985 fix: Add destructive styling to delete button in dashboard config rem… (#21729)
* fix: Add destructive styling to delete button in dashboard config removal dialog

* changed translation key 'remove' to 'delete'

* Update src/translations/en.json

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-08-21 18:25:42 +00:00
Paul Bottein
968c0de141 Fix migration from call-service to perform-action (#21746) 2024-08-21 20:13:09 +02:00
Paul Bottein
77d8aff1f4 Add missing label_id and floor_id key in action struct (#21753)
* Add missing label_id key in action struct

* Add missing floor_id key in action struct
2024-08-21 19:59:02 +02:00
Steve Repsher
5e486d9cf0 Correct serving modern build to macOS companion app (#21724) 2024-08-21 11:51:07 -04:00
Michael Arthur
f730761b3f add returning lawn mower state (#21740) 2024-08-21 16:34:33 +02:00
Steve Repsher
46fc9c1a33 Remove old ha-form-style (#21751) 2024-08-21 06:29:13 +02:00
Denis Shulyaka
8ed68bf295 Add check for conversation entity (#21736)
* Add check for conversation entity

* Use true as default
2024-08-20 13:53:07 +02:00
renovate[bot]
5622180d42 Update dependency @octokit/rest to v21.0.2 (#21739) 2024-08-19 20:30:33 -04:00
renovate[bot]
ef1f9b371d Update dependency @types/chromecast-caf-receiver to v6.0.17 (#21733)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-18 23:08:06 -04:00
renovate[bot]
0b79684cf1 Update dependency @codemirror/legacy-modes to v6.4.1 (#21731)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-18 23:07:03 -04:00
renovate[bot]
bc68d8df11 Update dependency marked to v14 (#21654)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-17 12:59:26 +02:00
renovate[bot]
ebbade2fb7 Update dependency @lezer/highlight to v1.2.1 (#21719) 2024-08-16 21:59:36 -04:00
renovate[bot]
2b5f778f2e Update dependency @bundle-stats/plugin-webpack-filter to v4.14.1 (#21718) 2024-08-16 21:58:23 -04:00
Paul Bottein
91fc2383cb Add badges for sidebar view (#21715) 2024-08-16 16:52:52 +02:00
Paul Bottein
1080a8c961 Add missing box shadow theme variable to entity badge (#21714) 2024-08-16 16:18:29 +02:00
renovate[bot]
6144049f8c Update dependency lint-staged to v15.2.9 (#21712)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-16 12:42:11 +02:00
renovate[bot]
4ad3ad6e93 Update dependency @codemirror/view to v6.32.0 (#21694)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-16 06:41:35 +02:00
karwosts
16e84296da Use defined response_variable for json copy_to_clipboard button (#21705) 2024-08-16 06:40:56 +02:00
karwosts
3e1ea8d236 fix ha-card-condition-state invert selector (#21711) 2024-08-16 06:39:55 +02:00
Martin Vyšňovský
8c9996fc81 Make delete button red when removing todo item (#21466) (#21708) 2024-08-16 06:39:27 +02:00
Charles Garwood
336b5fb547 Update styling on Template dev-tools (#21661)
* Update styling on Template dev-tools

* Remove unnecessary divs
2024-08-15 09:14:27 +02:00
G Johansson
3f0f3affb6 Remove deprecated mailbox (#21689)
Remove mailbox
2024-08-14 12:38:06 +02:00
renovate[bot]
6754b8893b Update dependency eslint-plugin-unused-imports to v4.1.3 (#21669)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-13 16:00:05 +00:00
Adam Kapos
6ec4323c76 Enable background transparency & effects on badges (#21667)
Enable background effects on badges
2024-08-13 09:23:09 +02:00
dependabot[bot]
20408392d2 Bump actions/upload-artifact from 4.3.5 to 4.3.6 (#21671)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-08-12 08:46:05 +02:00
dependabot[bot]
b030a5d1f0 Bump relative-ci/agent-action from 2.1.11 to 2.1.12 (#21672)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-08-12 08:44:59 +02:00
Franck Nijhof
a9f8eb5ab1 Merge branch 'dev' 2024-08-09 20:00:53 +02:00
Franck Nijhof
e26e6d7c2d Bumped version to 20240809.0 2024-08-09 19:58:41 +02:00
Simon Lamon
e0c98e4524 Fix left over "script" in default config when using perform action (#21650) 2024-08-09 19:55:57 +02:00
Simon Lamon
2832f501d1 Fix scripted blueprints (#21649) 2024-08-09 19:38:33 +02:00
renovate[bot]
d2f2d682a9 Update CodeMirror (#21628)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-09 06:25:41 +00:00
renovate[bot]
54b2121273 Update dependency @lit-labs/virtualizer to v2.0.14 (#21637)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-09 08:15:58 +02:00
renovate[bot]
c5ca731e05 Update dependency qrcode to v1.5.4 (#21638)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-09 08:15:11 +02:00
renovate[bot]
fd9c6c5449 Update dependency @bundle-stats/plugin-webpack-filter to v4.14.0 (#21639)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-09 08:13:02 +02:00
renovate[bot]
39f4355c1a Update dependency core-js to v3.38.0 (#21617)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-08 15:57:47 -04:00
Vaibhav Tank
35fed0b0e2 Fix logout button text color on confirmation dialog (#21595) 2024-08-08 09:18:38 +02:00
Madelena Mak
f0f0aefca1 Clean up OHF badge for splash screen (#21593)
* Clean up OHF badge for splash screen

* Fix demo logo size

* Fixed the code to Bram's feedback

* Pixel pushing
2024-08-08 07:56:51 +02:00
karwosts
b60864086f Localize some column headers (#21622) 2024-08-08 07:55:15 +02:00
Jesse Hills
6629f372fc Fix typo in assist-render-pipeline-events.ts (#21620) 2024-08-08 07:54:35 +02:00
dependabot[bot]
ec9a95dde0 Bump @75lb/deep-merge from 1.1.1 to 1.1.2 (#21616)
Bumps [@75lb/deep-merge](https://github.com/75lb/deep-merge) from 1.1.1 to 1.1.2.
- [Commits](https://github.com/75lb/deep-merge/compare/v1.1.1...v1.1.2)

---
updated-dependencies:
- dependency-name: "@75lb/deep-merge"
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-08-07 12:16:34 +00:00
renovate[bot]
3cd0c49c78 Update dependency luxon to v3.5.0 (#21609)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-07 14:03:12 +02:00
karwosts
e1ae95dd9f Fix webhook textfield icon color for dark mode (#21610) 2024-08-07 08:47:26 +02:00
Franck Nijhof
ab38dad156 Bumped version to 20240806.1 2024-08-06 16:55:24 +02:00
Franck Nijhof
1ddeca3eeb Merge branch 'dev' 2024-08-06 16:54:59 +02:00
Franck Nijhof
9c6aef033d Add indicator/alert to YAML integrations on integration page (#21607) 2024-08-06 16:48:29 +02:00
Bram Kragten
b23aacef84 Condition testing display fix (#21606) 2024-08-06 16:33:54 +02:00
Bram Kragten
7d218c89ae Improve state badge migration (#21603) 2024-08-06 16:13:12 +02:00
Bram Kragten
ffa96d789f Update weather card layout options (#21604) 2024-08-06 16:12:36 +02:00
Franck Nijhof
f08f455698 Merge branch 'dev' 2024-08-06 12:10:50 +02:00
Franck Nijhof
5eae163796 Bumped version to 20240806.0 2024-08-06 12:09:23 +02:00
Franck Nijhof
9e7f01a009 Only migrate automation actions if there are any (#21599) 2024-08-06 11:39:52 +02:00
Simon Lamon
eeffa3561c Add badge label (#21598) 2024-08-06 11:38:08 +02:00
renovate[bot]
f096eb2031 Update dependency lint-staged to v15.2.8 (#21597)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-06 10:25:36 +02:00
renovate[bot]
3aad7431da Migrate renovate config (#21594)
Migrate config renovate.json

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-06 10:08:09 +02:00
renovate[bot]
a4f167559c Update Yarn to v4.4.0 (#21592)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-05 23:15:32 -04:00
renovate[bot]
44a0582e83 Update vaadinWebComponents monorepo to v24.4.5 (#21585)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-05 23:12:45 -04:00
Bram Kragten
735560c552 Merge branch 'dev' 2024-08-05 17:16:34 +02:00
Bram Kragten
94c28ea534 Bumped version to 20240805.1 2024-08-05 17:16:24 +02:00
karwosts
5b7c20af33 fix broken perform-action translation in gauge card editor (#21589) 2024-08-05 15:15:39 +00:00
Paul Bottein
4719775926 Allow name in state content for badges (#21576) 2024-08-05 17:14:10 +02:00
Bram Kragten
5c30c1647c Show name for badges without config (#21588)
* Show name for badges without config

* also for state label type
2024-08-05 15:12:28 +00:00
karwosts
3ba572ee37 Fix pointer cursor issues (#21587)
* Fix pointer cursor issues

* one more
2024-08-05 17:07:03 +02:00
karwosts
0adee7d189 Use getStubConfig for picture-elements (and more fixes) (#21579) 2024-08-05 17:05:31 +02:00
Bram Kragten
b5c2b555bc Merge branch 'dev' 2024-08-05 16:37:14 +02:00
Bram Kragten
51b6d7758d Bumped version to 20240805.0 2024-08-05 16:36:50 +02:00
karwosts
0f21dfadf1 Dont load unnecessary translations for helper dialog (#21573) 2024-08-05 16:33:36 +02:00
Robert Resch
54e8a34f21 Change yaml integration icon (#21586) 2024-08-05 16:32:04 +02:00
Steve Repsher
dfbf4abd5d Link old service worker to new name (#21581) 2024-08-05 15:52:46 +02:00
dependabot[bot]
62d8434596 Bump actions/upload-artifact from 4.3.4 to 4.3.5 (#21583) 2024-08-05 08:36:50 +02:00
renovate[bot]
d6df228e17 Update dependency @babel/preset-env to v7.25.3 (#21572)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-03 13:08:44 +00:00
Simon Lamon
00faa16349 Add some other tile cards to design page (#21563) 2024-08-03 15:06:41 +02:00
renovate[bot]
3c92fe4170 Update typescript-eslint monorepo to v7.18.0 (#21546)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-02 20:58:26 +02:00
renovate[bot]
02a9d67c7d Update babel monorepo to v7.25.2 (#21548)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-02 20:57:20 +02:00
Bram Kragten
b368f886f9 20240802.0 (#21562) 2024-08-02 16:11:50 +02:00
Bram Kragten
88718bca23 Bumped version to 20240802.0 2024-08-02 15:56:25 +02:00
Bram Kragten
33931b29a1 Try to force refresh if old service worker is used (#21561)
* Try to force refresh if old service worker is used

* Update register-service-worker.ts
2024-08-02 15:32:21 +02:00
Bram Kragten
a9310fdde0 fix hui-action-editor (#21560) 2024-08-02 14:27:05 +02:00
Bram Kragten
d634317438 Fix tabs not shown in edit card dialog (#21559) 2024-08-02 13:46:25 +02:00
Bram Kragten
a41978f647 Await starting audio recorder (#21557) 2024-08-02 12:57:57 +02:00
Bram Kragten
7e799bf639 migrate script sequence to new format (#21556) 2024-08-02 12:47:41 +02:00
Paulus Schoutsen
73617711ff Show in Assist dialog if assistant is unable to control Home Assistant (#21549)
* Show in Assist dialog if assistant is unable to control Home Assistant

* Update src/translations/en.json
2024-08-02 12:31:06 +02:00
karwosts
edbfc22bf8 Add a warning for improper usage of the template selector (#21545)
* Add a warning when adding template yaml in the template selector

* refinement
2024-08-02 12:30:09 +02:00
karwosts
5e75f6a6c2 Add a destructive confirmation when deleting a picture-elements element (#21541) 2024-08-02 12:28:37 +02:00
karwosts
6dc80306e8 Add help links to helper integration config flow forms (#21537) 2024-08-02 12:27:48 +02:00
Simon Lamon
acd1b04b0a Fix width of numeric features in tile card (#21543) 2024-08-01 23:57:02 +02:00
renovate[bot]
7e9d09e11c Update dependency magic-string to v0.30.11 (#21540)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-01 18:37:07 +02:00
renovate[bot]
038f7ec000 Update dependency husky to v9.1.4 (#21539)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-01 18:36:30 +02:00
renovate[bot]
08959cbabf Update dependency @codemirror/view to v6.29.1 (#21532)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-08-01 18:16:37 +02:00
Bram Kragten
b611674ebd Minify ohf logo (#21528) 2024-08-01 12:29:16 +02:00
Bram Kragten
da75eecfa5 Merge branch 'dev' 2024-08-01 11:15:27 +02:00
Bram Kragten
2f696bd511 Fix demo service worker (#21527)
* fix demo service worker

* cast too
2024-08-01 09:11:27 +00:00
Bram Kragten
9e3284a7db Add ping to mock hass (#21526)
add ping to mock hass
2024-08-01 08:54:43 +00:00
Bram Kragten
0c3471e0b7 Skip database migration check on demo (#21525) 2024-08-01 08:54:14 +00:00
karwosts
1ca0b58aca Picture elements editor minor adjustments (#21512)
* Picture elements editor minor adjustments

* image selector for image element

* revert change to expanded
2024-08-01 10:43:08 +02:00
renovate[bot]
adceed689b Update dependency marked to v13.0.3 (#21513)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-31 21:32:03 +02:00
Bram Kragten
fdf829bc81 20240731.0 (#21510) 2024-07-31 16:21:25 +02:00
Bram Kragten
574fc99889 Rename service button to action button (#21511) 2024-07-31 16:19:32 +02:00
Bram Kragten
3a83cb36a1 Bumped version to 20240731.0 2024-07-31 15:27:19 +02:00
Paulus Schoutsen
a458ccf995 Update OHF logo on loading screen (#21509)
* Update OHF logo on loading screen

* tweak

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-07-31 13:24:30 +00:00
Bram Kragten
560e2c9438 Migrate service call element to use action key (#21506)
Migrate service call element
2024-07-31 14:54:01 +02:00
Bram Kragten
78becb5440 Allow and migrate action key in service action (#21503) 2024-07-31 14:36:14 +02:00
Bram Kragten
da2e530601 Migrate state label badge to entity badge (#21507) 2024-07-31 14:34:51 +02:00
Bram Kragten
a88a7c5236 Change yaml config of UI service call actions (#21508) 2024-07-31 14:34:43 +02:00
karwosts
0a095c6f21 Add enable_millisecond to duration selector (#21498)
Add enable_milliseconds to duration selector
2024-07-31 12:34:57 +02:00
Bram Kragten
e8dd835eeb rename actions in UI editors to interactions (#21505) 2024-07-31 11:39:32 +02:00
karwosts
e05c66444a Picture Elements Visual editor (#19718)
* preliminary edits

* more functional prototype

* all types implemented

* mostly style and localization updates

* fix empty conditional case

* Move getConfigElement to elements themselves

* drop unneeded imports

* move struct validation to individual element editors

* description for unknown types

* Update src/panels/lovelace/editor/config-elements/elements/hui-service-button-element-editor.ts

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

* Update src/panels/lovelace/editor/config-elements/elements/hui-state-icon-element-editor.ts

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

* Update src/panels/lovelace/editor/config-elements/elements/hui-service-button-element-editor.ts

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

* Update src/panels/lovelace/editor/config-elements/elements/hui-state-badge-element-editor.ts

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

* Update hui-picture-elements-card-row-editor.ts

* Fix merge mistake

* Update src/panels/lovelace/create-element/create-picture-element.ts

remove comment

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-07-31 11:16:57 +02:00
Paulus Schoutsen
d0e61ca31a Show OHF logo on loading and about screen (#21504)
* Show OHF logo on loading screen

* Also add OHF logo to about page
2024-07-31 09:12:11 +00:00
Simon Lamon
1f90a0c2e5 Add translation for unknown entity (#21484)
* unknown entity

* prettier
2024-07-31 11:05:14 +02:00
illuzn
dbd84901f8 Implement show_empty functionality for the markdown card (#21379)
* Implement show_empty functionality

* Implement show_empty functionality

* import fireEvent

* Order imports correctly

* Lint with prettier

* Unhide card when appropriate

* only run show code if card is hidden

* Commit coderabbit code cleanup

Co-authored-by: coderabbitai[bot] <136622811+coderabbitai[bot]@users.noreply.github.com>

* linting

---------

Co-authored-by: coderabbitai[bot] <136622811+coderabbitai[bot]@users.noreply.github.com>
2024-07-31 08:58:45 +00:00
Simon Lamon
0aa25dbed9 Don't eat spaces while searching (#21479) 2024-07-31 10:58:39 +02:00
Steve Repsher
dd74a35d3f Use Brotli compression for modern build (#17906) 2024-07-31 10:57:52 +02:00
Simon Lamon
b1d8ec0fe4 Call a service: Split remaining service_data's into data and target (#21440)
* service_data into data and target

* Add other possible targets
2024-07-31 10:46:00 +02:00
Simon Lamon
cd4af674a3 Move some polymer paper-tabs to mwc-tabs (#21390)
* dev-tools

* entity card editor

* edit section dialog

* edit view

* Set the page from the router back in dev tools

* Remove changes to developer tools

* Prettier
2024-07-31 10:44:52 +02:00
renovate[bot]
7a6491a901 Update babel monorepo to v7.25.0 (#21497)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-30 16:59:34 +02:00
Bram Kragten
8d20303d54 Show helpers setup in YAML also in the UI (#21500) 2024-07-30 15:13:05 +02:00
Bram Kragten
a5786b4761 Fix translation loading and manifest fetching for integration page (#21501) 2024-07-30 12:48:28 +02:00
Bram Kragten
4ade39543d Add created/modified to registry tables (#21494) 2024-07-30 11:18:50 +02:00
renovate[bot]
a85dda3365 Update dependency husky to v9.1.3 (#21443)
* Update dependency husky to v9.1.3

* Follow migration guide (options removed in 10.x, but deprecation notice right now)

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-07-30 07:44:43 +00:00
renovate[bot]
e578904ff7 Update dependency @material/web to v2 (#21489)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-29 17:56:22 +02:00
renovate[bot]
09f0da1ead Update dependency @codemirror/view to v6.29.0 (#21488)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-29 17:38:14 +02:00
Mike Degatano
2faa8fec17 Music Assistant repository is now built in (#21496) 2024-07-29 15:09:33 +00:00
renovate[bot]
945c4a66b1 Update dependency tar to v7.4.3 (#21491)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-29 11:43:43 +02:00
renovate[bot]
5d794e7e88 Update dependency tar to v7.4.2 (#21482)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-28 08:02:34 +02:00
renovate[bot]
88a33bee14 Update dependency typescript to v5.5.4 (#21474) 2024-07-26 02:09:07 -04:00
renovate[bot]
35ec9af23f Update typescript-eslint monorepo to v7.17.0 (#21472) 2024-07-26 02:07:16 -04:00
renovate[bot]
dd331173ad Update dependency tar to v7.4.1 (#21469)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-25 16:22:04 +00:00
renovate[bot]
885ccb84cb Update dependency eslint-plugin-unused-imports to v4.0.1 (#21468)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-25 18:06:19 +02:00
schelv
0358fe5614 Clearable time selector (#18590)
* initial attempt at clearable time selector

* only show clear button if there is a value

* use null instead of undefined.

* leave event value undefined

* move clear button into input

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: J. Nick Koston <nick@koston.org>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-07-25 18:05:59 +02:00
renovate[bot]
89d842c2a8 Update dependency @bundle-stats/plugin-webpack-filter to v4.13.4 (#21457)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-24 18:44:04 +02:00
Erik Montnemery
8911b55316 Adjust message about offline database migration (#21460)
Tweak message about offline database migration
2024-07-24 13:32:27 +02:00
Paul Bottein
6791e85625 Set 56px row height for new section button and title (#21456) 2024-07-23 13:13:35 +02:00
Erik Montnemery
79618ce114 Fix offline db migration support (#21452)
* Fix offline db migration support

* Add error handling
2024-07-23 11:47:47 +02:00
Quentame
87ba0e73dd picture cards: add person image support (#20593)
* picture cards: add person image support

* fix: person attributes typing

* review: apply comment from @coderabbitai

* fix lint:types

* review: put person domain in image_entity config

* add picture card compatibility & exemple in gallery

* fix lint

* Allow only image or person domains on image_entity editor config

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

* fix domain type

* gracefully use the default config.image if the person don't have an image

* gracefully use the default config.image if the person don't have an image (that works)

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-07-23 09:50:34 +02:00
renovate[bot]
567a2ea019 Update dependency @braintree/sanitize-url to v7.1.0 (#21451)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-23 09:23:46 +02:00
karwosts
811c34b489 Button to copy service response as json for templates (#21226)
* Button to copy service response as json for templates
2024-07-22 18:06:48 +02:00
Paul Bottein
dd22ae446a Don't show badge container if all badges are hidden (#21449) 2024-07-22 15:45:06 +02:00
Bram Kragten
d96ddf968c Show yaml setup integrations in the UI (#21447)
* Show yaml setup integrations in the UI

* Update en.json

* Move config entry logic to memoize function
2024-07-22 15:44:08 +02:00
karwosts
bbb64870a1 Leave climate humidity mode if entity stops supporting it (#21423)
* Leave climate humidity mode if entity stops supporting it

* check changedProps
2024-07-22 10:28:51 +02:00
dependabot[bot]
f05ddd3fcd Bump softprops/action-gh-release from 2.0.6 to 2.0.8 (#21446)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-07-22 10:05:35 +02:00
renovate[bot]
0612e25d9f Lock file maintenance (#21430)
* Lock file maintenance

* bump vaadin to 24.4.4

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2024-07-20 13:32:20 -04:00
renovate[bot]
559ecf3eae Update dependency @lokalise/node-api to v12.7.0 (#21442)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-20 15:57:09 +00:00
renovate[bot]
ddb31a8342 Update dependency @codemirror/view to v6.28.6 (#21441)
* Update dependency @codemirror/view to v6.28.5

* Update dependency @codemirror/view to v6.28.6

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-20 15:56:25 +00:00
Onne
1c978b7cce Fix last point of line charts. And small other fixes to line charts. (#21235)
* Fixes last point of graphs.

Especially for items that don't often change state, the last state could
be essentially be ignored for quite a while, using the average of the
last series of entries instead.

Also for detailed graphs, the initial values could be off, because the
initial last value would be computed on bad data, resulting in NaN.

And no longer adds a double entry at end if graph has only one point.
2024-07-20 08:20:52 +00:00
renovate[bot]
9d9624c960 Update dependency @octokit/rest to v21.0.1 (#21439)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-20 08:08:00 +02:00
Paul Bottein
179245e1aa Add picker for badges (#21436) 2024-07-19 20:56:29 +02:00
Steve Repsher
345000a0e9 Redefine browser requirements for modern (latest) builds (#16506)
* Redefine browser requirements for modern (latest) builds

* Rename babel class properties plugin

* Fix only allowing latest Android

* Add browsers released in last year

* Use at or above for utilization (no change to browsers currently)

* Only use time query (no effective change)

* Add transform for private methods

* Fix some typos in browserslist config

Co-authored-by: Quentame <polletquentin74@me.com>

* bump browserslist-useragent-regex

* Add fallback feature detection for Array.prototype.findLast

---------

Co-authored-by: Quentame <polletquentin74@me.com>
2024-07-19 10:49:19 -04:00
Paul Bottein
d94d5f96c3 Fix state content options when opening (#21437) 2024-07-19 16:48:03 +02:00
Bram Kragten
0fa3538db5 Change abi of wheel to cp312 (#21435) 2024-07-19 15:50:50 +02:00
Jan-Philipp Benecke
1749725229 Remember hidden detailed energy device statistics (#21406)
* Remember hidden detailed energy device statistics

* Do not subscribe
2024-07-19 13:56:38 +02:00
Bram Kragten
83e94d32e3 Bumped version to 20240719.0 2024-07-19 12:49:36 +02:00
Bruno Pantaleão Gonçalves
7fed4e6b37 Tell mobile app to scan for Improv devices when 'Add Integration' tap (#21420) 2024-07-19 12:48:51 +02:00
leonardmgh
677cffd650 Fix halfopen websocket (#18934)
* initial suggestion

* Refactored implementation

* Updated implementation

* Cancel existing inverval
2024-07-19 10:07:55 +00:00
Paul Bottein
1faa1480e4 Remove badges configuration from view settings (#21433) 2024-07-19 10:03:18 +00:00
karwosts
8cb63ac36d Fix quirks in URL field in view editor (#21410) 2024-07-19 11:54:35 +02:00
Paul Bottein
6e29b77e94 Use layout property for panel view (#21418) 2024-07-19 11:53:46 +02:00
dougiteixeira
38e7b8c467 Allow use trigger/condition selector in config flows (#21431) 2024-07-19 09:39:06 +00:00
karwosts
d078807255 Show a fallback string when repair translation fails (#21400) 2024-07-19 11:05:03 +02:00
Steve Repsher
82d84de426 Enable service worker for legacy build (#21177) 2024-07-19 10:54:27 +02:00
Paul Bottein
729a12af0c Add new badges design with UI editor (#21401)
* Add new entity badge

* Improve badge render

* Add edit mode

* Add editor

* Increase height

* Use hui-badge

* Add editor

* Add drag and drop

* Fix editor translations

* Fix icon

* Fix inactive color

* Add state content

* Add default config

* Fix types

* Add custom badge support to editor

* Fix custom badges

* Add new badges to masonry view

* fix lint

* Fix inactive color

* Fix entity filter card

* Add display type option

* Add support for picture

* Improve focus style

* Add visibility editor

* Fix visibility

* Fix add/delete card inside section

* Fix translations

* Add error badge

* Rename classes

* Fix badge type

* Remove badges from section type

* Add missing types
2024-07-19 10:52:22 +02:00
Paul Bottein
ce43774b5f Fix tile card padding in vertical mode (#21409) 2024-07-18 21:03:21 +02:00
karwosts
e63d82d291 Fix persistent notification count on server restart (#21405)
* Fix persistent notification count on server restart
2024-07-18 20:53:17 +02:00
Stefan Agner
d997cfcef0 Add error handling to device delete (#21403)
Currently, if device delete fails, the frontend stays silent. The
user might get hints in the Core logs, but nothing shown on the
frontend.

This adds error handling similar to other places.
2024-07-18 20:50:46 +02:00
renovate[bot]
219f548261 Update typescript-eslint monorepo to v7.16.1 (#21426)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-18 20:34:51 +02:00
karwosts
ee2b10912c Stop closed event propagating in automation editor elements (#21424) 2024-07-18 20:34:13 +02:00
renovate[bot]
e3b0630797 Update dependency @babel/core to v7.24.9 (#21422)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-18 20:15:53 +02:00
Joost Lekkerkerker
30d0293a4b Add model_id to device info card (#21417)
* Add model_id to device info card

* Update src/panels/config/devices/device-detail/ha-device-info-card.ts

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* Add model_id to device info card

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-07-17 18:09:25 +02:00
Stefan Agner
7468ab985a Use Thread BR extended address in WS API calls (#21172)
* Use extended address in WS API calls

This follows the HA Core change and passes the extended address to the
OTBR WS API calls where necessary. It also follows the new OTBR info
format which potentially includes multiple OTBRs.

This allows to support multiple OTBR managed by a single system.

Note: There is one corner case when none of the OTBR is found via
discovery. In this case we offer to reset the OTBR. Currently we simply
offer this for the primary or first one found.

* Fix lint error

* Update src/panels/config/integrations/integration-panels/thread/thread-config-panel.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update src/panels/config/integrations/integration-panels/thread/thread-config-panel.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Use Record type to map OBTR data

* Add labels to Thread network operation icons

* Apply suggestions from code review

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-07-17 09:06:09 +02:00
renovate[bot]
ef3758da55 Update dependency prettier to v3.3.3 (#21408)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-07-16 18:32:13 +02:00
renovate[bot]
2a970b8416 Update fullcalendar monorepo to v6.1.15 (#21404)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-16 17:54:29 +02:00
Paul Bottein
f70126eb62 Adjust row height in grid (#21311)
* Set row height to 56px

* Adjust padding and sizes

* Adjust margin

* Fix pointer-events

* Fix image size

* Clean code
2024-07-15 14:11:03 +02:00
Paul Bottein
f87296d978 Add state content component (#21370)
* Move state content into its own component for reusability

* Add entity state content selector

* Use live timer

* Rename live timer to remaining time and remove remaining attribute from state content list

* Move default in state content component

* Fix picker
2024-07-15 14:08:00 +02:00
renovate[bot]
2890d5c8cf Update vaadinWebComponents monorepo to v24.4.3 (#21399)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-15 09:45:05 +00:00
Simon Lamon
15a7ace278 Add on primary color to ha-slider (#21389)
add on primary
2024-07-15 11:38:48 +02:00
dependabot[bot]
71a2c40dd7 Bump home-assistant/wheels from 2024.01.0 to 2024.07.1 (#21398)
Bumps [home-assistant/wheels](https://github.com/home-assistant/wheels) from 2024.01.0 to 2024.07.1.
- [Release notes](https://github.com/home-assistant/wheels/releases)
- [Commits](https://github.com/home-assistant/wheels/compare/2024.01.0...2024.07.1)

---
updated-dependencies:
- dependency-name: home-assistant/wheels
  dependency-type: direct:production
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-07-15 09:00:16 +02:00
dependabot[bot]
a08bbcd1b4 Bump actions/setup-node from 4.0.2 to 4.0.3 (#21397)
Bumps [actions/setup-node](https://github.com/actions/setup-node) from 4.0.2 to 4.0.3.
- [Release notes](https://github.com/actions/setup-node/releases)
- [Commits](https://github.com/actions/setup-node/compare/v4.0.2...v4.0.3)

---
updated-dependencies:
- dependency-name: actions/setup-node
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-07-15 06:59:05 +00:00
renovate[bot]
5ec257fa18 Update dependency webpack to v5.93.0 (#21394)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-14 22:30:44 +02:00
renovate[bot]
9b01c0b2f0 Update dependency eslint-plugin-lit-a11y to v4.1.4 (#21392)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-14 17:21:05 +02:00
renovate[bot]
7dd860c539 Update babel monorepo to v7.24.8 (#21391)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-14 17:20:19 +02:00
karwosts
dbc2db2591 Make config flow previews more generic (#21382)
* Make config flow previews more generic
2024-07-14 17:01:21 +02:00
renovate[bot]
29aa57229c Update dependency gulp-zopfli-green to v6.0.2 (#21385) 2024-07-13 20:40:32 -04:00
renovate[bot]
8d74174be1 Update dependency glob to v11 (#21375)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-13 11:39:17 +02:00
Paul Bottein
a60242f042 Fix state color for locking and unlocking state (#21369) 2024-07-13 11:35:03 +02:00
renovate[bot]
db314522d7 Update dependency glob to v10.4.5 (#21374)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-13 01:18:34 +02:00
renovate[bot]
7b66ee06eb Update vaadinWebComponents monorepo to v24.4.2 (#21376)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-13 01:15:19 +02:00
renovate[bot]
3f34dacec9 Update typescript-eslint monorepo to v7.16.0 (#21372)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-11 21:16:54 +02:00
Bram Kragten
277650e1c1 Update en.json 2024-07-11 12:26:23 +02:00
Paul Bottein
e59c04c685 Display live remaining time for timer on tile card (#21290)
Display timer by default on tile card
2024-07-11 11:09:14 +02:00
Bram Kragten
d9583582e6 Rename service call to action (#21362) 2024-07-11 09:00:15 +02:00
Bram Kragten
5ead5ed058 Fix unhiding default hidden column (#21358)
the first commit is the right commit...
2024-07-10 18:25:57 +02:00
renovate[bot]
f2993602f9 Update dependency superstruct to v2 (#21324)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-10 17:09:06 +02:00
Simon Lamon
11b490d145 Dev tools events: Add a clear events button (#21353)
Clear events
2024-07-10 15:01:56 +02:00
Bram Kragten
cd4937b539 Fix unhiding default hidden columns (#21354)
* Fix unhiding default hidden columns

* Update dialog-data-table-settings.ts
2024-07-10 14:58:26 +02:00
Paul Bottein
daa36788e0 Reload the card when changing the configuration in editor (#21351) 2024-07-10 12:39:50 +02:00
Paul Bottein
0447247add 20240710.0 (#21350) 2024-07-10 08:34:04 +02:00
Paul Bottein
7edc4efc95 Bumped version to 20240710.0 2024-07-10 08:21:12 +02:00
Bram Kragten
144d278e4a Don't block interaction on disabled automation selector (#21347) 2024-07-09 17:03:40 +02:00
Paul Bottein
541453c245 Fix hidden conditional card in editor preview (#21344) 2024-07-09 15:37:05 +02:00
G Johansson
ca53af5c41 Add turn_on/off to FanEntity (#21339) 2024-07-09 10:26:42 +02:00
renovate[bot]
bd54eb40a7 Update dependency glob to v10.4.3 (#21343)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-09 09:59:36 +02:00
renovate[bot]
8ff2396a53 Update vaadinWebComponents monorepo to v24.4.1 (#21334)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-08 17:42:39 +02:00
Bram Kragten
c85e29f2bb Use localize func in table settings dialog (#21335) 2024-07-08 17:41:59 +02:00
karwosts
e7a749ef7d Add title to stack editor UI (#21328)
Add title to stack editor UI
2024-07-08 14:13:29 +02:00
dependabot[bot]
bef53aef57 Bump actions/upload-artifact from 4.3.3 to 4.3.4 (#21332) 2024-07-08 08:42:44 +02:00
G Johansson
877d0db1bb Add defrosting to HVAC actions for ClimateEntity (#21330) 2024-07-07 18:54:58 +02:00
renovate[bot]
aa49d6ef6b Update dependency marked to v13 (#21094)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-07 13:32:07 +02:00
renovate[bot]
d646ce4995 Update dependency @codemirror/view to v6.28.4 (#21321)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-06 17:42:38 +02:00
renovate[bot]
d6e6844f23 Update dependency @codemirror/autocomplete to v6.17.0 (#21320)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-06 17:23:49 +02:00
renovate[bot]
66e26e1a27 Update dependency @braintree/sanitize-url to v7.0.4 (#21314)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-05 21:19:50 +02:00
Paul Bottein
b7473b58fb Fix sensor card display (#21313) 2024-07-05 21:01:19 +02:00
Bram Kragten
895333aa05 20240705.0 (#21306) 2024-07-05 13:40:27 +02:00
Bram Kragten
42b5fbec9b Bumped version to 20240705.0 2024-07-05 13:22:23 +02:00
Paul Bottein
f7072c247e Improve sensor card graph inside section grid (#21289) 2024-07-05 12:17:31 +02:00
Matthias de Baat
f995f19f06 Clarify remove vs. delete (#21297)
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
Co-authored-by: Franck Nijhof <frenck@frenck.nl>
2024-07-05 09:00:19 +02:00
renovate[bot]
7f50504908 Update dependency typescript to v5.5.3 (#21300)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-04 19:21:19 +00:00
Paul Bottein
dc93a0ce54 Fix energy selection date card in grid layout (#21293)
Fix energy selection card in grid layout
2024-07-04 21:18:50 +02:00
Simon Lamon
3e4d06fca3 Change delete/remove wording in tag area to be consistent (#21299)
delete tags
2024-07-04 21:09:34 +02:00
Paul Bottein
050bef0564 Better handle auto height in card resize editor (#21260)
* Add auto-height option to resize editor

* Use min instead of max

* Remove auto height
2024-07-04 21:09:10 +02:00
renovate[bot]
1abebdae21 Update typescript-eslint monorepo to v7.15.0 (#21296)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-04 20:07:42 +02:00
renovate[bot]
b411ae0286 Update dependency @lokalise/node-api to v12.6.0 (#21291)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-04 19:18:37 +02:00
Paul Bottein
202bd148ef Fix iframe card overflow in vertical stack (#21282) 2024-07-04 12:29:17 +02:00
renovate[bot]
15589927c8 Update dependency @codemirror/view to v6.28.3 (#21277)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-07-04 11:46:55 +02:00
Bram Kragten
df7b5b08cf Allow custom localize function for datatable (#21270) 2024-07-04 11:46:10 +02:00
Steve Repsher
8b9fa9bc39 Clean up imports and unopened tag on device config page (#21274) 2024-07-04 10:01:01 +02:00
Bram Kragten
c07e1122e1 Tweak demo, add some translations, tweak media players (#21271)
Co-authored-by: coderabbitai[bot] <136622811+coderabbitai[bot]@users.noreply.github.com>
2024-07-04 08:11:39 +02:00
Paul Bottein
1ceef7c3d3 Set min column size to 1 for vertical tile card (#21275) 2024-07-03 22:32:56 +02:00
karwosts
e332364ec0 Fix automation picker overflow menu for keyboard (#21048)
* Fix automation picker overflow menu for keyboard

* some updates from review

* typing

* no removeEventListener

* updates from review
2024-07-03 11:56:44 -04:00
Bram Kragten
97c4cf9391 Hide some things in demo (#21268) 2024-07-03 13:33:00 +00:00
Bram Kragten
522f66423b Fix demo map panel (#21265) 2024-07-03 13:26:19 +00:00
Bram Kragten
58ba9f628a 20240703.0 (#21264) 2024-07-03 14:27:49 +02:00
Bram Kragten
57e48e2561 Bumped version to 20240703.0 2024-07-03 14:23:31 +02:00
Bram Kragten
37af77dabe Make sure unhidden columns are put at the correct place (#21262) 2024-07-03 14:23:05 +02:00
Paulus Schoutsen
2b5fba4a30 Add support for capability attributes in demo (#21263) 2024-07-03 14:08:38 +02:00
Paulus Schoutsen
d833910796 Fix demo development inside a dev container (#21261) 2024-07-03 13:52:53 +02:00
Paul Bottein
81c796beb4 Fix area card background and improve grid support (#21259) 2024-07-03 13:16:55 +02:00
Paul Bottein
19ee150395 Remove layout options for media player (#21258) 2024-07-03 11:54:11 +02:00
Steve Repsher
82329833f5 Remove Safari 14.0 patch for delegatesFocus (#21247) 2024-07-03 06:28:57 +02:00
Bram Kragten
28ced4bfd3 20240702.0 (#21255) 2024-07-02 21:37:23 +02:00
Bram Kragten
ab3b8593f4 Bumped version to 20240702.0 2024-07-02 21:21:25 +02:00
Paul Bottein
094203f0b4 Add min/max row/columns to resize card editor (#21244)
* Add min/max row/columns to resize card editor

* Add humidifier and thermostat card

* Removed unused condition

* Don't set max rows

* Add media card

* Add button card

* Use same rule if there is footer

* Don't show disabled cell

* Add min rows to sensor card

* Update sizes

* Update sizes

* Update sizes

* Add min rows to weather forecast card
2024-07-02 21:19:29 +02:00
Bram Kragten
9a2051a679 Change take control of blueprint UX (#21254)
* Change take control of blueprint UX

* Add margin to ha-alert

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-07-02 21:18:58 +02:00
Paul Bottein
09accb3071 Ignore aspect ratio in grid section (#21248)
* Ignore aspect ratio in grid section

* Feedback
2024-07-02 18:50:42 +02:00
Simon Lamon
7d432cd11a Fix logbook card display/reloading issues (#21253)
remove await logic
2024-07-02 18:44:36 +02:00
Paulus Schoutsen
7258e31348 Tweak first section in section demo (#21249)
* Tweak first section in section demo

* Allow automation entities be toggled
2024-07-02 17:11:16 +02:00
Steve Repsher
5707ca0016 Fix English only translations build (#21245) 2024-07-02 15:13:04 +02:00
Paulus Schoutsen
76abfea6ed Hide demo card when showing demo from frontpage (#21243)
* Hide demo card when showing demo from frontpage

* Store in constant on load

* reverse

* Remove filter

* move constnat

* Make Home Assistant title
2024-07-02 14:59:52 +02:00
Steve Repsher
d01377da3c Fix Webpack bundling of recorder worklet (#21239)
* Fix Webpack bundling of recorder worklet
2024-07-01 16:31:22 +02:00
Simon Lamon
e97be57e3b Application credentials: small improvements (#21233)
* small improvements

* Update ha-config-application-credentials.ts

* Update ha-config-application-credentials.ts

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-07-01 13:11:52 +02:00
Paulus Schoutsen
c71a051b6d Remove ga.js (#21242) 2024-07-01 12:11:26 +02:00
Paul Bottein
f41fab6968 Improve take control of automation/script wording (#21241) 2024-07-01 11:12:15 +02:00
renovate[bot]
bda61da666 Update dependency @material/web to v1.5.1 (#21224)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-30 09:34:43 +02:00
renovate[bot]
93445ced74 Update dependency eslint-plugin-lit-a11y to v4.1.3 (#21227)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-29 13:30:05 -04:00
Paul Bottein
fd6a192db1 20240628.0 (#21223) 2024-06-28 22:04:49 +02:00
Paul Bottein
b81314fc1f Bumped version to 20240628.0 2024-06-28 21:11:07 +02:00
Simon Lamon
9beb4c39ff Implement search in application credentials table (#21219)
Implement search functions
2024-06-28 21:10:24 +02:00
Simon Lamon
18a6f8d64d Add credential to user after creation (#21221) 2024-06-28 21:08:51 +02:00
Paul Bottein
beec720b9b Use display contents in horizontal stack only (#21217) 2024-06-28 20:56:01 +02:00
Paul Bottein
85865af0c3 Fix update config mecanism in hui-card (#21218) 2024-06-28 20:17:57 +02:00
Simon Lamon
d33cf4f199 Reload application credentials after single delete (#21216)
Reload application credentials after delete
2024-06-28 14:46:27 +02:00
Simon Lamon
4a1087c969 Add storage variables for application credentials config table (#21215)
Implement storage variables
2024-06-28 14:45:33 +02:00
Simon Lamon
cbc95a5e2d Fix icon header labels in Automations, Scene and Script tables (#21214)
Change icon header labels
2024-06-28 14:44:57 +02:00
Simon Lamon
dcd4c39978 Fix add application credential keyboard handling (#21205)
double primaryAction
2024-06-28 14:44:30 +02:00
renovate[bot]
11d832c2ea Update dependency @bundle-stats/plugin-webpack-filter to v4.13.3 (#21197) 2024-06-27 23:00:52 -04:00
renovate[bot]
3b15d26500 Update typescript-eslint monorepo to v7.14.1 (#21195)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-27 21:57:31 +02:00
renovate[bot]
df65038341 Update dependency mocha to v10.5.0 (#21194)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-27 14:55:43 -04:00
Bram Kragten
d72e8c35d8 20240627.0 (#21192) 2024-06-27 20:02:18 +02:00
Paul Bottein
da2865d8bf Fix size of cards inside stack cards (#21190)
* Fix size of cards inside stack cards

* Apply style everywhere

* Fix stack

* Fix grid stack

* Set block only for square
2024-06-27 19:31:55 +02:00
Bram Kragten
fd64d17d88 Bumped version to 20240627.0 2024-06-27 19:30:48 +02:00
Paul Bottein
5273293cd6 Add last updated property to tile card state content (#21191) 2024-06-27 18:46:39 +02:00
Bram Kragten
49c42fc757 Add support for native QR code scanner (#21187) 2024-06-27 17:15:33 +02:00
Paul Bottein
7603fa3aa8 Don't set hass to undefined in lovelace cards. (#21189)
* Wait for hass and config before building the card

* Don't use setter

* Improve code readability

* Use hasupdated

* Rename build to load
2024-06-27 16:49:10 +02:00
karwosts
7aa005e0ce Fix device integration filter for entityless devices (#21136)
* Fix device integration filter for entityless devices

* code review
2024-06-27 12:40:09 +02:00
renovate[bot]
b2a55dd737 Update dependency @types/chromecast-caf-receiver to v6.0.16 (#21183)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-27 06:34:34 +02:00
Paul Bottein
5bc3ad4c63 20240626.2 (#21181) 2024-06-26 23:19:57 +02:00
Paul Bottein
ccad1afcf0 Bumped version to 20240626.2 2024-06-26 23:18:57 +02:00
Paul Bottein
530745d20d Revert "20240626.1" (#21180)
Revert "20240626.1 (#21179)"

This reverts commit a16cae0671.
2024-06-26 23:18:27 +02:00
Paul Bottein
a16cae0671 20240626.1 (#21179)
* Fix undefined value in search (#21175)

* Fix hass object in nested hui-card (#21178)

* Bumped version to 20240626.1
2024-06-26 23:09:42 +02:00
Paul Bottein
231c923776 Bumped version to 20240626.1 2024-06-26 23:08:56 +02:00
Paul Bottein
b08b67179e Fix hass object in nested hui-card (#21178) 2024-06-26 21:05:47 +00:00
Paul Bottein
d9f1b06199 Fix undefined value in search (#21175) 2024-06-26 20:37:07 +02:00
Bram Kragten
8d0c4e4a52 20240626.0 (#21171) 2024-06-26 12:49:50 +02:00
Bram Kragten
4b7526c8a3 Merge branch 'master' into dev 2024-06-26 12:38:37 +02:00
Bram Kragten
6267ab5ed3 Bumped version to 20240626.0 2024-06-26 12:36:57 +02:00
Paul Bottein
ae94231800 Use resize controller for weather card (#19806)
* Use resize controller for weather card

* Don't use observe
2024-06-26 12:35:49 +02:00
Bram Kragten
7d28f3f585 Allow to hide and sort columns in data tables (#21168)
* Allow to hide and sort columns in data tables

* fix unused

* store
2024-06-26 11:51:32 +02:00
Bram Kragten
adea384f40 Update logo_x.svg 2024-06-26 11:50:18 +02:00
Bram Kragten
55b66250f4 Take convert of blueprint automation and script (#21151)
* substituteBlueprint

* WIP ux

* Simplify feature

* Add take control to scripts

* Add translations and catch error

* Clean import

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-06-26 11:24:47 +02:00
Philip Allgaier
182111912c Rename "Twitter" to "X (formerly Twitter)" (#20694)
* Rename "Twitter" to "X (formerly Twitter)"

* Add translations

* Show x logo on light mode

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-06-26 11:13:52 +02:00
renovate[bot]
8a0924bf1f Update dependency typescript to v5.5.2 (#21144)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-26 10:50:25 +02:00
Simon Lamon
94dc9308ea Replace octal escape sequences (#21156)
* replace octal escape characters

* Add disable eslint
2024-06-26 10:19:52 +02:00
Paul Bottein
f42a9ac070 Ignore diacritics (accents) in search (#21150)
* Ignore diacritics in search

* Rename variable
2024-06-26 10:07:31 +02:00
Paul Bottein
1acada625f Improve user and person dialogs (#21162)
* Improve user dialog

* Update person dialog

* Improve add user dialog

* Fix secondary option
2024-06-26 10:03:43 +02:00
Paul Bottein
128dbbcfef Better resizing support for thermostat card (#21120)
* Better resizing support for thermostat card

* Use resize controller

* Fix typings

* Don't use query

* Use render to set style
2024-06-26 10:03:10 +02:00
Bram Kragten
57d8544dbf Add menu with remove option to application credentials (#21139) 2024-06-26 09:47:46 +02:00
Bram Kragten
76daa2bb7f Add support for sections in filters (#21157) 2024-06-25 20:01:10 +02:00
renovate[bot]
9cbb51549b Update dependency @types/mocha to v10.0.7 (#21163)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-25 12:42:54 +00:00
Paul Bottein
bd1ede4145 Fix grid size picker size (#21161) 2024-06-25 12:24:04 +02:00
Paul Bottein
321a085c0e Resize card editor (#21115) 2024-06-24 22:10:31 +02:00
Bram Kragten
6a3041988a Allow to change username (#21152) 2024-06-24 18:51:43 +02:00
renovate[bot]
23fcdf876c Update dependency @codemirror/view to v6.28.2 (#21154)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-24 12:24:01 -04:00
Bram Kragten
00f325e961 Support expandable in initial form data (#21153) 2024-06-24 17:30:43 +02:00
renovate[bot]
d00b3cfc61 Update Yarn to v4.3.1 (#21149)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-24 13:33:19 +02:00
karwosts
4cc9e74ea8 Fix 'Move to view' operation (#21142) 2024-06-24 11:56:06 +02:00
dependabot[bot]
a56b9a96ce Bump softprops/action-gh-release from 2.0.5 to 2.0.6 (#21148)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-06-24 08:37:48 +02:00
renovate[bot]
d4b5f4bc14 Update dependency @octokit/rest to v21 (#21146)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-23 23:22:08 -04:00
renovate[bot]
cf1523ee73 Update dependency @types/chromecast-caf-receiver to v6.0.15 (#21138)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-23 12:54:15 +02:00
renovate[bot]
f5d571ca84 Update dependency webpack to v5.92.1 (#21134)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-22 20:54:24 +02:00
karwosts
362e92f313 Add some weather attribute icons and units (#21133) 2024-06-22 15:42:26 +02:00
Jan-Philipp Benecke
5ddf72b973 Add preview to Threshold config & option flow (#19845)
Co-authored-by: Franck Nijhof <git@frenck.dev>
2024-06-22 13:32:40 +02:00
renovate[bot]
6e78c28f51 Update dependency @codemirror/autocomplete to v6.16.3 (#21130)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-22 09:10:52 +02:00
renovate[bot]
772f0bb669 Update dependency tar to v7.4.0 (#21129)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-22 08:51:43 +02:00
renovate[bot]
846c2a848f Update dependency glob to v10.4.2 (#21127)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-22 08:51:08 +02:00
renovate[bot]
8495757005 Update dependency @braintree/sanitize-url to v7.0.3 (#21126) 2024-06-21 22:09:25 -04:00
karwosts
9960d38b91 Offer to delete no-longer-recorded statistics (#21119) 2024-06-21 11:18:24 +02:00
Simon Lamon
d3222f8bb0 Various fixes in dialogs (#20935)
* allow escape and scrim action for repair dialogs

* improve delete entity dialogs

* reiterate refresh token dialog wordings (kept refresh token for now)

* improve device delete dialogs

* Improve deletable text and invalidation
2024-06-21 11:15:01 +02:00
Simon Lamon
2e5cce5409 Replace paper-listbox in cast frontend (#19954)
* hc-cast

* Update cast/src/launcher/layout/hc-cast.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update cast/src/launcher/layout/hc-cast.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update cast/src/launcher/layout/hc-cast.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Fixes

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-06-21 11:13:13 +02:00
Paul Bottein
f78946447f Show card preview inside section in card editor (#21065)
* Show card inside section in card editor

* Replace edit mode by preview

* Add backward compatibility for custom cards

* Re-order props
2024-06-21 11:12:18 +02:00
Jay Turner
eb0579ddc5 Use EnergyCardBaseConfig where appropriate (#20896)
* Use EnergyCardBaseConfig where appropriate

* Update type key

* Rename class

* Run prettier
2024-06-21 11:11:41 +02:00
Steve Repsher
686424fc70 Add CoreJS polyfills to modern build (#20676) 2024-06-21 11:07:39 +02:00
renovate[bot]
039e9b40bd Update typescript-eslint monorepo to v7.13.1 (#21121)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-20 14:41:07 -04:00
karwosts
8272bef890 Sort filter-domains on translated name (#21116) 2024-06-19 17:31:04 +02:00
Kevin Jahrens
62528b2413 Fix back paths (#21112)
Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-06-19 07:08:14 +00:00
renovate[bot]
fa24f529e0 Lock file maintenance (#21114)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-19 08:58:38 +02:00
dependabot[bot]
43a54f6cda Bump ws from 7.5.9 to 7.5.10 (#21111) 2024-06-18 20:56:53 -04:00
Paulus Schoutsen
9c153bbd58 Split out service entities (#21076)
* Hide notify entiites from generated dashboard

* Split out service entities on device info page

* Update src/panels/lovelace/common/generate-lovelace-config.ts

* Split service -> notify/assist
2024-06-18 08:58:45 +02:00
Bram Kragten
27afe9ecb7 Wrap code editor for template selector (#21104)
* Wrap code editor for template selector
2024-06-17 19:15:55 +00:00
dependabot[bot]
72f989e2bd Bump actions/checkout from 4.1.6 to 4.1.7 (#21102) 2024-06-17 10:19:48 +02:00
renovate[bot]
a6ef46565f Update dependency @codemirror/view to v6.28.1 (#21099)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-16 09:43:11 +02:00
renovate[bot]
a35ac09688 Update dependency lint-staged to v15.2.7 (#21098)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-15 20:55:19 +02:00
Douwe
27024135ea Update hui-grid-section.ts (#21088)
Add variable to align title
2024-06-15 18:21:42 +02:00
Franck Nijhof
8759ed740a Make the radius of the home zone configurable (#21096) 2024-06-15 14:41:09 +02:00
Franck Nijhof
bb3e8ae33d Update home-assistant-js-websocket to 9.4.0 (#21097) 2024-06-15 08:03:55 -04:00
renovate[bot]
b5b60c9bf0 Update vaadinWebComponents monorepo to v24.4.0 (#21089)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-15 00:12:37 -04:00
renovate[bot]
3b6a2cf7d8 Update dependency @codemirror/view to v6.28.0 (#21081)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-15 00:09:09 -04:00
renovate[bot]
7e10e14102 Update dependency lint-staged to v15.2.6 (#21092)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-14 21:21:25 +02:00
renovate[bot]
a580abab4a Update dependency webpack to v5.92.0 (#21090)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-14 20:21:11 +02:00
renovate[bot]
11523c08c4 Update Yarn to v4.3.0 (#21084) 2024-06-14 12:29:02 -04:00
renovate[bot]
7a8988528b Update dependency prettier to v3.3.2 (#21087)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-14 08:42:55 +02:00
renovate[bot]
2a6380f083 Update typescript-eslint monorepo to v7.13.0 (#21082)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-14 08:29:55 +02:00
Paul Bottein
f43319a3ae Bumped version to 20240610.1 2024-06-13 20:49:43 +02:00
Paul Bottein
e8eefaf1d3 Fix current mode not selected in card feature (#21063) 2024-06-13 20:46:50 +02:00
Steve Repsher
06d82a4925 Do not inject Intl polyfill into ecma402-abstract package (#21074) 2024-06-13 20:45:50 +02:00
Paulus Schoutsen
4991d52fcc Hide notify entities from generated dashboard (#21075)
Hide notify entiites from generated dashboard
2024-06-13 20:45:35 +02:00
Simon Lamon
0b391eafcf Fix diagnostic download not downloading (#21078) 2024-06-13 20:45:12 +02:00
Paul Bottein
0bb34830f8 Fix selected state for selected config entries (#21079) 2024-06-13 20:45:02 +02:00
Paul Bottein
29881c8bb4 Fix selected state for selected config entries (#21079) 2024-06-13 18:26:45 +02:00
Simon Lamon
56254ddf03 Fix diagnostic download not downloading (#21078) 2024-06-13 13:31:30 +02:00
Paulus Schoutsen
007ba70641 Hide notify entities from generated dashboard (#21075)
Hide notify entiites from generated dashboard
2024-06-13 08:04:27 +02:00
Steve Repsher
3e1227b064 Do not inject Intl polyfill into ecma402-abstract package (#21074) 2024-06-12 14:45:57 -04:00
Matthias Alphart
067e179f26 Translation support for device automation extra fields (#20567)
* Translation support for device trigger extra fields

* Prefer component translation over default

* Move device trigger extra_fields translations to backend

* move translations for extra_fields of conditions and actions too
2024-06-12 14:09:50 +02:00
AlCalzone
9a3f7df25e Z-Wave: Prevent closing the Add Device dialog when user input is required (#20999)
* prevent closing the Z-Wave Add node dialog when user input is required

* ask user for confirmation before leaving page during bootstrapping

* fix: no non-null assertion
2024-06-12 13:48:40 +02:00
Paul Bottein
c7b4e8f37c Fix current mode not selected in card feature (#21063) 2024-06-12 13:40:44 +02:00
Paul Bottein
bfa8b886ab Make update actions sticky on more info (#21053) 2024-06-12 13:39:04 +02:00
Paul Bottein
433c00b73a Move card loading logic into hui-card (#21018)
* Move card rebuild to hui-card

* Use hui card in stack card

* add once to event

* Do not use state

* Use hui card in conditional card

* Use editMode instead of lovelace in hui card

* Fix edit mode

* Use hui-card in card dialog and panel todo

* Fix edit mode

* Fix types

* Migrate entity filter card

* Update demo card

* Fix UI view

* Allow edit mode attribute

* Remove unused condition

* Remove unused section preview code

* Remove useless check for config
2024-06-12 13:38:21 +02:00
Stefan Agner
a497f42f73 Move send credentials to phone to main Thread configuration panel (#21066)
Move send credentials to phone to main view

Currently the button is hidden in the more info dialog, and even there
it seems that it is currently not rendered correctly.

This moves the button to the main view, make it more obvious while
still keeping it out of the way if the feature is not applicable.
2024-06-12 13:35:29 +02:00
Stefan Agner
165723cb5b Clarify Thread credentials transfer direction (#21067)
"Import credentials" on a phone can be missunderstood as importing
credentials from Home Assistant to the phone, but this is not what
this command is doing.

Use "Send credentials to Home Assistant" to make it clear what the
direction of the transfer is.
2024-06-12 13:32:51 +02:00
Bruno Pantaleão Gonçalves
42b5fa696a Fix "canImportKeychain" boolean for thread panel (#21062) 2024-06-11 10:04:13 +02:00
renovate[bot]
59062d96a8 Update dependency @rollup/plugin-commonjs to v26 (#21037)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-10 21:56:01 +02:00
Paulus Schoutsen
d36bbfe07d Hide hidden updates from sidebar/settings (#21058) 2024-06-10 15:52:24 -04:00
Bram Kragten
4a8bb5034d Merge branch 'dev' 2024-06-10 19:50:24 +02:00
Bram Kragten
0d489213a4 Bumped version to 20240610.0 2024-06-10 19:50:10 +02:00
koostamas
c54acc9369 Fix automation describeCondition for number state type (#21052)
When using a number state condition in an automation, the UI used an incorrect evaluation when trying to describe the condition which made the label default to the default value.
To fix this, I just changed the evaluation to check directly for `undefined` value.
2024-06-10 19:19:26 +02:00
Simon Lamon
562bc084f0 Revert fullcalendar back to v6.1.11 (#21039)
* Drop fullcalendar back to v6.1.11

* Add resolution
2024-06-10 09:23:53 +02:00
karwosts
6fce2f35a5 Add a title to triggered dialog (#21046) 2024-06-09 21:33:58 +02:00
karwosts
f4e24bed2e Fix cancel button in section edit (#21045) 2024-06-09 12:54:38 +00:00
renovate[bot]
09969c0e2d Update babel monorepo to v7.24.7 (#21035)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-08 19:52:09 +02:00
renovate[bot]
4b0181774b Update CodeMirror (#21022)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-08 19:51:08 +02:00
renovate[bot]
272db5e9e8 Update dependency @rollup/plugin-replace to v5.0.7 (#21036)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-08 19:50:43 +02:00
renovate[bot]
9ae3a824d9 Update dependency prettier to v3.3.1 (#21033)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-08 12:29:12 +02:00
renovate[bot]
9db55c9391 Update dependency @lit-labs/virtualizer to v2.0.13 (#21029)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-08 09:42:52 +02:00
renovate[bot]
59697127c0 Update dependency @rollup/plugin-replace to v5.0.6 (#21031)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-08 08:50:00 +02:00
renovate[bot]
565600e945 Update dependency @codemirror/view to v6.26.4 (#21021)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-07 16:08:38 +02:00
karwosts
721eebf367 Add floor selector to script fields (#21016) 2024-06-07 13:02:58 +02:00
renovate[bot]
f5ae842167 Update typescript-eslint monorepo to v7.12.0 (#21014) 2024-06-06 20:35:13 -04:00
renovate[bot]
3575734ed0 Update dependency @codemirror/language to v6.10.2 (#21008) 2024-06-06 20:34:16 -04:00
karwosts
4e8de1f64d Todo button menu: add stop propagation (#20996) 2024-06-05 11:43:21 +02:00
Bram Kragten
a8366c6416 Merge branch 'dev' 2024-06-05 11:42:10 +02:00
Bram Kragten
cd73b8ac29 Bumped version to 20240605.0 2024-06-05 11:41:51 +02:00
Paul Bottein
74eca6b1f5 Increase check update timeout to 15s (#20998) 2024-06-05 10:13:28 +02:00
Paulus Schoutsen
9ef0bd6e46 Fix Assist styling (#20997) 2024-06-05 09:53:40 +02:00
renovate[bot]
53eb7f771f Update dependency prettier to v3.3.0 (#20992)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-04 20:27:20 +02:00
Bram Kragten
8ff8c01bba Merge branch 'dev' 2024-06-04 16:47:15 +02:00
Bram Kragten
cd62f064cb Bumped version to 20240604.0 2024-06-04 16:47:00 +02:00
Paul Bottein
db82b856e0 Fix filter card visibility when show empty is false (#20985) 2024-06-04 16:46:38 +02:00
Paul Bottein
ab340e13e9 Fix max option saving using keyboard for script mode (#20984) 2024-06-04 16:46:08 +02:00
Paul Bottein
22c54b3fea Fix card editor size on mobile (#20976) 2024-06-04 16:45:54 +02:00
Alex van den Hoogen
2dd7e598d5 Add missing hui-root callback, fixes #20854 (#20975)
* Add missing hui-root callback, fixes #20854

* Set scroll event listener on hui-root to passive
2024-06-04 14:03:04 +02:00
Raman Gupta
d1ce06e368 Fix parameter name in zwave_js WS API (#20981) 2024-06-04 11:21:52 +02:00
Bram Kragten
52f3ff3306 20240603.0 (#20974) 2024-06-03 18:56:01 +02:00
Bram Kragten
9717304b68 Bumped version to 20240603.0 2024-06-03 18:43:00 +02:00
Bram Kragten
c646f3c39a Save search filter in session storage (#20973)
* Save search filter in session storage

* Apply suggestions from code review

Co-authored-by: coderabbitai[bot] <136622811+coderabbitai[bot]@users.noreply.github.com>

---------

Co-authored-by: coderabbitai[bot] <136622811+coderabbitai[bot]@users.noreply.github.com>
2024-06-03 18:42:34 +02:00
Paul Bottein
0297ec5a7b Add visibility editor to card editor (#20926)
* Add visibility editor to card editor

* Add translations

* AI suggestion
2024-06-03 18:23:47 +02:00
Paul Bottein
e48286c2a0 Fix conditional card visiblity inside section (#20966)
* Fix conditional card visiblity inside section

* Remove _ from protected method
2024-06-03 18:23:30 +02:00
Brynley McDonald
f2b2da9877 Fix filters for entity/device from integrations dashboard (#20953) 2024-06-03 17:50:40 +02:00
Simon Lamon
250f87cfd8 Improve error messages in config entries (#20934)
* Improve error messages and test completely

* Add css back

* Revert ha-alert changes

* Update src/panels/config/integrations/ha-config-integration-page.ts

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-06-03 16:29:47 +02:00
Paul Bottein
9f6afb162a Make lovelace optional in card and section (#20970) 2024-06-03 16:05:41 +02:00
Paul Bottein
0add65feff Use event for section visibility instead of mutation observer (#20967) 2024-06-03 15:54:40 +02:00
Paul Bottein
c08d9a9166 Fix card display in view panel (#20972) 2024-06-03 15:49:31 +02:00
ildar170975
d9a9038cec Update ha-entity-marker.ts: add CSS variable for border-radius (#20914)
* Update ha-entity-marker.ts

* fix whitespace
2024-06-03 15:40:46 +02:00
Paul Bottein
6bee3ef45c Fix fallback icon color in dark mode (#20969) 2024-06-03 14:16:18 +02:00
Paul Bottein
3a855f95ad Fix broken config switch in demo (#20971) 2024-06-03 13:37:32 +02:00
Paulus Schoutsen
e7f3393ec6 Tweak styles Assist dialog (#20960) 2024-06-03 11:42:43 +02:00
karwosts
d7cb4cb537 Revert "Filter unrecorded entities from history panel (#19621)" (#20941)
This reverts commit d88670034a.
2024-06-03 10:03:30 +02:00
renovate[bot]
c55720c933 Update dependency @codemirror/autocomplete to v6.16.2 (#20965)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-03 07:49:47 +00:00
dependabot[bot]
f78e757485 Bump relative-ci/agent-action from 2.1.10 to 2.1.11 (#20964)
Bumps [relative-ci/agent-action](https://github.com/relative-ci/agent-action) from 2.1.10 to 2.1.11.
- [Release notes](https://github.com/relative-ci/agent-action/releases)
- [Commits](https://github.com/relative-ci/agent-action/compare/v2.1.10...v2.1.11)

---
updated-dependencies:
- dependency-name: relative-ci/agent-action
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-06-03 09:39:01 +02:00
renovate[bot]
fa03c58a93 Update dependency tar to v7.2.0 (#20952)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-06-02 15:21:42 +02:00
renovate[bot]
49f1ad633f Update dependency @codemirror/autocomplete to v6.16.1 (#20948) 2024-06-01 22:39:12 -04:00
renovate[bot]
d449e10120 Update dependency eslint-plugin-lit to v1.14.0 (#20950) 2024-06-01 22:37:39 -04:00
renovate[bot]
474c8c243e Update dependency ua-parser-js to v1.0.38 (#20939)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-31 14:49:31 -04:00
renovate[bot]
e9e53e9451 Update dependency workbox-build to v7.1.1 (#20937)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-31 14:29:02 +02:00
renovate[bot]
cfa84f30be Update typescript-eslint monorepo to v7.11.0 (#20932)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-31 00:41:51 -04:00
karwosts
7416ae7dfd Fix double unsubscribe in todo list card (#20928) 2024-05-30 20:21:39 +02:00
Bram Kragten
10a5c4dfb4 20240530.0 (#20925) 2024-05-30 16:27:39 +02:00
Bram Kragten
6f1fa139e7 Bumped version to 20240530.0 2024-05-30 16:08:31 +02:00
Paulus Schoutsen
b38a348957 Disable beta menu instead of hiding (#20906) 2024-05-30 15:29:28 +02:00
Simon Lamon
f97971faf6 Improve refresh token dialogs (#20917)
* Improve refresh token dialogs

* Remove this
2024-05-30 10:39:15 +02:00
Steve Repsher
c5ae9e8497 Remove eslint-plugin-disable (#20902) 2024-05-30 09:49:40 +02:00
Paul Bottein
c00287c401 Fix config entry menu (#20908) 2024-05-29 23:49:20 +02:00
Bram Kragten
1a2daf8a7a 20240529.0 (#20901) 2024-05-29 18:27:40 +02:00
Bram Kragten
c0e048023d format webpack.cjs 2024-05-29 18:04:24 +02:00
Bram Kragten
431f4937c1 Update webpack.cjs 2024-05-29 17:55:40 +02:00
Bram Kragten
0a55220837 Merge branch 'master' into dev 2024-05-29 17:53:04 +02:00
Paul Bottein
13f01492b4 Add visibility option to dashboard cards (#20840)
* Create hui card

* Add compatiblity with helpers

* Improve layout options

* Fix conditional card

* Add missing import

* Add visibility option in config

* Fix conditions

* Fix case with multiple conditions

* Remove useless set hass
2024-05-29 17:50:16 +02:00
Bram Kragten
ce5bcf61f9 Bumped version to 20240529.0 2024-05-29 17:49:29 +02:00
Bram Kragten
d31a777135 use image selector for view background (#20898)
* use image selector for view background

* make config future proof

* improvements
2024-05-29 17:29:09 +02:00
Paul Bottein
5cc08cfe0b Fix area card editor when an entity have an unknown device (#20900) 2024-05-29 14:29:04 +00:00
Steve Repsher
3eea7dc6cd Use valid locale for translation test (#20899) 2024-05-29 15:44:56 +02:00
karwosts
a629f01300 Collapsible blueprint input sections (#19946)
* Deduplicate blueprint editor code

* Collapsible blueprint sections

* add description

* renamed collapsed

* unused import

* unused import

* Don't allow collapsing sections with required

* Update to new schema
2024-05-29 15:44:11 +02:00
renovate[bot]
f1345af526 Update dependency @bundle-stats/plugin-webpack-filter to v4.13.2 (#20897)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-29 12:44:04 +00:00
karwosts
064c51f487 Add a picture uploader to picture-card-editor (#18695)
* Add a picture uploader to picture-card-editor

* add imageSelector

* lint

* Add delete button to picture-upload

* updates from feedback

* fix lint

* Update en.json

* Update selector.ts

* remove delete
2024-05-29 14:32:53 +02:00
karwosts
d88670034a Filter unrecorded entities from history panel (#19621)
* Filter unrecorded entities from history panel

* cache result

* Cache excluded entities instead of recorded entities
2024-05-29 14:32:22 +02:00
Georgi Stanojevski
5fab1969a8 Add Macedonian (Македонски) to the frontend. (#20701)
Following: https://developers.home-assistant.io/docs/translations/#maintainer-steps-to-add-a-new-language

Steps 1 and 2.

- It has the "mk" code in the IANA subtag registry.
- Adding it in src/translations/translationMetadata.json
2024-05-29 14:13:45 +02:00
Simon Lamon
b3e14d449e Show detailed config entry error inline (#20764)
* Put config entry error inline

* Fixes (show configure button and don't make them interactive)
2024-05-29 14:07:52 +02:00
Steve Repsher
97206ee8fe Inject element polyfills where used using Babel (#20689) 2024-05-29 14:02:40 +02:00
Steve Repsher
7748315fc3 Inject Intl polyfills where used (#20798)
* Inject Intl polyfills where used

* Replace Intl polyfill in localize method with loading intl-messageformat asynchronously

* Remove spurious feature tests for Intl
2024-05-29 14:01:21 +02:00
Paul Bottein
e059ca146b Script change icon (#20885)
* Add icon to rename dialog

* Check in entity registry

* Only use icon for script
2024-05-29 13:57:13 +02:00
Jay Turner
56cabeb497 Fix type value on Interface for the energy-usage-graph (#20895) 2024-05-29 10:33:12 +00:00
Paul Bottein
7a7bd87f50 Unify usage of dashboard title (#20853) 2024-05-29 12:29:52 +02:00
Adam Kapos
ff9c794659 Add UI for setting view background (#20708)
* Add UI for setting view background

* Update eslint-plugin-unused-imports to fix parse failure

* Changes from review
2024-05-29 12:23:54 +02:00
Bram Kragten
2921161336 Save data table filters in session storage (#20894)
* Save data table filters in session storage

* typing fix

* remove url logic, rename storage key
2024-05-29 12:20:30 +02:00
G Johansson
91e5fcacd5 Add default code to alarm_control_panel (#20062)
Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-05-29 11:05:46 +02:00
Raman Gupta
febbf34de6 Change Z-Wave JS API model to match zwave-js (#20793)
* Change Z-Wave JS API model to match zwave-js

* fix qrprovisioninginformation

* remove additional properties from QRProvisioningInformation
2024-05-29 09:25:09 +02:00
Bram Kragten
5a2977f4d4 Add collapse & expand all groups (#20891)
* Add collapse & expand all groups

* review suggestion
2024-05-29 09:16:26 +02:00
Paul Bottein
7a7a355765 Allowing toggle of expiration date for refresh token (#20846)
* Allowing removal of expiration date for refresh token

* Adjust wording and add icon

* Update current

* Update src/translations/en.json

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

* Update wording

* Allow enable and disable

* Better type

* Better handle errors

* Use relative date

* Update src/panels/profile/ha-refresh-tokens-card.ts

* Update API

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-05-29 09:12:08 +02:00
Paul Bottein
ccebae84a7 Use list for change mode dialog (#20890)
* Use list for change mode dialog

* Add listbox role

* Remove unused import
2024-05-28 18:23:12 +02:00
renovate[bot]
f96f38ee82 Update dependency lint-staged to v15.2.5 (#20892)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-28 10:46:59 -04:00
renovate[bot]
d4056e6a32 Update dependency @bundle-stats/plugin-webpack-filter to v4.13.1 (#20889)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-28 09:31:17 +02:00
renovate[bot]
389a7a6ed9 Update dependency eslint-plugin-unused-imports to v4 (#20884)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-27 14:04:45 -04:00
renovate[bot]
05aecaaaf1 Update babel monorepo to v7.24.6 (#20883)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-27 15:47:29 +02:00
karwosts
085131d546 Rename energy 'Today' button to 'Now' (#20871) 2024-05-27 14:13:55 +02:00
renovate[bot]
c2737d5cec Update dependency @bundle-stats/plugin-webpack-filter to v4.13.0 (#20877)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-27 14:11:34 +02:00
renovate[bot]
29ae46d775 Update dependency @material/web to v1.5.0 (#20878)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-27 14:09:55 +02:00
Yosi Levy
dfee3ba089 RTL fixes (#20880) 2024-05-27 14:09:29 +02:00
renovate[bot]
1dbb70b964 Update dependency glob to v10.4.1 (#20881)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-27 08:39:34 +02:00
renovate[bot]
1eecc5c0e2 Update dependency glob to v10.4.0 (#20879)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-27 08:22:11 +02:00
Franck Nijhof
81c0bcff0b Add sequence action building block (#20874)
* Add sequence action building block

* This is a non-conditional action

* Render sequence in automation traces graph

* Render trace timeline

* Process review comment
2024-05-26 14:54:05 -04:00
karwosts
6ccbeb8a75 Fix entity picker delete button (#20875) 2024-05-26 15:29:57 +02:00
renovate[bot]
f59ed0a72b Update dependency @rollup/plugin-commonjs to v25.0.8 (#20873) 2024-05-25 21:45:51 -04:00
renovate[bot]
a9f00ded0f Update fullcalendar monorepo to v6.1.13 (#20869)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-25 16:10:53 +00:00
renovate[bot]
74730ba201 Update dependency lint-staged to v15.2.4 (#20868)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-24 22:12:56 +02:00
renovate[bot]
95b2f7d821 Update dependency glob to v10.3.16 (#20867)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-24 22:07:19 +02:00
renovate[bot]
661b14da54 Update formatjs monorepo (#20847)
* Update formatjs monorepo

* Update dependency @formatjs/intl-locale to v4

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-24 18:49:48 +02:00
Steve Repsher
41e34c0d61 Inject ResizeObserver polyfill where needed (#20754) 2024-05-24 12:21:46 -04:00
Simon Lamon
5d044a06eb Remove empty electricity grid state (#20794)
* Remove empty grid state

* Apply feedback

* AI review
2024-05-24 16:40:47 +02:00
karwosts
f617426808 Bake numeric device classes into formatEntityState (#19878)
* Bake numeric device classes into formatEntityState

* Apply suggestions from code review

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-05-24 16:17:23 +02:00
karwosts
3c3d54243c Fix pick-theme-row and behavior of default theme mode (#20783) 2024-05-24 16:06:22 +02:00
Paul Bottein
afc624bf4b Remove strict connection (#20861) 2024-05-24 15:50:45 +02:00
AlCalzone
0991628843 Z-Wave JS: Title-Case "S2 Access Control" (#20850)
* Z-Wave JS: Title-Case "S2 Access Control"

* Apply sentence case to example description
2024-05-24 13:23:17 +00:00
Paul Bottein
34b9c7b9d1 Fix long title for section in add card dialog (#20863) 2024-05-24 15:10:17 +02:00
karwosts
d52641b495 Device trigger - sync value with initialHaFormData (#20810)
Device trigger - sync yaml with initialHaFormData
2024-05-24 15:06:40 +02:00
renovate[bot]
80c7fd2bf2 Update typescript-eslint monorepo to v7.10.0 (#20858)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-23 21:36:30 +02:00
Steve Repsher
e0062cf190 Inject ElementInternals polyfill where needed (#20818) 2024-05-23 14:25:58 -04:00
karwosts
7d2cee650d Sort yaml reloads on translated domain (#20857) 2024-05-23 16:26:03 +02:00
c0ffeeca7
66560b1f1c Apply sentence-style capitalization to headings (#20855) 2024-05-23 15:22:06 +02:00
NP v/d Spek
a500b582e3 Modify the way the update shows available updates (#20773)
* Modify the way the update shows available updates

* Update src/data/update.ts

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* Update src/data/update.ts

* Update src/translations/en.json

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-05-22 16:15:17 +02:00
Adam Kapos
19f94ff8cc Fix app-theme-color not following header color (#20758)
* Fix app-theme-color not following header color

* Revert incorrect fix for #20671 that only applies when a primary color is set by the user
2024-05-22 15:26:13 +02:00
AlCalzone
0b6994d402 Z-Wave JS: Sort security classes from highest to lowest (#20851) 2024-05-22 14:18:09 +02:00
karwosts
9fe8f507ec Add configurable actions to Gauge Card (#20833)
* Add actions to gauge card

* struct support

* tap_action in UI

* Apply suggestions from code review

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* typo

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-05-22 14:10:22 +02:00
Simon Lamon
2113cf5280 Trim search inputs (#20825) 2024-05-22 10:39:32 +02:00
Paul Bottein
ae9e1b724f Fix voice assistant expose datatable storage key (#20843) 2024-05-21 19:20:29 +02:00
karwosts
9b28c7cf69 Script editor updates (match automation editor) (#20791)
* Show descriptions in script editor

* Script editor updates (match automation editor)

* review feedback
2024-05-21 19:01:51 +02:00
renovate[bot]
d9bac06806 Update formatjs monorepo (#20838)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-21 12:29:21 -04:00
karwosts
b1e37cb1e1 Missing checkbox in zwave dialog (#20841) 2024-05-21 11:56:55 -04:00
Paul Bottein
a2a89502d8 Add visibility option to sections (conditional section) (#20805)
* Add first version of section visibility option

* Move visibility logic into view

* Simplify section view structure

* Don't add hidden section to dom

* Move visilibity logic to hui-section

* Setup section editor

* Add visibility view

* Add basic settings editor

* Improve visibility editor

* Update conditional base

* Feedbacks

* Better typings
2024-05-21 10:43:23 +02:00
Paul Bottein
4cc5d2d04b Improve open and opening state for lock (#20808)
* Add open and opening color

* Split isAvailable into multiple function

* Use done wording
2024-05-21 09:19:36 +02:00
renovate[bot]
79abcca3b3 Update dependency @braintree/sanitize-url to v7.0.2 (#20836)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-20 19:54:15 +02:00
renovate[bot]
043f383a35 Update dependency chart.js to v4.4.3 (#20835)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-20 13:25:08 -04:00
dependabot[bot]
d4dd767941 Bump actions/checkout from 4.1.5 to 4.1.6 (#20829) 2024-05-20 08:29:31 +02:00
renovate[bot]
174f1991b1 Lock file maintenance (#20823)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-19 03:04:28 +00:00
renovate[bot]
e15495a626 Update dependency eslint-plugin-lit to v1.13.0 (#20775)
* Update dependency eslint-plugin-lit to v1.13.0

* Set attribute-names rule to warning

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2024-05-19 02:49:44 +00:00
renovate[bot]
a8a9a797cb Update dependency sinon to v18 (#20822)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-18 21:57:01 -04:00
karwosts
914dbc1e28 Reset select-selector to undefined when cleared (#20821) 2024-05-18 17:28:59 +02:00
Jan-Philipp Benecke
111816f08a Use domain translation in filter for domain search (#20763)
* Use domain translation in filter for domain search
2024-05-18 10:15:29 +02:00
renovate[bot]
1b4534890c Update dependency @lokalise/node-api to v12.5.0 (#20819)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-18 10:02:44 +02:00
renovate[bot]
ed6542469d Update dependency core-js to v3.37.1 (#20815) 2024-05-17 08:30:47 -04:00
renovate[bot]
3774a3d6ba Update typescript-eslint monorepo to v7.9.0 (#20812)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-16 16:32:31 -04:00
Bram Kragten
bfa293ae3a Allow storing thread credentials in phone keychain (#20743)
* Allow storing thread credentials in phone keychain

* Update dialog-thread-dataset.ts

* use preferred of dataset if available
2024-05-16 10:01:40 +02:00
renovate[bot]
9264adb799 Update vaadinWebComponents monorepo to v24.3.13 (#20802)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-16 09:19:36 +02:00
renovate[bot]
829ea4a9e4 Update dependency @types/chromecast-caf-sender to v1.0.10 (#20801)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-16 09:04:29 +02:00
Paul Bottein
be26f8bc24 Add grouping by area and domain in voice assistant expose data table (#20797) 2024-05-15 11:41:09 +02:00
renovate[bot]
c864b34a9a Update dependency glob to v10.3.15 (#20795)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-15 08:55:31 +02:00
Cody C
099ea61a94 Add checks to energy dashboard for when preferences are empty (#19765)
* Forbid completing energy dashboard setup unless at least one statistic is selected
* If energy setup was completed but there are no sources available, start setup wizard again
2024-05-13 20:57:37 +02:00
karwosts
3ebe6027be Minor fixes to energy sources behavior (#20785) 2024-05-13 18:41:51 +02:00
karwosts
f5f2a5ad5b Show descriptions in script editor (#20765)
* Show descriptions in script editor

* descriptions in blueprints also
2024-05-13 14:19:47 +02:00
Paulus Schoutsen
d046700d06 Show tag ID if no name, sort by last updated on mobile (#20788) 2024-05-13 09:56:23 +02:00
dependabot[bot]
2ad84b2832 Bump softprops/action-gh-release from 2.0.4 to 2.0.5 (#20790)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-05-13 09:13:29 +02:00
dependabot[bot]
f9ccb9fc72 Bump actions/checkout from 4.1.4 to 4.1.5 (#20789)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-05-13 09:12:12 +02:00
renovate[bot]
6d3940db1e Update dependency glob to v10.3.14 (#20784)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-12 19:08:52 +02:00
renovate[bot]
20d174431d Update dependency chai to v5.1.1 (#20781)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-12 13:06:07 +02:00
renovate[bot]
1900710e06 Update Yarn to v4.2.2 (#20778) 2024-05-11 15:41:07 -04:00
renovate[bot]
ed86a48e1c Update dependency sinon to v17.0.2 (#20772)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-10 15:08:14 -04:00
renovate[bot]
d2bdb52926 Update vaadinWebComponents monorepo to v24.3.12 (#20761)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-09 14:21:35 +02:00
G Johansson
9c57c9f151 Support open / opening state in LockEntity (#19944) 2024-05-08 21:01:57 +02:00
karwosts
9e9cb15a42 Minor improvements to service call descriptions. (#20733)
* Minor improvements to service call descriptions.
2024-05-08 18:04:38 +02:00
renovate[bot]
6421a9443d Update dependency intl-messageformat to v10.5.12 (#20755)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-08 12:50:05 +02:00
Paulus Schoutsen
f2b43ddad8 Allow adding card from history panel (#19582)
* Allow adding card from history panel

* Better empty entities check
2024-05-07 17:11:27 +02:00
Yosi Levy
e55b59d9b7 Logical property style fixes (#20752)
logical prop fixes
2024-05-07 15:35:34 +02:00
Paul Bottein
4a77359a06 Use Material 3 ripple (#20751)
* Use material web ripple component

* Improve button style

* Use css animation instead of ripple for action

* Use ha ripple in all components

* Remove unused label
2024-05-07 15:30:45 +02:00
renovate[bot]
505d7b6ddb Update dependency tar to v7.1.0 (#20748) 2024-05-07 08:23:16 +02:00
Steve Repsher
79cdc43699 Enhance webpack transform async plugin to use babel runtime (with fix) (#20745) 2024-05-06 18:06:21 -04:00
renovate[bot]
8ff9823cd7 Update dependency @octokit/rest to v20.1.1 (#20746)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-06 20:42:37 +02:00
Paul Bottein
3488c60818 Fix tile card margin on old devices (#20742) 2024-05-06 19:49:52 +02:00
Bram Kragten
b2af21ba5c Bumped version to 20240501.1 2024-05-06 17:50:01 +02:00
Paul Bottein
12a61a0021 Remove alarm modes list when adding a alarm modes card feature (#20688) 2024-05-06 17:49:30 +02:00
Simon Lamon
649917cdde Always save custom display name in energy dashboard when hitting Enter (#20702)
Change to Input event
2024-05-06 17:49:14 +02:00
karwosts
3ed27ee853 Add spacer for FAB under the zone list (#20706) 2024-05-06 17:48:58 +02:00
karwosts
c1d3a76917 Energy CSV download should not require admin (#20704) 2024-05-06 17:48:38 +02:00
Paul Bottein
571ed6b9e9 Revert usage of babel runtime for legacy bundle (#20741)
Revert usage of babel runtine for legacy bundle
2024-05-06 17:48:21 +02:00
Paulus Schoutsen
a347315fa7 Fix showing options button on conversation agent picker (#20736) 2024-05-06 17:47:59 +02:00
Simon Lamon
57d1405115 Show ungrouped group when there are results (#20716) 2024-05-06 17:47:41 +02:00
Yosi Levy
e5ff6bd2f5 Font updates in new filters (#20482)
* Style changes

* Fixes
2024-05-06 17:47:21 +02:00
Yosi Levy
43a422cdca Font updates in new filters (#20482)
* Style changes

* Fixes
2024-05-06 15:39:36 +02:00
Douwe
11f2bef05c Add header text align theme variable to stack cards (#20563)
* Update hui-stack-card.ts

Added variable

* Update hui-stack-card.ts

Updated the variable, so that it would not be in line with the rest of the variables. In this way, the variable only works for hui-stack titles.

* Update hui-stack-card.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-05-06 13:35:36 +00:00
karwosts
ff9f331287 Expand createDomains to more selectors (#20714)
Expand createDomains to more pickers
2024-05-06 15:26:13 +02:00
Steve Repsher
cdf64ccdaa Refactor translation merges to use native transform stream (#20666) 2024-05-06 15:17:01 +02:00
Simon Lamon
8b220acca2 Show ungrouped group when there are results (#20716) 2024-05-06 15:07:22 +02:00
Paul Bottein
8fdb7fa1d5 Update newsletter link (#20740)
* Update newsletter link

* Update src/panels/config/dashboard/ha-config-dashboard.ts

* Update src/onboarding/dialogs/community-dialog.ts
2024-05-06 14:57:51 +02:00
Paulus Schoutsen
008c842431 Fix showing options button on conversation agent picker (#20736) 2024-05-06 12:24:22 +02:00
Paul Bottein
bc41de0d9c Revert usage of babel runtime for legacy bundle (#20741)
Revert usage of babel runtine for legacy bundle
2024-05-06 12:12:19 +02:00
renovate[bot]
7310c9cf6d Update Yarn to v4.2.1 (#20735) 2024-05-05 21:49:14 -04:00
Steve Repsher
84b436c08e Fix self-injection for custom polyfills (#20718)
* Fix self-injection for custom polyfills

* Update build-scripts/bundle.cjs

Co-authored-by: Joost Lekkerkerker <joostlek@outlook.com>

---------

Co-authored-by: Paulus Schoutsen <balloob@gmail.com>
Co-authored-by: Joost Lekkerkerker <joostlek@outlook.com>
2024-05-03 16:37:40 -04:00
renovate[bot]
1925a47bdc Update dependency eslint-plugin-unused-imports to v3.2.0 (#20715)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-03 16:05:13 +00:00
renovate[bot]
438a426458 Update babel monorepo to v7.24.5 (#20707) 2024-05-02 21:25:29 -04:00
karwosts
f923deb71d Energy CSV download should not require admin (#20704) 2024-05-02 21:08:54 +02:00
renovate[bot]
e79bc71ab7 Update typescript-eslint monorepo to v7.8.0 (#20703)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-02 21:04:03 +02:00
karwosts
11b0990d2b Add spacer for FAB under the zone list (#20706) 2024-05-02 21:02:57 +02:00
Simon Lamon
870cb0c65f Always save custom display name in energy dashboard when hitting Enter (#20702)
Change to Input event
2024-05-02 20:03:36 +02:00
Paul Bottein
deda2009f8 Remove alarm modes list when adding a alarm modes card feature (#20688) 2024-05-02 19:22:43 +02:00
renovate[bot]
b2797ab8da Update dependency gulp to v5 (#20601)
* Update dependency gulp to v5

* Fix premature cloasing of hash stream

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2024-05-01 15:13:28 +02:00
renovate[bot]
644dcb0381 Update dependency systemjs to v6.15.1 (#20682)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-05-01 13:12:18 +02:00
Bram Kragten
c65f4f7a6e Revert "Remove strict connections" (#20685)
Revert "Remove strict connections (#20662)"

This reverts commit 1df92fa863.
2024-05-01 12:53:01 +02:00
Bram Kragten
e2266aa671 Merge branch 'dev' 2024-05-01 12:04:10 +02:00
Bram Kragten
68a79490dc Bumped version to 20240501.0 2024-05-01 12:03:26 +02:00
Paul Bottein
6febe8552e Allow to reorder alarm modes in card feature (#20684) 2024-05-01 11:55:06 +02:00
Bram Kragten
f611f23f6f Make sure lovelace theme background is set on it's container (#20683) 2024-05-01 11:24:40 +02:00
Bram Kragten
ef4f11fdf8 20240430.0 (#20681) 2024-04-30 23:58:58 +02:00
Bram Kragten
627e06663b Bumped version to 20240430.0 2024-04-30 23:44:32 +02:00
Paul Bottein
ab01633069 Fix ha settings row display in more info settings (#20680) 2024-04-30 21:12:53 +00:00
Bram Kragten
17dcc90638 Update entity status filter and grouping (#20679) 2024-04-30 23:04:48 +02:00
Paul Bottein
d0df029ff1 Update check update icon and add toast when checking update (#20677)
* Update check update icon

* Add toast when checking for update
2024-04-30 19:21:30 +00:00
Paul Bottein
86a7e69812 Allow to reorder and filter options in select options card feature (#20675) 2024-04-30 21:14:49 +02:00
Adam Kapos
af9417f2a6 Add theme support for dialog surface background (#20653)
* Add theme support for dialog surface background

* Change from review

* Change from review

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Run prettier

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-04-30 21:12:36 +02:00
Paul Bottein
7120ad99b9 Add customize mode option to card features with modes (#20670)
* Add customize mode options to card features with modes

* Better type

* Fix water heater and humidifier

* Clean schema
2024-04-30 18:38:51 +02:00
Adam Kapos
334c245b65 Fix visual differences between regular and energy dashboards (#20654)
* Fix visual differences between regular and energy dashboards

* Order padding properties the same way between energy and lovelace

* Change from code review
2024-04-30 15:07:54 +02:00
Nicooow
bcb72d83b8 Fix an inconsistency in dark mode (#20671)
* add app-theme-color var

* Fix Prettier format

* Fix regression on default dark theme

* prevent duplicate calculation
2024-04-30 12:03:19 +00:00
karwosts
c99e0e846b More config/entities status filters (#20638) 2024-04-30 12:32:32 +02:00
J. Nick Koston
ec3f63e8a3 Fallback to raw config entry reason if localize returns an empty string (#20668)
Show config entry reason if localize returns an empty string
2024-04-30 12:25:45 +02:00
karwosts
1bc33a30ec Display version info for custom integrations (#20652)
* Display version info for custom integrations

* no width
2024-04-30 12:23:20 +02:00
krazos
8cca233b7c Update unlock icon for tile card lock features (#20667)
Update unlock icon for tile card lock features so it's easier to see the difference between lock and unlock buttons
2024-04-29 20:53:33 +02:00
karwosts
a78608bfb4 Reorderable card-feature modes (#20647)
* Reorderable card-feature modes

* unused var in getStubConfig
2024-04-29 17:48:01 +02:00
Bram Kragten
e7c1ac94af 20240429.0 (#20665) 2024-04-29 17:44:33 +02:00
Bram Kragten
1a797b3415 Bumped version to 20240429.0 2024-04-29 17:36:46 +02:00
Bram Kragten
2b27a4da2b Show abort reason when no translation (#20664) 2024-04-29 17:35:30 +02:00
Bram Kragten
1df92fa863 Remove strict connections (#20662)
* Remove strict connections

* Update cloud-remote-pref.ts
2024-04-29 16:42:23 +02:00
Bram Kragten
cdde85315a fix list items cloud account (#20663) 2024-04-29 14:26:14 +00:00
Paul Bottein
dc67f9faf4 Fix cloud page design on mobile (#20661) 2024-04-29 16:03:02 +02:00
dependabot[bot]
3ad1be50a2 Bump actions/upload-artifact from 4.3.2 to 4.3.3 (#20658)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-04-29 12:38:02 +02:00
dependabot[bot]
8aadfe7d28 Bump actions/checkout from 4.1.3 to 4.1.4 (#20659)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-04-29 12:33:17 +02:00
renovate[bot]
cff54b73a4 Update dependency @lokalise/node-api to v12.4.1 (#20643)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-27 20:01:32 +02:00
Philip Allgaier
b54cfeb0c0 Hide "Browse Media" button for unavailable media players (#20629)
* Hide "Browse Media" button for unavailable media players
2024-04-27 14:36:42 +02:00
renovate[bot]
cefe612b11 Update dependency @octokit/plugin-retry to v7.1.1 (#20641)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-27 11:16:55 +02:00
renovate[bot]
4bc874b497 Update workbox monorepo to v7.1.0 (#20642)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-27 11:16:43 +02:00
Philip Allgaier
f3abaa8e02 Align lawn-mower and vacuum more-info layouts (#20632) 2024-04-26 14:07:38 +02:00
Philip Allgaier
21a563fe98 Add details for offset format to sun trigger (#20625)
Add details for offset to sun trigger
2024-04-26 14:05:04 +02:00
Paul Bottein
1acbcccd62 20240426.0 (#20636) 2024-04-26 11:42:26 +02:00
Paul Bottein
35d6c638ab Bumped version to 20240426.0 2024-04-26 11:40:38 +02:00
Bram Kragten
68f8239708 Update cloud remote settings (#20619)
* Update cloud remote settings

* Change again

* Update cloud-remote-pref.ts

* Update UI

* Add missing translations

* use hr and simplify condition

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-04-26 11:36:03 +02:00
renovate[bot]
0db64cca0b Update dependency @babel/helper-define-polyfill-provider to v0.6.2 (#20627)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-25 23:37:11 -04:00
renovate[bot]
accfda5f4b Update typescript-eslint monorepo to v7.7.1 (#20628) 2024-04-25 20:51:55 -04:00
Philip Allgaier
c97c20f57d Add mock area registry to demo to fix card picker (#20626) 2024-04-25 18:50:16 +00:00
Philip Allgaier
2725d0191d Disable counter more-info dec/inc buttons when min/max reached (#20624) 2024-04-25 20:49:20 +02:00
renovate[bot]
852cc62398 Update dependency @types/leaflet to v1.9.12 (#20623)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-25 17:56:27 +02:00
David F. Mulcahey
654e3ce437 Fix ZHA UI issues (#20622) 2024-04-25 16:16:00 +02:00
Bram Kragten
20a3a00aec add inital data for language selector (#20620)
* add inital data for language selector

* Update compute-initial-ha-form-data.ts
2024-04-25 15:25:18 +02:00
Bram Kragten
22b927d666 make sure we always have trigger and action (#20621)
* make sure we always have trigger and action

* script too
2024-04-25 15:24:33 +02:00
Philip Allgaier
709d6be2e3 Fix wrong chevron icon direction for groups in data tables (#20617)
Fix chevron icon for groups in data table
2024-04-25 11:28:36 +02:00
Bram Kragten
64f54d9aaa 20240424.1 (#20609) 2024-04-24 14:45:22 +02:00
Bram Kragten
fbda9ca418 Bumped version to 20240424.1 2024-04-24 14:30:36 +02:00
Paul Bottein
4e97e3763e Use theme mode property for ha-map (#20606)
* Use theme mode property for ha-map

* Use theme mode in ha-location-editor

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-04-24 14:28:33 +02:00
Bram Kragten
4c9c52d27d Add filter for domains to entity settings (#20605) 2024-04-24 13:53:14 +02:00
Bram Kragten
87bcd3e471 Add multiselect area to automation/scene/script (#20604) 2024-04-24 10:10:43 +00:00
Paul Bottein
7e9b01b56d Fix text alignment for open lock card feature (#20603)
Fix text aligment for open lock card feature
2024-04-24 09:36:17 +00:00
karwosts
713763fc21 Fix visual map issues (#20541)
* Fix visual map issues (#15587)

- hover background color of zoom control in dark mode
- map light mode when dark theme is used
- background color of zoom control with map dark mode when light theme is used

* Fix breaking change (#15587)

* Change theme mode selection to use dropdown (#15587)

- Additionally fixed unpleasant horizontal scrollbar in map editor

* Add yaml migration, fix force light/dark options

---------

Co-authored-by: Christoph Wen <wen.christoph@gmail.com>
2024-04-24 11:35:37 +02:00
renovate[bot]
5b7ab1bfcb Update dependency cropperjs to v1.6.2 (#20600)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-24 11:28:58 +02:00
Bram Kragten
8712adbf8d 20240424.0 (#20602) 2024-04-24 11:21:24 +02:00
Bram Kragten
4b0d19b615 Fix duplicate imports from merge 2024-04-24 11:14:55 +02:00
Bram Kragten
90e5d259af Merge branch 'master' into dev 2024-04-24 11:13:34 +02:00
Bram Kragten
af3a331f57 Bumped version to 20240424.0 2024-04-24 11:09:48 +02:00
Bram Kragten
67c60a4aa8 Add strict connection cloud settings (#20585)
* Add strict connection cloud settings

* Change static page to guard page

* saving files helps...

* Add create link button

* use correct service
2024-04-24 11:06:15 +02:00
Bram Kragten
62de16bb8e Implement storing sorting and grouping for all tables (#20594) 2024-04-24 11:06:00 +02:00
Marc Geurts
d9b71e754d Add lock features for tile card (#20539)
* Added lock features for tile card

* Change success label
2024-04-24 10:30:34 +02:00
Matthias Alphart
5fc950f09f Fix ha-filter-states clear filter behaviour (#20599)
Fix ha-filter-states clear filter behaviour
2024-04-24 10:28:17 +02:00
J. Nick Koston
0725c7b160 Restore getHassTranslationsPre109 (#20597)
* Revert "Remove legacy state translations (#20536)"

This reverts commit e376efc579.

* keep
2024-04-24 10:26:24 +02:00
Steve Repsher
469dbbcccc Rollback gulp to version 4 (#20598) 2024-04-24 10:25:52 +02:00
Bram Kragten
ffdd661b1f Make fallback translations work (#20596) 2024-04-24 07:31:29 +02:00
Bram Kragten
81922f5a3e Save and restore collapsed groups (#20591) 2024-04-23 21:00:17 +02:00
renovate[bot]
7e25366897 Update dependency @types/chromecast-caf-receiver to v6.0.14 (#20589)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-23 18:04:44 +02:00
Bram Kragten
8ab61b5468 Add title when text in datatable doesnt fit (#20590) 2024-04-23 13:50:44 +02:00
Bram Kragten
8239f6dd60 Update hass-tabs-subpage-data-table.ts 2024-04-22 20:28:21 +02:00
Bram Kragten
45dce18e4d typo 2024-04-22 20:15:52 +02:00
Bram Kragten
a428ad0655 Add bulk area assignment to device dashboard (#20581)
* Add bulk area assignment to device dashboard

* Update ha-config-devices-dashboard.ts
2024-04-22 18:35:58 +02:00
Bram Kragten
1b54d51e4a Add option for custom group order to data table (#20582) 2024-04-22 18:28:50 +02:00
Bram Kragten
eb1354d229 Allow groups in data table to be collapsed (#20579) 2024-04-22 18:27:46 +02:00
Bram Kragten
4d21f9e80c Allow to group entities by domain (#20580)
Allow group entities by domain
2024-04-22 18:27:13 +02:00
Paul Bottein
62f46baacf Fix more info slider in iOS (#20586) 2024-04-22 18:26:50 +02:00
Bram Kragten
a3090796d2 Store grouping and sorting for device table (#20583) 2024-04-22 18:13:44 +02:00
renovate[bot]
c34c5d64f9 Update dependency @codemirror/commands to v6.5.0 (#20587)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-22 18:09:46 +02:00
Bram Kragten
66228f5858 Add new timestamp state domains (#20584) 2024-04-22 16:33:32 +02:00
Bram Kragten
ac378cfe6d Update external barcode scanning API (#20470) 2024-04-22 12:52:59 +02:00
Nicooow
7ecf8b755e Add css var for meta theme-color attribute (#20558)
* add app-theme-color var

* Fix Prettier format
2024-04-22 09:51:21 +02:00
Matthias Alphart
141107f1f3 Apply initial values to forms of device trigger extra fields (#20555)
* Apply default values of device trigger extra fields

* use computeInitialHaFormData
2024-04-22 09:48:50 +02:00
karwosts
b5277dee53 When munging statistics to history, assume always numeric (#20544) 2024-04-22 09:41:12 +02:00
Steve Repsher
4b593c1c96 Enhance webpack transform async plugin to use babel runtime (#20543) 2024-04-22 09:40:20 +02:00
dependabot[bot]
50ce1b94c8 Bump actions/upload-artifact from 4.3.1 to 4.3.2 (#20575)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-04-22 09:22:38 +02:00
dependabot[bot]
8bf27a83ec Bump actions/checkout from 4.1.2 to 4.1.3 (#20576)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-04-22 09:21:14 +02:00
renovate[bot]
389f0d3d23 Update dependency marked to v12.0.2 (#20577)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-22 09:19:52 +02:00
karwosts
b966601e6a Hide beta toggle when unsupervised (#20573) 2024-04-21 09:50:14 +02:00
renovate[bot]
f2a0881821 Update dependency @types/tar to v6.1.13 (#20572)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-21 09:36:09 +02:00
renovate[bot]
50a49eae43 Update dependency date-fns-tz to v3.1.3 (#20552)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-20 14:23:57 -04:00
renovate[bot]
1c04561004 Update dependency @codemirror/commands to v6.4.0 (#20569)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-20 19:39:54 +02:00
renovate[bot]
b80d94d260 Update dependency magic-string to v0.30.10 (#20568)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-20 19:39:42 +02:00
karwosts
87012e23e7 Wrap unbreakable area names in ha-card header (#20566) 2024-04-20 19:39:24 +02:00
Simon Lamon
f39758b103 Only create sortable when not disabled (#20565) 2024-04-20 14:32:40 +02:00
G Johansson
697bbf428e Add translation to integration setup failures (#19128) 2024-04-20 09:16:36 +02:00
renovate[bot]
c7444a2605 Update dependency @octokit/auth-oauth-device to v7.1.1 (#20560)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-20 09:03:01 +02:00
karwosts
3a5f4d33d2 Fix stopped_unknown_reason localization message (#20557)
* Fix stopped_unknown_reason localization message
2024-04-20 08:45:05 +02:00
renovate[bot]
c3dc62523b Update dependency core-js to v3.37.0 (#20559) 2024-04-19 20:45:00 -04:00
renovate[bot]
424622061a Lock file maintenance (#20553) 2024-04-19 00:47:42 -04:00
renovate[bot]
a3b021b11d Update dependency @material/web to v1.4.1 (#20551) 2024-04-19 00:12:18 -04:00
renovate[bot]
b60ad8b143 Update typescript-eslint monorepo to v7.7.0 (#20549) 2024-04-18 18:55:17 -04:00
J. Nick Koston
e376efc579 Remove legacy state translations (#20536)
* Remove legacy state translations

https://github.com/home-assistant/core/pull/112023
2024-04-18 06:33:07 +02:00
renovate[bot]
382035a1d4 Update dependency @types/color-name to v1.1.4 (#20546)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-17 18:55:59 -04:00
renovate[bot]
542e22fe0e Update dependency tar to v7.0.1 (#20547)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-17 22:54:57 +00:00
karwosts
af37d57779 Fix entity picker delete entity (#20542) 2024-04-17 19:48:25 +02:00
renovate[bot]
fbef0b0186 Update dependency gulp to v5 (#20305)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-17 12:31:10 -04:00
renovate[bot]
9e67d6add8 Update dependency @types/leaflet to v1.9.11 (#20538)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-17 18:21:59 +02:00
Simon Lamon
25c702ad2b Don't display keyboard shortcut hints in quickbar if keyboard shortcuts are disabled (#20527)
Fix forgotten hint shortcut tip
2024-04-15 20:20:45 +02:00
Bram Kragten
6516597c93 Fix zones on mobile, align mobile and non mobile view (#20525)
* Fix zones on mobile, align mobile and non mobile view

* Fix CI

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-04-15 20:20:14 +02:00
renovate[bot]
1df9c38a8c Update dependency tar to v7 (#20513)
* Update dependency tar to v7

* Update fetch-nightly-translations.js

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-04-15 13:40:38 +00:00
renovate[bot]
bd7217145a Update dependency element-internals-polyfill to v1.3.11 (#20512)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-15 15:07:09 +02:00
renovate[bot]
569fef38a4 Update vaadinWebComponents monorepo to v24.3.11 (#20523)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-15 15:03:46 +02:00
Thomas Steiner
f21c89cf1a Make allow attribute configurable in iframe panel (#19087)
* Make allow attribute configurable in iframe panel

* Delete .vscode/settings.json

* Update ha-panel-iframe.ts

* Don't quote

* Update src/panels/iframe/ha-panel-iframe.ts

Co-authored-by: Quentame <polletquentin74@me.com>

* Make `allow` configurable for `hui-iframe-card`

* Update src/panels/iframe/ha-panel-iframe.ts

Co-authored-by: Quentame <polletquentin74@me.com>

* Update src/panels/lovelace/cards/hui-iframe-card.ts

Co-authored-by: Quentame <polletquentin74@me.com>

* Update src/panels/iframe/ha-panel-iframe.ts

Co-authored-by: Quentame <polletquentin74@me.com>

* Update src/panels/lovelace/cards/hui-iframe-card.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Delete src/panels/iframe/ha-panel-iframe.ts

* Restore dev

* Update ha-panel-iframe.ts

* Prettier

---------

Co-authored-by: Quentame <polletquentin74@me.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-04-15 14:48:57 +02:00
renovate[bot]
02cc418969 Update CodeMirror (#20520)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-15 09:21:07 +00:00
Cougar
4faba159c0 ZHA (Zigbee) visualization enhancement (#20511) 2024-04-15 11:09:16 +02:00
Adam Kapos
29816e6c5e Fix malformed CSS in dialog surface (#20519) 2024-04-15 11:06:07 +02:00
karwosts
5317a11c39 Sort custom cards in card picker (#20517) 2024-04-14 22:32:35 +02:00
Simon Lamon
27c53b3241 Replace paper-listbox in zone area (#19955)
* ha-config-zone

* Fixes

* add selected event back

* Fixes

* remove leftover paper-item css rule

* Fixup merge conflict
2024-04-14 13:46:38 +02:00
renovate[bot]
919befa961 Update dependency typescript to v5.4.5 (#20510) 2024-04-13 20:43:27 -04:00
renovate[bot]
f9c02ed099 Update dependency date-fns-tz to v3.0.1 (#20509) 2024-04-13 20:38:12 -04:00
karwosts
b35c325f43 Rebuild stack card when a child card rebuilds (#19861) 2024-04-12 20:53:04 +02:00
karwosts
b82f1128fe Location/zone editor updates (#19994) 2024-04-12 20:51:23 +02:00
karwosts
178feb7330 Create helpers from automation editor (#19287)
* Create helpers from automation editor

* support multiple createDomains

* localization

* fix lint

* Move multi domain to entity picker

* Update dialog-helper-detail.ts

* Update ha-config-helpers.ts

* optimize a little

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-04-12 18:38:39 +00:00
karwosts
0118a5bf4c Allow customizing display name for energy device (#20033)
* Allow customizing display name for energy device

* use display name in device settings list
2024-04-12 20:31:59 +02:00
renovate[bot]
e0087bd142 Update dependency @material/web to v1.4.0 (#20177)
* Update dependency @material/web to v1.4.0

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-04-12 15:15:33 +00:00
renovate[bot]
c2d3e7900e Update date-fns to v3 (major) (#20504)
* Update date-fns to v3

* update imports

* breaking changes

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-04-12 17:03:30 +02:00
Charles Garwood
fb8312110b Add support for setting label description (#20421)
* Add support for setting label description
2024-04-12 15:49:07 +02:00
renovate[bot]
16de57342e Update dependency eslint-plugin-wc to v2.1.0 (#20500)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-12 08:23:48 -04:00
renovate[bot]
ad6e041c04 Update dependency @codemirror/view to v6.26.2 (#20505)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-12 13:10:15 +02:00
Steve Repsher
e22e3e88a0 Speed up and simplify translations build (#19988)
* Speed up and simplify translations build

- Remove use of gulp-flatmap for merges (wasted input) and just loop over translation files.
- Parse and buffer master only once for all merges.
- Remove lokalise key reference transform from non-English files. This is already done by Lokalise when they are downloaded.
- Remove tabs from merged output to minimize buffer sizes.
- Pipe merges to a hashing stream, removing extra tasks and intermediate file I/O.
- Pipe hashed files to a single custom asynchronous transform stream to fragmentize the files. It expands the stream to push a new file for each fragment.
- Incorporate flattening into fragmentization.
- Delete entire ui.panel key for base translation (instead of leaving an empty object).
- Optimize flatten method to stop copying output over and over.
- Convert empty and test filters to JSON.parse() revivers for simplicity and better performance.
- Incorporate supervisor builds into main tasks using a simple toggle (i.e. remove duplicate code).
- Funcify local tasks and simplify exported tasks.
- Incorporate test metadata task into a simplified metadata task.

* Fix Lokalise key reference link

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

---------

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-04-12 12:49:18 +02:00
Steve Repsher
dc8a50965c Group date-fns packages (#20499) 2024-04-12 12:22:18 +02:00
Bram Kragten
1914de7ddf Bumped version to 20240404.2 2024-04-12 11:21:05 +02:00
Simon Lamon
2e505cfb1f Add spacing between icon and name in entity button bar (#20492)
* Fix width between icon and name

* Remove no-text
2024-04-12 11:20:15 +02:00
Bram Kragten
ab49aca815 Handle errors in multi select (#20494) 2024-04-12 11:19:57 +02:00
Bram Kragten
c96968e476 Fix issues with application credentials (#20495) 2024-04-12 11:19:31 +02:00
Simon Lamon
8f050516ec Fix missing argument in voice assistant expose search label (#20491) 2024-04-12 11:18:47 +02:00
Simon Lamon
27d2b244a4 Add spacing between icon and name in entity button bar (#20492)
* Fix width between icon and name

* Remove no-text
2024-04-12 11:17:51 +02:00
Bram Kragten
be2f2c6271 Handle errors in multi select (#20494) 2024-04-12 11:15:15 +02:00
Bram Kragten
8dc2797b16 Fix issues with application credentials (#20495) 2024-04-12 11:10:23 +02:00
renovate[bot]
7ca8dabc44 Update typescript-eslint monorepo to v7.6.0 (#20497)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-11 16:32:52 -04:00
Bram Kragten
baeb55e217 Merge branch 'master' into dev 2024-04-11 11:16:42 +02:00
Simon Lamon
a8502fcc11 Fix missing argument in voice assistant expose search label (#20491) 2024-04-11 11:10:02 +02:00
Paulus Schoutsen
9f5bc5b196 Match on correct entity ID of HA conversation agent (#20484) 2024-04-10 11:41:12 +02:00
Bruno Pantaleão Gonçalves
7556ab9506 Add css var for header webkit backdrop filter (#20473)
* Add CSS var for header -webkit-backdrop-filter

* Add backdrop to energy and developer tools
2024-04-10 11:40:44 +02:00
Adam Kapos
bf176ac314 Make it possible for themes to blur backgrounds (#20447)
* Make it possible for themes to blur card backgrounds

* Make it possible for themes to blur dialog backgrounds

* Add ha prefix

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Rename dialog-backdrop-filter to ha-dialog-scrim-backdrop-filter

With backwards compatibility

* Run prettier

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-04-10 11:37:35 +02:00
Adam Kapos
9903e22eaa Change tile to display "last triggered" in relative time (#20463) 2024-04-09 14:11:58 +02:00
Simon Lamon
1e0f7d9629 Don't display keyboard shortcut hints if keyboard shortcuts are disabled (#20456)
* Shortcut hints

* Prettier
2024-04-09 14:10:59 +02:00
Charles Garwood
e8a140af44 Don't duplicate the label as the description in Z-Wave Config (#20454)
Don'tduplicate the label as the description
2024-04-09 14:09:21 +02:00
Bram Kragten
b091d4f298 Write log on translation error (#20430)
* Write log on translation error

* Update ha-config-devices-dashboard.ts

---------

Co-authored-by: Franck Nijhof <git@frenck.dev>
2024-04-09 13:25:27 +02:00
renovate[bot]
35cf3063cb Update dependency @lokalise/node-api to v12.4.0 (#20252) 2024-04-08 20:49:48 -04:00
renovate[bot]
7141ef17be Update dependency @codemirror/legacy-modes to v6.4.0 (#20475) 2024-04-08 20:36:26 -04:00
renovate[bot]
be2c68c0bb Update octokit monorepo (#20453) 2024-04-08 20:32:57 -04:00
renovate[bot]
7c944d3767 Update dependency mocha to v10.4.0 (#20279) 2024-04-08 20:29:48 -04:00
renovate[bot]
1d4f02df2e Update dependency glob to v10.3.12 (#20298) 2024-04-08 20:28:30 -04:00
renovate[bot]
2007a74a20 Update babel monorepo to v7.24.4 (#20451) 2024-04-08 20:23:53 -04:00
renovate[bot]
8c0839ad57 Update dependency @types/tar to v6.1.12 (#20457) 2024-04-08 20:22:31 -04:00
renovate[bot]
516b9a54c4 Update dependency typescript to v5.4.4 (#20468) 2024-04-08 20:21:33 -04:00
renovate[bot]
0d3e730c9c Update dependency magic-string to v0.30.9 (#20465)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-08 09:33:26 +02:00
renovate[bot]
c7a87d02b2 Update dependency @types/leaflet to v1.9.9 (#20452) 2024-04-07 20:37:42 +02:00
Bram Kragten
dd082c204b Remove unused type (#20429) 2024-04-05 12:22:47 +02:00
renovate[bot]
c4af3d1579 Update typescript-eslint monorepo to v7.5.0 (#20426)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-05 11:36:28 +02:00
Bram Kragten
10eadbcbbb Merge branch 'dev' 2024-04-04 21:31:51 +02:00
Bram Kragten
17141824f7 Bumped version to 20240404.1 2024-04-04 21:31:30 +02:00
Bram Kragten
4cfd6c010f Fix overflow on submenus (#20415) 2024-04-04 19:54:36 +02:00
Bram Kragten
daa9024bff Make pages full height 2024-04-04 17:16:36 +02:00
Bram Kragten
e96aca90fe 20240404.0 (#20414) 2024-04-04 16:23:24 +02:00
Bram Kragten
0580a31961 Bumped version to 20240404.0 2024-04-04 16:16:30 +02:00
Bram Kragten
5c42c5130c Add count of items (#20410)
* Add count of items

* Adjust layout, correct filter count
2024-04-04 16:15:13 +02:00
Bram Kragten
72d1e37a23 Fix integration filter search (#20408) 2024-04-04 13:26:26 +02:00
Bram Kragten
61c9072a08 Fix icons in entity settings (#20405) 2024-04-04 13:00:14 +02:00
Bram Kragten
08b25f9c2a Add floor and label support to describe action (#20403) 2024-04-04 13:00:05 +02:00
Samuel Schultze
1a03b49700 Fix calendar range selection (#20394)
fix: calendar range selector
2024-04-04 12:59:54 +02:00
Paul Bottein
2d4a8e2e45 Fix search input outlined background color and margin (#20407) 2024-04-04 12:53:03 +02:00
Bram Kragten
8486377604 Fix z-index create category dialog (#20406) 2024-04-04 10:51:04 +00:00
Paul Bottein
3a4e9b6856 Avoid duplicate entity ids in history (#20402)
* Avoid duplicate entity ids in history

* Don't need to check for size
2024-04-04 12:12:04 +02:00
Bram Kragten
5f5ac5419b Add floor and label support to history panel (#20388) 2024-04-04 00:06:03 +02:00
Bram Kragten
92b7a3b477 Adjust integration filter height for search bar (#20382) 2024-04-03 21:54:27 +02:00
Bram Kragten
4326519a3f 20240403.1 (#20380) 2024-04-03 16:58:47 +02:00
Bram Kragten
00837acdfc Bumped version to 20240403.1 2024-04-03 16:52:23 +02:00
Bram Kragten
7704be12b1 When creating a label or category with multi select, also assign it (#20379)
* When creating a label or category with multi select, also assign it

* correct scope

* again
2024-04-03 16:51:33 +02:00
Bram Kragten
712ddb531b Make selection bar responsive (#20378) 2024-04-03 16:48:02 +02:00
Bram Kragten
d52afc3f71 Add settings shortcut to scene and script table (#20375) 2024-04-03 16:11:32 +02:00
Bram Kragten
92f6083e0b Faulty helpers should not be selectable (#20373) 2024-04-03 15:19:05 +02:00
Bram Kragten
5751fdbe56 Improve entity integration filter (#20372) 2024-04-03 15:18:40 +02:00
Bram Kragten
962b30adb9 20240403.0 (#20370) 2024-04-03 14:50:16 +02:00
Bram Kragten
3b5b3f3bb6 Handle disabled entities in multi select label (#20371) 2024-04-03 14:40:48 +02:00
Bram Kragten
1a6d96cf3a Bumped version to 20240403.0 2024-04-03 14:18:07 +02:00
Bram Kragten
034fd9b4df Manage areas from floor dialog (#20347)
* manage areas from floor dialog

* Finish

* fix exclude
2024-04-03 14:17:32 +02:00
Bram Kragten
eb79a1e7d7 Allow to remove labels in multi select (#20368)
* Allow to remove labels in multi select

* reducedTouchTarget

* fix devices

* Update ha-config-devices-dashboard.ts
2024-04-03 14:17:21 +02:00
Bram Kragten
e25d4f17aa Add create category and label to multi select (#20365)
* Add create category and label to multi select

* move out of map
2024-04-03 13:23:00 +02:00
Bram Kragten
ccde9cceee Add category and filters to helpers (#20346)
* Add category and filters to helpers

* Add support for adding label and category in multi select

* remove labels multi
2024-04-03 13:22:40 +02:00
Paul Bottein
578d3c4260 Set input and button background color to white for toolbar (#20369) 2024-04-03 11:10:51 +00:00
Bram Kragten
bfdc9a3d86 Add area to automation, scene, script tables (#20366)
* Add area to automation, scene, script tables

* typing
2024-04-03 13:04:47 +02:00
Bram Kragten
5315545a4d Add search to integration filter (#20367) 2024-04-03 12:03:35 +02:00
Paul Bottein
82a3b9d80f Use tree for nested floor instead of icon (#20363) 2024-04-03 09:27:30 +00:00
Bram Kragten
3de985a3b8 Prevent line break in selection menu (#20361) 2024-04-03 11:04:24 +02:00
Bram Kragten
567ee8000d Fix toggles in automation datatable on firefox (#20360) 2024-04-03 08:30:08 +00:00
Bram Kragten
03939001b2 Fix elements above filter dialog (#20359) 2024-04-03 08:28:33 +00:00
Bram Kragten
30d18050d1 Add arrow to areas under floors (#20344) 2024-04-03 10:24:10 +02:00
Bram Kragten
95caf8c7df make subpage data table full height (#20358) 2024-04-03 10:12:36 +02:00
Bram Kragten
6c1f328d71 Take lang into account when sorting groups (#20355)
* Take lang into account when sorting groups

* make sure empty values are at the bottom
2024-04-03 10:12:25 +02:00
Bram Kragten
bb20ab8c2c Fix removing labels (#20354) 2024-04-03 09:54:49 +02:00
Bram Kragten
29eb73176a 20240402.2 (#20348) 2024-04-02 23:34:17 +02:00
Bram Kragten
17ad3a87f3 Bumped version to 20240402.2 2024-04-02 23:31:14 +02:00
Bram Kragten
ed7c9c33b9 Add my link support for labels (#20345) 2024-04-02 22:31:37 +02:00
Bram Kragten
59b66219cb Add clear filter button to individual filters (#20343) 2024-04-02 22:05:03 +02:00
Bram Kragten
1e2c1d1464 Add search to device and entity filters (#20341) 2024-04-02 21:46:21 +02:00
Bram Kragten
5b86b1277f Add edit button to areas in area dashboard + color add floor fab (#20339) 2024-04-02 21:41:56 +02:00
Paul Bottein
41fdf31e34 Check for entity state and entity string in conditional card (#20331)
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-04-02 20:39:39 +02:00
Bram Kragten
9bef5c2af9 Add clear button to search field (#20332) 2024-04-02 19:42:54 +02:00
Paul Bottein
ed1a69071b Replace add label by manage labels in filters (#20330) 2024-04-02 19:05:01 +02:00
Paul Bottein
56d328b4db Fix error in console when taking control of the strategy (#20329) 2024-04-02 18:33:30 +02:00
Paulus Schoutsen
33c7e0fa2d Hide conversation entities from default dashboard (#20327) 2024-04-02 14:55:22 +00:00
Bram Kragten
4f1cf1110f 20240402.1 (#20326) 2024-04-02 16:41:12 +02:00
Bram Kragten
a434bfd944 Bumped version to 20240402.1 2024-04-02 16:33:05 +02:00
Bram Kragten
21ed8e4206 Load translations when adding item in pickers (#20325)
* Load translations when adding item in pickers

* Update ha-selector-label.ts
2024-04-02 15:33:10 +02:00
Paul Bottein
169d782580 Fix label wrap (#20323)
* Don't wrap headline on ha-menu-item

* Don't wrap text on ha-label
2024-04-02 13:20:22 +00:00
Bram Kragten
8a015f4e38 Update multi select of entities config (#20319)
* Update multi select of entities config

* Update ha-config-entities.ts
2024-04-02 15:16:20 +02:00
Bram Kragten
cbb08c6202 Add multi select to scripts and scenes (#20318) 2024-04-02 15:16:10 +02:00
Bram Kragten
6301bc713c Add multi select to devices (#20321) 2024-04-02 15:16:00 +02:00
Paul Bottein
a5d7043ce4 Update style of more info style (#20322)
* Set more info border radius to 36px

* Use control button for alarm more info
2024-04-02 15:05:21 +02:00
Bram Kragten
912d2cbd79 Add warning color for menu item (#20317)
* Add warning color for menu item

* align icons
2024-04-02 14:40:53 +02:00
Bram Kragten
48ee3a34eb Sort labels by name (#20316) 2024-04-02 13:37:46 +02:00
Paul Bottein
21263a1ffb Improve more info dialog navigation for specific view (#20312) 2024-04-02 12:45:39 +02:00
Paul Bottein
db59e138e9 Fix pickers (#20315)
* Fix not found area picker

* Fix no match for categories
2024-04-02 12:45:13 +02:00
Bram Kragten
bc8012dcc9 Add shortcut to label filter from label config page (#20313) 2024-04-02 11:50:50 +02:00
Bram Kragten
d8b43597a0 Use area and floor dialog when adding item in picker (#20311)
* Use area and floor dialog when adding item in picker

* use const
2024-04-02 11:49:05 +02:00
Bram Kragten
d3bf0da289 20240402.0 (#20314) 2024-04-02 11:44:05 +02:00
Bram Kragten
871949e760 Bumped version to 20240402.0 2024-04-02 11:41:16 +02:00
Bram Kragten
4fb42d3545 Fix and optimize automation overflow (#20293)
* WIP fix and optimize automation overflow

* finish

* Prettier

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-04-02 11:23:43 +02:00
Bram Kragten
2e58d6656c Add drag and drop to area dashboard (#20289)
* Add drag and drop to area dashboard

* Update ha-config-areas-dashboard.ts

* Fix unassign path

* Add delay for touch

* Update ha-config-areas-dashboard.ts

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-04-02 11:23:32 +02:00
Bram Kragten
a3024b38e9 fix floor icon color dark mode (#20310) 2024-04-02 10:44:13 +02:00
Bram Kragten
85f2016371 Add floor selector (#20295) 2024-04-02 10:43:50 +02:00
Bram Kragten
1ce3347c2e Add multi select to automations (#20291)
* Add multi select to automations

* allow to clear category, add icons

* use popover

* revert changes to group. by and sort menu, fix dark mode

* ha-menu

* responsive
2024-04-02 10:14:17 +02:00
renovate[bot]
4f8415e8a7 Update dependency @codemirror/view to v6.26.1 (#20300)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-04-02 09:13:46 +02:00
Simon Lamon
b202a36feb Clean menu implementation (#20294)
* Clean menu

* Clean up imports

* Fix imports
2024-03-31 12:28:28 +02:00
Bram Kragten
7e3e224746 Some data table fixes (#20286) 2024-03-30 21:11:35 +01:00
Bram Kragten
503a7979d0 Fix clearing of filters (#20288)
* Fix clearing of filters

* Update ha-filter-integrations.ts

* Update ha-filter-integrations.ts
2024-03-30 15:32:34 +01:00
Simon Lamon
f3ba6e7996 Fix uncaught keyFunction errors when data table filtering (#20285)
* Undefined keys

* Apply suggestion

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Prettier

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-03-30 13:44:59 +00:00
Bram Kragten
f13dcb4139 Fix flickering toast (#20287) 2024-03-30 14:40:13 +01:00
Yosi Levy
e8dc61ec36 RTL fixes to new data table (#20283)
RTL fixes to new features
2024-03-30 13:32:29 +01:00
Simon Lamon
88c59c5c13 Add label filter for helper page (#20281)
* Label filter for helper page

* Clean up debugging label
2024-03-30 13:30:24 +01:00
Paul Bottein
fd06d434f2 20240329.1 (#20280) 2024-03-29 21:25:10 +01:00
Paul Bottein
85f80ff863 Bumped version to 20240329.1 2024-03-29 21:23:46 +01:00
Paul Bottein
d56abe6b72 Fix stack card border radius reset on iOS (#20278) 2024-03-29 21:22:31 +01:00
Paul Bottein
d24d29e42f 20240329.0 (#20277) 2024-03-29 19:10:34 +01:00
Paul Bottein
bc14b8468d Bumped version to 20240329.0 2024-03-29 19:09:09 +01:00
Paul Bottein
f924f81ec1 Add labels on entities datatable (#20274) 2024-03-29 18:47:22 +01:00
Paul Bottein
3a6382df55 Add labels on devices datatable (#20275) 2024-03-29 18:46:34 +01:00
Paul Bottein
1dba049038 Fix floor creation in floor picker (#20276) 2024-03-29 18:05:06 +01:00
Simon Lamon
f539516252 Label filters for devices & entities (#20253)
More label filters
2024-03-29 16:41:18 +01:00
Paul Bottein
abd02eda0f Fix empty line in data table when using group_by (#20273) 2024-03-29 15:16:01 +00:00
Paul Bottein
99695d6cb3 Use md-menu for group by and sort by for data table (#20266) 2024-03-29 16:15:21 +01:00
Paul Bottein
cb1c2b59df Use primary color for filter badge color (#20263) 2024-03-29 16:12:18 +01:00
Paul Bottein
8368f977b9 Improve data table search bar style (#20271) 2024-03-29 16:10:41 +01:00
Paul Bottein
e05595f318 Fix add category and add label animation (#20272) 2024-03-29 16:09:10 +01:00
Paul Bottein
11cf2ec39d Fix selecting no category message (#20268) 2024-03-29 15:41:05 +01:00
renovate[bot]
e5c43fcfcd Update typescript-eslint monorepo to v7.4.0 (#20256)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-29 12:44:45 +01:00
Paul Bottein
520581c165 Reapply filters if entity registry change (#20265) 2024-03-29 11:37:13 +01:00
Paul Bottein
d1119a3b61 Restore theme usage in stack card in panel view (#20264) 2024-03-29 11:16:28 +01:00
Paul Bottein
5dd029cc05 Add delete action in label overflow menu (#20261) 2024-03-29 10:25:54 +01:00
Paul Bottein
510e010f97 Fix search for labels and categories (#20262) 2024-03-29 10:25:02 +01:00
Paul Bottein
1300cffa3b Hide show all categories button is no categories (#20255) 2024-03-28 23:13:51 +01:00
Simon Lamon
8fbcbb0b68 Add label button to ha-filter-labels (#20251) 2024-03-28 18:51:36 +01:00
Paul Bottein
e02a47a16a 20240328.0 (#20250) 2024-03-28 16:49:01 +01:00
Paul Bottein
7b26c1ffcb Bumped version to 20240328.0 2024-03-28 16:45:12 +01:00
Bram Kragten
d3e62454a5 Add default icons for area and floors (#20214)
* Add default icons for area and floors

* Add default icon for floor based on level

* Allow deleting floor level

* Use texture box for area

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-03-28 16:35:56 +01:00
Paul Bottein
6b8f4e92a7 Display category dialog in category picker (#20234) 2024-03-28 13:51:53 +01:00
Paul Bottein
b590b21183 Fix unassign category action (#20235) 2024-03-28 13:51:37 +01:00
Paul Bottein
a08484f450 Fix default label color (#20232) 2024-03-28 12:30:53 +00:00
Paul Bottein
2978ca13c5 Fix label creation in label picker (#20233) 2024-03-28 13:09:51 +01:00
Bram Kragten
31c0850b14 Add default icons to categories (#20215)
* Add default icons to categories

* Update ha-filter-categories.ts

* smaller graphic margin in filters
2024-03-28 11:45:41 +01:00
Bram Kragten
1d85f0717a Add label and floor to target struct (#20213) 2024-03-28 09:15:58 +01:00
Bram Kragten
795c16a941 20240327.0 (#20210) 2024-03-27 17:52:08 +01:00
Bram Kragten
55c8589841 Merge branch 'master' into dev 2024-03-27 17:45:26 +01:00
Bram Kragten
4687add37a Bumped version to 20240327.0 2024-03-27 17:41:56 +01:00
Paul Bottein
c25e23ccd6 Fix translations for label and category (#20209)
* Fix translations for label and category

* Update en.json

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-03-27 17:41:38 +01:00
Bram Kragten
e42ddb8f0f Update ha-target-picker.ts 2024-03-27 17:36:12 +01:00
Bram Kragten
705c0e58fc Allow delete floor (#20208)
* Allow delete floor

* Update src/translations/en.json

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-03-27 17:35:29 +01:00
Paul Bottein
7427e17926 Remove border from chip and use ha-label for label (#20205) 2024-03-27 16:33:32 +00:00
Paul Bottein
2c4b31dcaa Use primary color for user message in assist dialog (#20207) 2024-03-27 16:31:39 +00:00
Bram Kragten
ae8671af96 Add filtering and grouping to device and entities config pages (#20204)
* Add filtering and grouping to device and entities config pages

* Update hass-tabs-subpage-data-table.ts

* Change label

* Update ha-config-voice-assistants-expose.ts

* fix expose multi select

* Update ha-config-voice-assistants-expose.ts
2024-03-27 17:26:56 +01:00
Bram Kragten
f5ff55abc5 Support no level on floors (#20206) 2024-03-27 16:15:06 +00:00
karwosts
b662512995 Fix missing column headers for various data tables (#20160)
* Fix missing column headers for automation/scene/script/blueprint

* more tables

* Update ha-automation-picker.ts

* Update ha-script-picker.ts

* Update ha-scene-dashboard.ts
2024-03-27 17:04:45 +01:00
renovate[bot]
64c3fb1723 Update formatjs monorepo (#20196)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-27 16:31:04 +01:00
renovate[bot]
fb99dc4cd0 Update dependency transform-async-modules-webpack-plugin to v1.0.4 (#20186)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-27 16:30:37 +01:00
Bram Kragten
e08a0c44ba Add filtering and grouping to scenes and scripts (#20203)
* Add filtering and grouping to scenes and scripts

* hide labels when there are none

* Update ha-data-table.ts
2024-03-27 16:24:49 +01:00
Bram Kragten
68935d46ce Add categories, filtering, grouping to automation panel (#20197)
* Add categories and filtering to automation panel

* Update search-input-outlined.ts

* Update ha-config-entities.ts

* fix resetting area filter

* fixes

* Update ha-category-picker.ts

* Update ha-filter-blueprints.ts

* fix updating badge

* fix overflow issue
2024-03-27 15:26:01 +01:00
karwosts
141c8c5192 Fix energy dates when using server TZ (#20191)
* Fix energy dates when using server TZ

* update
2024-03-27 15:24:25 +01:00
Quentame
7ca5467f4c climate: Add preset exemple (#19092)
* Add none, frost_protection & auto preset mode icons

* Revert preset icons addition
2024-03-27 12:53:14 +01:00
Tomasz
5de53964d9 Update en.json - fix expand_label_id, use areas instead of area (#20200)
Update en.json
2024-03-27 12:05:59 +01:00
Paul Bottein
8d8807e659 Fix profile page (#20199)
* Add icon to profile page

* Fix notification dot color
2024-03-27 11:17:31 +01:00
Paul Bottein
9347944cbd Update matter app translations (#20198) 2024-03-27 10:07:44 +01:00
Paul Bottein
480448acbb Add maximum number of columns option for section view (#20145)
* Add maximum number of columns option for section view

* Add comment
2024-03-27 08:53:53 +01:00
renovate[bot]
202fa82646 Update vaadinWebComponents monorepo to v24.3.10 (#20180)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-26 18:12:38 -04:00
renovate[bot]
feecc9f838 Update dependency @bundle-stats/plugin-webpack-filter to v4.12.2 (#20190)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-26 18:10:34 -04:00
dependabot[bot]
2f9e667517 Bump express from 4.18.3 to 4.19.2 (#20193)
Bumps [express](https://github.com/expressjs/express) from 4.18.3 to 4.19.2.
- [Release notes](https://github.com/expressjs/express/releases)
- [Changelog](https://github.com/expressjs/express/blob/master/History.md)
- [Commits](https://github.com/expressjs/express/compare/4.18.3...4.19.2)

---
updated-dependencies:
- dependency-name: express
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-03-26 18:09:37 -04:00
Paul Bottein
5547bc7356 Add question based matter commissioning flow (#20188)
* Create add device dialog

* Add translations and shared design

* Disable add buttons when no code

* Use right endpoint

* Add loading state

* Update logos

* Add native flow

* Add store links to download app

* Always display qr code and link

* Update translations

* Share assets and translations with app dialog
2024-03-26 20:53:05 +01:00
Bram Kragten
eb4ae926b7 Add support for labels (#20189)
* Add support for labels

* Update ha-label-picker.ts

* Remove aliases from label

* Use opacity for chips in labels picker

* Fix label filtering in target picker

* Update ha-labels-picker.ts

* Update dialog-area-registry-detail.ts

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-03-26 20:52:17 +01:00
On Freund
b239ec2b71 Add image domain to sensors (#20194) 2024-03-26 20:48:27 +01:00
Simon Lamon
e9cac94aee Show integration page if no integrations are configured (#20107)
* Show integration page if no integrations are configured

* Feedback
2024-03-26 14:48:36 -04:00
Bram Kragten
5289cd3af1 Add floor support (#20187)
* Add floor support

* Update src/components/ha-area-floor-picker.ts

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* Use different type for floor area picker

* type

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-03-26 18:00:09 +01:00
Paul Bottein
45a5c1c235 Add confirmation button in lock more info (#20093)
* Add confirmation button in more info lock

* Reset confirm open on service call

* Use text instead of toast for success
2024-03-25 15:56:55 +01:00
Paul Bottein
db3709952c Fix stack style in panel view (#20135) 2024-03-25 15:55:19 +01:00
Paul Bottein
447932eedb Update control slider color (#20124)
* Increase control slider thickness and border radius

* Increase control switch, select thickness and border radius

* Update assumed state toggle buttons
2024-03-25 15:54:37 +01:00
Paul Bottein
10cc3bdd3f Fix header on take control dialog (#20123) 2024-03-25 15:53:52 +01:00
Paul Bottein
6ee2bfed36 Add theme variables for grid section and sections view (#20099)
* Fix variable

* Add section view theme variables

* Add grid section theme variables
2024-03-25 15:53:21 +01:00
renovate[bot]
01efb831b7 Update dependency tar to v6.2.1 (#20178)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-25 09:52:20 +01:00
dependabot[bot]
9e1e20bd94 Bump actions/cache from 4.0.1 to 4.0.2 (#20179) 2024-03-25 08:59:15 +01:00
potelux
869ace74ad Allow commas in state of history download (#20088)
Allow commas and quotes in state of history download
2024-03-24 21:30:08 -04:00
karwosts
94d56367fc Split profile page (#20103) 2024-03-24 21:18:55 -04:00
renovate[bot]
68a5ba668e Update dependency webpack to v5.91.0 (#20172)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-23 23:04:37 -04:00
renovate[bot]
b2b590cf67 Update babel monorepo to v7.24.3 (#20169) 2024-03-23 17:20:27 -04:00
renovate[bot]
6f7c071769 Update dependency typescript to v5.4.3 (#20174) 2024-03-23 17:19:26 -04:00
renovate[bot]
c1a7164ce7 Update dependency webpack-dev-server to v5.0.4 (#20165) 2024-03-23 17:17:55 -04:00
renovate[bot]
b77839c139 Update dependency @lokalise/node-api to v12.3.0 (#20162)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-22 18:11:42 +01:00
renovate[bot]
e2f2a9322c Update dependency transform-async-modules-webpack-plugin to v1.0.3 (#20153)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-22 14:33:02 +01:00
renovate[bot]
e4bd6c885d Update babel monorepo to v7.24.1 (#20158)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-22 14:07:15 +01:00
renovate[bot]
8201701d17 Update dependency core-js to v3.36.1 (#20156)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-22 08:40:26 -04:00
renovate[bot]
a5e6b78e1d Update dependency @braintree/sanitize-url to v7.0.1 (#20154)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-22 08:38:15 -04:00
renovate[bot]
027eccba06 Update typescript-eslint monorepo to v7.3.1 (#20155) 2024-03-22 01:05:38 +00:00
dependabot[bot]
12f10513f0 Bump webpack-dev-middleware from 7.0.0 to 7.1.1 (#20152) 2024-03-21 20:53:25 -04:00
renovate[bot]
9907ed51f0 Update typescript-eslint monorepo to v7.3.0 (#20151) 2024-03-21 20:51:07 -04:00
Paul Bottein
90e9f79841 Add iframe strategy (#20068)
* Add iframe strategy with editor

* Unify sandbox parameters

* Update translations

* Remove title from editor

* Add editor when creating iframe strategy

* Update src/translations/en.json
2024-03-21 13:44:49 +01:00
Bram Kragten
c30b9cdfcf Change gender to voice for cloud tts settings (#20057)
* change gender to voice for cloud tts settings

* Use voice in cloud tts try dialog

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-03-20 09:56:32 +00:00
Paul Bottein
7e1fa0cf38 Fix drag and drop when switching views (#20143) 2024-03-20 10:43:30 +01:00
Paul Bottein
b6587488d4 Center title in zha pairing page (#20142) 2024-03-20 10:34:02 +01:00
Quentame
552eeeddf6 conditional & entity-filter: add ability to filter through entity_id & add entity-filter conditional's conditions (#19182)
* entity-filter: add ability to filter through entity_id value

* review: test filter value against undefined

Co-authored-by: karwosts <32912880+karwosts@users.noreply.github.com>

* review: better handle state values that could be mixed with an entity_id

* Add multiple filter/condition types

* Fix automation's NumericStateCondition above/below types

* Replace operator condition by state for string or number

* Move to condition: type & attr

* Remove enable attr

* fix condition state array

* Remove necessary undefined check

* Move to condition: use same codebase as conditionnal card

* Fix entities error 'read properties of undefined' + conditions first

* Fix lint

* Merge condition to set the entity to filter on

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* review: make numeric_state below & above working together again, with entity_id support

* shorthand getValueFromEntityId

* review: states are string

* Split legacy state filter and condition logic

* Fix types

* Fix type

* Update gallery doc

* Fix operator in while numaric array

* Rename condition card header in gallery

* Don't use real gas station name

* Update gallery

* Update card is entity in condition change

* Don't check for entity id in state condition

* Improve check

* Update condition card demo

* Revert "Don't check for entity id in state condition"

This reverts commit f5e6a65a37.

* Use set instead of list

* Update demo

---------

Co-authored-by: karwosts <32912880+karwosts@users.noreply.github.com>
Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-03-19 14:29:34 +01:00
Paul Bottein
cbc150bad2 Fix hidden entity filter card in section (#20117) 2024-03-19 10:24:12 +01:00
Bram Kragten
8a4ed121b5 Add option to remove cloud data (#20055) 2024-03-19 10:23:32 +01:00
Paul Bottein
a9793dc0a5 Remove border radius in panel view (#20122) 2024-03-19 10:21:30 +01:00
renovate[bot]
c9deef84ca Lock file maintenance (#20132)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-19 10:19:38 +01:00
renovate[bot]
1582aaeb4c Update vaadinWebComponents monorepo to v24.3.9 (#20120)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-18 15:01:27 +01:00
karwosts
707520c15c Themed graph color support for energy devices graphs (#19998)
Themed graph color support for energy devices
2024-03-18 14:42:24 +01:00
Alex Yao
d5de435f06 Fix html5 notification toggle (#20028)
* Fix html5 notification toggle

* Update src/components/ha-push-notifications-toggle.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* fix lint

---------

Co-authored-by: alexyao2015 <alexyao2015@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-03-18 11:03:33 +00:00
dependabot[bot]
9e3dfaa400 Bump softprops/action-gh-release from 2.0.2 to 2.0.4 (#20115) 2024-03-18 08:29:45 +01:00
dependabot[bot]
7aa92ec249 Bump actions/checkout from 4.1.1 to 4.1.2 (#20114) 2024-03-18 07:29:10 +01:00
renovate[bot]
2fdcd40f00 Update CodeMirror (#20105)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-17 18:18:10 -04:00
renovate[bot]
3b15b786ff Update dependency webpack-dev-server to v5.0.3 (#20095)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-17 18:15:49 -04:00
renovate[bot]
b212b30e58 Update dependency @babel/helper-define-polyfill-provider to v0.6.1 (#20098) 2024-03-17 17:48:12 -04:00
renovate[bot]
6fd89f8585 Update dependency @bundle-stats/plugin-webpack-filter to v4.12.1 (#20104) 2024-03-17 17:46:14 -04:00
renovate[bot]
0406d21703 Update dependency @lokalise/node-api to v12.2.1 (#20102) 2024-03-17 17:45:11 -04:00
renovate[bot]
293f89a07b Update dependency @codemirror/autocomplete to v6.14.0 (#20078) 2024-03-15 10:56:46 -04:00
dependabot[bot]
520a0b4075 Bump follow-redirects from 1.15.3 to 1.15.6 (#20086) 2024-03-15 10:54:57 -04:00
renovate[bot]
488602e232 Update dependency superstruct to v1.0.4 (#20082) 2024-03-15 08:21:34 -04:00
renovate[bot]
1e8d353162 Update typescript-eslint monorepo to v7.2.0 (#20085) 2024-03-15 08:19:02 -04:00
Simon Lamon
b3718b8b4a Fix broken state_color in Entities card (#20077)
Restore button functionality
2024-03-15 11:22:25 +01:00
Simon Lamon
097cba5c60 Use the entityId in the legacy shopping cart (#20083) 2024-03-15 11:20:42 +01:00
Simon Lamon
fa6d8d0891 Bump Python version to 3.12 (#20084) 2024-03-14 20:06:03 +01:00
Paul Bottein
31797c55df Add map strategy (#20067) 2024-03-14 14:22:24 +01:00
karwosts
56a23c5c3d Small reorganization of profile settings (#20076)
* Small reorganization of profile settings

* use isExternal
2024-03-14 01:17:07 -04:00
Klara
adc89f1487 Fix spelling mistake of Changelog in About (#20044)
Fix spelling mistake
2024-03-13 15:24:11 +00:00
Jan-Philipp Benecke
7facc375bc Avoid starting config flow and show alert dialog early if single config entry only (#19648)
* Add note that integration only supports one entry on the integration page

* Set on error

* Move single instance info to the manifest and add it to the add integration dialog as well

* Get config entries only when single_instance_only set and add check to redirect

* Make single_instance_only optional

* Add missing import

* Use new manifest option name

* Fix translation key

* Rename dialog and re-add button

* Fix linting error

* Use alert dialog instead of new one

* Remove ha-alert on integration page

* Remove css change

* Apply language tweak

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Franck Nijhof <frenck@frenck.nl>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-03-13 16:20:28 +01:00
renovate[bot]
91d3fb0ea8 Update dependency date-fns-tz to v2.0.1 (#20075)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-13 10:05:27 -04:00
Yosi Levy
4ab0047dc1 RTL fixes for state info (#20056) 2024-03-13 09:17:27 +01:00
Samuel Schultze
279eeaa442 Add swing modes card feature (#19999)
feat: add swing modes card feature
2024-03-12 14:14:06 +01:00
Matt
d4d0fb2a03 Add azimuth to sun.sun dialog's more-info section (#20036) 2024-03-12 12:33:21 +01:00
Yosi Levy
d56fe8a542 Update simple-tooltip to 8.0.2 with RTL fix (remove patch) (#20039)
* Update simple-tooltip to 8.0.2 with RTL fix (remove patch)

* Remove patch
2024-03-12 00:37:39 -04:00
renovate[bot]
292701925d Update vaadinWebComponents monorepo to v24.3.8 (#20054) 2024-03-11 23:20:22 -04:00
renovate[bot]
52fc854cc3 Update dependency @babel/helper-define-polyfill-provider to v0.6.0 (#20061) 2024-03-11 23:04:42 -04:00
renovate[bot]
90ca039768 Update dependency open to v10.1.0 (#20059) 2024-03-11 23:03:28 -04:00
dependabot[bot]
9e81055070 Bump softprops/action-gh-release from 0.1.15 to 2.0.2 (#20048)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-03-11 10:57:49 +01:00
renovate[bot]
cea402ebf8 Update dependency marked to v12.0.1 (#20031) 2024-03-09 21:40:00 -05:00
renovate[bot]
6b939b95c0 Update dependency @codemirror/view to v6.25.1 (#20032) 2024-03-09 21:29:22 -05:00
renovate[bot]
b24621d1ea Update dependency typescript to v5.4.2 (#20035) 2024-03-09 21:25:49 -05:00
renovate[bot]
cc0fde2c08 Update CodeMirror (#19953)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-08 11:39:21 -05:00
renovate[bot]
3732998fb7 Update Yarn to v4.1.1 (#20020) 2024-03-08 07:48:46 -05:00
renovate[bot]
c699e265ef Update typescript-eslint monorepo to v7.1.1 (#20019) 2024-03-08 07:46:22 -05:00
renovate[bot]
98bb726f1a Update dependency magic-string to v0.30.8 (#20003) 2024-03-08 07:45:09 -05:00
renovate[bot]
c132e7ed85 Update dependency xss to v1.0.15 (#20000) 2024-03-08 07:43:35 -05:00
Bram Kragten
298cebe17f Bumped version to 20240307.0 2024-03-07 16:10:42 +01:00
Paul Bottein
d03825d200 Block moving card to a section view or a strategy view (#20016) 2024-03-07 16:10:26 +01:00
Paul Bottein
d9ab9db211 Fix width of create section button (#20015) 2024-03-07 16:10:25 +01:00
Simon Lamon
58a607561a Fix visibility save in dashboard edit (#20013)
Visibility fix
2024-03-07 16:10:25 +01:00
Simon Lamon
0ae1f11ffc Fix removal of badges after yaml dashboard change (#20012)
* Fix badges removed after yaml change

* Remove test code
2024-03-07 16:10:24 +01:00
Yosi Levy
db48c5a6a3 Sections RTL fixes (#20007) 2024-03-07 16:10:23 +01:00
Paul Bottein
effefdbff1 Add layout options to cards and improve grid and sections defaults (#20001)
* Add grid options to cards

* Fix the height of the card it's rows option is provided

* Add variable

* Adjust grid margin

* Use layout options

* Fix max width when only one column

* Update card API
2024-03-07 16:10:22 +01:00
Paul Bottein
233c969402 Block moving card to a section view or a strategy view (#20016) 2024-03-07 14:56:57 +00:00
Paul Bottein
3b885dd01f Fix width of create section button (#20015) 2024-03-07 15:47:10 +01:00
Simon Lamon
52c8554d89 Fix removal of badges after yaml dashboard change (#20012)
* Fix badges removed after yaml change

* Remove test code
2024-03-07 15:12:56 +01:00
Simon Lamon
b55baef985 Fix visibility save in dashboard edit (#20013)
Visibility fix
2024-03-07 15:12:02 +01:00
Paul Bottein
b593b15f27 Add layout options to cards and improve grid and sections defaults (#20001)
* Add grid options to cards

* Fix the height of the card it's rows option is provided

* Add variable

* Adjust grid margin

* Use layout options

* Fix max width when only one column

* Update card API
2024-03-07 10:22:26 +00:00
Yosi Levy
00669ac0c3 Sections RTL fixes (#20007) 2024-03-07 11:18:56 +01:00
Paul Bottein
33a4258c06 Set grid gap to 32px (#19990)
Set grip grap to 32px
2024-03-06 11:43:03 +01:00
Bram Kragten
d4a8fcbe03 Bumped version to 20240306.0 2024-03-06 11:38:57 +01:00
Paul Bottein
36c3b938ce Add section max width variable to section view (#19995) 2024-03-06 11:38:05 +01:00
Bram Kragten
bf2fad2a2a Patch HLS light module (#19993)
Patch hls light module
2024-03-06 11:37:20 +01:00
Paul Bottein
9cbd49b867 Add description to sections demo (#19991)
* Add description to sections demo

* Update wording
2024-03-06 11:36:03 +01:00
Paulus Schoutsen
9de59131f4 Run script in script editor open more info if fields (#19982)
* Run script in script editor open more info if fields

* Extract function
2024-03-06 11:36:02 +01:00
Paul Bottein
7f44e89829 Use shorter name for dashboard (#19980) 2024-03-06 11:36:01 +01:00
Paul Bottein
572e4457b3 Fix margin on browse media button (#19979) 2024-03-06 11:36:00 +01:00
Paul Bottein
a5bcf87c08 Add description to sections demo (#19991)
* Add description to sections demo

* Update wording
2024-03-05 23:45:16 -05:00
Paul Bottein
8ca5b7528b Add section max width variable to section view (#19995) 2024-03-05 23:55:10 +01:00
Bram Kragten
d951e68c10 Patch HLS light module (#19993)
Patch hls light module
2024-03-05 22:25:35 +01:00
Paul Bottein
32e8d2043c Set grid gap to 32px (#19990)
Set grip grap to 32px
2024-03-05 17:30:35 +01:00
Michael
bf028915ec Add clickForMoreInfo to statistics graph card (#19178)
* add clickForMoreInfo

* only show more info on graphs when mouse is used

* disable clickForMoreInfo already in more-info popup

* check if not isExternalStatistic

* Apply suggestions from code review

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-03-05 15:13:51 +01:00
renovate[bot]
b03f483e4f Update dependency eslint-config-airbnb-typescript to v18 (#19986)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-05 08:16:19 -05:00
Paul Bottein
6f6202eb69 Fix margin on browse media button (#19979) 2024-03-04 23:18:09 -05:00
Paulus Schoutsen
7ab2d1496e Run script in script editor open more info if fields (#19982)
* Run script in script editor open more info if fields

* Extract function
2024-03-04 22:23:14 +01:00
dependabot[bot]
acc229a7e1 Bump actions/cache from 4.0.0 to 4.0.1 (#19966)
Bumps [actions/cache](https://github.com/actions/cache) from 4.0.0 to 4.0.1.
- [Release notes](https://github.com/actions/cache/releases)
- [Changelog](https://github.com/actions/cache/blob/main/RELEASES.md)
- [Commits](https://github.com/actions/cache/compare/v4.0.0...v4.0.1)

---
updated-dependencies:
- dependency-name: actions/cache
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-03-04 15:01:08 -05:00
renovate[bot]
64ffa86fe3 Update dependency @octokit/plugin-retry to v7.0.3 (#19962)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-04 14:59:37 -05:00
G Johansson
8b77024fb9 Add reconfigure config entry (#19794) 2024-03-04 20:23:01 +01:00
Paul Bottein
42aa18ac16 Use shorter name for dashboard (#19980) 2024-03-04 13:07:37 -05:00
Paul Bottein
54d21666d0 Bumped version to 20240304.0 2024-03-04 17:21:05 +01:00
Paul Bottein
aac00a5e78 Change wording from add section to create section (#19978)
* Rename add section to create section

* update function name
2024-03-04 17:19:59 +01:00
Paul Bottein
63d93f2a36 Don't suggest to pick another card for sections (#19977) 2024-03-04 17:19:58 +01:00
Paul Bottein
a9f453ea36 Add sections dashboard to demo dashboard (#19976) 2024-03-04 17:19:57 +01:00
Paul Bottein
d248de92e5 Clean generated config for tile in sections (#19974)
* Do not include show_entity_picture false in tile card config

* Update src/panels/lovelace/common/generate-lovelace-config.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-03-04 17:19:56 +01:00
Paul Bottein
0ed483ba51 Do not reserve space for condition card in grid section (#19973)
* Do not reserve space for condition card in grid section

* Update src/panels/lovelace/sections/hui-grid-section.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-03-04 17:19:54 +01:00
Paul Bottein
68fbadf21b Fix masonry badges not centered (#19972) 2024-03-04 17:19:53 +01:00
Paul Bottein
ac66079d41 Fix badges not saved in view editor (#19971) 2024-03-04 17:19:52 +01:00
Paul Bottein
56c681bcf8 Make migration warning alert sticky at the top for views (#19970) 2024-03-04 17:19:51 +01:00
Paul Bottein
c5c4253760 Expose dialog to custom card helpers (#19969) 2024-03-04 17:19:50 +01:00
karwosts
84e6f2fc4f Fix a bug in energy batteryToGrid calculation (#19958) 2024-03-04 17:19:48 +01:00
karwosts
8cedaae645 Support max_devices for energy-devices-detail-graph (#19936)
* Support max_devices for energy-devices-detail-graph

* responsive ui editor
2024-03-04 17:19:47 +01:00
Jeremy Noesen
e350ba4726 Update cast launch screen colors (#19754) 2024-03-04 17:19:46 +01:00
Paul Bottein
1b7742ef7f Change wording from add section to create section (#19978)
* Rename add section to create section

* update function name
2024-03-04 16:33:31 +01:00
Paul Bottein
0c6bf701c7 Clean generated config for tile in sections (#19974)
* Do not include show_entity_picture false in tile card config

* Update src/panels/lovelace/common/generate-lovelace-config.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-03-04 14:50:40 +00:00
Jeremy Noesen
05e2e305e4 Update cast launch screen colors (#19754) 2024-03-04 15:45:54 +01:00
karwosts
5523cd6203 Fix a bug in energy batteryToGrid calculation (#19958) 2024-03-04 15:44:17 +01:00
Paul Bottein
50da4bcd37 Do not reserve space for condition card in grid section (#19973)
* Do not reserve space for condition card in grid section

* Update src/panels/lovelace/sections/hui-grid-section.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-03-04 14:31:49 +00:00
Paul Bottein
b99072d986 Use icon in area card if there is no image (#19933) 2024-03-04 15:31:07 +01:00
Paul Bottein
b9a7a7c422 Don't suggest to pick another card for sections (#19977) 2024-03-04 15:30:31 +01:00
Paul Bottein
88ccbcd883 Fix badges not saved in view editor (#19971) 2024-03-04 14:28:58 +00:00
Paul Bottein
b5bb6c6fe5 Expose dialog to custom card helpers (#19969) 2024-03-04 15:22:22 +01:00
Paul Bottein
19a3810168 Add sections dashboard to demo dashboard (#19976) 2024-03-04 15:22:04 +01:00
Paul Bottein
8ccc38eb00 Fix masonry badges not centered (#19972) 2024-03-04 15:04:45 +01:00
Paul Bottein
70146a08c1 Make migration warning alert sticky at the top for views (#19970) 2024-03-04 15:04:20 +01:00
karwosts
19d50b9c92 Support max_devices for energy-devices-detail-graph (#19936)
* Support max_devices for energy-devices-detail-graph

* responsive ui editor
2024-03-04 15:02:32 +01:00
renovate[bot]
05c1328ca7 Update dependency gulp-merge-json to v2.2.1 (#19942)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-03 17:03:18 -05:00
renovate[bot]
99c2dd9765 Update dependency @bundle-stats/plugin-webpack-filter to v4.12.0 (#19957) 2024-03-03 12:43:34 -05:00
renovate[bot]
edbe6851f7 Update dependency @types/chromecast-caf-sender to v1.0.9 (#19960) 2024-03-03 12:42:30 -05:00
renovate[bot]
a7867a9253 Update babel monorepo to v7.24.0 (#19945) 2024-03-02 21:38:07 -05:00
renovate[bot]
94e70f81ed Update dependency chart.js to v4.4.2 (#19947)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-02 15:00:33 -05:00
renovate[bot]
3d8654253a Update octokit monorepo (#19941) 2024-03-01 21:31:44 -05:00
Paul Bottein
69dbcec678 Bumped version to 20240301.0 2024-03-01 16:15:03 +01:00
Paul Bottein
de8b0ba8c5 Transform helper to warning for edit view type (#19934) 2024-03-01 16:12:49 +01:00
Paul Bottein
730cd9f983 Use max column count instead of max width for section grid (#19932) 2024-03-01 16:12:48 +01:00
Paul Bottein
67d8765624 Add badges support to sections view (#19929) 2024-03-01 16:12:47 +01:00
Paul Bottein
39bd07de73 Revert "Bumped version to 20240301.0"
This reverts commit 3202ea55d2.
2024-03-01 15:59:01 +01:00
Paul Bottein
3202ea55d2 Bumped version to 20240301.0 2024-03-01 15:41:56 +01:00
Paul Bottein
329a8c0c90 Transform helper to warning for edit view type (#19934) 2024-03-01 09:31:25 -05:00
Paul Bottein
c05824c641 Revert "Transform helper to warning for edit view type"
This reverts commit 3abdffda9c.
2024-03-01 14:57:08 +01:00
Paul Bottein
3abdffda9c Transform helper to warning for edit view type 2024-03-01 14:55:34 +01:00
Paul Bottein
67da851efc Use max column count instead of max width for section grid (#19932) 2024-03-01 13:09:21 +01:00
Paul Bottein
5463a27255 Add badges support to sections view (#19929) 2024-03-01 13:09:10 +01:00
renovate[bot]
ec0434c9b0 Update dependency hls.js to v1.5.7 (#19927)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-03-01 11:58:00 +01:00
renovate[bot]
7d8cb5c863 Update typescript-eslint monorepo to v7.1.0 (#19922) 2024-02-29 18:32:16 -05:00
Bram Kragten
4f01348ffb Improve error display in automation/script traces (#19920) 2024-02-29 13:09:02 -05:00
Bram Kragten
ca7e257e95 Bumped version to 20240228.1 2024-02-29 16:44:43 +01:00
Paul Bottein
a34332b48d Fix section editing after disconnect/reconnect (#19917)
* Fix section editing after disconnect/reconnect

* Update src/components/ha-sortable.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-02-29 16:44:11 +01:00
Paul Bottein
962912c43c Add allow changing type of empty views (#19912) 2024-02-29 16:44:10 +01:00
Paul Bottein
2af3400464 Fix section editing after disconnect/reconnect (#19917)
* Fix section editing after disconnect/reconnect

* Update src/components/ha-sortable.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-02-29 14:12:19 +00:00
renovate[bot]
b6e220a4c5 Update vaadinWebComponents monorepo to v24.3.7 (#19919)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-29 13:54:55 +01:00
renovate[bot]
d5d45f100e Update dependency open to v10.0.4 (#19918)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-29 13:54:22 +01:00
renovate[bot]
6b9ca60c47 Update octokit monorepo to v7 (major) (#19914)
Update octokit monorepo to v7

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-29 13:54:02 +01:00
Simon Lamon
bc445a1e27 Lokalize automation trace area (#19836)
* Translate automation trace timeline area

* Fix undefined changed_variables

* change naming options in triggered_by

* Split messages for stopped_by

* remove stopped message
2024-02-29 13:51:18 +01:00
dependabot[bot]
a087b4c43e Bump ip from 1.1.8 to 1.1.9 (#19915) 2024-02-29 01:20:20 -05:00
Paul Bottein
8f67ddf968 Add allow changing type of empty views (#19912) 2024-02-28 21:51:21 +01:00
Simon Lamon
9ef07484dd Replace paper-toast with mwc-snackbar (#19579)
* toast

* Fixes

* Linting

* Remove empty styles

* PR feedback

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-02-28 21:50:58 +01:00
Bram Kragten
7475cb56a1 20240228.0 (#19908) 2024-02-28 17:07:48 +01:00
Paulus Schoutsen
5287061699 Update script more info (#19899)
* Update script more info

* Fixes

* Update styling

* remarks

* Always show cancel button

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-02-28 17:07:26 +01:00
Bram Kragten
3ef1110109 Bumped version to 20240228.0 2024-02-28 16:51:50 +01:00
Bram Kragten
2efe2589d2 Merge branch 'rc' into dev 2024-02-28 16:50:23 +01:00
Bram Kragten
4fb596357d Add advanced options block to cloud remote connection (#19907)
* Add advanced options block to cloud remote connection

* Review
2024-02-28 16:28:51 +01:00
karwosts
dd98ec771d Infer a limited history chart from state object (#19176)
* Infer a limited history chart from state object

* bugfix

* bugfix

* minor fixes from feedback
2024-02-28 15:20:56 +00:00
Paul Bottein
94f74308d8 Escape special characters of automation ID in URL (#19790)
* Escape special character of automation ID in URL

* Use encodeURIComponent
2024-02-28 13:29:00 +00:00
renovate[bot]
b982884933 Pin dependencies (#19905)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-28 08:26:26 -05:00
renovate[bot]
c47c6e358b Update dependency color-name to v2 (#19906)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-28 13:05:53 +00:00
Charles Baynham
46394d0bf9 Always show "create new zone from current location" option (#19649) 2024-02-28 13:56:30 +01:00
karwosts
4dc154201a Support color names in energy themes (#19597)
* Support color names in energy themes

* fix yarn
2024-02-28 13:55:11 +01:00
Simon Lamon
ebdbab81d3 Mobile view calendar improvements (#19218)
* Mobile view calendar improvements

* Remove very narrow

* Revert default choice
2024-02-28 13:51:59 +01:00
Paul Bottein
155098bc41 Center section in section view (#19904) 2024-02-28 13:30:10 +01:00
karwosts
291638a9dd Deduplicate blueprint editor code (#19791)
* Deduplicate blueprint editor code

* prune unneeded imports
2024-02-28 13:08:31 +01:00
karwosts
763c672e36 Automated outlier detection for adjust sum dialog (#18723) 2024-02-28 12:54:44 +01:00
Paul Bottein
c945534640 Disable the ability to change the view type to sections and the other way around (#19902)
* Disable the ability to change the view type to sections and the other way around

* Update src/translations/en.json

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update src/translations/en.json

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update src/translations/en.json

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-02-28 12:35:32 +01:00
Marcel van der Veldt
5b3074d939 Replace button to manually add a Thread border router with more info button (#19903)
Replace button to manually add a border router with more info button
2024-02-28 11:33:21 +00:00
Marko Dimjašević
3b89b72568 Automation editor: clarify multiple triggers logic (#19647)
* Automation editor: clarify multiple triggers logic

* Implement PR feedback

* Update src/translations/en.json

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-02-28 11:29:18 +00:00
Cody C
1d9fa1522c Fix MFA module name not showing on step completion (#19581)
* Fix MFA module name not showing on step completion

Fixes #18918

* Update src/panels/profile/dialog-ha-mfa-module-setup-flow.ts

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-02-28 11:07:38 +00:00
renovate[bot]
4db743db00 Update dependency webpack-dev-server to v5 (#19807)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-28 12:07:27 +01:00
Cody C
d5f8231f97 Update dashboard resources title to reflect translations (#19641)
* Update dashboard resources title to reflect translations

* Update dashboard resources title to reflect translations
2024-02-28 11:57:12 +01:00
Simon Lamon
32c403d069 Replace more paper-items (#19707)
Remove leftover paper items
2024-02-28 11:52:45 +01:00
renovate[bot]
220da51606 Update dependency @material/web to v1.3.0 (#19877)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-28 11:47:54 +01:00
Paulus Schoutsen
9ae234a02f Mark paste button list item as interactive (#19898)
* Mark paste button list item as interactive

* Update add-automation-element-dialog.ts

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-02-28 10:46:27 +00:00
Jim
401bbed67b Improve service filtering (#19811)
* Improve service filtering

Split filter term by space and match if each word is individually present

* Prettier formatting

* Fix un-necessary toLowerCase() call

Co-authored-by: karwosts <32912880+karwosts@users.noreply.github.com>

* Combine filter check conditions into the same loop

* Prettier formatting

---------

Co-authored-by: karwosts <32912880+karwosts@users.noreply.github.com>
2024-02-28 11:42:19 +01:00
Marcel van der Veldt
83190c21db Clear Matter ping result when closing the dialog (#19901) 2024-02-28 10:42:07 +00:00
karwosts
ccdd906e2f Restore alphabetical sorting to Areas (#19897) 2024-02-28 11:37:02 +01:00
Paul Bottein
f4c932ef9c Automatically add section to empty section view and improve delete wording (#19892)
* Automatically add section to empty section view and improve delete wording

* Update delete dialog

* Update delete dialog
2024-02-28 11:35:19 +01:00
Yosi Levy
0892ed18e5 RTL fixes (#19834)
* RTL fixes

* Additional update

* Fixed comments
2024-02-28 11:26:18 +01:00
Joakim Sørensen
3afc218adc Combine component/components PageNavigation keys (#19890)
* Combine component/components PageNavigation keys

* Update src/panels/config/ha-panel-config.ts
2024-02-28 11:25:41 +01:00
Erik Montnemery
841b9c0917 Add support for translation domain in data entry flows (#19900) 2024-02-28 11:12:19 +01:00
karwosts
a479c6e786 Download energy panel data to CSV (#19863)
* Download energy panel data to CSV

* table format changes

* unique types for cost/compensation
2024-02-27 23:02:39 -05:00
Paulus Schoutsen
babb723521 Fix script data (#19894) 2024-02-27 22:05:27 +01:00
Joakim Sørensen
29954e530e Hide the core backup integration if hassio is loaded (#19833)
* Hide the core backup integration if hassio is loaded

* Combine to single entry
2024-02-27 14:36:16 +00:00
karwosts
fb3c94f403 Improve map/zone navigation (#19740)
* Improve map/zone navigation

* dont remove tabs
2024-02-27 15:24:42 +01:00
karwosts
dd8c1d359c localize input_select form (#19829) 2024-02-27 15:22:34 +01:00
Steve Repsher
45e09a262b Fix issues with state_color as false (#19776)
* Fix issues with state_color as false

* Remove format from glance timestamp

* Restore type assertion hack and remove conditional

* Revert "removal of glance timestamp format and adjust types to make it work

* Revert to minimal change just to pass false state_color
2024-02-27 15:20:13 +01:00
Paulus Schoutsen
d6d61a4137 Show script fields in Script more info dialog (#19879)
* Show script fields in more info dialog

* Apply suggestions from code review

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Guard for state obj changes

* Update src/components/ha-service-control.ts

Co-authored-by: Marc Geurts <geurtsmarc@hotmail.com>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
Co-authored-by: Marc Geurts <geurtsmarc@hotmail.com>
2024-02-27 15:05:28 +01:00
dependabot[bot]
8fe7711634 Bump es5-ext from 0.10.62 to 0.10.63 (#19883)
Bumps [es5-ext](https://github.com/medikoo/es5-ext) from 0.10.62 to 0.10.63.
- [Release notes](https://github.com/medikoo/es5-ext/releases)
- [Changelog](https://github.com/medikoo/es5-ext/blob/main/CHANGELOG.md)
- [Commits](https://github.com/medikoo/es5-ext/compare/v0.10.62...v0.10.63)

---
updated-dependencies:
- dependency-name: es5-ext
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-02-27 08:05:46 -05:00
James Woglom
a5ec7fc251 Resolve iframe CORS errors - Fix #19724 (#19884)
* Resolve iframe CORS errors - Fix #19724

* add newline
2024-02-27 12:17:29 +00:00
Paul Bottein
b9935717dc Focus cancel button on destructive confirmation dialog (#19889) 2024-02-27 12:51:35 +01:00
Paul Bottein
bb25817bae Reduce drag and drop delay on touch (#19888) 2024-02-27 12:50:59 +01:00
Paul Bottein
bf8a33e086 Fix button card and sensor card in grid section (#19887) 2024-02-27 12:50:37 +01:00
renovate[bot]
bf56f50e0a Update dependency gulp-json-transform to v0.5.0 (#19885)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-27 11:26:11 +01:00
renovate[bot]
3a8e2c429f Update dependency eslint to v8.57.0 (#19882) 2024-02-26 18:38:40 -05:00
chammp
e8fca5d93c Directly prompt for lock code in dashboards (#19835)
Prompt for lock codes in more places
2024-02-26 15:21:02 +01:00
Yosi Levy
a39cf99024 RTL updates (#19848)
* RTL updates

* Additional fixes

* TODO fix
2024-02-26 15:14:32 +01:00
renovate[bot]
0ff27154e6 Update fullcalendar monorepo to v6.1.11 (#19865)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-23 14:32:13 -05:00
renovate[bot]
766fd4cbf5 Update dependency webpack to v5.90.3 (#19858)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-22 15:19:44 -05:00
renovate[bot]
1869260868 Update CodeMirror (#19857)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-22 15:17:02 -05:00
renovate[bot]
93046d78f6 Update dependency webpackbar to v6.0.1 (#19859)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-22 15:15:30 -05:00
renovate[bot]
3e51f9a505 Update typescript-eslint monorepo to v7.0.2 (#19862)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-22 15:14:06 -05:00
Paul Bottein
d95bf64edf Add experimental sections view (#19846) 2024-02-22 20:51:48 +01:00
karwosts
47f7cf5419 Add devices to energy collection (#19849)
* Include individual devices in energy collection

* async cleanup, fix includeTypes filter
2024-02-22 16:23:06 +01:00
Paul Bottein
267fc3743d Fix device class icon not showing in entities config page (#19854) 2024-02-22 10:42:37 +01:00
karwosts
a6d73f7615 Allow unhiding entity hidden by integration (#19753) 2024-02-22 10:42:15 +01:00
dependabot[bot]
b360c854a8 Bump ip from 1.1.8 to 1.1.9 (#19855) 2024-02-21 20:28:37 -05:00
renovate[bot]
a088b20987 Update dependency hls.js to v1.5.6 (#19843)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-21 17:43:38 -05:00
renovate[bot]
af6dd545dc Update dependency @bundle-stats/plugin-webpack-filter to v4.10.1 (#19844)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-21 21:59:27 +00:00
karwosts
a26df88022 More accurate cardSize for Tile card (#19853)
More accurate cardSize for tile card
2024-02-21 22:08:30 +01:00
renovate[bot]
86ec272581 Update dependency @types/sortablejs to v1.15.8 (#19839)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-20 14:39:33 +01:00
karwosts
2a803e09a4 Detail view for energy devices graph (#19068)
* Detail view for energy devices graph

* Use getCommonOptions

* Remove visibility toggle on horizontal bar chart

* make a new card

* unneeded translations

* graph titles

* Update src/translations/en.json

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-02-20 14:14:04 +01:00
renovate[bot]
50cf6d2af9 Lock file maintenance (#19832)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-19 12:34:52 -05:00
karwosts
86626b1855 Localize Long Lived Token Dialog (#19830) 2024-02-19 10:06:33 +01:00
renovate[bot]
63603a281e Update dependency webpack to v5.90.2 (#19828)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-18 16:01:25 -05:00
renovate[bot]
faf05f5339 Update dependency @bundle-stats/plugin-webpack-filter to v4.10.0 (#19825)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-18 00:42:48 -05:00
Paul Bottein
4de3db52cb Remove cancel button on edit view dialog (#19821) 2024-02-17 20:33:50 -05:00
renovate[bot]
9a9fbda08b Update dependency core-js to v3.36.0 (#19822)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-17 13:09:59 -05:00
renovate[bot]
ea642515c1 Update dependency husky to v9.0.11 (#19818)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-17 13:06:30 -05:00
renovate[bot]
add2dedc7f Update dependency hls.js to v1.5.5 (#19817) 2024-02-16 20:30:51 -05:00
Simon Lamon
4ba4a28aa0 Bring back backend translations in devcontainer (#19793)
* Bring back translations

* Apply feedback

Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>

---------

Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2024-02-16 12:41:53 -05:00
Bram Kragten
7050453783 Check active matter fabric by index (#19692)
Check active fabric by id
2024-02-16 17:13:43 +01:00
renovate[bot]
8f984517bb Update typescript-eslint monorepo to v7 (major) (#19810)
Update typescript-eslint monorepo to v7

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-16 10:05:05 -05:00
karwosts
2524c96db6 Localize system log detail (#19813) 2024-02-16 16:03:35 +01:00
karwosts
26600e3d78 Compact legend mode for statistics-graph-card (#19089)
* Compact legend mode for statistics-graph-card

* remove clearable from selector

* Remove legend_mode, make compact default
2024-02-16 16:02:42 +01:00
renovate[bot]
316756d06a Update dependency eslint-plugin-unused-imports to v3.1.0 (#19814)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-16 10:00:56 -05:00
Tucker Kern
7357b914d0 Add fan preset modes feature to Tile cards (#19618)
* Add support for fan preset modes in Tile cards.

Convert climate-preset-mode-card-feature to a more generic preset-modes-card-feature that supports fan entitys.

* Split fan and climate preset modes features

* Restore climate-preset-modes as an editable feature
2024-02-16 15:04:16 +01:00
karwosts
8548c9767b Localize assist pipeline debug (#19812)
localize assist pipeline debug
2024-02-16 10:47:24 +01:00
renovate[bot]
a30a35f82f Update dependency chai to v5.1.0 (#19809) 2024-02-15 19:26:46 -05:00
karwosts
84938ccc94 stopPropagation on automation moveUp/moveDown (#19804)
* stopPropagation on automation moveUp/moveDown

* also conditions and triggers
2024-02-15 10:04:40 +01:00
Bram Kragten
8136cc8008 Cloud: allow remote enable (#19691)
* Cloud: allow remote enable

* core does this
2024-02-14 15:05:18 +01:00
PolishKrowa
2dc9d268ec Allowed ObjectSelector to work in forms (#19761) 2024-02-14 09:16:24 +00:00
Steve Repsher
226dad309c Install libpcap for core in devcontainers (#19787) 2024-02-14 10:08:14 +01:00
Paul Bottein
33cdd51f00 Improve lovelace card events (#19785) 2024-02-14 10:07:50 +01:00
karwosts
a3a099126e Fix to display correct weather attribute unit (#19750) 2024-02-14 10:03:04 +01:00
Jeremy Noesen
4e22fea6e2 Fix status text centering for cast launch screen (#19748) 2024-02-14 09:57:39 +01:00
Yosi Levy
fd06f28253 Patch simple tooltip for RTL (#19767) 2024-02-14 09:57:10 +01:00
Paulus Schoutsen
553230ca23 Change how external QR code scanning works (#19743) 2024-02-14 09:56:02 +01:00
karwosts
208bfebc12 Fix chart alignments (#19788) 2024-02-13 09:24:02 +01:00
Jan Čermák
802b0949ac Fix My redirect for supervisor_logs (#19780)
My link for supervisor_logs redirected to common logs after the removal
of Supervisor panel. Leverage provider param added in #19355 to show
Supervisor logs directly.
2024-02-13 09:23:04 +01:00
Yosi Levy
b65dc47f72 Drawer fix (#19789) 2024-02-13 09:22:19 +01:00
renovate[bot]
c5a3670838 Update dependency prettier to v3.2.5 (#19711)
* Update dependency prettier to v3.2.5

* Reformat

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2024-02-12 22:53:41 +00:00
renovate[bot]
cd167ac645 Update dependency @codemirror/view to v6.24.0 (#19781)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-12 13:12:23 -05:00
dependabot[bot]
eb3e756637 Bump actions/setup-node from 4.0.1 to 4.0.2 (#19777) 2024-02-12 08:23:29 +01:00
dependabot[bot]
5049210524 Bump actions/upload-artifact from 4.3.0 to 4.3.1 (#19778) 2024-02-12 07:51:26 +01:00
renovate[bot]
eeaad86c4b Update vaadinWebComponents monorepo to v24.3.6 (#19771) 2024-02-11 22:25:11 -05:00
renovate[bot]
71483e0bc7 Update dependency mocha to v10.3.0 (#19772) 2024-02-11 22:23:51 -05:00
renovate[bot]
10650e8937 Update dependency marked to v12 (#19706)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-10 18:19:33 -05:00
renovate[bot]
99d72ba817 Update dependency hls.js to v1.5.4 (#19757)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-10 17:58:45 -05:00
renovate[bot]
e21ad742b1 Update dependency @codemirror/search to v6.5.6 (#19762)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-10 17:56:50 -05:00
renovate[bot]
1bcb1e7768 Update dependency magic-string to v0.30.7 (#19744)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-08 15:28:26 -05:00
renovate[bot]
618fee98ce Update typescript-eslint monorepo to v6.21.0 (#19747)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-08 15:27:25 -05:00
renovate[bot]
83da89437f Update dependency lint-staged to v15.2.2 (#19737)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-08 20:19:53 +01:00
Bram Kragten
35ebfc15c9 Merge branch 'rc' 2024-02-08 18:32:06 +01:00
Bram Kragten
f0a9185e4a handle undefined and null in cast 2024-02-08 18:31:23 +01:00
Bram Kragten
b3766cbc62 Merge branch 'rc' 2024-02-08 18:09:07 +01:00
Bram Kragten
fac82fa185 Revert "Bumped version to 20240208.0"
This reverts commit 17bd7f9476.
2024-02-08 18:08:35 +01:00
Bram Kragten
3469013f1a Bumped version to 20240207.1 2024-02-08 18:07:15 +01:00
Bram Kragten
03486e4125 cast allow empty view, pick first (#19739) 2024-02-08 18:06:57 +01:00
Bram Kragten
20560fb847 Fix cast launch screen (#19738) 2024-02-08 18:06:37 +01:00
Bram Kragten
bad18da658 Fix icons in gallery, demo and cast (#19732)
* Fix icons in gallery and demo

* Add to lovelace gallery

* Update icons.ts

* add BACKWARDS_COMPAT support for icons

* Update entity-state.ts

* Update icons.ts

* Update icons.ts
2024-02-08 18:06:27 +01:00
Paul Bottein
e26c7c491a Fix demo dashboard (#19734) 2024-02-08 18:06:11 +01:00
Paul Bottein
b0c8ae0c94 Fix suggest card dialog (#19735) 2024-02-08 18:05:55 +01:00
Bram Kragten
cc1658cbab Add service icons to traces (again :D) (#19728)
* Add service icons to traces (again :D)

* Update hat-graph-node.ts
2024-02-08 18:05:41 +01:00
Paul Bottein
4b768f0635 Use rgb theme variables for qrcode (#19726) 2024-02-08 18:05:27 +01:00
Paul Bottein
989057d947 Show icon of disabled entities (#19717) 2024-02-08 18:05:16 +01:00
Bram Kragten
6671d24fa6 Improve matter ping dialog (#19715) 2024-02-08 18:05:05 +01:00
Bram Kragten
297c721229 Matter cleanup on close dialog (#19714) 2024-02-08 18:04:51 +01:00
Bram Kragten
17bd7f9476 Bumped version to 20240208.0 2024-02-08 17:45:37 +01:00
Bram Kragten
045ff7a45e cast allow empty view, pick first (#19739) 2024-02-08 17:43:50 +01:00
Bram Kragten
8624853ec4 Fix cast launch screen (#19738) 2024-02-08 17:40:43 +01:00
Bram Kragten
336376d2a5 Fix icons in gallery, demo and cast (#19732)
* Fix icons in gallery and demo

* Add to lovelace gallery

* Update icons.ts

* add BACKWARDS_COMPAT support for icons

* Update entity-state.ts

* Update icons.ts

* Update icons.ts
2024-02-08 17:04:05 +01:00
Paul Bottein
189793bff4 Fix demo dashboard (#19734) 2024-02-08 15:40:03 +01:00
Paul Bottein
1e35f973d6 Fix suggest card dialog (#19735) 2024-02-08 15:38:55 +01:00
Bram Kragten
6033f8b31a Add QR and constant selector to gallery (#19730)
* Add QR and constant selector to gallery

* Update ha-selector.ts
2024-02-08 14:38:08 +01:00
Bram Kragten
c3b2ebf380 Don't use ES5 build for dev server (#19731) 2024-02-08 14:33:34 +01:00
Bram Kragten
23cbecb2c4 Add service icons to traces (again :D) (#19728)
* Add service icons to traces (again :D)

* Update hat-graph-node.ts
2024-02-08 13:33:10 +01:00
Paul Bottein
b1e1b44c75 Use rgb theme variables for qrcode (#19726) 2024-02-08 12:04:23 +01:00
Paul Bottein
abb014745a Show icon of disabled entities (#19717) 2024-02-07 19:42:39 +01:00
Bram Kragten
e51c98e1a7 Improve matter ping dialog (#19715) 2024-02-07 15:52:04 +01:00
Paul Bottein
9513699332 Use gap instead of margin for vertical and horizontal card (#19699) 2024-02-07 15:51:01 +01:00
Bram Kragten
b57bc8cd06 Matter cleanup on close dialog (#19714) 2024-02-07 14:24:14 +00:00
Bram Kragten
70c502bb45 Merge branch 'rc' 2024-02-07 11:22:12 +01:00
Bram Kragten
add0b55657 Merge branch 'dev' into rc 2024-02-07 11:21:56 +01:00
Bram Kragten
d61fc9ec6c Bumped version to 20240207.0 2024-02-07 11:21:33 +01:00
Paul Bottein
d1592bf262 Fix ha-state-badge name in picture element card (#19703)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-02-07 10:15:10 +01:00
karwosts
3c744c09f1 Fix plant battery level icon (#19704)
* Fix plant battery level icon

* cleanup

* cleanup
2024-02-06 15:42:23 +01:00
Cody C
3ef61aaf02 Move cloud login forgot password link into card actions area (#19642)
* Move cloud login forgot password link into card actions area

Aligns login forgot password link styling with create resend confirmation styling.

* Amend cloud-login buttons / links to show on single line
2024-02-06 15:30:55 +01:00
Paul Bottein
c738127c09 Fix horizontal stack margin (#19700) 2024-02-06 11:36:22 +01:00
Paulus Schoutsen
6e62f568fc Include climate attributes in history download (#19667)
* Include climate attributes in history download

* Add attributes for water heater and humidifier

* Simplify typing
2024-02-06 10:36:47 +01:00
Bram Kragten
2ba3a991a9 Improve matter share device dialog (#19693)
* Improve matter share device dialog

* Add border

* Update dialog-matter-open-commissioning-window.ts
2024-02-05 18:15:10 +01:00
Bram Kragten
50e559487d Merge branch 'rc' 2024-02-05 14:45:51 +01:00
Bram Kragten
4cd02c81bb Merge branch 'dev' into rc 2024-02-05 14:45:33 +01:00
Bram Kragten
55c6d3a7c4 Bumped version to 20240205.0 2024-02-05 14:45:17 +01:00
renovate[bot]
242f3813bc Update vaadinWebComponents monorepo to v24.3.5 (#19684)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-05 13:32:18 +00:00
renovate[bot]
aa93cb17a7 Update dependency @lit-labs/motion to v1.0.7 (#19650)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-05 13:30:44 +00:00
renovate[bot]
4692d885d1 Update dependency @codemirror/language to v6.10.1 (#19688)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-05 13:30:21 +00:00
Cody C
b39ac984f9 Fix last input margins in supervisor-network.ts (#19659)
* Fix last input margins in supervisor-network.ts

Resolves #19658

* Update src/panels/config/network/supervisor-network.ts

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-02-05 13:28:01 +00:00
renovate[bot]
9894d83e22 Update Yarn to v4.1.0 (#19634)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-05 14:12:49 +01:00
Cody C
113083a241 Avoid unnecessary redirect on empty state card page (#19643)
Avoid unnecessary redirect on hui-empty-state-card page
2024-02-05 13:53:52 +01:00
Cody C
32971cc875 Remove flag that sets icon as required when creating a new dashboard (#19640)
Less friction to create a new dashboard. Moreover, an icon isn't actually required in order to create the dashboard anyway. See https://github.com/home-assistant/frontend/issues/19639
2024-02-05 13:41:37 +01:00
Bram Kragten
137f59feb1 Remove comments from css (#19689)
remove comments from css
2024-02-05 13:39:47 +01:00
Paulus Schoutsen
6675121b85 Allow deselecting all values (#19677) 2024-02-05 12:48:18 +01:00
Paul Bottein
aed0a35c9c Fix button card color when off (#19685) 2024-02-05 12:47:23 +01:00
Paul Bottein
65a8518d99 Increase drop zone for automation editor (#19687) 2024-02-05 12:35:34 +01:00
dependabot[bot]
cb690e9d4e Bump release-drafter/release-drafter from 5 to 6 (#19683)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Co-authored-by: Franck Nijhof <git@frenck.dev>
2024-02-05 08:59:50 +01:00
renovate[bot]
5da67de95f Update dependency magic-string to v0.30.6 (#19651)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-04 21:04:01 +01:00
renovate[bot]
b9609f2154 Update dependency husky to v9.0.10 (#19674)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-04 21:01:29 +01:00
renovate[bot]
aaabb6e1fb Update dependency webpack to v5.90.1 (#19675)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-04 20:35:46 +01:00
renovate[bot]
6561de34f0 Update dependency husky to v9.0.9 (#19672)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-04 16:36:32 +01:00
Cody C
016ff74483 Fix grammar of Storage area messages (#19644) 2024-02-03 14:14:01 +01:00
renovate[bot]
f5e9839b42 Update dependency lint-staged to v15.2.1 (#19646)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-03 14:12:04 +01:00
Bram Kragten
d044f4d34e 20240202.0Merge branch 'rc' 2024-02-02 16:29:21 +01:00
Bram Kragten
696717dd90 20240202.0Merge branch 'dev' into rc 2024-02-02 16:28:34 +01:00
Bram Kragten
eb3b168975 Bumped version to 20240202.0 2024-02-02 16:28:10 +01:00
Bram Kragten
aa400ce6ab Reload entity component icons when missing (#19629)
* Reload entity component icons when missing

* Improve typing, improve caching

* Make copy

* review suggestion

* overload

* Update icons.ts

* Update icons.ts
2024-02-02 16:26:47 +01:00
Paulus Schoutsen
682f9a0f04 Clean up the overlapping history in the CSV download (#19622)
* Clean up the overlapping history in the CSV download

* Speed up merge

* undefined unit

* Fix targetPickerValue handling
2024-02-02 16:06:29 +01:00
Paulus Schoutsen
e478038206 Remove refresh button from history panel (#19631) 2024-02-02 15:21:29 +01:00
Paul Bottein
259a9a4f58 Fix assist devices search bar color (#19627) 2024-02-02 12:12:43 +01:00
Bram Kragten
b08d1ae7e9 Update button focus style to match tile focus style (#19608) 2024-02-02 12:02:54 +01:00
renovate[bot]
3970fdd070 Update dependency hls.js to v1.5.3 (#19619)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-02 11:46:33 +01:00
renovate[bot]
946445b2df Update dependency eslint-plugin-lit-a11y to v4.1.2 (#19626)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-02 11:45:09 +01:00
renovate[bot]
17b090af58 Update typescript-eslint monorepo to v6.20.0 (#19613)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-02 11:44:43 +01:00
karwosts
6690a0e4b1 Add names to map path tooltip (#19565)
* Add names to map path tooltip

* Apply suggestions from code review

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* prettier

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-02-02 11:40:31 +01:00
Paul Bottein
c291448ffa Improve automation drag and drop interaction (#19624) 2024-02-02 11:31:01 +01:00
renovate[bot]
6f831699be Update dependency husky to v9.0.7 (#19612)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-02-02 09:37:14 +01:00
Bram Kragten
fb73bfb964 Only show more info on graphs when mouse is used (#19606)
only show more info on graphs when mouse is used
2024-02-01 17:57:08 +01:00
Bram Kragten
28a0d216f9 Fix race in lovelace (#19609) 2024-02-01 17:56:46 +01:00
Bram Kragten
69f2566526 Matter tweaks (#19607) 2024-02-01 17:56:37 +01:00
Yosi Levy
7b3797502a RTL simplification and updates (#19586)
* RTL simplification and updates

* Fixes

* Fix weird icon offset when mwc-list-item is in a concat html``

* Additional updates
2024-02-01 14:29:00 +01:00
Paul Bottein
cf960be07e Fix item path for default in choose automation action (#19602) 2024-02-01 14:05:01 +01:00
Paulus Schoutsen
8a410d6c82 Add error checking to download button (#19596)
Clean up history panel + add better error checking
2024-02-01 09:25:52 +01:00
Bram Kragten
22c3132638 20240131.0 (#19595) 2024-01-31 19:02:00 +01:00
Bram Kragten
ce32de6e23 20240131.0 (#19594) 2024-01-31 19:00:50 +01:00
Bram Kragten
b6bc88e460 Merge branch 'dev' of https://github.com/home-assistant/frontend into dev 2024-01-31 18:55:23 +01:00
Bram Kragten
6e00806f1a Update state-control-circular-slider-style.ts 2024-01-31 18:54:56 +01:00
Bram Kragten
d9fa148c49 Merge branch 'master' into dev 2024-01-31 18:52:58 +01:00
Bram Kragten
939b3a8092 Update button card styles (#19591) 2024-01-31 18:48:58 +01:00
Bram Kragten
95920ba710 Default to error correction Q when there is a center image (#19593)
default to error correction Q when there is a center image
2024-01-31 18:48:45 +01:00
Bram Kragten
462ac79890 Bumped version to 20240131.0 2024-01-31 18:35:09 +01:00
Paul Bottein
601a165b2a Disable reorder for readonly automation and disabled block (#19592) 2024-01-31 17:48:22 +01:00
Bram Kragten
62bb9b1a87 Add QR code selector (#19588) 2024-01-31 16:31:54 +01:00
Paul Bottein
b60ba35a9f Don't allow dragging parent into child element in automation editor (#19589) 2024-01-31 16:28:20 +01:00
Bram Kragten
c97c3f2fc4 Fix disabled users picker (#19590)
fix disabled users picker
2024-01-31 15:26:37 +00:00
Bram Kragten
ed888200f9 Add support for re-auth flows in repairs (#19587) 2024-01-31 15:06:01 +01:00
Bram Kragten
f4859320eb Add icon to areas (#19585)
* Add icon to areas

* Fix gallery

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-01-31 13:18:43 +00:00
Marcel van der Veldt
b159f4c074 Add matter device info and actions (#19578)
* add matter device info panel (WIP)

* actually enable card on device page

* fix remove fabric

* add some translation labels

* add dialog to interview node

* do not show info for bridged devices

* first device action

* add ping node action and dialog

* ping should be always available

* update model for MatterCommissioningParameters

* add basic support for open commissioning window

* move fabric management to dialog

* review

* Add link to thread panel

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-01-31 14:16:21 +01:00
Cody C
b700e08d52 Simplify MFA onboarding styling & flow (#19584)
Align MFA onboarding flow

* Aligns QR Code to centre to make scanning on mobile easier
* Removes background from manual key text
* Re-adds spacing to bottom of form so it is not hard up against the code entry form
2024-01-31 10:51:07 +01:00
karwosts
c1bdd679ff Promote edit dashboard button out of overflow menu (#19345) 2024-01-31 10:45:10 +01:00
Paulus Schoutsen
b728b9efc4 Allow mobile apps to provide QR code functionality (#19570)
* Add QR code scanner to external bus

* Make `hasQRScanner` a version number
2024-01-31 10:44:21 +01:00
David F. Mulcahey
8acae63939 Update ZHA reconfigure device dialog to show accurate cluster configuration statuses (#19527) 2024-01-31 09:50:55 +01:00
Bram Kragten
374f5ee1be Update thread preferred router (#19580) 2024-01-31 00:58:03 +01:00
karwosts
528533a2dd Combine climate graph with temperature device_classes (#19485) 2024-01-31 00:33:28 +01:00
Maxim A
2b18db8525 Add Y axis limits options for historical charts (#19297)
* Add Y axis limit options for historical charts

* Fir formatting according to linter

* Revert statistic graph changes

* Cleanup local tests leftover

* Show fit Y fit option only if limits are set
2024-01-31 00:18:14 +01:00
Joni Käki-Mäkelä
6cd8ee9253 Disable pointer-events for tile-card .icon-container class that don't have a "button" role (#19497)
Set pointer-events to none for icon containers that don't have button role
2024-01-31 00:15:41 +01:00
karwosts
e45709fffc Fix map icon color (#19567)
* Fix map icon color

* different solution

* updates from code review
2024-01-30 23:57:35 +01:00
Simon Lamon
28c21b1041 Localize trigger state in automation editor (#19554)
* trigger state

* Lokalize

* don't change existing trigger

* space

* Fixes
2024-01-30 23:36:39 +01:00
G Johansson
0919f0e89e Add new TURN_ON and TURN_OFF Climate feature flags (#19523) 2024-01-30 15:11:08 +01:00
Paul Bottein
64fc58ddd2 Always allow reorder for triggers, conditions, actions and options (#19574)
* Move up and down action to overflow menu

* Always enable reorder mode on desktop

* Use media query helper
2024-01-30 15:06:02 +01:00
Joakim Plate
568e9ebc38 Add volume flow rate (#19344) 2024-01-30 15:03:39 +01:00
renovate[bot]
33888beb63 Update dependency marked to v11.2.0 (#19572)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-30 14:55:16 +01:00
renovate[bot]
0bc6f9152a Update dependency webpack to v5.90.0 (#19541)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-30 14:54:45 +01:00
renovate[bot]
17fd0de102 Update dependency @lrnwebcomponents/simple-tooltip to v8 (#19138)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-30 14:52:45 +01:00
Simon Lamon
f98e66a409 Allow description placeholders in all repair flow title options (#19553)
Add description placeholders
2024-01-30 14:50:15 +01:00
Paul Bottein
314499005d Clean domain icons (#19533)
* Use state icon inside alarm control panel card

* Add domain icon component and clean old files

* Clean code

* Migrate area card

* Remove some icon rules

* Update ha-bar-media-player.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Update ha-domain-icon.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-01-30 14:49:39 +01:00
renovate[bot]
6dcc70f6fc Update dependency husky to v9 (#19550)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-30 14:30:09 +01:00
Yosi Levy
5e40bb55eb RTL fixes (#19563) 2024-01-30 14:27:40 +01:00
Cody C
476457fe2e Clarify wording of Thread network messaging (#19564)
* Removes ambiguity of many "may" statements, which are virtually certainly.
* Fix some typos / grammatical errors
2024-01-30 14:24:58 +01:00
karwosts
4c314928c6 Bigger touch target for mobile map history trace (#19569) 2024-01-30 14:21:10 +01:00
Bram Kragten
73460c7d8a Fix more info remote (#19575) 2024-01-30 13:51:12 +01:00
Cody C
767b2b6b9c Add documentation link to ZHA pairing mode page (#19518)
Add pairing instructions docs link to ZHA Add Devices page

While we ask people to refer to the instructions of their device, they may need some further support to locate this. We can direct them to the ZHA documentation.
2024-01-30 13:39:57 +01:00
Joakim Sørensen
0944b1e9d3 Simplify GtHub markdown alerts (#19536)
Simplify GtHub merkdown alerts
2024-01-30 13:37:47 +01:00
karwosts
623ac88166 Fix trace graph for non-safari & safari (#19557) 2024-01-30 13:23:53 +01:00
karwosts
3a204d889f Fix QR codes (#19552) 2024-01-30 13:07:58 +01:00
Bram Kragten
107f0da88b Allow config flow to show error per field (#19522) 2024-01-30 12:24:45 +01:00
karwosts
86bbff36ea Delete all refresh tokens (attempt #2) (#19547)
* Add a button to delete all refresh tokens (#18680)

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Don't delete LL tokens. Don't delete the current token

* Update src/data/auth.ts

Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>

* typing

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2024-01-29 18:07:44 +01:00
renovate[bot]
42a52f9a1c Update dependency @material/web to v1.2.0 (#19546)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-29 15:01:48 +01:00
renovate[bot]
ade8687d7b Update formatjs monorepo (#19561)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-29 14:58:05 +01:00
dependabot[bot]
e1341a1961 Bump actions/upload-artifact from 4.2.0 to 4.3.0 (#19562)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-01-29 09:25:41 +01:00
renovate[bot]
74282e9afe Update dependency hls.js to v1.5.2 (#19559)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-28 19:45:50 +00:00
renovate[bot]
687c9753a0 Update babel monorepo to v7.23.9 (#19558)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-28 14:38:06 -05:00
renovate[bot]
4825163b20 Update dependency chai to v5.0.3 (#19556)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-28 14:35:39 -05:00
renovate[bot]
a37bea3701 Update dependency @types/tar to v6.1.11 (#19555)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-28 14:34:04 -05:00
renovate[bot]
0d8f9351cc Update dependency @codemirror/view to v6.23.1 (#19540) 2024-01-27 21:36:37 -05:00
renovate[bot]
692774f6c4 Update dependency @bundle-stats/plugin-webpack-filter to v4.9.2 (#19545) 2024-01-27 21:34:02 -05:00
Stanisław Czajka
6ee1404eef Fixed volume slider alignment (#19534) 2024-01-26 16:26:11 +00:00
Yosi Levy
97652bd2f6 Various RTL fixes (#19495)
* Various RTL fixes

* Additional RTL

* Additional fixes

* Revert ha-dialog

* Improve margin-title

* Additional fixes

* Additional fixes

* Fix prettier

* More fixes

* Additional fixes

* Fix prettier

* Fix prettier again

* Additional updates

* Additional fixes

* Final fixes (left only)
2024-01-26 17:15:27 +01:00
renovate[bot]
a566479ddc Update typescript-eslint monorepo to v6.19.1 (#19529)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-25 17:35:14 +00:00
Cody C
44e62fbb04 Fix text alignment on mobile devices for zha-add-devices-page.ts (#19517)
discovery_text ("Make sure your devices are in pairing mode. Check the instructions of your device on how to do this.") is showing left aligned on mobile, which is inconsistent with the discovered_text ("Devices will show up here once discovered.") underneath.
2024-01-25 18:23:23 +01:00
Michael
1f9e919762 Add info about removing of unused tokens (#19479)
add info about removing of unused tokens
2024-01-25 18:21:52 +01:00
Paulus Schoutsen
973752b974 Refactor suggest card function (#19528) 2024-01-25 18:21:30 +01:00
Bram Kragten
75bbc33fa2 Bumped version to 20240125.0 2024-01-25 13:32:28 +01:00
Bram Kragten
59a3a35b19 Handle cast connect different instance better (#19526) 2024-01-25 13:00:55 +01:00
Bram Kragten
b224ec50e4 Add automation/editor/show command to external bus (#19524) 2024-01-25 00:01:10 +01:00
Bram Kragten
2925ef3db0 Add support for service icons (#19507)
* Add service icons

* Fix lint

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-01-24 19:21:08 +00:00
Erik Montnemery
c2d71ac789 Allow inverting switch_as_x cover, lock, valve (#19324)
* Allow inverting switch_as_x cover, lock, valve

* Reconfigure invert option via options flow

* Don't reopen dialog

* Add explanation for invert option

* Address review comments

* Hide switch_as_x options flow
2024-01-24 18:32:35 +01:00
Paul Bottein
85f086d02e Improve icon translations support (#19516)
* Use slot for icon picker

* Use icon translations for disabled entities in device page

* Don't use fallback for light effect

* Fix device class

* Fix climate hvac mode

* Migrate fan direction to icon translations

* Remove attribute fallback

* Rename variable

* Update src/panels/lovelace/card-features/hui-climate-hvac-modes-card-feature.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-01-24 18:31:06 +01:00
Paul Bottein
beb3454f8d Hide fallback when dragging items in sidebar (#19521) 2024-01-24 18:16:59 +01:00
renovate[bot]
807d08d8eb Update dependency core-js to v3.35.1 (#19519) 2024-01-23 21:11:52 -05:00
Bram Kragten
cc4cfe1b5c Add set_conversation_response action (#19512) 2024-01-23 13:16:49 +01:00
G Johansson
88f67230fc Preview for time_date helper (#19476) 2024-01-23 12:04:23 +01:00
renovate[bot]
d335dd4b83 Update dependency @types/luxon to v3.4.2 (#19514)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-22 19:43:05 -05:00
renovate[bot]
98e3dbceb5 Update dependency @bundle-stats/plugin-webpack-filter to v4.9.1 (#19513)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-22 20:15:44 +01:00
Paul Bottein
1c9ea0a9d9 Add stateValue parameter to ha-state-icon (#19508)
* Add state value option to entityIcon

* Migrate lock, valve and cover more info to icon translations

* Migrate tile card

* Remove domain icon from area card

* Use attribute
2024-01-22 20:10:08 +01:00
Paulus Schoutsen
f6af73b222 Allow expanding a history graph card (#19481)
* Allow expanding a history graph card

* Update styling
2024-01-22 12:53:04 -05:00
Simon Lamon
9354ed927b Localize sun condition in automation editor (#19473)
Sun condition
2024-01-22 18:17:20 +01:00
karwosts
545d140dcf Various leaflet map bugfixes (#19475)
* Various leaflet map bugfixes

* move pan to updated
2024-01-22 18:12:25 +01:00
Steve Repsher
634122657c Fix incompatible object/array property types (3 of 3) (#19510) 2024-01-22 18:03:42 +01:00
Steve Repsher
349344161a Fix incompatible object/array property types (2 of 3) (#19482) 2024-01-22 16:04:58 +01:00
Joakim Sørensen
28a8863f45 Allow for lists inside GitHub alerts when redered in markdown (#19505)
* Allow for lists inside GitHub alerts when redered in markdown

* simplify
2024-01-22 16:03:07 +01:00
karwosts
5c72c38c0d Revert "Add a button to delete all refresh tokens" (#19480) 2024-01-22 15:57:06 +01:00
renovate[bot]
fffed0f5e1 Update vaadinWebComponents monorepo to v24.3.4 (#19506)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-22 08:21:23 -05:00
Bram Kragten
bf4b76864d Adjust check focus behaviour for todo list (#19472)
* Adjust check focus behaviour for todo list

* improve aria
2024-01-22 13:58:35 +01:00
dependabot[bot]
10ad0010cf Bump actions/cache from 3.3.3 to 4.0.0 (#19502)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-01-22 09:04:58 +01:00
dependabot[bot]
3a99a7de78 Bump actions/upload-artifact from 4.1.0 to 4.2.0 (#19503)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-01-22 08:59:58 +01:00
Franck Nijhof
69139b35e1 Clean up updater remains (#19501) 2024-01-21 23:07:40 +01:00
renovate[bot]
55a5739e77 Update dependency @babel/helper-define-polyfill-provider to v0.5.0 (#19496)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-21 15:26:07 -05:00
renovate[bot]
a8b48b4619 Update dependency prettier to v3.2.4 (#19483)
* Update dependency prettier to v3.2.4

* Reformat

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2024-01-21 06:09:59 +00:00
Steve Repsher
dcb3accdb8 Fix incompatible object/array property types (1 of 3) (#19450) 2024-01-19 20:16:15 +00:00
Cody C
45398f84cb Update hassio-addon-dashboard.ts to fix back button issue (#19477) 2024-01-19 21:06:29 +01:00
Joakim Sørensen
319cf64977 Do not "load" forever if null is returned for release notes (#19478) 2024-01-19 21:05:11 +01:00
Bram Kragten
646c02d855 Implement more attribute icons (#19469) 2024-01-19 20:55:16 +01:00
renovate[bot]
77dd2a87d9 Update formatjs monorepo (#19471)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-19 17:58:51 +01:00
Joakim Sørensen
51059e99a5 Add support for new GitHub alerts (#19470) 2024-01-19 17:10:46 +01:00
Bram Kragten
809df848ef Use entity registry icon directly (#19466) 2024-01-19 14:42:20 +00:00
Paul Bottein
619675318c Remove wrong usage of aria-hidden (#19454) 2024-01-19 15:28:46 +01:00
Bram Kragten
081636b3e7 Add support for icon translations (#19406)
* Add support for icon translations

* Use slot for icons

* Update more-info-climate.ts

* Review and fixes

* Update entity-registry-settings-editor.ts
2024-01-19 14:55:02 +01:00
Steve Repsher
b969144f50 Initialize more boolean properties (#19452) 2024-01-19 09:43:00 +01:00
Steve Repsher
24bfa4919a Fix property visibility mismatches (2 of 2) (#19448) 2024-01-19 09:39:41 +01:00
renovate[bot]
fcc9a80103 Update formatjs monorepo (#19453)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-19 01:08:10 -05:00
renovate[bot]
99a365fb49 Lock file maintenance (#19451)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-19 00:45:56 -05:00
renovate[bot]
6a95177b32 Update typescript-eslint monorepo to v6.19.0 (#19447)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-18 14:56:50 -05:00
Bram Kragten
ca68eaab38 Update cast idle logo (#19443) 2024-01-18 17:05:25 +01:00
Steve Repsher
6234f7b7d2 Initialize boolean properties (#19445) 2024-01-18 16:39:33 +01:00
Paul Bottein
04f6a01c3d Avoid thermostat card interaction on scroll on touch devices (#19423)
* Avoid thermostat card interaction on scroll on touch devices

* Fix background interaction on safari

* Fix interaction in Safari

* Make listeners private
2024-01-18 14:31:44 +01:00
Steve Repsher
9bad3c8101 Lint for unknown tags and turn off unknow attribute check (#19439) 2024-01-18 14:30:59 +01:00
Paul Bottein
7398c6ab3e Automation nested drag and drop (#19338)
* Add nested drag and drop for actions

* Add nested drag and drop for triggers, conditions and options

* Update src/panels/config/automation/action/types/ha-automation-action-choose.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* Move object at the root level

* Add support for choose option

* Fix undefined container (e.g else action)

* Add common nested array move function

* Move item at root level for manual automation

* Fix array move

* Don't fallback on body

* migrate blueprint and script

* Add drag and drop to service control

* Use context for reorder mode

* Rename reorder mode functions

* Fix hide menu props

* Fix drag and drop for choose action

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-01-18 14:26:17 +01:00
Steve Repsher
4046534fa8 Compress static HTML/XML (#19437) 2024-01-17 17:58:32 -05:00
renovate[bot]
8f43caee2e Update dependency @types/luxon to v3.4.1 (#19438)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-17 17:57:31 -05:00
karwosts
83c5408f8f Minor form localizations (#19434)
* Minor form localizations

* missing imports
2024-01-17 14:40:58 -05:00
karwosts
7d4284d409 Custom device_classes for Area Card sensors (#19421)
* Custom device_classes for Area Card sensors

* no sensor DOMAIN_ICONS
2024-01-17 13:22:08 +01:00
Steve Repsher
58c4bf081b Fix boolean and nullable attribute bindings (#19432) 2024-01-17 12:45:21 +01:00
Paulus Schoutsen
d1478567f0 Add title to grid card editor (#19429)
* Add title to grid card editor

* Update src/panels/lovelace/editor/config-elements/hui-grid-card-editor.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-01-17 12:43:25 +01:00
Paulus Schoutsen
d85c729fa5 Add a download button to history panel (#19428) 2024-01-17 11:47:45 +01:00
renovate[bot]
c65fadbd8a Update dependency sortablejs to v1.15.2 (#19426)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-16 23:47:21 -05:00
renovate[bot]
4326007022 Update dependency prettier to v3.2.2 (#19431)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-17 04:41:16 +00:00
Paulus Schoutsen
38b01e9335 Add a download button to history panel 2024-01-16 21:35:07 -05:00
karwosts
22625a805d Don't show duplicates in statistics picker (#19422)
* Filter duplicates from ha-statistics-picker

* use repeat
2024-01-16 22:40:27 +01:00
karwosts
a06c9d0cc6 Localize show_password in auth form (#19300)
* Localize show_password in auth form

* changes from review
2024-01-16 22:39:35 +01:00
Paul Bottein
490ed86e86 Add per domain style for tile card image (#19419) 2024-01-16 15:04:18 +01:00
Paul Bottein
df2514d79f Use new mdi oscillating icon (#19410) 2024-01-16 15:02:27 +01:00
Matthew Grove
13a8b10f5c Fix incorrect padding on bottom of empty list (#19414) 2024-01-16 15:02:06 +01:00
Steve Repsher
bb4f09ad9a Fix missing imports (2 of 2) (#19417) 2024-01-16 15:01:34 +01:00
Bram Kragten
1f2683dd56 Restrict adding todo list and calendars to admin users (#19408) 2024-01-16 10:44:28 +01:00
renovate[bot]
0ba8babd87 Update dependency prettier to v3.2.1 (#19415)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-15 22:00:08 +00:00
renovate[bot]
65d4d44f06 Update dependency @codemirror/autocomplete to v6.12.0 (#19412)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-15 16:52:48 -05:00
renovate[bot]
6f8c366bad Update dependency prettier to v3.2.0 (#19411)
* Update dependency prettier to v3.2.0

* Reformat

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2024-01-15 16:49:22 -05:00
Simon Lamon
3842e8e3a7 Wrap descriptions in automation list descriptions (#19367)
* Wrapped automation descriptions

* Fix

* Fixes

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-01-15 14:59:46 +00:00
Steve Repsher
b881a2a88a Fix complex attribute and expressionless property bindings (#19348) 2024-01-15 15:52:48 +01:00
Steve Repsher
70fcea0c2b Disable attributes for hass, stateObj, selector, and route properties (#19362)
* Disable attribute for hass properties

* Disable attribute for stateObj properties

* Disable attribute for selector properties

* Disable attribute for route properties

* Switch from Object type to no attribute for same properties
2024-01-15 15:52:10 +01:00
karwosts
9f26bedf51 Custom device_classes for alert icons in Area Card (#19131)
* Custom device_classes for alerts in Area Card

* small refactor

* drop more-info feature

* Update src/panels/lovelace/editor/config-elements/hui-area-card-editor.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

* localization and css updates

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2024-01-15 15:51:19 +01:00
Simon Lamon
2053cf23c2 Replace some paper-items by list-item (#19314)
* system log card

* cloud login

* cloud account

* ha config voice assistants assistants

* ha config person

* ha-device-entities-card

* cloud login

* change --paper-item-icon-color into --state-icon-color

* Apply code review

* Revert "change --paper-item-icon-color into --state-icon-color"

This reverts commit b91ef0017e.

* Remove unneeded mwc-lists
2024-01-15 15:41:05 +01:00
Steve Repsher
b801441201 Fix property visibility mismatches (1 of 2) (#19376) 2024-01-15 15:40:03 +01:00
AlexandrErohin
7209ed055a fix not showing base error bug (#19340) 2024-01-15 14:38:51 +00:00
Joakim Plate
894205eff7 Display that entity is disabled in more info (#19378)
* Display that entity is disabled in more info

* Correct formatting
2024-01-15 15:37:59 +01:00
Steve Repsher
64b0b64468 Cache Typescript runs for faster checks (#19381) 2024-01-15 15:36:26 +01:00
Steve Repsher
920df03cc1 Fix missing imports (1 of 2) (#19363) 2024-01-15 15:34:46 +01:00
karwosts
5a91f613ca Remove fire-dom-event from action struct (#19390) 2024-01-15 15:34:19 +01:00
karwosts
61eaa07b25 Honor display_precision over duration-type format (#19396) 2024-01-15 15:33:00 +01:00
Cody C
62f6766e1b Fix onboarding state exception following restore (#19389)
Fixes #19388
2024-01-15 15:31:37 +01:00
renovate[bot]
f5994d2ae5 Update vaadinWebComponents monorepo to v24.3.3 (#19403)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-15 14:12:11 +01:00
Yosi Levy
7e93367394 RTL stack card fix (#19394) 2024-01-15 13:55:11 +01:00
dependabot[bot]
6256192c0c Bump actions/upload-artifact from 3.1.3 to 4.1.0 (#19401)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2024-01-15 09:20:26 +01:00
dependabot[bot]
08fb3ced5f Bump actions/cache from 3.3.2 to 3.3.3 (#19400) 2024-01-15 07:56:19 +01:00
karwosts
5aa5ce8b5e Fix blank_before_percent (#19397)
* Fix blank_before_percent

* types n stuff
2024-01-14 15:23:42 -05:00
Steve Repsher
7c389a6cf0 Fix dependencies labeler (#19391) 2024-01-14 09:32:28 +01:00
renovate[bot]
f63ba0c20a Update dependency hls.js to v1.5.1 (#19387) 2024-01-13 22:36:10 -05:00
Simon Lamon
01e80108d7 Fix nightly builds (#19386) 2024-01-13 17:30:47 -05:00
renovate[bot]
148c0c98d3 Update dependency hls.js to v1.5.0 (#19377)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-13 14:39:08 -05:00
renovate[bot]
11a9a2f56b Update dependency @lit-labs/virtualizer to v2.0.12 (#19380)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-13 14:38:05 -05:00
Bram Kragten
6cdf1c1689 Bumped version to 20240112.0 2024-01-12 16:25:34 +01:00
renovate[bot]
2cfaa4f261 Update typescript-eslint monorepo to v6.18.1 (#19371)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-12 05:11:37 +00:00
renovate[bot]
d3b0d03e70 Update dependency lit-analyzer to v2.0.3 (#19369)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-11 23:59:13 -05:00
renovate[bot]
08b8978ee8 Update dependency ts-lit-plugin to v2.0.2 (#19370)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-11 23:57:25 -05:00
renovate[bot]
d2019c2315 Update babel monorepo to v7.23.8 (#19368)
* Update babel monorepo to v7.23.8

* bump @babel/helpers

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2024-01-11 23:52:37 -05:00
Bram Kragten
02a7d0e797 Clean up local auth flow, preselect remember me (#19354) 2024-01-11 11:03:32 +01:00
Bram Kragten
03751d2581 Load registries in core, wait them to be loaded before generating das… (#19356)
* load registries in core, wait them to be loaded before generating dashboard

* import

* improve

* Split out subscribe functions
2024-01-11 09:48:20 +01:00
Bram Kragten
b9069b25ad Assist devices: Move logic from column to data (#19359)
* Move logic from column to data

* Type
2024-01-11 09:48:10 +01:00
Paulus Schoutsen
a136fa687f Add page to list assist devices (#19301)
* Add page to list assist devices

* Translate title too
2024-01-10 15:22:59 +01:00
Bram Kragten
de35e89c58 Update ha-config-logs.ts 2024-01-10 15:21:54 +01:00
Bram Kragten
85beefec4c Fix logs, dont require advanced mode, allow provider in url and my (#19355)
* Fix logs, dont require advanced mode, allow provider in url and my

* Add params to my link with quick key `m`
2024-01-10 13:50:07 +01:00
renovate[bot]
877c9b007b Update dependency open to v10.0.3 (#19351) 2024-01-10 07:33:15 -05:00
Steve Repsher
adb851a2b4 Fix unclosed HTML tags (#19343)
* Fix unclosed HTML tags

* Add missing import and remove unused class for debug tools

* Remove div from debug page
2024-01-10 10:53:03 +01:00
Steve Repsher
6ab5116c34 Fix incompatible number property types (#19349) 2024-01-10 10:49:35 +01:00
Paul Bottein
a5630a4a7d Use switch for valve in entity row (#19342) 2024-01-09 16:15:33 +01:00
renovate[bot]
e8c1a34f3b Update typescript-eslint monorepo to v6.18.0 (#19341)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-09 15:20:51 +01:00
Steve Repsher
88abeada44 Remove Intl polyfill on connection and consistently resolve time zone (#19326) 2024-01-09 15:06:50 +01:00
Steve Repsher
96a41704ea Fix incompatible boolean property types (#19337) 2024-01-09 15:02:15 +01:00
Steve Repsher
8583c879f2 Fix invalid directive bindings (#19330) 2024-01-09 15:00:59 +01:00
Steve Repsher
3edc77c978 Fix missing element tag definitions (#19329) 2024-01-09 15:00:30 +01:00
dependabot[bot]
03a1c21f34 Bump follow-redirects from 1.15.3 to 1.15.4 (#19336) 2024-01-08 21:14:38 -05:00
renovate[bot]
80b1a6297b Update dependency @types/luxon to v3.4.0 (#19333) 2024-01-08 20:57:22 -05:00
renovate[bot]
056eb888f3 Update dependency @types/chromecast-caf-receiver to v6.0.13 (#19332) 2024-01-08 20:56:32 -05:00
Steve Repsher
d4ec608123 Fix invalid media queries in calendar and todo editors (#19295) 2024-01-08 15:45:24 +01:00
Steve Repsher
2451cf77f9 Fix various missing component imports (#19296) 2024-01-08 15:43:53 +01:00
Simon Lamon
3b6b77c75b Localize time pattern trigger in automation editor (#19173) 2024-01-08 15:24:37 +01:00
Steve Repsher
e0f578c135 Start linting with lit-analyzer (#19302) 2024-01-08 14:26:25 +01:00
karwosts
ec2ae15e3f Cleanup else/default block when deleting all actions (#19298) 2024-01-08 14:10:23 +01:00
Steve Repsher
f5fc66f47e Better restrict applying dependencies label (#19319) 2024-01-08 14:08:21 +01:00
Steve Repsher
ae79df8c55 Allow TLA for legacy build and remove static Intl polyfills (#19207) 2024-01-08 14:07:08 +01:00
Paul Bottein
104aef3dec Add ha-sortable component (#19294) 2024-01-08 14:02:41 +01:00
dependabot[bot]
17e62c10d4 Bump home-assistant/wheels from 2023.10.5 to 2024.01.0 (#19321) 2024-01-08 08:17:13 +01:00
karwosts
90965a4f4d Localize statistics datatable string (#19289) 2024-01-06 23:19:44 -05:00
renovate[bot]
8960f5fef9 Update dependency @types/luxon to v3.3.8 (#19308) 2024-01-06 20:50:10 -05:00
Yosi Levy
783a8242e1 Fix for RTL in Supervisor dashboards (#19290) 2024-01-05 14:56:15 +01:00
Simon Lamon
7a8f5c0cc9 Replace remaining paper inputs (#19292) 2024-01-05 14:31:58 +01:00
renovate[bot]
53be012b34 Update CodeMirror (#19214) 2024-01-04 20:42:11 -05:00
renovate[bot]
be7b3a56f9 Update dependency core-js to v3.35.0 (#19215) 2024-01-04 20:36:13 -05:00
renovate[bot]
554e5b7be5 Update typescript-eslint monorepo to v6.17.0 (#19286) 2024-01-04 19:48:57 -05:00
renovate[bot]
249c89669e Update dependency systemjs to v6.14.3 (#19282)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-04 13:11:06 -05:00
Bram Kragten
7ce9a937b1 20240104.0 (#19284) 2024-01-04 17:48:13 +01:00
Paul Bottein
456c011f3e Fix thermostat and humidifier card rendering when off (#19281)
* Fix thermostat and humidifier card rendering when off

* Fix action color
2024-01-04 17:44:58 +01:00
Bram Kragten
a31b9f1b4d Fix due date when no time in certain timezones (#19280)
* Fix due date when no time in certain timezones

* Update dialog-todo-item-editor.ts
2024-01-04 17:44:57 +01:00
Bram Kragten
a1cf18468b Remove overflow hidden from profile (#19279) 2024-01-04 17:44:56 +01:00
Bram Kragten
f147a5e909 fix valve entities row (#19278) 2024-01-04 17:44:55 +01:00
Franck Nijhof
8d541595b8 Update getStates to support valves (#19277) 2024-01-04 17:44:54 +01:00
Bram Kragten
32fd8270d7 Fix turning valve on/off (#19269) 2024-01-04 17:44:53 +01:00
Bram Kragten
efddbfcfa0 Fix circular progress size + fix bug in assist pipeline debug (#19268) 2024-01-04 17:44:53 +01:00
karwosts
0b20725f5f Fix select view dialog (#19267)
* Fix select view dialog

* add import
2024-01-04 17:44:52 +01:00
renovate[bot]
030566c1e8 Update dependency marked to v11.1.1 (#19254) 2024-01-04 17:44:51 +01:00
Bram Kragten
fef2c44cb8 Bumped version to 20240104.0 2024-01-04 17:44:16 +01:00
Bram Kragten
fe5431976d Bumped version to 20240104.0 2024-01-04 17:43:37 +01:00
Paul Bottein
72dedc7596 Fix thermostat and humidifier card rendering when off (#19281)
* Fix thermostat and humidifier card rendering when off

* Fix action color
2024-01-04 16:18:16 +01:00
Bram Kragten
8615b799c6 Fix due date when no time in certain timezones (#19280)
* Fix due date when no time in certain timezones

* Update dialog-todo-item-editor.ts
2024-01-04 14:24:33 +01:00
Bram Kragten
fd6cae48b7 Remove overflow hidden from profile (#19279) 2024-01-04 13:20:35 +01:00
Bram Kragten
ecadc06b45 fix valve entities row (#19278) 2024-01-04 11:52:38 +01:00
Franck Nijhof
e5d31d85dd Update getStates to support valves (#19277) 2024-01-04 10:54:20 +01:00
Bram Kragten
e427ffca5f Fix turning valve on/off (#19269) 2024-01-03 21:27:30 -05:00
Bram Kragten
4f05bd9e22 Fix circular progress size + fix bug in assist pipeline debug (#19268) 2024-01-03 21:21:42 -05:00
renovate[bot]
0d8c0ac1a0 Update dependency marked to v11.1.1 (#19254) 2024-01-03 17:45:46 -05:00
karwosts
3984702d3e Fix select view dialog (#19267)
* Fix select view dialog

* add import
2024-01-03 20:36:59 +01:00
Bram Kragten
979085a9de Fix supervisor dev build (#19266) 2024-01-03 20:35:54 +01:00
Bram Kragten
7a6fc573c2 Fix version bump script (#19264) 2024-01-03 14:19:30 +00:00
Bram Kragten
b99b13251f 20240103.3 (#19263) 2024-01-03 15:03:00 +01:00
Bram Kragten
288d173a4d Bumped version to 20240103.3 2024-01-03 15:02:14 +01:00
Bram Kragten
2c69fe8c53 Fix checking todo item that dont support due date (#19262)
* Fix checking todo item that dont support due date

* make cleaner

* Revert "make cleaner"

This reverts commit fa33b33614.

* Update dialog-todo-item-editor.ts

* do check in 1 place
2024-01-03 15:00:24 +01:00
Paul Bottein
62dafac72b Display edit button for climate fan mode feature (#19259) 2024-01-03 15:00:23 +01:00
karwosts
22929672a0 Remove tile pointer/ripple/index when it has no action (#19137)
* Remove tile pointer/ripple/index when it has no action

* update

* Apply suggestions from code review

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-01-03 15:00:22 +01:00
Bram Kragten
ae0eac3415 Bumped version to 20240103.0 2024-01-03 15:00:06 +01:00
Bram Kragten
6929a9c603 Bumped version to 20240103.0 2024-01-03 14:59:45 +01:00
karwosts
41bb677ebe Remove tile pointer/ripple/index when it has no action (#19137)
* Remove tile pointer/ripple/index when it has no action

* update

* Apply suggestions from code review

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2024-01-03 14:58:59 +01:00
Bram Kragten
8368fb4408 Fix checking todo item that dont support due date (#19262)
* Fix checking todo item that dont support due date

* make cleaner

* Revert "make cleaner"

This reverts commit fa33b33614.

* Update dialog-todo-item-editor.ts

* do check in 1 place
2024-01-03 13:58:36 +00:00
Paul Bottein
acbb7e0453 Display edit button for climate fan mode feature (#19259) 2024-01-03 14:26:40 +01:00
Bram Kragten
4ea7d826bc 20240103.1 (#19258) 2024-01-03 12:37:44 +01:00
Bram Kragten
336214d97f Revert conditional rendering of condition (#19257)
* Fix conditionally showing `triggered by`

* revert conditional rendering

* Update add-automation-element-dialog.ts

* Update add-automation-element-dialog.ts
2024-01-03 12:29:30 +01:00
Bram Kragten
c9a0ae6e2d Bumped version to 20240103.1 2024-01-03 12:29:10 +01:00
Bram Kragten
6224cb6994 Bumped version to 20240103.1 2024-01-03 12:28:46 +01:00
Bram Kragten
29fefa1d60 Revert conditional rendering of condition (#19257)
* Fix conditionally showing `triggered by`

* revert conditional rendering

* Update add-automation-element-dialog.ts

* Update add-automation-element-dialog.ts
2024-01-03 11:20:11 +00:00
Bram Kragten
0bc69fb9b3 20240103.0 (#19256) 2024-01-03 10:55:23 +01:00
Bram Kragten
6e7366bf69 Calculate used domains on open of action dialog (#19255) 2024-01-03 10:38:51 +01:00
Bram Kragten
8ee4aa9e63 Bumped version to 20240103.0 2024-01-03 10:38:30 +01:00
Bram Kragten
c7a98fa5a1 Bumped version to 20240103.0 2024-01-03 10:37:59 +01:00
Bram Kragten
46565715c9 Calculate used domains on open of action dialog (#19255) 2024-01-03 10:37:30 +01:00
Bram Kragten
386c3ea1ca 20240102.0 (#19234) 2024-01-02 20:02:03 +01:00
Simon Lamon
c2f3e43ee5 Set default values for required and disabled for labeled slider (#19246)
Set default values
2024-01-02 20:01:15 +01:00
Bram Kragten
7354988ec9 Move notification services to main list (#19235) 2024-01-02 20:01:14 +01:00
Simon Lamon
8a8b04ed00 Set default values for required and disabled for labeled slider (#19246)
Set default values
2024-01-02 20:00:19 +01:00
Bram Kragten
e721481757 Move notification services to main list (#19235) 2024-01-02 19:58:37 +01:00
renovate[bot]
2933d642ed Update dependency @bundle-stats/plugin-webpack-filter to v4.8.4 (#19230)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2024-01-02 13:55:44 -05:00
Bram Kragten
53dedc6c65 Bumped version to 20240102.0 2024-01-02 18:49:50 +01:00
Bram Kragten
7d412a9913 Bumped version to 20240102.0 2024-01-02 18:49:31 +01:00
Bram Kragten
de3b9a5bb2 Give todo and calendar edit static header (#19233) 2024-01-02 18:48:59 +01:00
Bram Kragten
5eaa6dafd9 Give todo and calendar edit static header (#19233) 2024-01-02 18:48:34 +01:00
Bram Kragten
8d496e1511 Update add-automation-element-dialog.ts 2024-01-02 18:48:06 +01:00
Bram Kragten
f994b378f1 Update add-automation-element-dialog.ts 2024-01-02 18:47:39 +01:00
JLo
01bd88ce10 New copy for device trigger in automation editor (#19232)
New copy for device trigger in automation editor: 
"Set of conditions provided by your device. Great way to start."
2024-01-02 18:44:33 +01:00
Josh McCarty
18b5fd59a6 Add missing device classes for entity-registry-settings-editor (#19231)
* Add connectivity device class for binary sensors

* Add update device class

* Separate connectivity and update
2024-01-02 18:44:32 +01:00
Bram Kragten
750c1d5013 Change format of service description (#19229) 2024-01-02 18:44:31 +01:00
Bram Kragten
f2226cdec2 Use brand icons in actions (#19227) 2024-01-02 18:44:30 +01:00
Bram Kragten
c125ec087a Remove references to "service call" from actions (#19226) 2024-01-02 18:44:29 +01:00
Bram Kragten
f099f66065 Automation editor tweaks (#19225)
* Automation editor tweaks

* fix styling
2024-01-02 18:44:28 +01:00
JLo
4fcf99faa7 Review on automation editor text (#19223)
- Added `.` to bloc descriptions
- Changed "Other" into "OTher triggers" "Other conditions" and "Other actions"
- Adapted a few descriptions
2024-01-02 18:44:28 +01:00
karwosts
2add88ccc2 Localize a device action string (#19203) 2024-01-02 18:44:27 +01:00
JLo
7d6dfaad15 New copy for device trigger in automation editor (#19232)
New copy for device trigger in automation editor: 
"Set of conditions provided by your device. Great way to start."
2024-01-02 17:39:55 +00:00
Josh McCarty
def2eadc24 Add missing device classes for entity-registry-settings-editor (#19231)
* Add connectivity device class for binary sensors

* Add update device class

* Separate connectivity and update
2024-01-02 17:35:08 +00:00
Bram Kragten
53a25dde26 Change format of service description (#19229) 2024-01-02 18:31:18 +01:00
Bram Kragten
6f7da16d1d Use brand icons in actions (#19227) 2024-01-02 18:11:34 +01:00
Bram Kragten
5ac0360494 Remove references to "service call" from actions (#19226) 2024-01-02 16:08:26 +01:00
karwosts
1b6def4875 Localize a device action string (#19203) 2024-01-02 14:07:34 +01:00
Bram Kragten
52fcf64cfd Automation editor tweaks (#19225)
* Automation editor tweaks

* fix styling
2024-01-02 13:36:06 +01:00
JLo
c650e23432 Review on automation editor text (#19223)
- Added `.` to bloc descriptions
- Changed "Other" into "OTher triggers" "Other conditions" and "Other actions"
- Adapted a few descriptions
2024-01-02 11:08:05 +00:00
renovate[bot]
428604d91d Update babel monorepo to v7.23.7 (#19220) 2024-01-01 20:15:34 -05:00
Bram Kragten
aa94ec7949 20240101.0 (#19217) 2024-01-01 14:08:07 +01:00
Bram Kragten
d0c1481f76 Bumped version to 20240101.0 2024-01-01 13:58:47 +01:00
renovate[bot]
6cc9a99b77 Update dependency terser-webpack-plugin to v5.3.10 (#19211)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-31 13:47:55 -05:00
renovate[bot]
d25f49b694 Update dependency chai to v5 (#19208)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-31 13:46:23 -05:00
renovate[bot]
b92d25e28a Update Material Design Icons to v7.4.47 (#19192) 2023-12-30 21:08:13 -05:00
renovate[bot]
bf5c5bc46f Update dependency open to v10.0.2 (#19206) 2023-12-30 21:06:30 -05:00
renovate[bot]
e7cc842be4 Update dependency rollup-plugin-visualizer to v5.12.0 (#19204) 2023-12-30 21:05:23 -05:00
Bram Kragten
cb29d35949 Allow to clear due date (#19201) 2023-12-30 20:21:33 +01:00
Bram Kragten
fe18f70e51 Only make count field template (#19198) 2023-12-30 18:40:01 +01:00
Bram Kragten
ee57f26415 Sort domains correctly, scroll to top on back (#19197) 2023-12-30 18:39:21 +01:00
karwosts
721ec8e559 Localize some strings in integration panel (#19200) 2023-12-30 18:37:50 +01:00
Erik Montnemery
c584f83071 Fix display of variables tab when automation step not executed (#19186)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-12-30 17:16:54 +00:00
Erik Montnemery
3c2fed5041 Improve message when an automation step was not executed (#19185)
* Improve message when an automation step was not executed

* Use step instead of node
2023-12-30 18:08:24 +01:00
Erik Montnemery
7e6d974438 Fix iteration index when displaying changed variables (#19184) 2023-12-30 14:08:01 +01:00
Bram Kragten
c95a30c837 Use username in example on empty automation page (#19189) 2023-12-29 20:45:51 +01:00
Bram Kragten
cb568d005e dont allow UI editor when templates are used in repeat (#19188) 2023-12-29 17:59:11 +00:00
Bram Kragten
442cce1574 Fix play media action not shown (#19187) 2023-12-29 18:56:15 +01:00
Erik Montnemery
c25baf25ad Exclude hidden entities from scenes (#19179) 2023-12-29 18:41:10 +01:00
renovate[bot]
5e279405c7 Update typescript-eslint monorepo to v6.16.0 (#19174) 2023-12-28 20:32:43 -05:00
Bram Kragten
7b4ecfd30a 20231228.0 (#19170) 2023-12-28 15:34:42 +01:00
Bram Kragten
e5707b423f Bumped version to 20231228.0 2023-12-28 15:33:39 +01:00
Bram Kragten
7983556f98 Update sortable styling (#19169) 2023-12-28 15:32:49 +01:00
Bram Kragten
1916dff57b Keep todo item selected when checked/unchecked (#19168)
* Keep todo item selected when checked/unchecked

* update label when in reoder mode
2023-12-28 15:32:40 +01:00
Bram Kragten
b11563d618 Small automation editor fixes (#19160) 2023-12-28 15:32:31 +01:00
Bram Kragten
b180a587bf Address feedback of automation editor (#19167) 2023-12-28 14:18:18 +01:00
Simon Lamon
5b11e0ce29 Fix self referencing translation (#19159) 2023-12-27 20:26:17 +01:00
Bram Kragten
d6684c5806 Revert hide automation desc in advanced mode (#19158) 2023-12-27 17:46:17 +01:00
Bram Kragten
9d9e789f4b 20231227.0 (#19157) 2023-12-27 17:29:11 +01:00
Bram Kragten
1a0e3890f4 Bumped version to 20231227.0 2023-12-27 17:22:34 +01:00
Bram Kragten
caece9d6ad Add QR code element (#19155)
* Add QR code element

* fixes

* move to workflow

* limit webpack imports
2023-12-27 17:22:09 +01:00
renovate[bot]
953a3793c4 Update dependency vue to v2.7.16 (#19156)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-27 17:19:27 +01:00
Jan-Philipp Benecke
8bfae3b4cf Fix ha-combo-box helper text not displaying text (#19154)
* Fix ha-combo-box helper text

* Update src/components/ha-combo-box.ts

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-12-27 15:22:19 +00:00
Bram Kragten
6911685bd0 Only focus search when not in fullscreen dialog (#19153) 2023-12-27 12:45:49 +00:00
Bram Kragten
71025eaf4d Fix dialog headers (#19152)
* Fix dialog headers

* increase padding
2023-12-27 13:45:36 +01:00
Bram Kragten
3aa612b766 Todo list layout fixes (#19150) 2023-12-27 13:22:36 +01:00
Simon Lamon
a2ffd0ae83 Circular progress improvement in update area (#18983)
* Fixes

* Add aria label again
2023-12-27 11:07:40 +01:00
Simon Lamon
c399da586e Increase battery column width (#19143) 2023-12-27 11:00:48 +01:00
Erik Montnemery
d7826e4e6c Show +/- volume buttons for media players which support VOLUME_SET (#19111)
* Show +/- volume buttons for media players which support VOLUME_SET

* Fixup
2023-12-27 11:00:12 +01:00
Yosi Levy
f5d13c9079 Various RTL fixes (#19134)
* Various RTL fixes

* Various RTL fixes
2023-12-27 10:59:28 +01:00
Paul Bottein
01a142790f Add update actions card feature (#19110)
* Add update tile feature

* Fix translations

* Add confirmation dialog

* Remove unused styles

* Fix gallery

* Update wording

* Update src/translations/en.json
2023-12-27 10:55:14 +01:00
karwosts
df54687de1 Fix trailing energy gaps, refactor chart options (#19117)
* Fix trailing gap on energy graph cards

* Use date methods instead of unix time calculation

* Fix trailing energy gaps, refactor chart options

---------

Co-authored-by: Till Fleisch <till@fleisch.dev>
2023-12-27 10:53:16 +01:00
karwosts
bded31b311 Fix entities sort for hidden/readonly (#19124) 2023-12-27 10:51:36 +01:00
c0ffeeca7
67e573aff7 HVAC in demo - fix typo (#19132) 2023-12-27 10:25:30 +01:00
c0ffeeca7
6295c4ac76 Add Oxford comma (#19133) 2023-12-27 10:24:57 +01:00
renovate[bot]
469811847f Lock file maintenance (#19084)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-26 11:53:07 -05:00
renovate[bot]
8a1aefefca Update vaadinWebComponents monorepo to v24.3.2 (#19141)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-25 15:39:49 -05:00
renovate[bot]
bea16028a1 Update dependency open to v10.0.1 (#19145)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-25 15:38:06 -05:00
dependabot[bot]
bedb7d1d9e Bump actions/setup-node from 4.0.0 to 4.0.1 (#19140)
Bumps [actions/setup-node](https://github.com/actions/setup-node) from 4.0.0 to 4.0.1.
- [Release notes](https://github.com/actions/setup-node/releases)
- [Commits](https://github.com/actions/setup-node/compare/v4.0.0...v4.0.1)

---
updated-dependencies:
- dependency-name: actions/setup-node
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2023-12-25 15:37:25 -05:00
renovate[bot]
1a3a20f478 Update dependency element-internals-polyfill to v1.3.10 (#19136) 2023-12-24 23:25:00 -05:00
Bram Kragten
68ecb7c219 Store height and width of dialog, autofocus searchbar (#19122) 2023-12-23 00:03:52 +01:00
renovate[bot]
61b04a882b Update dependency core-js to v3.34.0 (#18974)
* Update dependency core-js to v3.34.0

* Update Babel setting with package.json version

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2023-12-22 15:41:33 -05:00
renovate[bot]
f8e621c5b9 Update dependency open to v10 (#19116)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-22 14:16:41 -05:00
Bram Kragten
2f2209682e Update learn more URLs to just "Learn more" 2023-12-22 16:40:20 +01:00
Bram Kragten
f4f361b51a Add automation picker descriptions (#19121) 2023-12-22 16:35:41 +01:00
Erik Montnemery
55e59f8cb0 Add valve to switch_as_x domains (#19118) 2023-12-22 11:34:09 +01:00
renovate[bot]
6d20ed0a22 Update dependency hls.js to v1.4.14 (#19112) 2023-12-21 20:22:36 -05:00
renovate[bot]
874f604295 Update typescript-eslint monorepo to v6.15.0 (#19113) 2023-12-21 20:21:23 -05:00
renovate[bot]
30d36a11c1 Update dependency eslint-plugin-lit to v1.11.0 (#19103) 2023-12-21 20:19:36 -05:00
Bram Kragten
09dcc29175 Add description and due support to todo lists (#19107) 2023-12-21 21:30:24 +01:00
Bram Kragten
8f07e6f141 Group add automation elements in dialog (#19086)
* Group add automation elements in dialog

* Add search

* clear filter on close

* Split out services

* group services by integration type

* Update add-automation-element-dialog.ts

* fix typing

* clear filter on back

* Update add-automation-element-dialog.ts

* Fix search

* scroll to top

* Add service descriptions

* fix clipboard

* Move play media, sort services

* use helpers

* move to data

* Move building blocks to a group

* fix search

* Update add-automation-element-dialog.ts

* Update en.json

* fix alignment of single line and multi line items

* use repeat instead of map
2023-12-21 21:01:27 +01:00
Bram Kragten
7b6b5724e1 Add descriptions to automation page sections (#19081)
* Add descriptions to automation page sections

* add name key

* Update manual-automation-editor.ts

* hide explanation if there is content

* Update src/translations/en.json

* hide when advanced
2023-12-21 21:01:11 +01:00
Quentame
521c0b58c8 Add climate fan mode feature to thermostat & tile cards (#19094)
* climate: Add fan_only exemple

* climate: add fan_mode feature to thermostat & tile cards

* review: update dropdown icon
2023-12-21 15:49:08 +01:00
Bram Kragten
53839ab7b1 Update text on empty automation/script/scene pages (#19095) 2023-12-21 15:36:56 +01:00
Chris Roberts
dcfe9617b3 Make disabled sliders properly visible (#19102)
Followed similar variable usage by ha-*-chip components.

Fixes #19101
2023-12-20 21:26:48 +00:00
Matthias Alphart
58eebf2dbd Clear Area picker when "Add new area" was canceled (#19088) 2023-12-20 22:17:31 +01:00
Paul Bottein
af9b64c6f0 Add option to show current temperature on thermostat card (#19049)
* Fix unit position when no decimal

* Add option to switch between current and target for thermostat card

* Refactor code

* Clean label code

* Rename config name
2023-12-20 14:41:22 +01:00
Paul Bottein
2b18ac8d4e Add option to show current humidity on humidifier card (#19079) 2023-12-20 14:12:59 +01:00
karwosts
2306234063 Localize date-range-picker (#18945) 2023-12-19 09:25:56 +01:00
renovate[bot]
883a9e422e Update dependency eslint to v8.56.0 (#19083) 2023-12-18 21:24:47 -05:00
Dmitry Tsydzik
d77ce721e3 Add possibility to define group id manually for ZHA (#18932)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-12-18 15:37:57 +01:00
Bram Kragten
325ad6f721 Fix step any in number selector (#19077) 2023-12-18 15:24:46 +01:00
Simon Lamon
d762a9365f Automation traces localization (#18862) 2023-12-18 15:06:41 +01:00
Paul Bottein
ce983f043e Fix empty classmap for thermostat card (#19078) 2023-12-18 14:00:37 +01:00
Bram Kragten
45b7ebbe46 Add empty page to automation/script/scene config (#19075) 2023-12-18 13:59:36 +01:00
Paul Bottein
3e7fa66790 Add valve entity (#19024)
* Add valve entity

* Update icon based on device class

* Check assumed state first

* Reset mode if entity id changes
2023-12-18 13:53:52 +01:00
renovate[bot]
ad543dbffb Update dependency webpackbar to v6 (#19076)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-18 12:31:13 +00:00
karwosts
cdd2c7be9a Fix date-range-picker overflow on energy dashboard small screen (#19026) 2023-12-18 13:20:21 +01:00
Simon Lamon
ddf6945190 Localize state condition in automation editor (#18864)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-12-18 13:19:19 +01:00
Simon Lamon
f2745747ba Replace more polymer paper inputs and remove paper-input style attributes (#18929) 2023-12-18 13:05:56 +01:00
Charles Garwood
ff9d179c13 Minor tweak to Z-Wave JS Config Dashboard layout (#19032) 2023-12-18 12:56:30 +01:00
karwosts
e813108c66 Optional boolean service field defaults to false (#19043) 2023-12-18 12:56:01 +01:00
karwosts
62d8cdfcf9 Fix missing tooltips in energy-usage-graph (#19031) 2023-12-18 12:52:52 +01:00
karwosts
5b9d46e350 Add a safe mode item to the github issue template checkist (#19022) 2023-12-18 12:49:03 +01:00
renovate[bot]
e5db95b2d2 Update vaadinWebComponents monorepo to v24.3.1 (#19052)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-18 12:08:21 +01:00
karwosts
a8f7c7c999 Fix hide legend toggle in stats graph editor (#19021) 2023-12-18 11:55:50 +01:00
c0ffeeca7
8a423fb775 Assist, no wake word: point docs link to wake word installation proce… (#19040)
Assist, no wake word: point docs link to wake word installation procedure
2023-12-18 11:47:32 +01:00
c0ffeeca7
90c3d69af6 No supervisor message: fix typo (#19041) 2023-12-18 11:46:44 +01:00
renovate[bot]
bcb2d73c5c Update dependency @material/web to v1.1.1 (#19064)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-18 11:44:20 +01:00
dependabot[bot]
8a6cea12e1 Bump github/codeql-action from 2 to 3 (#19072)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2023-12-18 09:23:52 +01:00
renovate[bot]
0056de146a Update dependency @codemirror/view to v6.22.3 (#19063)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-17 19:04:01 -05:00
renovate[bot]
0bcdbef11e Update dependency eslint-plugin-import to v2.29.1 (#19070)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-17 19:02:58 -05:00
renovate[bot]
1b208cb531 Update dependency marked to v11.1.0 (#19054) 2023-12-15 21:12:42 -05:00
renovate[bot]
6a975e260c Update dependency @rollup/plugin-json to v6.1.0 (#19057) 2023-12-15 21:10:09 -05:00
renovate[bot]
02d2bde269 Update dependency @babel/helper-define-polyfill-provider to v0.4.4 (#19047) 2023-12-15 01:52:14 +00:00
renovate[bot]
70cfa7f48a Update babel monorepo to v7.23.6 (#19046) 2023-12-14 20:41:13 -05:00
renovate[bot]
b7d4b9c21b Update typescript-eslint monorepo to v6.14.0 (#19051) 2023-12-14 20:35:42 -05:00
renovate[bot]
673c947c11 Update dependency lit-analyzer to v2.0.2 (#19053) 2023-12-14 20:34:40 -05:00
Arno
2682a55148 Fixing issue #10581 Automation Debug Trace Graph not displaying right in Safari (#19036) 2023-12-14 11:53:53 +01:00
renovate[bot]
616f6ddf5f Update dependency @koa/cors to v5 [SECURITY] (#19018) 2023-12-14 02:38:00 +00:00
renovate[bot]
29769813bc Update dependency @codemirror/view to v6.22.2 (#19016) 2023-12-14 01:58:39 +00:00
renovate[bot]
221c46344a Update dependency rollup-plugin-visualizer to v5.11.0 (#19025) 2023-12-13 20:46:12 -05:00
renovate[bot]
a33eb25c92 Update dependency prettier to v3.1.1 (#19027) 2023-12-13 20:45:00 -05:00
Simon Lamon
1dc61320a6 Fix Github Action labeler configuration (#19023) 2023-12-12 20:35:21 +01:00
karwosts
ad556a43f9 Sort default dashboard area cards by alphabetical order if no order specified (#18989) 2023-12-12 14:25:12 +01:00
renovate[bot]
12e6701ffa Update dependency marked to v11.0.1 (#19007) 2023-12-11 20:56:46 -05:00
karwosts
7167b66719 Don't leave empty arrays in the service control target (#18986) 2023-12-11 11:19:28 +01:00
dependabot[bot]
a52ba5fbd1 Bump actions/stale from 8.0.0 to 9.0.0 (#19004) 2023-12-11 08:06:47 +01:00
dependabot[bot]
22cf903656 Bump actions/setup-python from 4 to 5 (#19005) 2023-12-11 08:05:40 +01:00
dependabot[bot]
d77b657036 Bump actions/labeler from 4.3.0 to 5.0.0 (#19003) 2023-12-11 07:46:59 +01:00
renovate[bot]
4a3038c12c Update dependency hls.js to v1.4.13 (#18994) 2023-12-10 22:02:24 -05:00
renovate[bot]
3ac7cd5d4a Update dependency @codemirror/state to v6.3.3 (#18984) 2023-12-09 20:57:44 -05:00
renovate[bot]
58eddd2b42 Update dependency typescript to v5.3.3 (#18993) 2023-12-09 16:44:38 -05:00
renovate[bot]
d808da68bd Update dependency @lokalise/node-api to v12.1.0 (#18973) 2023-12-08 22:09:23 -05:00
renovate[bot]
2ed4d1efa0 Update dependency @braintree/sanitize-url to v7 (#18975) 2023-12-08 22:00:36 -05:00
Paul Bottein
6ce613acd2 20231208.2 (#18971) 2023-12-08 14:50:28 +01:00
Paul Bottein
fcb9e13a84 Bumped version to 20231208.2 2023-12-08 14:49:04 +01:00
Bram Kragten
3ada2f3279 Fix label when there is no target (#18969) 2023-12-08 13:38:01 +00:00
Paul Bottein
8d2d45ae4e Add dropdown style to hvac_modes feature (#18963) 2023-12-08 13:43:59 +01:00
Simon Lamon
c9e6963387 Fix todo url (#18954)
* Fix todo url

* Move searchParams

* Update src/panels/todo/ha-panel-todo.ts

* check if saved entity exists

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-12-08 13:35:57 +01:00
Paul Bottein
6d36b0e28c Hide climate mode control on default dashboard if there is only one hvac mode (#18964)
Hide hvac mode on default dashboard if there is only one hvac mode
2023-12-08 10:58:08 +00:00
Paul Bottein
aa38e2d409 20231208.1 (#18962) 2023-12-08 10:36:45 +01:00
Paul Bottein
61117bb34f Bumped version to 20231208.1 2023-12-08 10:30:33 +01:00
Simon Lamon
86a3c32844 Fix area in device picker (#18955)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-12-08 09:17:40 +00:00
Paul Bottein
b855b3e103 Format number attribute for media player (#18949) 2023-12-08 10:14:55 +01:00
renovate[bot]
80edeebab9 Update dependency chart.js to v4.4.1 (#18957) 2023-12-07 20:38:49 -05:00
renovate[bot]
f366e287b1 Update typescript-eslint monorepo to v6.13.2 (#18953) 2023-12-07 20:34:08 -05:00
renovate[bot]
9ce8684aba Update dependency lint-staged to v15.2.0 (#18930) 2023-12-07 20:32:47 -05:00
renovate[bot]
caa6ea531c Update dependency @types/luxon to v3.3.7 (#18956) 2023-12-07 20:28:26 -05:00
Paul Bottein
cca1183ee3 Revert "Remove card features for humidifier and climate on default dashboard" (#18944)
* Revert "Remove card features for humidifier and climate on default dashboard (#18747)"

This reverts commit 2afd2788e2.

* Rename humidifier feature
2023-12-07 16:53:07 +01:00
Paul Bottein
0f9c97aea0 Center login content for every screen size (#18943) 2023-12-07 13:45:05 +00:00
Paul Bottein
8d08aa8c79 Fix tile card interaction when border width is set to 0 (#18941) 2023-12-07 14:40:23 +01:00
renovate[bot]
eebcab435d Update dependency rollup-plugin-visualizer to v5.10.0 (#18936)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-07 11:15:26 +01:00
Bram Kragten
76d3c6e237 Revert fetching config flow after subscribe for progress (#18939) 2023-12-07 09:31:34 +01:00
karwosts
a820ca1e90 Fix number selector display for 0 (#18927) 2023-12-06 17:03:44 +01:00
Paul Bottein
fce4e5e382 20231206.0 (#18925) 2023-12-06 14:24:48 +01:00
Paul Bottein
39260d172f Bumped version to 20231206.0 2023-12-06 14:23:09 +01:00
Paul Bottein
e646528b86 Fix empty classmap in state control (#18922)
* Fix empy classmap in state control

* Don't use class map
2023-12-06 14:22:32 +01:00
Bram Kragten
86726102fb Fix issues with circular progress (#18920) 2023-12-06 14:21:28 +01:00
Bram Kragten
1330558819 Force media player browser dialog re-layout after open animation (#18910) 2023-12-06 14:14:14 +01:00
Paul Bottein
b4ab0fc10b Reduce sensitivity of the circular slider on touch devices (#18921) 2023-12-06 14:13:19 +01:00
Paul Bottein
15becf9ef6 Add ellipsis to thermostat and humidifier card title (#18924) 2023-12-06 13:28:03 +01:00
Paul Bottein
ef3785ce9f Fix particles over alert in login screen (#18923) 2023-12-06 13:16:47 +01:00
renovate[bot]
134e13005d Update dependency eslint-config-prettier to v9.1.0 (#18909) 2023-12-05 18:18:46 -05:00
Bram Kragten
eb5e7ba3f3 20231205.0 (#18916) 2023-12-05 18:10:37 +01:00
Bram Kragten
dccd9b2541 Bumped version to 20231205.0 2023-12-05 18:07:59 +01:00
Paul Bottein
de83ad7a7a Reduce circular slider sensitivity when used in card (#18908)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-12-05 18:06:29 +01:00
Paul Bottein
7e55b9e6b8 Add humidifier modes and toggle feature (#18912) 2023-12-05 18:06:03 +01:00
Paul Bottein
1b74ca47bf Add target humidity feature (#18913) 2023-12-05 16:42:07 +01:00
Bram Kragten
c3d4be9ceb wrap config validation (#18914) 2023-12-05 14:32:35 +00:00
karwosts
b8d0c7f7c7 Consistent sortable cursor (#18897) 2023-12-05 10:45:20 +01:00
karwosts
92bce4078f Confirmation dialog for todo clear checked items (#18905) 2023-12-05 10:44:40 +01:00
Bram Kragten
ff8f0697c2 Fix media control card background image (#18891) 2023-12-05 09:15:04 +01:00
renovate[bot]
dddba7af00 Update dependency eslint to v8.55.0 (#18904) 2023-12-05 02:19:03 +00:00
karwosts
14a49d6664 Copy to clipboard button for service response (#18872) 2023-12-04 14:24:35 +00:00
Bram Kragten
22da402d56 Fix border radius for outlined icon button old browsers (#18888) 2023-12-04 15:17:43 +01:00
Bram Kragten
aa4acc6572 Use resize polyfill from lit virtualizer (#18886) 2023-12-04 08:34:31 -05:00
Simon Lamon
4d432fba57 Hide battery level and battery icon in tile card (#18826) 2023-12-04 14:26:45 +01:00
G Johansson
97b71c785b Fix use of "" on lock entity more info (use default code) (#18706)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-12-04 13:23:11 +00:00
Paul Bottein
8a93284bb3 Use resize-controller instead of container queries (#18885) 2023-12-04 14:16:10 +01:00
renovate[bot]
bb2abe4efc Update dependency marked to v11 (#18860)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-12-04 13:11:51 +00:00
Simon Lamon
ccada33caf Accessibility improvements for circular progress indicators (#18506) 2023-12-04 14:06:25 +01:00
ildar170975
c5f15ee6ba Update ha-chart-base.ts: fix "Tooltip: a long name may overflow" (#18849) 2023-12-04 14:05:02 +01:00
renovate[bot]
6f240ec681 Update vaadinWebComponents monorepo to v24.2.5 (#18887)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-04 12:59:01 +00:00
renovate[bot]
fc6aef138d Update dependency fs-extra to v11.2.0 (#18848)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-04 13:57:40 +01:00
Bram Kragten
ae2e8e7402 20231204.0 (#18882) 2023-12-04 12:10:33 +01:00
Bram Kragten
6d0eb05954 Bumped version to 20231204.0 2023-12-04 12:08:11 +01:00
Bram Kragten
96fbbc55e1 Make history split by device class option in history card (#18871) 2023-12-04 12:06:26 +01:00
Bram Kragten
7e74502ba3 Add particles to login, move forgot password link (#18868) 2023-12-04 11:34:42 +01:00
Paul Bottein
b273b31b03 Don't allow yaml dashboard to be in edit mode (#18879) 2023-12-04 10:17:52 +01:00
renovate[bot]
cf00ac74c6 Update dependency sortablejs to v1.15.1 (#18876)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-04 00:57:31 -05:00
renovate[bot]
cc702f0fb3 Update dependency @types/luxon to v3.3.6 (#18875)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-12-04 00:53:54 -05:00
renovate[bot]
cc6eb5789d Update dependency clean-css to v5.3.3 (#18870) 2023-12-03 11:28:51 -05:00
renovate[bot]
669b80a9e1 Update babel monorepo to v7.23.5 (#18865) 2023-12-02 19:41:02 -05:00
karwosts
4c4fddee94 Fix for energy cards not refreshing hourly (#18854) 2023-12-02 23:33:04 +01:00
renovate[bot]
b28a4e6b50 Update fullcalendar monorepo to v6.1.10 (#18859) 2023-12-02 03:26:39 +00:00
renovate[bot]
bdd6a55a84 Update dependency @codemirror/commands to v6.3.2 (#18857) 2023-12-01 22:16:38 -05:00
renovate[bot]
d1ebc06994 Update typescript-eslint monorepo to v6.13.1 (#18853) 2023-12-01 22:15:42 -05:00
renovate[bot]
2a150788b4 Update typescript-eslint monorepo to v6.13.0 (#18845)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-30 15:06:07 -05:00
Bram Kragten
b854d23431 20231130.0 (#18843) 2023-11-30 17:19:47 +01:00
Bram Kragten
72caf72e80 Bumped version to 20231130.0 2023-11-30 17:18:58 +01:00
Bram Kragten
a6ff1899df Prevent double quick action (#18842) 2023-11-30 16:18:04 +00:00
Paul Bottein
6a999597df Rename number feature to number value feature (#18836) 2023-11-30 16:17:54 +00:00
Bram Kragten
219fc9e53a Group history by device class (#18841) 2023-11-30 17:17:26 +01:00
Bram Kragten
861959ed2d add previous button to login screen (#18837) 2023-11-30 17:06:22 +01:00
Damian Sypniewski
f7f50294e7 Added hold and double tap actions for tile card (#18345) 2023-11-30 16:03:07 +01:00
Bram Kragten
a226333c1e Update area-filter-dialog.ts 2023-11-30 15:16:01 +01:00
Bram Kragten
75f18aa69b Move disabled items always to the bottom, only change color of text, … (#18814)
* Move disabled items always to the bottom, only change color of text, dont drag disabled items

* Don't allow to drag hidden items

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2023-11-30 14:37:10 +01:00
Simon Lamon
60ff4fdc1f Ensure helper type is always localized (#18825)
* Ensure helper type is always localized

* Remove the check
2023-11-30 14:14:13 +01:00
renovate[bot]
8d14cb0ab7 Update vaadinWebComponents monorepo to v24.2.4 (#18835)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-30 08:12:43 -05:00
Bram Kragten
606c809880 Update size of icon on launch screen (#18833) 2023-11-30 12:34:46 +01:00
Simon Lamon
f1692038f8 Fix developer tools set state for unexisting entity (#18827)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-11-30 10:59:51 +00:00
Paul Bottein
79f5ec0cd5 Fix dashboard crashed when deleting hidden area (#18832) 2023-11-30 10:59:31 +00:00
renovate[bot]
416a2a080d Update CodeMirror (#18829)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-30 10:58:49 +00:00
Paul Bottein
92dc8b1561 Fix map dark mode (#18830) 2023-11-30 11:47:44 +01:00
karwosts
07b807adfc Fit map on load (#18819) 2023-11-30 10:49:40 +01:00
Simon Lamon
843430ef41 Cleanup iron resize event (#18813) 2023-11-29 21:02:57 +01:00
Bram Kragten
b5b2392dd2 Guard for no person for user (#18812) 2023-11-29 20:59:06 +01:00
Bram Kragten
ef735d65cf 20231129.1 (#18811) 2023-11-29 15:31:24 +01:00
karwosts
bf24740c7b Fix non-hass shouldUpdate regressions (#18810) 2023-11-29 14:28:38 +00:00
Bram Kragten
4ec11c7cf6 Bumped version to 20231129.1 2023-11-29 15:25:35 +01:00
Bram Kragten
2803e6aa95 20231129.0 (#18809) 2023-11-29 12:53:12 +01:00
Bram Kragten
8ff36d0ccf Merge branch 'master' into dev 2023-11-29 12:39:58 +01:00
Bram Kragten
e7e465df69 Bumped version to 20231129.0 2023-11-29 12:38:24 +01:00
karwosts
0c042079ed ha-selector-selector implementation (#18421)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-11-29 11:09:49 +00:00
lunmay
a5a9bcafa7 Typo fixes: "url" -> "URL" in blueprint (#18808) 2023-11-29 11:48:20 +01:00
Bram Kragten
867f625b0a Fix has changed for when hass is not changed (#18778) 2023-11-29 11:20:04 +01:00
Jan Bouwhuis
3876c67588 Add translation support for script errors (#18786)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-11-29 11:14:29 +01:00
Paul Bottein
93158bb3af Add re-import blueprint (#18807)
* Add re-import blueprint

* Add disabled color to icon
2023-11-29 10:56:52 +01:00
schelv
5c47d8652d Add Option For Kelvin Unit To Color Temperature Selector (#18627) 2023-11-29 10:56:44 +01:00
Josh McCarty
eda0d12867 Dev tools events layout (#18389)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-11-29 09:51:33 +00:00
Bram Kragten
4a53de4466 Lazy load language picker in auth and onboarding (#18806) 2023-11-29 10:50:05 +01:00
karwosts
e730649a8d Fix condition key function for template shorthand notation (#18107) 2023-11-29 10:46:22 +01:00
Steve Repsher
3a94deef69 Fix minifying templates from dependencies (#18795) 2023-11-29 10:35:53 +01:00
Bram Kragten
c1c186d279 Cleanup event listeners (#18803) 2023-11-29 10:21:12 +01:00
Matthias Alphart
7356db919a Default to ltr for reading direction (#18767) 2023-11-29 10:17:31 +01:00
Amit Finkelstein
44157a5df3 Fix map auto-fit (#18801) 2023-11-29 10:16:34 +01:00
Paul Bottein
2acd1ff5e8 Refactor and cleanup device picker (#18804) 2023-11-29 10:01:54 +01:00
Bram Kragten
150a5571cf Refactor and cleanup entity config page (#18797) 2023-11-29 09:19:53 +01:00
Bram Kragten
1eb25f4829 Add import thread credentials to external bus (#18777) 2023-11-29 09:01:33 +01:00
Bram Kragten
d8d4ecf79f Refactor and clean up of device pages (#18796) 2023-11-29 09:01:11 +01:00
karwosts
081bd98e98 Fix map autofit (#18799) 2023-11-29 00:29:52 +01:00
Robert Van Gorkom
6134f415e9 Fix race condition with picture-elements card custom elements (#18765) 2023-11-28 21:23:06 +00:00
karwosts
b6a7581eca Augment history panel with Long Term Statistics (#18213)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-11-28 22:14:05 +01:00
Paul Bottein
7727f34e8f Add area filter selector for default dashboard (#18779)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-11-28 21:43:34 +01:00
Amit Finkelstein
9b20e1cf56 Avoid re-rendering map with "sources" (#18635) 2023-11-28 20:30:28 +01:00
Steve Repsher
b901ecacca Add missing Intl polyfills to modern build (#18794) 2023-11-28 19:28:10 +00:00
Simon Lamon
7691f7eb05 PolymerElement cleanup (#18793) 2023-11-28 20:25:12 +01:00
Bram Kragten
8c0c56b954 Login page feedback (#18791) 2023-11-28 20:21:10 +01:00
karwosts
d968a20862 More disconnected callback errors (#18792) 2023-11-28 20:19:49 +01:00
karwosts
9f1cd80a31 Add a Grid/List toggle for Media Browser (#18256)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-11-28 16:34:34 +00:00
Paul Bottein
5a9ccc5ae7 Fix humidifier more info (#18789) 2023-11-28 17:30:39 +01:00
Paul Bottein
6d7b0c5626 Fix tile features colors (#18788) 2023-11-28 17:30:23 +01:00
karwosts
400b8034e1 missing disconnectedCallback in energy-period-selector (#18790) 2023-11-28 17:27:08 +01:00
Bram Kragten
05a22e3271 Keep targets when switching services (#18772) 2023-11-28 14:42:40 +01:00
Bram Kragten
c1f76e0565 Update ha-authorize.ts 2023-11-28 13:44:23 +01:00
Simon Lamon
4582c3ba0a Migrate state cards from Polymer to Lit (#18257) 2023-11-28 13:30:39 +01:00
Kendell R
f4ee734ea3 Use new localize format (#18574)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-11-28 12:29:41 +00:00
Bram Kragten
2087028c47 Update home.markdown 2023-11-28 13:24:09 +01:00
Paul Bottein
37a56b250a Add multiple option to text selector (#18785)
* Add multiple option to text selector

* Make multiple optional

* Update src/components/ha-selector/ha-selector-text.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-11-28 11:28:29 +01:00
Márton Braun
71a41be20a Add fit_zones parameter to map card (#18760) 2023-11-28 11:04:43 +01:00
Bram Kragten
ffb19b31a5 Use subscribe for todo items (#18776) 2023-11-28 08:28:13 +01:00
Bram Kragten
db68c7faa9 Log errors when downloading lokalise translations (#18781) 2023-11-28 08:21:19 +01:00
renovate[bot]
07ae958eb0 Update dependency vis-data to v7.1.9 (#18783)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-27 19:16:43 -05:00
renovate[bot]
b62b5f6575 Update dependency rollup-plugin-visualizer to v5.9.3 (#18782)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-27 19:15:00 -05:00
Bram Kragten
2e1fb9df66 Update design of login page (#18770) 2023-11-27 23:06:51 +01:00
Bram Kragten
31c91cea9a Update translations_upload_base 2023-11-27 17:59:13 +01:00
Bram Kragten
9dc844ca28 Dont change pipeline if local storage changes (#18773) 2023-11-27 15:42:07 +01:00
karwosts
02ebc028c8 Add custom card names to the edit card dialog header (#18750)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-11-27 15:30:39 +01:00
karwosts
5d35605b82 Filter energy card updates with shouldUpdate (#18763) 2023-11-27 15:29:15 +01:00
Bram Kragten
22e86af5b3 Fix race condition with Data Entry Flow Progress (#18775) 2023-11-27 11:28:49 +01:00
dependabot[bot]
8c39ed46a8 Bump dessant/lock-threads from 5.0.0 to 5.0.1 (#18769) 2023-11-27 07:40:59 +01:00
Raman Gupta
5965c3fdaa Add alert to zwave_js device info page for custom device config (#18686) 2023-11-26 11:09:02 +01:00
renovate[bot]
15a5d2bc38 Update dependency @bundle-stats/plugin-webpack-filter to v4.8.3 (#18761) 2023-11-25 22:22:03 -05:00
Paul Bottein
0432cc95fc Allow overriding blueprints (#18718) 2023-11-25 11:49:58 +01:00
renovate[bot]
6dafaac021 Update dependency @types/sortablejs to v1.15.7 (#18756)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-25 00:03:20 -05:00
renovate[bot]
d8929c9252 Update dependency @types/mocha to v10.0.6 (#18755)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-25 00:02:42 -05:00
renovate[bot]
5fa3a720b3 Update dependency @bundle-stats/plugin-webpack-filter to v4.8.2 (#18752) 2023-11-24 23:34:03 -05:00
renovate[bot]
6d3b838b6a Update dependency @types/leaflet-draw to v1.0.11 (#18753) 2023-11-24 23:33:03 -05:00
Bram Kragten
58e0179321 Add local login flow (#18717) 2023-11-24 17:22:05 +01:00
Paul Bottein
eaf7e29b8a Fix thermostat humidifier card size (#18749) 2023-11-24 16:27:01 +01:00
renovate[bot]
260f1df1b9 Update babel monorepo to v7.23.4 (#18730)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-24 15:58:57 +01:00
renovate[bot]
a88a4ef82c Update dependency typescript to v5.3.2 (#18736)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-24 15:57:57 +01:00
Steve Repsher
075cca5991 Inject polyfills where used (#18719) 2023-11-24 15:57:21 +01:00
Simon Lamon
1d2dc37f75 Migrate push notification toggle from Polymer to Lit (#18565) 2023-11-24 15:47:09 +01:00
Paul Bottein
3da7025d78 Improve search for single character (#18748) 2023-11-24 14:37:59 +00:00
Paul Bottein
15b1d8ee14 Move more info control component to state control (#18745) 2023-11-24 14:33:11 +00:00
karwosts
239d8fa948 Fix card-picker search for single character (#18733)
* Fix card-picker search for single character

* Update src/panels/lovelace/editor/card-editor/hui-card-picker.ts

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2023-11-24 15:23:27 +01:00
Bram Kragten
1de2e6161d Make thermostat centered in panel or grid view (#18731)
* Make thermostat centered in panel or grid view

* Update hui-humidifier-card.ts
2023-11-24 14:17:06 +01:00
Paul Bottein
3e7f008277 Rename tile features to card features (#18732) 2023-11-24 13:36:58 +01:00
G Johansson
31a93d360d Make lock default code a password field (#18722) 2023-11-24 13:11:18 +01:00
Paul Bottein
2afd2788e2 Remove card features for humidifier and climate on default dashboard (#18747) 2023-11-24 12:53:41 +01:00
renovate[bot]
322fa99147 Update dependency @types/tar to v6.1.10 (#18742)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-24 11:13:49 +00:00
renovate[bot]
c43ad52ff1 Update dependency @types/sortablejs to v1.15.6 (#18741)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-24 12:03:01 +01:00
Paul Bottein
6aa9737481 Fix ha control select option size (#18746) 2023-11-24 12:02:44 +01:00
renovate[bot]
7d9d6b99d9 Update dependency @types/luxon to v3.3.5 (#18739) 2023-11-24 03:46:28 +00:00
renovate[bot]
9c69e6f87c Update dependency @types/mocha to v10.0.5 (#18740) 2023-11-23 22:36:00 -05:00
renovate[bot]
0c90021895 Update typescript-eslint monorepo to v6.12.0 (#18734) 2023-11-23 21:59:42 -05:00
Paul Bottein
9163b9c124 Add new design to humidifier card (#18711) 2023-11-23 00:37:19 +01:00
renovate[bot]
61717e1529 Update dependency core-js to v3.33.3 (#18721)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-22 13:38:08 -05:00
renovate[bot]
168d418c27 Update dependency @bundle-stats/plugin-webpack-filter to v4.8.1 (#18720)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-22 13:36:11 -05:00
Paul Bottein
c787c920fc Add new design to thermostat card (#18709)
* Add new design for thermostat card

* Add feature to thermostat card

* Fix margin

* Add current

* use big number component

* Add current

* Fix translations

* Add theme and name options

* Reduce margin on small card

* Fix types

* Add hvac mode to default dashboard

* Don't put feature full size

* Full width for features

* Improve design on small screen
2023-11-22 14:42:42 +01:00
Steve Repsher
1526209f82 Adjust bundle filenames for stats and debugging (#18677) 2023-11-22 14:11:23 +01:00
Steve Repsher
cf355c419d Fix Babel runtime helper injections (#18698) 2023-11-22 14:10:28 +01:00
Paul Bottein
eef024587b Use entity component translations for update entity (#18608) 2023-11-22 12:43:33 +01:00
Paul Bottein
270d463d02 Add configuration to default dashboard (#18658)
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2023-11-22 12:40:17 +01:00
renovate[bot]
0735705dd3 Update dependency eslint to v8.54.0 (#18707) 2023-11-20 19:21:17 -05:00
dependabot[bot]
0a1dbe6d9d Bump dessant/lock-threads from 4.0.1 to 5.0.0 (#18699)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Co-authored-by: Franck Nijhof <git@frenck.dev>
2023-11-20 08:47:54 +01:00
renovate[bot]
15395275ba Update dependency prettier to v3.1.0 (#18675)
* Update dependency prettier to v3.1.0

* Reformat

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2023-11-19 23:31:56 -05:00
karwosts
6e66ba202f Add a button to delete all refresh tokens (#18680)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-11-19 13:32:25 +01:00
karwosts
5ebe1e0369 Add shortcut from energy dashboard to energy settings (#18596) 2023-11-19 13:31:55 +01:00
renovate[bot]
860ab7a3ba Lock file maintenance (#18696)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-18 22:50:36 -05:00
renovate[bot]
d499640304 Update dependency @lezer/highlight to v1.2.0 (#18672)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-18 22:28:46 -05:00
renovate[bot]
4f3f516767 Update dependency rrule to v2.8.1 (#18648)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-18 21:06:30 -05:00
renovate[bot]
0996dbf2a1 Update formatjs monorepo (#18684)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-18 21:37:37 +00:00
renovate[bot]
bc59e52cea Update dependency marked to v10 (#18651)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-18 16:33:31 -05:00
wittypluck
b8d4e957e2 Add logarithmic scale option to Statistics and History graph cards (#18637) 2023-11-18 17:31:29 +01:00
karwosts
8002ec75bc Temporarily filter cleared statistics from devtools table (#18694) 2023-11-18 17:30:48 +01:00
karwosts
a45eefa742 Add live camera & custom AR to Area card (#18643) 2023-11-18 17:26:21 +01:00
Jan Bouwhuis
a1236924aa Ensure websocket_api error messages shows longer (#18690) 2023-11-17 20:35:08 +01:00
renovate[bot]
9320e8c1a3 Update Yarn to v4.0.2 (#18687)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-17 11:35:32 -05:00
karwosts
addcd3a983 Typo in bug_report.yml (#18681)
Update bug_report.yml
2023-11-17 15:53:12 +01:00
Paul Bottein
e1dc73e992 Fix yaml editor lovelace (#18664) 2023-11-16 18:55:09 +01:00
renovate[bot]
ba8849ed4d Update typescript-eslint monorepo to v6.11.0 (#18679)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-16 12:48:12 -05:00
Thomas Lovén
36bca04341 Polyfill ElementInternals for material-web components. Fix #18600 (#18638) 2023-11-16 18:17:41 +01:00
Simon Lamon
fb95de1f73 Add translations for the developer tools statistic issues (#18646) 2023-11-16 18:16:51 +01:00
karwosts
3addfc3548 Localization bugfixes in config devices/entities/helpers (#18645) 2023-11-16 18:13:31 +01:00
renovate[bot]
e2e80d1f49 Update vaadinWebComponents monorepo to v24.2.3 (#18678)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-16 12:03:38 -05:00
renovate[bot]
a96eba2637 Update dependency @lit-labs/virtualizer to v2.0.11 (#18583)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-16 11:55:24 -05:00
renovate[bot]
274810b954 Update dependency luxon to v3.4.4 (#18674)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-16 11:40:03 -05:00
Paul Bottein
842df983c3 Add new dashboard dialog (#18657)
* Add new dashboard dialog

* Update default dashboard wording
2023-11-16 13:43:55 +01:00
Simon Lamon
0eeadcd31a Replace paper-input in cast (#18647) 2023-11-16 12:39:54 +01:00
Josh McCarty
8d37c5612b Move attribute pre styles to ha-attribute-value component (#18649) 2023-11-16 12:28:45 +01:00
dnikles
e94461f7fe Update dialog-add-integration.ts (#18615) 2023-11-16 12:18:18 +01:00
Bram Kragten
f5edee1e91 Add support for warnings in check_config (#18489) 2023-11-16 12:17:14 +01:00
Paul Bottein
98cdbb4559 Add minimal UI for climate and water entity without target (#18666) 2023-11-16 12:16:37 +01:00
Paul Bottein
f3f63d95b5 Restore map filter theme (#18667) 2023-11-16 12:12:17 +01:00
karwosts
244340f211 Allow search for integration name in log search (#18668) 2023-11-16 12:08:10 +01:00
Paul Bottein
75626431b1 Improve ripple background color for tile card (#18579) 2023-11-16 10:57:24 +01:00
Allen Porter
244868348b Delete To-do items in a batched single request (#18662) 2023-11-16 09:52:03 +01:00
renovate[bot]
a909c6d905 Update formatjs monorepo (#18663) 2023-11-15 20:49:16 -05:00
Michael Hansen
f2efff9d71 Use stt-vad-end event in assist debug panel (#18671)
* Use stt-vad-end event in assist debug panel

* Remove end_suffix
2023-11-15 21:36:49 +00:00
karwosts
08a7a10e1c Don't save new automation when save dialog is cancelled (#18655) 2023-11-15 18:03:47 +01:00
Simon Lamon
b35e5abd83 Fix Edit Area dialog doesn't save area (#18659)
secondary action
2023-11-15 18:00:35 +01:00
karwosts
291e9fc0a2 Fix onboarding password form (#18665) 2023-11-15 17:58:22 +01:00
Paul Bottein
de370d6384 Add todo entity_id in URL (#18653) 2023-11-15 11:26:03 +01:00
Paul Bottein
1cf928b425 Improve Lovelace types (#18652) 2023-11-15 11:13:49 +01:00
renovate[bot]
b9c62c34a0 Update dependency lint-staged to v15.1.0 (#18660)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-15 10:49:33 +01:00
renovate[bot]
37554213dc Update dependency @bundle-stats/plugin-webpack-filter to v4.8.0 (#18654) 2023-11-14 20:37:44 -05:00
renovate[bot]
3845fd2ef9 Update dependency @types/tar to v6.1.9 (#18650) 2023-11-14 20:35:55 -05:00
renovate[bot]
837b36a430 Update dependency marked to v9.1.6 (#18644)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-13 19:46:13 +01:00
karwosts
bff09a7a36 Fix login password form (#18619) 2023-11-13 19:45:34 +01:00
renovate[bot]
a5e5efa526 Update dependency @codemirror/autocomplete to v6.11.0 (#18633)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-12 22:29:54 -05:00
renovate[bot]
1cd5b9ff37 Update babel monorepo to v7.23.3 (#18632)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-12 21:16:45 -05:00
renovate[bot]
6a11155dd7 Update dependency vis-data to v7.1.8 (#18625) 2023-11-11 21:09:28 -05:00
renovate[bot]
1acb76d2f0 Update dependency @types/leaflet to v1.9.8 (#18622) 2023-11-12 02:07:18 +00:00
renovate[bot]
2e8a40efd5 Update dependency @types/ua-parser-js to v0.7.39 (#18616) 2023-11-11 20:58:50 -05:00
renovate[bot]
845a0e4e39 Update dependency @types/js-yaml to v4.0.9 (#18621) 2023-11-11 20:56:30 -05:00
Paul Bottein
9417f13cc9 Add unit for number tile feature (#18602) 2023-11-10 19:30:07 +01:00
renovate[bot]
d3f52f3bc0 Update dependency @types/tar to v6.1.8 (#18614)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-10 18:17:57 +00:00
renovate[bot]
7d0ec00fde Update dependency @types/sortablejs to v1.15.5 (#18613)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-10 13:06:13 -05:00
renovate[bot]
6dbb5dd4be Update dependency @types/qrcode to v1.5.5 (#18610)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-10 13:05:36 -05:00
renovate[bot]
f30e7948cb Update dependency @types/luxon to v3.3.4 (#18605)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-10 13:04:49 -05:00
renovate[bot]
41472d8160 Update dependency @types/serve-handler to v6.1.4 (#18612)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-10 12:43:05 -05:00
renovate[bot]
e596d32426 Update dependency @types/mocha to v10.0.4 (#18606)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-10 12:41:33 -05:00
renovate[bot]
89de62812f Update dependency @types/leaflet-draw to v1.0.10 (#18603)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-10 12:39:56 -05:00
renovate[bot]
3e391fcbe6 Update dependency @types/html-minifier-terser to v7.0.2 (#18601)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-10 12:37:31 -05:00
karwosts
708ab2ed69 Localize hide/show password (#18607) 2023-11-10 18:12:36 +01:00
Paul Bottein
1d45cb78fe Rename tooltipUnit to unit for slider (#18599) 2023-11-10 18:08:12 +01:00
Philip Allgaier
d3f6ebd1d0 Add unit to temperature tile number button group (#17841)
* Add unit to temperature tile number button group

* Update gallery

* Use blank before unit

* Hide unit if no space

* Fix build

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2023-11-10 14:22:10 +01:00
Joseph Abbey
21644c70b3 Add number tile feature (#18562)
* hui-number-tile-feature

* Added support for number domain

* Apply suggestions from code review (thanks @piitaya)

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* Fixed the callback to use the correct service

* fix formatting

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2023-11-10 08:34:29 +00:00
karwosts
eb75389cac Localize clear in entity filter (#18598)
Localize  in entity filter
2023-11-10 08:27:36 +01:00
Bram Kragten
cd4f3a091b Fix add device dialog (#18591) 2023-11-10 08:27:02 +01:00
renovate[bot]
19c1973ec1 Update dependency @types/chromecast-caf-sender to v1.0.8 (#18597)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-10 03:35:04 +00:00
renovate[bot]
a8efbe5b06 Update dependency @types/chromecast-caf-receiver to v6.0.12 (#18595)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-10 03:22:14 +00:00
renovate[bot]
44b5c66c19 Update dependency @types/babel__plugin-transform-runtime to v7.9.5 (#18594)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-09 22:08:58 -05:00
renovate[bot]
3fa3bba4d8 Update formatjs monorepo (#18592)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-09 22:07:01 -05:00
renovate[bot]
ab09c821a2 Update typescript-eslint monorepo to v6.10.0 (#18586)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-09 22:05:26 -05:00
Paul Bottein
18b5215ce6 Only update dev tools yaml editor on entity change or submit (#18575)
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2023-11-09 18:24:45 +01:00
Bram Kragten
00a311bd63 Bumped version to 20231030.2 2023-11-09 18:23:17 +01:00
tzagim
749c2ab8ac Fix for RTL (#18509) 2023-11-09 18:22:27 +01:00
Kendell R
d06fdeb265 Fix "ttme" typo on the demo page (#18543) 2023-11-09 18:22:12 +01:00
Simon Lamon
06d76be2c2 Fix refresh in developer state tools (#18532) 2023-11-09 18:21:50 +01:00
David Bell
6728e8d107 Don't display hidden/non-visible calendars on the Calendar panel (#18541) 2023-11-09 18:21:32 +01:00
Kendell R
533e2bed8a Properly set direction styles (#18483) 2023-11-09 18:20:44 +01:00
karwosts
310a08f3e6 Fix choose add option (#18493) 2023-11-09 18:19:19 +01:00
Paul Bottein
0566889a1e Use strict comparison for above condition in conditional card (#18560) 2023-11-09 18:18:37 +01:00
Paul Bottein
37b7395986 Migrate chips to Material 3 chips. (#18513) 2023-11-09 17:57:37 +01:00
Bram Kragten
4933413140 Fix virtualizer with v2.0.10 (#18584) 2023-11-09 11:53:35 -05:00
Bram Kragten
1c16bd5ab2 rollback lit-labs/virtualizer to 2.0.8 (#18580) 2023-11-09 16:26:09 +01:00
Paul Bottein
3a926c6f83 Add pointer-events none to slider tooltip (#18577) 2023-11-09 14:57:23 +01:00
Paul Bottein
7a619ad55a Only update dev tools yaml editor on entity change or submit (#18575)
Co-authored-by: Simon Lamon <32477463+silamon@users.noreply.github.com>
2023-11-09 10:00:24 +01:00
Paul Bottein
bc21425981 Add tooltip to tile sliders and more info sliders (#18567) 2023-11-08 12:47:55 +01:00
renovate[bot]
f2505c0798 Update dependency eslint to v8.53.0 (#18558)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-08 11:48:22 +01:00
Steve Repsher
cee8c756fc Remove dependency esprima (#18564) 2023-11-08 11:24:03 +01:00
renovate[bot]
396b3aace9 Update dependency @codemirror/view to v6.22.0 (#18553)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-07 18:02:11 -05:00
renovate[bot]
28dc1e4da9 Update vaadinWebComponents monorepo to v24.2.2 (#18552)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-07 17:59:54 -05:00
Kendell R
aa0419e783 Minify logos (#18542) 2023-11-07 13:39:38 +01:00
Jan Bouwhuis
fd9c24d05e Add localization to service call exceptions (#18447) 2023-11-07 12:04:53 +01:00
Paul Bottein
8bdbe8c6a6 Use strict comparison for above condition in conditional card (#18560) 2023-11-07 12:04:04 +01:00
Steve Repsher
39550cefa0 Add some Renovate groups and enable NVM updates (#18559) 2023-11-07 11:53:47 +01:00
David Bell
589e3b63c7 Don't display hidden/non-visible calendars on the Calendar panel (#18541) 2023-11-06 15:09:54 +00:00
renovate[bot]
0cc38278b9 Update dependency @lit-labs/virtualizer to v2.0.10 (#18547)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-06 15:56:45 +01:00
renovate[bot]
aafdf7bed7 Update dependency vis-network to v9.1.9 (#18548)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-06 15:55:24 +01:00
Simon Lamon
a7f6ce3079 Fix refresh in developer state tools (#18532) 2023-11-06 15:53:23 +01:00
karwosts
3d03f74d66 Improve template trigger/condition descriptions (#18504) 2023-11-06 10:04:58 +01:00
tzagim
e09a6a23fc Fix for RTL (#18509) 2023-11-06 10:02:44 +01:00
Kendell R
9e4bb6ed0c Fix "ttme" typo on the demo page (#18543) 2023-11-06 10:02:00 +01:00
renovate[bot]
c45c8ab5c0 Update dependency sinon to v17.0.1 (#18535)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-05 14:16:21 -05:00
renovate[bot]
5ef6973933 Update dependency marked to v9.1.5 (#18523)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-05 14:14:50 -05:00
renovate[bot]
1df344580a Update dependency eslint-plugin-lit-a11y to v4.1.1 (#18534)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-05 14:13:25 -05:00
renovate[bot]
25acc479b9 Update dependency core-js to v3.33.2 (#18515) 2023-11-02 20:54:59 -04:00
renovate[bot]
c9f051374b Update dependency punycode to v2.3.1 (#18516) 2023-11-02 20:50:03 -04:00
renovate[bot]
bf5116fc0b Update typescript-eslint monorepo to v6.9.1 (#18518) 2023-11-02 20:47:03 -04:00
renovate[bot]
edc8cb1d2e Update dependency @rollup/plugin-replace to v5.0.5 (#18505) 2023-11-02 20:42:05 -04:00
Bram Kragten
a60bb3ae0a Clean up auth flow translation placeholders (#18502) 2023-11-02 21:02:42 +01:00
Paul Bottein
784f753f07 Display default action label in action selector (#18398) 2023-11-02 16:10:15 +01:00
Paul Bottein
e63c7e3763 Add trigger selector for blueprint (#18469) 2023-11-02 16:01:59 +01:00
karwosts
cfa522068c Localize trigger condition and add list formatting (#18488) 2023-11-01 15:42:43 +01:00
schelv
5f2375fe84 feat: Dynamically adjust gradient percentages based on min/max values (#18479) 2023-11-01 15:41:26 +01:00
Kendell R
a9e34d7590 Stop using ha-markdown on the auth page (#18480) 2023-11-01 15:36:17 +01:00
Paul Bottein
463cfb869f Add and and or condition to conditional card (#18409) 2023-11-01 15:28:37 +01:00
Paul Bottein
acb5a2b283 Add test button to conditional card (#18411) 2023-11-01 15:25:56 +01:00
Bram Kragten
08597d6e91 Bump node to v20 (#18497) 2023-11-01 15:22:23 +01:00
renovate[bot]
9478485268 Update Yarn to v4 (#18414)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-11-01 10:16:46 +00:00
renovate[bot]
0af9ec2fff Pin dependencies (#18498)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-11-01 09:51:15 +00:00
Kendell R
f6e74de05e Properly set direction styles (#18483) 2023-11-01 10:38:02 +01:00
Bram Kragten
8b0373d5c0 Revert bump to @lit/context@1.0.1 (#18496) 2023-11-01 10:35:50 +01:00
Bram Kragten
ddca7584ef Bumped version to 20231030.1 2023-11-01 10:21:08 +01:00
karwosts
e6cfe74cac Fix choose add option (#18493) 2023-11-01 10:20:25 +01:00
karwosts
d4218250af Fix choose add option (#18493) 2023-11-01 09:37:26 +01:00
renovate[bot]
78783942be Update dependency @lit-labs/observers to v2.0.2 (#18484)
* Update dependency @lit-labs/observers to v2.0.2

* Resolve @lit/reactive-element to v1

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2023-10-31 14:42:28 -04:00
renovate[bot]
17ad8013ca Update dependency @lit-labs/context to v0.5.1 (#18208)
* Update dependency @lit-labs/context to v0.5.1

* Switch to @lit/context and resolve reactive-element to v1

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2023-10-31 13:53:53 -04:00
renovate[bot]
f70767f084 Update dependency @lit-labs/motion to v1.0.6 (#18205)
* Update dependency @lit-labs/motion to v1.0.6

* Resolve to lit v2

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2023-10-31 14:31:42 +00:00
renovate[bot]
3972394d82 Update dependency @lit-labs/virtualizer to v2.0.9 (#18206)
* Update dependency @lit-labs/virtualizer to v2.0.9

* Resolve to lit v2

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2023-10-31 13:22:54 +00:00
renovate[bot]
5331fb4f5f Update dependency marked to v9.1.3 (#18485)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-31 08:44:18 -04:00
Matthias de Baat
16df352ba8 Update ha-dialogs.markdown (#18487) 2023-10-31 12:27:46 +00:00
Bram Kragten
3b553a3a4b 20231030.0 (#18478) 2023-10-30 21:45:08 +01:00
Bram Kragten
8e1e75dee1 Bumped version to 20231030.0 2023-10-30 21:44:17 +01:00
Bram Kragten
d27b4e04a9 Adapt to new todo services (#18477) 2023-10-30 20:32:32 +00:00
Simon Lamon
36f7b34ac5 Use trigger and condition type translation labels (#18413)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-10-30 20:54:30 +01:00
renovate[bot]
c0ff24bf1b Update dependency ua-parser-js to v1.0.37 (#18473)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-30 12:29:17 -04:00
Duco Sebel
abb5aa348f Allow individual item deletion in To-do list (#18464)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-10-30 14:21:29 +00:00
renovate[bot]
37ab5cbdc3 Update dependency fuse.js to v7 (#18462)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-10-30 15:09:12 +01:00
Bram Kragten
42be3b331c Fix buttons (#18472) 2023-10-30 13:56:48 +01:00
Paul Bottein
71e05f79c2 Update ts-lit-plugin to 2.0.1 (#18471) 2023-10-30 13:40:07 +01:00
karwosts
c5a0a5bbbf Fix statistics bar chart time axis (#18450) 2023-10-30 13:39:15 +01:00
dependabot[bot]
c3d809fcf3 Bump actions/setup-node from 3.8.1 to 4.0.0 (#18468)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2023-10-30 11:18:14 +01:00
renovate[bot]
cbd0c39091 Update formatjs monorepo (#18423) 2023-10-29 22:05:19 -04:00
renovate[bot]
113eb5be24 Update dependency eslint-plugin-lit to v1.10.1 (#18460) 2023-10-28 21:45:57 -04:00
renovate[bot]
c497669fd3 Update dependency ts-lit-plugin to v2.0.0 (#18459) 2023-10-29 01:39:04 +00:00
renovate[bot]
c32ca5885b Update dependency lit-analyzer to v2.0.1 (#18458) 2023-10-28 21:28:01 -04:00
renovate[bot]
3c792c4019 Update dependency @bundle-stats/plugin-webpack-filter to v4.7.8 (#18457) 2023-10-28 21:23:43 -04:00
renovate[bot]
9762e61ee2 Update vaadinWebComponents monorepo to v24.2.1 (#18454)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-28 20:36:52 +00:00
renovate[bot]
c09c39998b Update dependency vue to v2.7.15 (#18424)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-28 16:22:32 -04:00
renovate[bot]
d37e29c247 Update CodeMirror (#18453)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-28 16:20:45 -04:00
renovate[bot]
51f22cd74a Update dependency eslint-import-resolver-webpack to v0.13.8 (#18422)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-28 16:12:52 -04:00
renovate[bot]
b57dc968bd Update dependency eslint-plugin-import to v2.29.0 (#18425)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-28 16:07:23 -04:00
renovate[bot]
e2e8cb785a Update typescript-eslint monorepo to v6.9.0 (#18433)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-28 16:06:02 -04:00
Bram Kragten
3d674cf237 20231027.0 (#18448) 2023-10-27 16:55:37 +02:00
Bram Kragten
9961a4ae3f Bumped version to 20231027.0 2023-10-27 16:33:32 +02:00
Bram Kragten
c25755bfcd Translate todo panel title, update assist title/icon (#18442) 2023-10-27 16:33:02 +02:00
Bram Kragten
40983619d6 Reload when entering safe mode (#18443) 2023-10-27 15:48:01 +02:00
Bram Kragten
54758b5962 Don't override ranges provided by parent (#18444) 2023-10-27 15:47:47 +02:00
Bram Kragten
4f09485b20 Update todo list items when entity changes, only refresh on shopping … (#18445) 2023-10-27 15:47:37 +02:00
Paul Bottein
9207f6c407 Fix unit of measurement not displayed in entity settings (#18440) 2023-10-27 13:29:41 +02:00
Paul Bottein
1a2312460a Disable resource panel in safe mode (#18437) 2023-10-27 13:29:00 +02:00
Simon Lamon
951b88ab4c Fix change entity in dev tools state (#18441) 2023-10-27 13:27:01 +02:00
Bram Kragten
d3cc57d8b4 Don't use lookbehind assertion in slugify (#18438) 2023-10-27 12:53:17 +02:00
karwosts
4e9b118728 Ensure energy card titles always displayed (#18432) 2023-10-27 10:42:01 +02:00
Paul Bottein
4e6e924a40 20231026.0 (#18431) 2023-10-26 15:57:36 +02:00
Paul Bottein
f1748e4dd5 Bumped version to 20231026.0 2023-10-26 15:39:36 +02:00
Paul Bottein
d491d8f5ac Quick fix for lovelace resources not loaded (#18430) 2023-10-26 15:37:31 +02:00
Bram Kragten
cf0fde0f3c Change move item todo API (#18410)
* Change move item todo API

* Handle entity unavailable, add link to more info, allow to delete local todo
2023-10-26 15:37:13 +02:00
Paul Bottein
a7dc2cfaa6 Reduce slider handle size (#18427) 2023-10-26 15:25:47 +02:00
Paul Bottein
d8c7db6ebf Add translations to tile state content options (#18428) 2023-10-26 10:32:09 +00:00
J. Nick Koston
c3743b57ea Speed up first load by preloading recorder info (#18412) 2023-10-25 19:29:44 +00:00
Steve Repsher
e16a101de8 Compress service worker (#18407) 2023-10-25 17:17:11 +02:00
Paul Bottein
94ad47c60e Hide reveal icon on edge for text-field (#18408) 2023-10-25 17:15:43 +02:00
Bram Kragten
184ef7b7ff Bar media player fixes (#18402) 2023-10-25 16:04:05 +02:00
karwosts
81053f2e07 Fix an undefined exception in more-info popup for history graph (#18404) 2023-10-25 15:48:05 +02:00
Paul Bottein
e8b4eeec67 Allow any number in above and below numeric condition (#18403) 2023-10-25 13:38:39 +00:00
karwosts
b0b7e77e28 Fix schedule form rendering after disconnect (#18401) 2023-10-25 13:21:05 +00:00
Bram Kragten
073ead5828 20231025.1 (#18399) 2023-10-25 13:59:53 +02:00
Bram Kragten
763f80b46a Bumped version to 20231025.1 2023-10-25 13:59:11 +02:00
Bram Kragten
0c2531a7ee Update todo list card (#18396) 2023-10-25 13:57:50 +02:00
Paul Bottein
8d2ec8098c Fix state not condition for condition card (#18397) 2023-10-25 11:09:28 +00:00
Bram Kragten
fdaefadd18 20231025.0 (#18395) 2023-10-25 12:17:22 +02:00
Bram Kragten
d2caed2b68 Merge branch 'master' into dev 2023-10-25 11:51:01 +02:00
Jan-Philipp Benecke
402d443843 Add mac and bluetooth address to the device info card (#18392)
Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2023-10-25 11:47:54 +02:00
Bram Kragten
399f12194a Bumped version to 20231025.0 2023-10-25 11:47:02 +02:00
Bram Kragten
a745539c33 fix height issue calendar, make default on mobile list (#18394) 2023-10-25 11:46:28 +02:00
Bram Kragten
f6fddbc6ec Add create todo list button (#18387) 2023-10-25 11:38:45 +02:00
Steve Repsher
01f51f3247 Cache brand images (#17840) 2023-10-25 09:28:28 +02:00
karwosts
80112bb662 Add Fields to Script UI (#18250) 2023-10-25 09:23:15 +02:00
Jan-Philipp Benecke
7ce7cbb755 Add serial number to the device info card (#18386)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
Co-authored-by: Franck Nijhof <frenck@frenck.nl>
Co-authored-by: Franck Nijhof <git@frenck.dev>
2023-10-25 06:32:24 +02:00
karwosts
464ecffda7 Fix a crash in trace graph generation for if/else (#18390) 2023-10-24 23:18:21 +00:00
Paul Bottein
33e0c691c7 Use expansion panel for dashboard conditions (#18380) 2023-10-25 00:45:55 +02:00
c0ffeeca7
d94f7c90c0 Restart dialog description: consistently use indicative form (#18385)
Co-authored-by: Franck Nijhof <git@frenck.dev>
2023-10-24 23:39:23 +02:00
Raman Gupta
d8d16c4d5f Add Z-Wave controller hard reset device action (certification req) (#18216)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-10-24 23:16:21 +02:00
Bram Kragten
1cb238ec2a Fixes for todo card (#18388) 2023-10-24 22:53:54 +02:00
karwosts
3e6ab8b179 Chart updates to improve stability, possible fix for infinite loop (#18329)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-10-24 20:41:34 +00:00
Bram Kragten
10bcaadcdb center icons in restart dialog 2023-10-24 21:21:02 +02:00
Bram Kragten
67517643ef Add safe mode theme and alert dialog 2023-10-24 21:08:23 +02:00
Paul Bottein
eb35eb3de5 Disable dashboard resources in safe mode (#18382) 2023-10-24 20:15:11 +02:00
Paul Bottein
8350d71f6e Add restart in safe mode in restart dialog (#18375) 2023-10-24 20:09:54 +02:00
Paul Bottein
c840f1cbb1 Redesign about page (#18383) 2023-10-24 20:07:12 +02:00
Bram Kragten
8efc0816bb Rename shopping-list-card to todo-list-card (#18378) 2023-10-24 20:06:03 +02:00
J. Nick Koston
b12e4989db Subscribe to the issue registry as early as possible (#18384) 2023-10-24 19:34:47 +02:00
Bram Kragten
2b67731906 Add resize observer to full calendar, fix missing styles (#18381) 2023-10-24 19:33:15 +02:00
Bram Kragten
ccba7a7623 Add button to create local calendar in calendar panel (#18377) 2023-10-24 19:33:03 +02:00
Bram Kragten
c0dfc9f73e Performance tweaks in energy dashboard (#18379)
* Remove unneeded refresh from energy panel

* Optimize energy-period-selector
2023-10-24 18:18:29 +02:00
Bram Kragten
be1624f66f Convert shopping list card editor to ha-form (#18376)
* Convert shopping list card editor to ha-form

* hide todo from generated dashboard
2023-10-24 18:14:14 +02:00
Steve Repsher
32edbd7b33 Remove js-yaml resource proxy (#18369) 2023-10-24 14:17:25 +02:00
Josh McCarty
18827db9ba Add bottom padding to code editor (#18368) 2023-10-24 12:59:14 +02:00
karwosts
191250a66a Fix complex attribute display in devtools (#18371) 2023-10-24 12:57:36 +02:00
Erik Montnemery
1fdf609606 Rename safe mode to recovery mode (#18374)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-10-24 12:56:27 +02:00
Paul Bottein
6ffc0625d3 Add support for state content customization in tile card (#18180)
* Add support for state content customization

* Add reorder option

* Do not display null attributes

* Always return a value

* Add hide state option

* Add missing attribute unit

* Fix sortable create and destroy
2023-10-24 12:08:11 +02:00
Allen Porter
c9f5d16745 Rename status code string for To-do List NEEDS-ACTION status (#18373) 2023-10-24 12:07:36 +02:00
renovate[bot]
eb4afedf2e Update dependency eslint to v8.52.0 (#18370) 2023-10-23 20:46:04 -04:00
Bram Kragten
2b9540fe03 Add support for todo component (#18289) 2023-10-23 22:53:09 +02:00
renovate[bot]
53b8d1bb0a Update dependency sinon to v17 (#18346)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-23 15:18:23 +00:00
Simon Lamon
0ff5bffd0c Make time condition translatable (#18298) 2023-10-23 17:02:51 +02:00
Paul Bottein
82a464f50f Add translation to numeric condition card 2023-10-23 16:37:27 +02:00
Paul Bottein
fdddc18291 Add numeric state condition for conditional card (#18288)
* Add numeric state condition for conditional card

* Add validate ui

* Clean entity data

* Check for numeric state
2023-10-23 14:17:23 +00:00
Bram Kragten
463a3244cf Add two pane view to calendar panel (#18286)
Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2023-10-23 14:13:38 +00:00
karwosts
6cae11f0a6 Update statistics chart to respect entity display precision, fix precision bug in history chart (#18334) 2023-10-23 16:03:42 +02:00
renovate[bot]
65112b36ce Update dependency @material/web to v1.0.1 (#18335)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-23 15:53:18 +02:00
renovate[bot]
58625d2a9d Update dependency core-js to v3.33.1 (#18339)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-23 15:50:55 +02:00
Paul Bottein
9bafbdd989 Allow multiple states in conditional card (#18273)
* Allow multiple states in conditional card

* Update src/panels/lovelace/editor/conditions/types/ha-card-condition-state.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-10-23 13:49:43 +00:00
Paul Bottein
eedb42b2f3 Add user condition to conditional card (#18265)
* Add user condition to conditional card

* Refactor user fetch

* Add validate ui

* Use ha-check-list-item
2023-10-23 13:49:27 +00:00
Paul Bottein
4354ad3807 Move condition editor into its own file (#18340) 2023-10-23 15:31:49 +02:00
Paul Bottein
aeaf091b50 Use sensor device class for graph and precision (#18099)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-10-23 15:01:24 +02:00
Paul Bottein
c6be4d6f4d Improve warning messages in conditional card (#18272)
* Improve warning messages in conditional card

* Update src/panels/lovelace/editor/conditions/ha-card-condition-editor.ts

Co-authored-by: Bram Kragten <mail@bramkragten.nl>

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-10-23 14:50:45 +02:00
Caius-Bonus
c48b620e03 Fix inconsistencies in slugify between frontend and core implementation (#18297) 2023-10-23 08:37:56 +00:00
Steve Repsher
77e05decdf Remove ondemand methods for CodeMirror and SortableJS (#18336) 2023-10-23 10:29:49 +02:00
Necroneco
b24e99c56c Fix oscillating handler in more info fan card (#18305) (#18306) 2023-10-23 10:26:31 +02:00
J. Nick Koston
768344c3f7 Fix double load of lovelace resources (#18332) 2023-10-23 10:05:26 +02:00
Bram Kragten
03a21d5519 Only calculate opening direction when we are opening the datepicker (#18313) 2023-10-23 09:58:20 +02:00
dependabot[bot]
1247a5c8d3 Bump home-assistant/wheels from 2023.10.4 to 2023.10.5 (#18338)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2023-10-23 09:54:53 +02:00
dependabot[bot]
db8287df89 Bump actions/checkout from 4.1.0 to 4.1.1 (#18337)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2023-10-23 09:03:17 +02:00
renovate[bot]
71edbd6352 Update dependency sinon to v16.1.3 (#18325)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-22 13:05:20 -04:00
renovate[bot]
9d87a66908 Update dependency lint-staged to v15.0.2 (#18326)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-22 13:03:45 -04:00
renovate[bot]
11d62cece2 Lock file maintenance (#18284)
* Lock file maintenance

* Add resolution to keep lit at v2

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2023-10-22 03:34:14 +00:00
renovate[bot]
f15a65f5a6 Update dependency sinon to v16.1.1 (#18322)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-21 22:41:15 -04:00
renovate[bot]
a03d3f796b Update dependency @types/ua-parser-js to v0.7.38 (#18321) 2023-10-21 22:26:22 -04:00
renovate[bot]
d0f5b0e864 Update dependency @types/tar to v6.1.7 (#18320) 2023-10-21 23:43:59 +00:00
renovate[bot]
e4a67dd555 Update dependency @types/sortablejs to v1.15.4 (#18319) 2023-10-21 19:33:02 -04:00
renovate[bot]
f72ab94742 Update dependency @types/qrcode to v1.5.4 (#18317)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-21 23:22:48 +00:00
renovate[bot]
b521be6d3b Update dependency @types/serve-handler to v6.1.3 (#18318)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-21 19:11:27 -04:00
renovate[bot]
3fa7001be6 Update dependency @types/mocha to v10.0.3 (#18316)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-21 20:37:21 +00:00
renovate[bot]
b45226509b Update dependency @types/js-yaml to v4.0.8 (#18309)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-21 20:31:43 +00:00
renovate[bot]
2a5f8097bc Update dependency @types/luxon to v3.3.3 (#18315)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-21 16:24:47 -04:00
renovate[bot]
0ffe0f38e1 Update dependency @types/leaflet to v1.9.7 (#18310)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-21 20:19:23 +00:00
renovate[bot]
c48491088e Update dependency @codemirror/state to v6.3.1 (#18307)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-21 16:15:23 -04:00
renovate[bot]
f115e4025d Update dependency @types/html-minifier-terser to v7.0.1 (#18308)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-21 16:06:07 -04:00
renovate[bot]
7be8a799aa Update dependency @types/leaflet-draw to v1.0.9 (#18311)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-21 16:04:54 -04:00
karwosts
d992b2d40b Fix missing range labels in date-range-picker (#18274)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-10-21 15:40:38 +00:00
karwosts
96fbd8aefb Don't round statistic values before plotting (#18312) 2023-10-21 17:19:03 +02:00
renovate[bot]
17df761a1b Update dependency @types/esprima to v4.0.5 (#18304) 2023-10-20 23:44:38 -04:00
renovate[bot]
79b2fa96ed Update dependency @types/chromecast-caf-receiver to v6.0.11 (#18302) 2023-10-21 03:08:33 +00:00
renovate[bot]
c14e3333cf Update dependency @types/chromecast-caf-sender to v1.0.7 (#18303) 2023-10-20 22:56:56 -04:00
renovate[bot]
4af0ecbaa8 Update dependency @types/babel__plugin-transform-runtime to v7.9.4 (#18301) 2023-10-20 22:50:11 -04:00
Bram Kragten
ce11301516 Fix initial theming (#18296) 2023-10-20 20:44:53 +02:00
Josh McCarty
16766f8878 Wrap dict attributes (#18290) 2023-10-20 17:07:14 +02:00
renovate[bot]
5e933e8e15 Update typescript-eslint monorepo to v6.8.0 (#18292)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-19 23:28:11 -04:00
renovate[bot]
7eb92be84a Update formatjs monorepo (#18285)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-19 23:26:56 -04:00
Kendell R
60ec4d31db Fix some minor inconsistencies/duplications (#18071) 2023-10-19 17:29:05 +02:00
Steve Repsher
3526ba308f Remove unused imports from ZHA card and alias editor (#18282) 2023-10-19 17:17:27 +02:00
Steve Repsher
02a212a47d Load and set Polymer settings asynchronously (#18278) 2023-10-19 17:09:35 +02:00
Simon Vallières
49f88a98a5 Add multi-path icon support and path attributes (#18189) 2023-10-19 15:35:50 +02:00
Steve Repsher
feb371839c Fix yarn lock file (#18283) 2023-10-19 01:27:57 +02:00
renovate[bot]
24c37f5293 Update dependency @rollup/plugin-replace to v5.0.4 (#18280)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-18 18:25:15 -04:00
renovate[bot]
8f3fea5a33 Update dependency vis-network to v9.1.8 (#18281)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-18 18:24:28 -04:00
renovate[bot]
b2bc529d7b Update dependency @rollup/plugin-commonjs to v25.0.7 (#18279)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-18 18:23:24 -04:00
Jonas Lang
ad68782b79 Typo automation (#18266) 2023-10-18 13:42:30 +00:00
renovate[bot]
f432528388 Update dependency lint-staged to v15 (#18267)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-18 15:29:38 +02:00
Kendell R
f98c0769b0 Fix "No visual editor support for action: " (#18271) 2023-10-18 15:24:36 +02:00
Josh McCarty
b2cb0d8e0f Fixes alarm dialog inputmode for code input (#18263) 2023-10-17 12:23:40 +02:00
renovate[bot]
4c7c04bdc0 Update dependency marked to v9.1.2 (#18259) 2023-10-16 21:46:43 -04:00
renovate[bot]
ffb7469a7e Update dependency webpack to v5.89.0 (#18260) 2023-10-16 21:44:07 -04:00
Steve Repsher
d88831b719 Enable CORS for legacy bundle loading (#18248) 2023-10-16 20:40:15 +02:00
Steve Repsher
3b2f6d71f5 Minify ha-style/Roboto and load asynchronously (#18226) 2023-10-16 20:37:50 +02:00
Simon Lamon
a08185a1a5 Migrate developer state tools to LitElement (#18134)
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2023-10-16 20:37:04 +02:00
renovate[bot]
7ee91ca8fc Update vaadinWebComponents monorepo to v24.2.0 (#18255)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-16 15:54:20 +02:00
Simon Lamon
b6fe0cfa1b Replace internal material/web usages (#18219)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-10-16 15:42:59 +02:00
karwosts
c3a9682861 An alias editor and overflow menu for choose options (#18183) 2023-10-16 14:02:34 +02:00
Simon Lamon
62d21bea4f Replace polymer paper-slider (#18168)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-10-16 13:35:13 +02:00
Steve Repsher
434b9595c0 Remove SystemJS loader from Webpack builds (#18249) 2023-10-16 12:42:46 +02:00
renovate[bot]
a0f1b7f365 Update dependency @codemirror/autocomplete to v6.10.2 (#18253)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-16 12:40:37 +02:00
dependabot[bot]
628c2c39cf Bump relative-ci/agent-action from 2.1.8 to 2.1.10 (#18252)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2023-10-16 09:04:34 +02:00
Bram Kragten
4b885cbd93 Remove narrow from strategies (#18201) 2023-10-16 00:20:36 -04:00
Simon Lamon
02d9786f8c Fix lokalise translation upload (#18221)
Fix translation upload
2023-10-15 23:52:12 -04:00
renovate[bot]
88d14cd7b5 Update dependency magic-string to v0.30.5 (#18238)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-15 16:53:32 -04:00
renovate[bot]
4ea8f599cf Update dependency @codemirror/state to v6.3.0 (#18228)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-15 16:52:50 -04:00
renovate[bot]
37ef444180 Update babel monorepo to v7.23.2 (#18223)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-15 01:10:47 +00:00
renovate[bot]
4253feb8a2 Update dependency marked to v9.1.1 (#18224)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-14 21:00:11 -04:00
renovate[bot]
ce33cf7ff3 Update dependency @codemirror/autocomplete to v6.10.1 (#18218)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-14 20:59:07 -04:00
renovate[bot]
faa4455951 Update dependency @bundle-stats/plugin-webpack-filter to v4.7.7 (#18220)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-14 15:57:36 -04:00
renovate[bot]
08d8b43f44 Update dependency @types/js-yaml to v4.0.7 (#18212) 2023-10-13 20:59:48 -04:00
Paul Bottein
15c67fe299 Improve state and name display on state-card-display (#18207) 2023-10-13 10:38:19 +02:00
renovate[bot]
a10ec1f53c Update typescript-eslint monorepo to v6.7.5 (#18203)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-12 15:47:12 -04:00
Bram Kragten
1b220abf70 run on all branches 2023-10-12 19:09:33 +02:00
Till
607175706b Add date range picker to energy period selector (#14337) 2023-10-12 18:29:04 +02:00
Bram Kragten
f8966a2114 Slug not needed for reactive ci (#18200) 2023-10-12 17:00:29 +02:00
G Johansson
4c94ac5dda CountrySelector (#18035) 2023-10-12 16:47:28 +02:00
Bram Kragten
6d1e923b83 Voice assistant dev: fix wake word continue (#18181)
Start wake word when continue when wake word was used the previous run
2023-10-12 16:10:14 +02:00
Bram Kragten
2c743b7b56 Update relative-ci.yaml (#18197) 2023-10-12 15:26:33 +02:00
tzagim
6686da1f24 Fix for RTL languages - Profile panel + weather forecast card (#18191) 2023-10-12 14:27:01 +02:00
renovate[bot]
6bdeb45f6b Update vaadinWebComponents monorepo to v24.1.11 (#18195)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-12 14:25:06 +02:00
Simon Lamon
9f05a9679b Fix RelativeCI input issues (#18196) 2023-10-12 14:17:13 +02:00
Simon Lamon
51a6376991 Fix RelativeCI format issues (#18194) 2023-10-12 12:35:11 +02:00
Simon Lamon
c5056eb4d2 Allow Multiple Entities for Numeric State Trigger (#18064) 2023-10-12 09:37:19 +02:00
Steve Repsher
79f3759756 Create webpack bundle stats for Relative CI (#18178) 2023-10-12 09:28:34 +02:00
renovate[bot]
6c3b748279 Update dependency @rollup/plugin-node-resolve to v15.2.3 (#18193) 2023-10-11 16:52:28 -04:00
Bram Kragten
4293192e74 Use progress button when adding/updating mount (#18182) 2023-10-11 13:22:56 +02:00
Bram Kragten
ceaceaf47b Move select clearing to ha-select (#18190) 2023-10-11 13:22:17 +02:00
Piero
479a625662 Update url on tab reorder (#18169)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-10-11 12:49:08 +02:00
fustom
095d171a61 Tile card current temperature for climate entity (#18143) 2023-10-11 09:01:34 +02:00
renovate[bot]
8c3a7de6d9 Update dependency @mdi/js to v7.3.67 (#18185)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-10 23:42:48 -04:00
renovate[bot]
84e743c4c0 Update dependency @mdi/svg to v7.3.67 (#18186)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-10 23:26:46 -04:00
Paul Bottein
51f8d91ddf Fix user name in config page (#18187) 2023-10-10 23:25:21 -04:00
Kendell R
8f1a6ef1b1 Improve password show/hide buttons (#18176) 2023-10-10 13:26:54 +00:00
Kendell R
b3f1783269 Say "log in" instead of "login" on the authorize page (#18175) 2023-10-10 12:47:31 +02:00
renovate[bot]
7e630d0fc5 Update dependency eslint to v8.51.0 (#18172) 2023-10-09 21:38:05 -04:00
renovate[bot]
a4533251a1 Update dependency vis-network to v9.1.7 (#18167)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-09 15:32:45 -04:00
renovate[bot]
659db109aa Update CodeMirror (#18166)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-09 15:31:34 -04:00
Kendell R
d3fd27910a Separate outline color (#18109) 2023-10-09 18:29:25 +02:00
Simon Lamon
eae3c1309f Localize durations using Intl.NumberFormat (#18067) 2023-10-09 18:28:08 +02:00
Thomas Konrad
4a5b67e320 Add 'max devices' config to Energy Devices Graph (#17553) 2023-10-09 17:27:22 +02:00
Paul Bottein
86c014b677 Add screen condition to conditional card. (#18041) 2023-10-09 15:06:58 +02:00
karwosts
5a6d6dc7d3 Fix period selector in statistic card (#18131) 2023-10-09 14:41:27 +02:00
Steve Repsher
294df396f4 Remove test language from production (really) (#18137) 2023-10-09 14:40:06 +02:00
renovate[bot]
cc01e8d6a8 Update dependency core-js to v3.33.0 (#18119)
* Update dependency core-js to v3.33.0

* Update babel setting

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2023-10-09 12:38:31 +00:00
Michael
a3532a41da Add before offset to sun condition description (#18152) 2023-10-09 14:36:16 +02:00
karwosts
ae35fd1eb8 Fix handling of negative zero in number selectors (#17127) 2023-10-09 14:34:16 +02:00
Simon Lamon
63095f1501 Replace paper-items in Scene Editor (#18101) 2023-10-09 14:29:58 +02:00
Steve Repsher
bf9e2cd404 Move polyfill time zone data out of bundles (#18142) 2023-10-09 14:28:16 +02:00
Bram Kragten
5b7ef941e4 Make it possible to clear an optional select (#18047) 2023-10-09 14:24:18 +02:00
ildar170975
352e721d0c Update state-badge.ts: change border-radius for media_player (#18066) 2023-10-09 14:11:29 +02:00
ildar170975
220b4794c5 Update developer-tools-state.js: fix alignment for ha-tips (#17608) 2023-10-09 13:59:09 +02:00
karwosts
811ebde42a Add per-set theme coloring to remainder of energy dashboard (#17826) 2023-10-09 13:55:21 +02:00
ildar170975
bfeee618f4 more-info: make long states "multilined" (#17649)
* align info when a state is multiline

* Enable multiline for long states

* Update state-info.ts

* Update state-card-display.ts
2023-10-09 13:52:03 +02:00
karwosts
db9b16e9f5 Change help link in statistics pickers in energy dashboard (#18138) 2023-10-09 13:47:46 +02:00
Philip Allgaier
7861d813b1 Add translations for voice assistant debug page (#17843)
* Add translations for voice assistant debug page

* Apply suggestions from code review

---------

Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-10-09 11:46:59 +00:00
breakthestatic
d7760c4b7a Expose history replace in action editor (#17740)
* Expose existing navigation history replace to the UI

* Remove navigation_replace from GUI editor

* Restore default value
2023-10-09 12:02:30 +02:00
dependabot[bot]
a60a721ea5 Bump home-assistant/wheels from 2023.10.1 to 2023.10.4 (#18162)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2023-10-09 08:40:14 +02:00
renovate[bot]
36219e1cb4 Update dependency marked to v9.1.0 (#18148)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-08 13:33:17 -04:00
renovate[bot]
7fdbc9dd32 Update dependency sinon to v16.1.0 (#18158)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-08 13:31:05 -04:00
renovate[bot]
334be93254 Update dependency @rollup/plugin-commonjs to v25.0.5 (#18154)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-08 17:28:14 +00:00
renovate[bot]
c14a6d59e2 Update dependency @rollup/plugin-replace to v5.0.3 (#18157)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-08 13:19:25 -04:00
renovate[bot]
7a8139b650 Update dependency @rollup/plugin-json to v6.0.1 (#18155)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-08 17:16:16 +00:00
renovate[bot]
9d2a443217 Update dependency @rollup/plugin-babel to v6.0.4 (#18153)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-08 13:07:16 -04:00
renovate[bot]
484b166233 Update dependency @rollup/plugin-node-resolve to v15.2.2 (#18156)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-08 13:04:52 -04:00
renovate[bot]
530208cb6a Update Yarn to v3.6.4 (#18139)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-07 00:01:49 -04:00
renovate[bot]
b534ff8ca3 Update dependency @codemirror/view to v6.21.2 (#18132) 2023-10-05 20:17:36 -04:00
renovate[bot]
02bd50c434 Update typescript-eslint monorepo to v6.7.4 (#18128) 2023-10-05 20:14:53 -04:00
Paul Bottein
9a84ce7b81 20231005.0 (#18126)
* Update dependency @material/web to v1.0.0 (#18070)

* Update dependency @material/web to v1.0.0

* Fix icon button size

* Remove unused ios override

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* Update dependency magic-string to v0.30.4 (#18089)

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>

* Bump postcss from 8.4.30 to 8.4.31 (#18110)

Bumps [postcss](https://github.com/postcss/postcss) from 8.4.30 to 8.4.31.
- [Release notes](https://github.com/postcss/postcss/releases)
- [Changelog](https://github.com/postcss/postcss/blob/main/CHANGELOG.md)
- [Commits](https://github.com/postcss/postcss/compare/8.4.30...8.4.31)

---
updated-dependencies:
- dependency-name: postcss
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>

* Update CodeMirror (#18096)

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>

* Update vaadinWebComponents monorepo to v24.1.10 (#18092)

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>

* Make the "icon next/prev" series load faster (#18087)

* Preserve ancillary fields in a repeat action when modifying the form (#18068)

* Do not clear alias when editing automation action, condition or trigger (#18114)

* Use restart dialog confirmation for quick command (#18113)

* Add translations for restore backup dialogs (#18112)

Co-authored-by: c0ffeeca7 <38767475+c0ffeeca7@users.noreply.github.com>

* Hide tooltip after clicking on a chart to display more info (cosmetic change) (#18103)

* fix setting wake word to first option everytime (#18121)

* Fix class field for ha-icon-next/prev (#18118)

* Set border-radius to 0 for img in thread panel (#18124)

* Load Intl locale data in parallel (#18120)

* Load Intl locale data in parallel

* Switch to check result.ok

* Update dependency @codemirror/view to v6.21.1 (#18125)

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>

* Bumped version to 20231005.0

---------

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Co-authored-by: Kendell R <KTibow@users.noreply.github.com>
Co-authored-by: karwosts <32912880+karwosts@users.noreply.github.com>
Co-authored-by: c0ffeeca7 <38767475+c0ffeeca7@users.noreply.github.com>
Co-authored-by: K3A <966992+k3a@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2023-10-05 18:29:15 +02:00
Paul Bottein
6e00be6684 Bumped version to 20231005.0 2023-10-05 18:28:19 +02:00
renovate[bot]
91ec43b9bc Update dependency @codemirror/view to v6.21.1 (#18125)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-05 18:19:22 +02:00
Steve Repsher
4a4d9a08d5 Load Intl locale data in parallel (#18120)
* Load Intl locale data in parallel

* Switch to check result.ok
2023-10-05 10:26:15 -04:00
Paul Bottein
0c32d1eb4e Set border-radius to 0 for img in thread panel (#18124) 2023-10-05 15:48:18 +02:00
Steve Repsher
f43171f91c Fix class field for ha-icon-next/prev (#18118) 2023-10-05 12:52:31 +00:00
Bram Kragten
48593eee0d fix setting wake word to first option everytime (#18121) 2023-10-05 11:30:05 +02:00
K3A
c106a0ac85 Hide tooltip after clicking on a chart to display more info (cosmetic change) (#18103) 2023-10-05 11:28:07 +02:00
Paul Bottein
e1a71fbfaa Add translations for restore backup dialogs (#18112)
Co-authored-by: c0ffeeca7 <38767475+c0ffeeca7@users.noreply.github.com>
2023-10-05 11:26:50 +02:00
Paul Bottein
0489d8922e Use restart dialog confirmation for quick command (#18113) 2023-10-05 11:24:43 +02:00
Paul Bottein
d7f1e9d091 Do not clear alias when editing automation action, condition or trigger (#18114) 2023-10-05 11:23:44 +02:00
karwosts
32bc8bd01d Preserve ancillary fields in a repeat action when modifying the form (#18068) 2023-10-04 14:36:58 +02:00
Kendell R
242b018ece Make the "icon next/prev" series load faster (#18087) 2023-10-04 13:59:51 +02:00
renovate[bot]
c25447d001 Update vaadinWebComponents monorepo to v24.1.10 (#18092)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-04 13:57:42 +02:00
renovate[bot]
d2d718475f Update CodeMirror (#18096)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-04 13:56:13 +02:00
dependabot[bot]
8e1e42cd50 Bump postcss from 8.4.30 to 8.4.31 (#18110)
Bumps [postcss](https://github.com/postcss/postcss) from 8.4.30 to 8.4.31.
- [Release notes](https://github.com/postcss/postcss/releases)
- [Changelog](https://github.com/postcss/postcss/blob/main/CHANGELOG.md)
- [Commits](https://github.com/postcss/postcss/compare/8.4.30...8.4.31)

---
updated-dependencies:
- dependency-name: postcss
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2023-10-04 03:29:36 +00:00
renovate[bot]
014f9b8b73 Update dependency magic-string to v0.30.4 (#18089)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-10-03 23:15:36 -04:00
renovate[bot]
774c7e275c Update dependency @material/web to v1.0.0 (#18070)
* Update dependency @material/web to v1.0.0

* Fix icon button size

* Remove unused ios override

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2023-10-03 09:48:27 +00:00
Bram Kragten
75c43d15e1 20231002.0 (#18102) 2023-10-02 21:43:12 +02:00
Bram Kragten
e288b003d8 Bumped version to 20231002.0 2023-10-02 21:41:37 +02:00
yousaf465
4aa8518ed6 Change Urdu language to RTL (#18063)
Co-authored-by: karwosts <32912880+karwosts@users.noreply.github.com>
2023-10-02 21:26:07 +02:00
Bram Kragten
6acbf6395c Ignore prettier styling for tooltip of disk life time (#18097) 2023-10-02 21:23:13 +02:00
Bram Kragten
2030feabf7 Only set wakeword when not in new wakewords (#18095) 2023-10-02 21:23:02 +02:00
Bram Kragten
46d1dbcb47 Dont continue debug assist run when disconnected (#18098) 2023-10-02 21:22:50 +02:00
Bram Kragten
2f6297ec17 Always deduplicate found integrations in onboarding (#18091)
always deduplicate found integrations in onboarding
2023-10-02 14:30:28 +02:00
Paul Bottein
a3400a2f9c Prevent ha-form data lost if quick data updates (#18094) 2023-10-02 11:44:43 +02:00
Kendell R
c345f41416 Factor out style data to reduce bundle size (#18077) 2023-10-02 11:18:44 +02:00
Kendell R
292cdc7621 Fix clicking on radio buttons (and improve code) (#18078) 2023-10-02 10:58:10 +02:00
dependabot[bot]
c5ba74e0b4 Bump home-assistant/wheels from 2023.09.1 to 2023.10.1 (#18088)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2023-10-02 08:54:53 +02:00
renovate[bot]
41b24de559 Update dependency chai to v4.3.10 (#18082) 2023-10-01 20:24:14 -04:00
renovate[bot]
4fe7b18161 Update dependency chai to v4.3.9 (#18074)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-30 16:17:27 -04:00
renovate[bot]
399a979c33 Update dependency glob to v10.3.10 (#18072)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-30 16:16:20 -04:00
renovate[bot]
03c5482860 Update dependency @types/mocha to v10.0.2 (#18075)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-30 16:15:30 -04:00
Franck Nijhof
a116a50604 Hide shopping list from discovered onboarding integrations (#18069) 2023-09-29 22:39:57 +02:00
renovate[bot]
0dfa292c40 Update dependency glob to v10.3.9 (#18060)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-29 13:30:08 -04:00
Bram Kragten
5914a6c1a4 Clear wake word when new engine is picked, select first wake word. by… (#18058)
* Clear wake word when new engine is picked, select first wake word. by default

* Update assist-pipeline-detail-wakeword.ts
2023-09-29 12:38:11 +02:00
Bram Kragten
8daff17d6a Change linear-progress bar background color for dark mode (#18059) 2023-09-29 10:33:26 +02:00
renovate[bot]
59bd852e7a Update dependency @octokit/rest to v20.0.2 (#18053)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-28 22:51:10 -04:00
renovate[bot]
246fe2861e Update dependency eslint-plugin-wc to v2.0.4 (#18050)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-28 14:18:22 -04:00
renovate[bot]
dbf623ada2 Update typescript-eslint monorepo to v6.7.3 (#18051)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-28 14:17:33 -04:00
renovate[bot]
c848356a6d Update dependency @types/sortablejs to v1.15.3 (#18049)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-28 14:16:08 -04:00
Paul Bottein
47022d3a04 20230928.0 (#18052) 2023-09-28 20:15:04 +02:00
Paul Bottein
d732bd4776 Bumped version to 20230928.0 2023-09-28 20:12:59 +02:00
Raman Gupta
5a5265723c Handle breaking changes as result of zwave_js lib upgrade (#18009)
* Handle breaking changes as result of zwave_js lib upgrade

* fix capitalization
2023-09-28 20:00:21 +02:00
Bram Kragten
30c6e4e35e Link to docs when no wake word engines (#18046) 2023-09-28 19:34:31 +02:00
renovate[bot]
c5f909d89f Update dependency @types/serve-handler to v6.1.2 (#18048)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-28 13:19:14 -04:00
Simon Lamon
13a691606f Migrate developer events tools to LitElement (#17869) 2023-09-28 14:58:16 +00:00
Simon Lamon
44748df3ac Make numeric_state trigger and condition translatable (#18017) 2023-09-28 14:39:57 +02:00
dependabot[bot]
4f3dc82fd9 Bump get-func-name from 2.0.0 to 2.0.2 (#18043)
Bumps [get-func-name](https://github.com/chaijs/get-func-name) from 2.0.0 to 2.0.2.
- [Release notes](https://github.com/chaijs/get-func-name/releases)
- [Commits](https://github.com/chaijs/get-func-name/commits/v2.0.2)

---
updated-dependencies:
- dependency-name: get-func-name
  dependency-type: indirect
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2023-09-27 23:26:34 -04:00
Paul Bottein
b2e260d6ba Use initial color param for favorite color dialog (#18039)
* Use initial color param for favorite color dialog

* Select right mode if light is off
2023-09-27 16:26:16 +02:00
imgbot[bot]
7111a21173 [ImgBot] Optimize images (#18038)
Co-authored-by: ImgBotApp <ImgBotHelp@gmail.com>
2023-09-27 14:31:05 +02:00
karwosts
ad51d313a1 Debug option to enable logging server calls (#17956) 2023-09-27 14:26:25 +02:00
Bram Kragten
60345f3fe8 20230926.0 (#18037) 2023-09-26 23:56:14 +02:00
Bram Kragten
956723cf15 Bumped version to 20230926.0 2023-09-26 23:51:50 +02:00
K3A
dd6a69ea03 State History Charts - Handle click to chart to open More Info for the clicked entity (#18036) 2023-09-26 21:19:11 +00:00
Bram Kragten
98bd08c9dd Update layout of hardware info (#18034) 2023-09-26 23:09:14 +02:00
karwosts
6b31c07459 Add an image fit mode to hui-image and picture-entity-card (#17959) 2023-09-26 23:08:56 +02:00
renovate[bot]
c3b41afb68 Update dependency @types/esprima to v4.0.4 (#18031)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-26 23:07:07 +02:00
renovate[bot]
46d8f2eefb Update dependency @lokalise/node-api to v12 (#18029)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-26 23:05:51 +02:00
karwosts
0ffc7b59d6 Prevent creating views with duplicate URL (#17871) 2023-09-26 22:54:27 +02:00
karwosts
74be4ae20a Enable reorder mode for choose options (#17422) 2023-09-26 22:52:20 +02:00
karwosts
5455ce2e0f Display an error message when disabling the button in devtools/service (#17519) 2023-09-26 22:49:57 +02:00
karwosts
01405d96b6 Fix too wide energy chart bars (#17787) 2023-09-26 22:49:04 +02:00
renovate[bot]
965f893a65 Update dependency @octokit/auth-oauth-device to v6.0.1 (#18033)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-26 22:44:02 +02:00
Simon Lamon
0b6813d9dc Update Add and Edit area dialog (#17711) 2023-09-26 22:41:02 +02:00
Paul Bottein
cbd424ff5a Fix aria label auth page (#18032) 2023-09-26 22:39:25 +02:00
Bram Kragten
b899e39a9e Fix markdown card template handling (#17851) 2023-09-26 22:37:27 +02:00
karwosts
49a66961e2 Fix adjust statistic dialog after a period of sensor unavailability (#17934)
* Fix adjust statistic dialog after a period of sensor unavailability

* Remove fetching an unnecessary datapoint
2023-09-26 22:00:39 +02:00
karwosts
c69fb77b62 Fix choose description when a non-list form of conditions is used (#18023) 2023-09-26 21:54:40 +02:00
Bram Kragten
d794ec3408 Update assist-pipeline-detail-wakeword.ts 2023-09-26 21:27:27 +02:00
Paul Bottein
d8c98d8f96 Move auth components from shadow DOM to light DOM (#18015) 2023-09-26 20:17:03 +02:00
karwosts
acb32ae5c8 Allow saving the light current color as a favorite (#17992) 2023-09-26 18:59:59 +02:00
Bram Kragten
c567a61dd7 Add wake word to assist pipeline settings (#18019)
* Add wake word to assist pipeline settings

* Update assist-pipeline-detail-wakeword.ts

* Add icon for wake word domain

* format state

* implement `wake_word/info` command
2023-09-26 12:17:45 -04:00
Bram Kragten
2a8d98307e Fix chart not able to setup because canvas in use (#18018)
* Fix chart not able to setup because canvas in use

* Update ha-chart-base.ts
2023-09-26 17:58:02 +02:00
Bram Kragten
5aaf0cd579 Update logo (#17964) 2023-09-26 15:33:40 +02:00
renovate[bot]
f38e4dcf54 Update dependency @octokit/plugin-retry to v6.0.1 (#18026)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-26 12:54:40 +00:00
Steve Repsher
1df1ce5423 Stop notifications for errors writing to system log (#18022) 2023-09-26 14:43:27 +02:00
Paul Bottein
a68381a4d9 Clear quick bar items with closing the quick bar dialog (#18025) 2023-09-26 14:27:27 +02:00
renovate[bot]
f7604b136e Update dependency eslint to v8.50.0 (#18021)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-25 18:35:42 -04:00
karwosts
362d950515 Ensure computeStateName returns a string type (#17928) 2023-09-25 18:11:02 +02:00
Bram Kragten
22f9dbd65d Add wake word to assist pipeline debug (#17897) 2023-09-25 17:51:12 +02:00
karwosts
579050bfc7 Add new config options for map entity markers (#17938) 2023-09-25 17:26:53 +02:00
Joost Lekkerkerker
6b33b4e656 Add label to location selector (#17402)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-09-25 13:38:47 +00:00
renovate[bot]
dac7c0f5fd Lock file maintenance (#17960)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-09-25 12:43:17 +00:00
renovate[bot]
aaceff0d23 Update dependency marked to v9 (#17914)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-25 14:13:27 +02:00
renovate[bot]
48e5cc6b63 Update dependency eslint-plugin-lit-a11y to v4 (#17143)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2023-09-25 14:11:42 +02:00
renovate[bot]
799a0933ba Update dependency chart.js to v4.4.0 (#17736)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-25 14:11:18 +02:00
dependabot[bot]
940618f72d Bump home-assistant/wheels from 2023.04.0 to 2023.09.1 (#18011)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2023-09-25 14:10:42 +02:00
renovate[bot]
d8ff69b65d Update fullcalendar monorepo to v6.1.9 (#18007)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-25 14:08:54 +02:00
Steve Repsher
391aca6388 Improve core script and default to upgrade (#17915) 2023-09-25 14:08:30 +02:00
Simon Lamon
071d078e84 Make some triggers translatable (#17692) 2023-09-25 14:07:31 +02:00
renovate[bot]
61982bcb77 Update CodeMirror (#17996)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-25 13:23:51 +02:00
Bram Kragten
1c79fcc244 Fix translations onboarding integration (#17980) 2023-09-25 12:58:54 +02:00
dependabot[bot]
f3513e3e52 Bump actions/checkout from 4.0.0 to 4.1.0 (#18010)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2023-09-25 11:20:50 +02:00
renovate[bot]
b3b10fa2ef Update dependency eslint-plugin-wc to v2.0.3 (#17999)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-24 16:48:26 -04:00
renovate[bot]
0ffabcc055 Update dependency glob to v10.3.5 (#18000)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-24 16:44:03 -04:00
renovate[bot]
9da8499004 Update dependency eslint-plugin-wc to v2 (#17966)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-23 00:50:32 -04:00
renovate[bot]
04d1fccb87 Update formatjs monorepo (#17975)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-23 00:27:33 -04:00
renovate[bot]
fdf1eb5170 Update dependency @lokalise/node-api to v11.1.0 (#17995)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-23 00:24:25 -04:00
renovate[bot]
4e2877b035 Update vaadinWebComponents monorepo to v24.1.9 (#17976) 2023-09-22 00:45:15 +00:00
renovate[bot]
467059f515 Update dependency cropperjs to v1.6.1 (#17968) 2023-09-21 20:38:02 -04:00
renovate[bot]
e6db63bb63 Update typescript-eslint monorepo to v6.7.2 (#17982) 2023-09-21 20:33:43 -04:00
Paul Bottein
78ddec2c8c Small fixes for tile features (#17983)
* Add missing translations

* Remove unused import
2023-09-21 21:33:32 +02:00
Paul Bottein
9217d5bf40 Refactor strategy foundation (#17921) 2023-09-21 20:22:52 +02:00
Paul Bottein
90d01e4b63 Add style and preset modes options to climate preset tile feature (#17977) 2023-09-21 18:41:09 +02:00
Joost Lekkerkerker
e7960bf8c0 Make pull request template more in line with core (#17441) 2023-09-21 17:23:31 +02:00
Thomas Aldrian
bf12eaa1b3 Add climate preset tile feature (#17946)
* Add climate preset tile feature

* Minor fixes

* Formatting fixes

* Update src/panels/lovelace/create-element/create-tile-feature-element.ts

* Update src/panels/lovelace/editor/config-elements/hui-tile-card-features-editor.ts

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2023-09-21 12:27:41 +02:00
Bram Kragten
6179c75182 don't round update entity images (#17972) 2023-09-20 20:39:54 +02:00
Paul Bottein
4b5c7021ff Add select option tile feature (#17971) 2023-09-20 12:43:21 +02:00
Paul Bottein
3349031cbd Simplify data table template (#17825)
* Simplify data table template

* Fix backup and gallery
2023-09-20 12:09:44 +02:00
renovate[bot]
5e107d43d7 Update babel monorepo to v7.22.20 (#17965)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-19 14:36:07 -04:00
Steve Repsher
e46f2cd9bf Adjust password manager polyfill for form injections (#17830) 2023-09-19 14:51:38 +02:00
Steve Repsher
713ebfcc22 Enable shipped proposals in Babel (#17909) 2023-09-19 13:56:55 +02:00
renovate[bot]
46e4eafe95 Update dependency @types/babel__plugin-transform-runtime to v7.9.3 (#17957) 2023-09-19 07:45:50 -04:00
renovate[bot]
e6fd18e23b Update dependency @types/js-yaml to v4.0.6 (#17958) 2023-09-19 07:43:55 -04:00
renovate[bot]
71cd71dfd5 Update formatjs monorepo (#17890)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-18 12:50:43 -04:00
renovate[bot]
1019ccfd26 Update dependency @lrnwebcomponents/simple-tooltip to v7.0.18 (#17905)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-18 12:41:29 -04:00
renovate[bot]
577c1d8522 Update dependency @lit-labs/context to v0.4.1 (#17935)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-18 12:35:46 -04:00
renovate[bot]
63f0b469cc Update dependency vis-data to v7.1.7 (#17939) 2023-09-18 12:25:23 -04:00
renovate[bot]
e688417863 Update dependency @babel/core to v7.22.19 (#17948) 2023-09-18 08:27:41 -04:00
renovate[bot]
a19633e2d4 Update CodeMirror (#17944) 2023-09-18 08:21:31 -04:00
renovate[bot]
8797142cca Update dependency sinon to v16 (#17940) 2023-09-18 08:15:40 -04:00
Madelena Mak
2a7403b6fd Added new logo design guidelines (#17951)
Co-authored-by: Franck Nijhof <git@frenck.dev>
2023-09-17 22:29:53 +02:00
renovate[bot]
22efe14149 Update dependency @types/tar to v6.1.6 (#17931)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-15 18:57:25 -04:00
renovate[bot]
7cce24bcd1 Update typescript-eslint monorepo to v6.7.0 (#17923) 2023-09-14 20:25:46 -04:00
renovate[bot]
b8f0bb66cd Update dependency @codemirror/view to v6.18.1 (#17922)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-14 13:11:12 -04:00
renovate[bot]
b950f990b4 Update dependency @material/web to v1.0.0-pre.17 (#17882)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-13 10:11:13 +02:00
renovate[bot]
b511e7a37d Update vaadinWebComponents monorepo to v24.1.7 (#17894) 2023-09-12 20:38:23 -04:00
renovate[bot]
50f4b78f2e Update dependency ua-parser-js to v1.0.36 (#17912)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-12 11:45:17 -04:00
renovate[bot]
7b0b4cdfe4 Update dependency @codemirror/view to v6.18.0 (#17865) 2023-09-11 20:59:49 -04:00
renovate[bot]
c60e5c4c61 Update dependency eslint to v8.49.0 (#17904) 2023-09-11 20:41:20 -04:00
karwosts
709a63e6da Fix schedule helper form when resizing or dragging to or past midnight (#17900) 2023-09-11 22:54:45 +02:00
dependabot[bot]
f689eed073 Bump actions/checkout from 3.6.0 to 4.0.0 (#17891)
Bumps [actions/checkout](https://github.com/actions/checkout) from 3.6.0 to 4.0.0.
- [Release notes](https://github.com/actions/checkout/releases)
- [Changelog](https://github.com/actions/checkout/blob/main/CHANGELOG.md)
- [Commits](https://github.com/actions/checkout/compare/v3.6.0...v4.0.0)

---
updated-dependencies:
- dependency-name: actions/checkout
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2023-09-11 15:22:18 -04:00
renovate[bot]
cd55eee2fc Update dependency @babel/core to v7.22.17 (#17899)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-11 15:19:05 -04:00
Bram Kragten
40bb6566b8 20230911.0 (#17901) 2023-09-11 18:30:42 +02:00
dependabot[bot]
cf27e68748 Bump actions/cache from 3.3.1 to 3.3.2 (#17892)
Bumps [actions/cache](https://github.com/actions/cache) from 3.3.1 to 3.3.2.
- [Release notes](https://github.com/actions/cache/releases)
- [Changelog](https://github.com/actions/cache/blob/main/RELEASES.md)
- [Commits](https://github.com/actions/cache/compare/v3.3.1...v3.3.2)

---
updated-dependencies:
- dependency-name: actions/cache
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2023-09-11 12:24:36 -04:00
Bram Kragten
472ed2fe82 Bumped version to 20230911.0 2023-09-11 18:19:34 +02:00
Paul Bottein
d0a60984ed Allow user to theme all cover states in tile card and more info. (#17898) 2023-09-11 18:18:39 +02:00
Bram Kragten
24d401061c Show error when set state fails (#17850) 2023-09-11 18:13:36 +02:00
Bram Kragten
2352d05573 Ignore errors during logging (#17893) 2023-09-11 13:24:08 +02:00
renovate[bot]
87d53e38c4 Update dependency tar to v6.2.0 (#17861)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-10 19:21:53 -04:00
renovate[bot]
db3c535884 Update dependency core-js to v3.32.2 (#17887)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-10 19:18:23 -04:00
renovate[bot]
158b24f902 Update dependency luxon to v3.4.3 (#17872)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-10 19:16:40 -04:00
Joakim Sørensen
19c4ed4690 Show alternative names in certificate dialog (#17839) 2023-09-08 19:55:27 +02:00
Bram Kragten
eae4ca1271 if select has multiple, make init value an array (#17868)
if multiple, make it an array
2023-09-08 19:46:40 +02:00
Bram Kragten
db272e3e18 20230908.0 (#17866) 2023-09-08 15:56:12 +02:00
Bram Kragten
0276430ab5 Bumped version to 20230908.0 2023-09-08 15:55:22 +02:00
karwosts
db7caf1c32 Fix default formatEntityState function (#17852) 2023-09-08 15:54:54 +02:00
karwosts
7176a51fec update hasChanged for formatEntityState, fix glance card shouldUpdate (#17854) 2023-09-08 15:54:11 +02:00
Bram Kragten
4a6539d75b Clear template result when template changes (#17849) 2023-09-07 20:48:57 -04:00
renovate[bot]
850699ea70 Update dependency @types/chromecast-caf-sender to v1.0.6 (#17857) 2023-09-08 00:01:27 +00:00
renovate[bot]
c17cc22f88 Update typescript-eslint monorepo to v6.6.0 (#17858) 2023-09-07 19:59:46 -04:00
renovate[bot]
9e3f2d5cb7 Update babel monorepo to v7.22.15 (#17853) 2023-09-07 19:56:59 -04:00
renovate[bot]
0677c9c7b0 Update dependency @types/chromecast-caf-receiver to v6.0.10 (#17856) 2023-09-07 19:47:22 -04:00
Bram Kragten
af7e385884 Fix tooltip graph overflow (#17848) 2023-09-07 19:12:35 +02:00
Bram Kragten
35496ead23 20230906.1 (#17838) 2023-09-06 13:47:02 +02:00
Bram Kragten
ba88fef09b Bumped version to 20230906.1 2023-09-06 13:41:40 +02:00
Paul Bottein
ad0e59c8f4 Fix no listener margin in flow preview template (#17837) 2023-09-06 13:41:16 +02:00
Bram Kragten
14e6f5e8ca Subscribe to config entries in helper config (#17835) 2023-09-06 13:39:20 +02:00
Bram Kragten
41403a5d35 20230906.0 (#17834) 2023-09-06 09:54:26 +02:00
Bram Kragten
3c48157793 Use report errors instead of strict for template subscription (#17824) 2023-09-06 09:53:54 +02:00
Bram Kragten
3a07af6ad2 Bumped version to 20230906.0 2023-09-06 09:42:29 +02:00
Bram Kragten
c1c05f8d22 Add listeners to template helper preview (#17833) 2023-09-06 09:37:38 +02:00
Bram Kragten
29aed5371c Move translation fetching to gulp action (#17827) 2023-09-06 00:28:26 +02:00
Bram Kragten
76c878df57 Report Unhandled promise rejection as debug for now (#17831) 2023-09-05 16:39:40 -04:00
Bram Kragten
8acf557137 20230905.0 (#17828) 2023-09-05 18:11:08 +02:00
Bram Kragten
d6e7ebe71d Bumped version to 20230905.0 2023-09-05 18:07:59 +02:00
Erik Montnemery
085b26d5ea Simplify entity sources (#17770) 2023-09-05 14:45:22 +02:00
Bram Kragten
32472ca627 Add weather forecast options to more info (#17823) 2023-09-05 13:29:56 +02:00
Bram Kragten
c3c4bb4421 Fix initial value of select selector (#17822) 2023-09-05 13:29:47 +02:00
Paul Bottein
f7f1a0c32d Add better localize keys typings for config pages (#17815)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-09-05 11:39:03 +02:00
Bram Kragten
d4872b177f Start improve restore backup in onboarding (#17813) 2023-09-04 20:08:33 +02:00
Simon Lamon
5bb8c51d25 Guard against empty application credential domain (#17786) 2023-09-04 19:21:56 +02:00
Bram Kragten
4e62370d18 20230904.0 (#17819) 2023-09-04 19:18:58 +02:00
Bram Kragten
77c08fd00f Bumped version to 20230904.0 2023-09-04 19:18:08 +02:00
Bram Kragten
d8894a0078 Don't report errors while not connected (#17818) 2023-09-04 19:16:11 +02:00
renovate[bot]
4fd9c63633 Update dependency hls.js to v1.4.12 (#17817)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-04 15:31:48 +00:00
Paul Bottein
5e1583f925 Add keyboard support to onboarding links (#17816) 2023-09-04 17:20:51 +02:00
renovate[bot]
5d5894cae6 Update dependency @babel/preset-env to v7.22.14 (#17791)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-04 14:59:44 +02:00
renovate[bot]
5417513f49 Update dependency hls.js to v1.4.11 (#17809)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-04 14:59:07 +02:00
renovate[bot]
546ba8f12f Update dependency @codemirror/view to v6.17.1 (#17760)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-04 14:58:32 +02:00
Bram Kragten
a398b37380 Fix combobox selecting wrong item on iOS (#17812) 2023-09-04 12:39:22 +02:00
Kendell R
321f35f30e Fix hide disabled entities button (#17806)
fix hide disabled entities button
2023-09-04 11:49:05 +02:00
renovate[bot]
82dfb06a04 Update dependency @lit-labs/virtualizer to v2.0.7 (#17794)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-03 16:27:39 -04:00
c0ffeeca7
e666aac1bd Fix typo (#17803) 2023-09-03 11:34:54 -04:00
renovate[bot]
9e9a0e377e Update dependency glob to v10.3.4 (#17802) 2023-09-03 11:19:50 -04:00
renovate[bot]
ba3f9a318b Update dependency @types/qrcode to v1.5.2 (#17799) 2023-09-03 11:14:41 -04:00
renovate[bot]
f3b4eefb72 Update dependency @types/luxon to v3.3.2 (#17798) 2023-09-03 15:02:08 +00:00
renovate[bot]
6ac1db6953 Update dependency @types/ua-parser-js to v0.7.37 (#17800) 2023-09-03 10:54:11 -04:00
renovate[bot]
1b42189dd6 Update dependency @types/leaflet-draw to v1.0.8 (#17797) 2023-09-03 10:51:01 -04:00
renovate[bot]
0d893b3d2b Update dependency del to v7.1.0 (#17792) 2023-09-02 18:29:33 -04:00
renovate[bot]
7b167a4d7e Update dependency @types/leaflet to v1.9.4 (#17795) 2023-09-02 18:26:28 -04:00
renovate[bot]
8e2f1026e7 Update dependency prettier to v3.0.3 (#17776)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-09-01 14:22:35 -04:00
Paul Bottein
fe3a63af80 Sort data using locale in data tables (#17781)
* Sort data using locale in data tables

* Only use string compare is both values are string
2023-09-01 17:33:41 +02:00
Bram Kragten
f90ab60354 20230901.0 (#17782) 2023-09-01 17:02:38 +02:00
Bram Kragten
5da4e1860a Rename CO2 signal -> Electricity Map 2023-09-01 17:02:14 +02:00
Bram Kragten
6dcb7f2273 Hide google translate in onboarding 2023-09-01 16:53:14 +02:00
Bram Kragten
53ae7e5a0c Bumped version to 20230901.0 2023-09-01 16:42:30 +02:00
Bram Kragten
56381f9914 Show helper config entries without entities (#17780) 2023-09-01 14:38:56 +00:00
Paul Bottein
be31aecf00 Use right supported features for tilt position in editor (#17779) 2023-09-01 15:54:35 +02:00
Paul Bottein
cc5fffc174 Use state icon for helpers (#17777) 2023-09-01 15:54:19 +02:00
Bram Kragten
dd8a50af31 Add state color to preview row (#17778) 2023-09-01 15:45:32 +02:00
Paul Bottein
c8feded4f2 Use format entity state helpers everywhere (#17757) 2023-09-01 15:26:46 +02:00
Paul Bottein
0d0fe75f4e Use slider for color temp instead of wheel (#17771) 2023-09-01 15:25:27 +02:00
Paul Bottein
fb69deb617 Fix target range temperature in tile feature (#17772) 2023-09-01 15:24:36 +02:00
Paul Bottein
c291af5d97 Improve disabled state for select and number button control (#17773) 2023-09-01 15:19:28 +02:00
Paul Bottein
6d63028406 Move tile card features logic into its own file (#17775) 2023-09-01 15:18:47 +02:00
karwosts
3917739ad2 Fix chart tooltip crash for disabled entity (#17767) 2023-09-01 11:36:43 +02:00
renovate[bot]
e98e59a265 Update typescript-eslint monorepo to v6.5.0 (#17762)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-08-31 19:40:36 -04:00
renovate[bot]
16ed60902d Update dependency @types/sortablejs to v1.15.2 (#17761)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-08-31 19:35:19 -04:00
Paul Bottein
6c7efc17c2 Fix more info type test (#17758) 2023-08-31 22:37:25 +02:00
Bram Kragten
d187aa0ac6 20230831.0 (#17756) 2023-08-31 14:38:24 +02:00
Bram Kragten
9c60a047c1 Bumped version to 20230831.0 2023-08-31 14:33:00 +02:00
Bram Kragten
1825749036 Get forecasts from large to small (#17755) 2023-08-31 14:32:30 +02:00
Bram Kragten
93846a2867 Fix unit and currency, always select first result of search (#17753)
* Fix unit and currency, always select first result of search

* Update onboarding-location.ts
2023-08-31 14:23:33 +02:00
Bram Kragten
f3ed0160af Fix tooltip error for climate charts (#17752) 2023-08-31 14:22:39 +02:00
Bram Kragten
38b275f7f9 Dont resize chart-timeline (#17751) 2023-08-31 14:21:35 +02:00
Bram Kragten
c3a36efaa4 Fix device energy graphs (#17754) 2023-08-31 14:20:57 +02:00
Paul Bottein
68fa67e77a Use entity translation for away mode (#17750)
* Use entity translation for away mode

* Remove keys
2023-08-31 14:19:40 +02:00
Paul Bottein
806cebb024 Fix more info translation keys (#17749) 2023-08-31 11:06:29 +00:00
Paul Bottein
fa788a8223 Use heat or cool slider mode for auto if there is only one mode (#17748) 2023-08-31 13:00:58 +02:00
Paul Bottein
dfbaee1649 Fix margin between buttons row and attributes in more info (#17738) 2023-08-31 11:02:04 +02:00
karwosts
cfb698d0a6 Fix more info weather forecast (#17747) 2023-08-31 09:42:57 +02:00
Simon Lamon
63c3d6406d Remove Polymer app layout (#17739)
* Remove legacy app layout

* Remove left over ha-app-layout import
2023-08-30 12:24:31 -04:00
Raman Gupta
d817e92a57 Remove node status from zwave_js device info card (#17732) 2023-08-30 15:52:11 +02:00
Bram Kragten
96597b3963 20230830.0 (#17737) 2023-08-30 15:48:10 +02:00
Bram Kragten
40c7bc08d9 Merge branch 'master' into dev 2023-08-30 15:29:55 +02:00
Bram Kragten
b8cd1760f7 Bumped version to 20230830.0 2023-08-30 15:27:57 +02:00
Bram Kragten
24dd45c8cd Bump ChartJS to version 4 (#15531) 2023-08-30 15:27:24 +02:00
Simon Lamon
e06bd41b5e Migrate mailbox to LitElement (#17690)
* migrate mailbox to lit

* Make some methods private

* Clean up
2023-08-30 15:21:20 +02:00
Bram Kragten
c0793fad83 Listen to change event on string form too for autofill (#17733)
* Listen to change event on string form too for autofill

* Update ha-password-manager-polyfill.ts
2023-08-30 14:58:38 +02:00
karwosts
e002c5d96c Allow theme colors for individual sets in energy-usage-graph-card (#17527)
Co-authored-by: Bram Kragten <mail@bramkragten.nl>
2023-08-30 13:38:38 +02:00
karwosts
099e317d17 Fix zone dialog rendering wider than the window (#17642) 2023-08-30 13:37:50 +02:00
dependabot[bot]
ca1a183512 Bump actions/checkout from 3.5.3 to 3.6.0 (#17723)
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2023-08-30 13:31:09 +02:00
renovate[bot]
c1cacf735e Update dependency eslint to v8.48.0 (#17726)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-08-30 13:30:23 +02:00
renovate[bot]
515cfdb6d1 Update dependency cropperjs to v1.6.0 (#17728)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-08-30 13:29:56 +02:00
renovate[bot]
3a6cffd6c1 Update CodeMirror (#17730)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-08-30 13:29:02 +02:00
renovate[bot]
c84a826937 Update dependency marked to v7.0.5 (#17731)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-08-30 13:28:35 +02:00
Bram Kragten
c485e8d03e Update onboarding (#17734)
Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2023-08-30 13:24:25 +02:00
Bram Kragten
2ab67328d4 Update upload element (#17654) 2023-08-30 13:24:11 +02:00
Bram Kragten
d350c35c4e Add preview for template (#17699) 2023-08-30 12:56:53 +02:00
karwosts
034ce56da5 Updates to alarm panel card configuration (#17598)
* Updates to alarm panel card configuration

* changes from feedback
2023-08-30 11:42:51 +02:00
karwosts
ae9fcebfd5 Add sortable options to input_select settings menu (#17706)
* Sortable options in input_select settings menu

* fix lint

* no ripple, default cursor

* Update src/panels/config/helpers/forms/ha-input_select-form.ts

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>

* sortableStyles

* Use ha-list-item and mwc-list

---------

Co-authored-by: Paul Bottein <paul.bottein@gmail.com>
2023-08-30 07:59:06 +00:00
renovate[bot]
6197b55da8 Update dependency luxon to v3.4.2 (#17710)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-08-30 09:54:39 +02:00
Bram Kragten
4e5d57b5f3 Ask user to logout all devices when changing password (#17523)
* Ask user to logout all devices when changing password

* missing import

* use core command
2023-08-29 17:09:17 +02:00
Paul Bottein
7040c6d469 Add target temperature tile feature for climate and water heater (#17697) 2023-08-29 16:36:07 +02:00
Paul Bottein
6f99a39b55 Adapt more info button layout depending of number of items and screen (#17691) 2023-08-29 15:13:08 +02:00
Paul Bottein
7483833dcd Use active color for position cover tile feature even if it's closed (#17685) 2023-08-29 15:11:30 +02:00
Sam Reed
38fb48b231 Add trailing full stop to visit_addon_page message (#17719) 2023-08-29 14:38:15 +02:00
karwosts
166acee1c6 Fix language picker in profile displaying wrong language (#17725)
* fix language picker when changing language sort order #16642

* alternative fix
2023-08-29 09:45:54 +02:00
renovate[bot]
916a6df39b Update vaadinWebComponents monorepo to v24.1.6 (#17724)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-08-28 18:03:02 +02:00
renovate[bot]
70f37158fb Update dependency @material/web to v1.0.0-pre.16 (#17703)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-08-28 18:01:28 +02:00
renovate[bot]
5011bba20e Update dependency typescript to v5.2.2 (#17720)
* Update dependency typescript to v5.2.2

* Remove expect error for URL.canParse

---------

Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
Co-authored-by: Steve Repsher <steverep@users.noreply.github.com>
2023-08-27 17:43:49 +00:00
renovate[bot]
8897bc703d Update babel monorepo to v7.22.11 (#17717)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-08-27 13:15:40 -04:00
renovate[bot]
ea6e7d441a Update dependency chai to v4.3.8 (#17718)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-08-27 13:10:52 -04:00
renovate[bot]
f91396c986 Update Yarn to v3.6.3 (#17715)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-08-27 13:09:28 -04:00
renovate[bot]
4598b530af Update dependency @lit-labs/virtualizer to v2.0.6 (#17702)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-08-26 13:14:25 -04:00
renovate[bot]
dfabb4bc36 Update dependency @rollup/plugin-node-resolve to v15.2.1 (#17704) 2023-08-25 21:18:32 -04:00
Bram Kragten
66e0100c95 Fix combobox picking first item with label on blur (#17701) 2023-08-24 16:22:26 -04:00
renovate[bot]
a08a989ef5 Update dependency lint-staged to v14.0.1 (#17694)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-08-24 15:18:37 -04:00
renovate[bot]
000c28abf9 Update dependency magic-string to v0.30.3 (#17695)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-08-24 15:16:40 -04:00
renovate[bot]
6b67397c83 Update typescript-eslint monorepo to v6.4.1 (#17700)
Co-authored-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
2023-08-24 15:15:50 -04:00
karwosts
f68823a09e Add for_each to repeat action UI. Convert repeat to ha-form (#17688)
* Add for_each to repeat action UI. Convert repeat to ha-form

* reordermode as a selector option

* css styling
2023-08-24 18:13:10 +02:00
Bram Kragten
fc1782e676 Use 1 element for all group previews (#17693) 2023-08-24 10:14:30 +00:00
Simon Lamon
b4975344a1 Don't show a battery if the entity domain is Number (#17631) 2023-08-24 11:56:03 +02:00
Joakim Sørensen
2dc08d782f Hide STT and TTS entities from generated dashboard (#17689) 2023-08-24 08:59:41 +02:00
Bram Kragten
593b176ab8 Bump version to 20230802.1 2023-08-18 11:18:24 +02:00
karwosts
1a15c8da8c Fix default precision display in entity settings (#17491) 2023-08-18 11:15:18 +02:00
Bram Kragten
060e67397a Prevent voice settings to override entity registry settings dialog (#17485) 2023-08-18 11:14:42 +02:00
Bram Kragten
d6de29ca8a Change logic to determine if forecast is hourly (#17486) 2023-08-18 11:14:15 +02:00
Bram Kragten
220767b347 Use service translations in logbook (#17461) 2023-08-18 11:13:57 +02:00
karwosts
79e1fbe076 Fix device config dialog when disabled (#17464) 2023-08-18 11:13:38 +02:00
Bram Kragten
7d80eb06b0 20230802.0 (#17457) 2023-08-02 14:12:28 +02:00
Bram Kragten
a181189a49 20230801.0 (#17450) 2023-08-01 11:16:30 +02:00
Franck Nijhof
626b51112f 20230725.0 (#17407) 2023-07-25 18:02:12 +02:00
2640 changed files with 225969 additions and 93032 deletions

View File

@@ -1,39 +1,36 @@
[modern]
# Support for dynamic import is the main litmus test for serving modern builds.
# Although officially a ES2020 feature, browsers implemented it early, so this
# enables all of ES2017 and some features in ES2018.
supports es6-module-dynamic-import
# Exclude Safari 11-12 because of a bug in tagged template literals
# https://bugs.webkit.org/show_bug.cgi?id=190756
# Note: Dropping version 11 also enables several more ES2018 features
not Safari < 13
not iOS < 13
# Exclude KaiOS, QQ, and UC browsers due to lack of sufficient feature support data
# Babel ignores these automatically, but we need here for Webpack to output ESM with dynamic imports
# Modern builds target recent browsers supporting the latest features to minimize transpilation, polyfills, etc.
# It is served to browsers meeting the following requirements:
# - released in the last year + current alpha/beta versions
# - Firefox extended support release (ESR)
# - with global utilization at or above 0.5%
# - exclude dead browsers (no security maintenance for 2+ years)
# - exclude KaiOS, QQ, and UC browsers due to lack of sufficient feature support data
unreleased versions
last 1 year
Firefox ESR
>= 0.5%
not dead
not KaiOS > 0
not QQAndroid > 0
not UCAndroid > 0
# Exclude unsupported browsers
not dead
[legacy]
# Legacy builds are served when modern requirements are not met and support browsers:
# - released in the last 7 years + current alpha/beta versionss
# - with global utilization above 0.05%
# The lattermost query ensures that support for popular old browsers is not dropped too early
# (e.g. IE 11, Android 4.4, or Samsung 4).
#
# In addition, legacy browsers must support some minimum features that cannot be polyfilled:
# - ES5 (strict mode)
# - web sockets to communicate with backend
# - inline SVG used widely in buttons, widgets, etc.
# - custom events used for most user interactions
# - CSS flexbox used in the majority of the layout
# Nearly all of these are redundant with the above rules.
# As of May 2023, only web sockets must be added to the query.
# - with global utilization at or above 0.05%
# - exclude dead browsers (no security maintenance for 2+ years)
# - exclude Opera Mini which does not support web sockets
unreleased versions
last 7 years
> 0.05% and supports websockets
>= 0.05%
not dead
not op_mini all
[legacy-sw]
# Same as legacy plus supports service workers
unreleased versions
last 7 years
>= 0.05% and supports serviceworkers
not dead
not op_mini all

View File

@@ -1,5 +1,4 @@
# See here for image contents: https://github.com/microsoft/vscode-dev-containers/tree/v0.148.1/containers/python-3/.devcontainer/base.Dockerfile
FROM mcr.microsoft.com/vscode/devcontainers/python:0-3.11
FROM mcr.microsoft.com/devcontainers/python:1-3.13
ENV \
DEBIAN_FRONTEND=noninteractive \

View File

@@ -5,10 +5,15 @@
"context": ".."
},
"appPort": "8124:8123",
"postCreateCommand": "./.devcontainer/post_create.sh",
"postStartCommand": "script/bootstrap",
"containerEnv": {
"DEV_CONTAINER": "1",
"WORKSPACE_DIRECTORY": "${containerWorkspaceFolder}"
},
"remoteEnv": {
"NODE_OPTIONS": "--max_old_space_size=8192"
},
"customizations": {
"vscode": {
"extensions": [
@@ -16,7 +21,8 @@
"esbenp.prettier-vscode",
"runem.lit-plugin",
"github.vscode-pull-request-github",
"eamodio.gitlens"
"eamodio.gitlens",
"yeion7.styled-global-variables-autocomplete"
],
"settings": {
"files.eol": "\n",

22
.devcontainer/post_create.sh Executable file
View File

@@ -0,0 +1,22 @@
#!/bin/bash
# This script will run after the container is created
# add github cli
(type -p wget >/dev/null || (sudo apt update && sudo apt-get install wget -y)) \
&& sudo mkdir -p -m 755 /etc/apt/keyrings \
&& out=$(mktemp) && wget -nv -O$out https://cli.github.com/packages/githubcli-archive-keyring.gpg \
&& cat $out | sudo tee /etc/apt/keyrings/githubcli-archive-keyring.gpg > /dev/null \
&& sudo chmod go+r /etc/apt/keyrings/githubcli-archive-keyring.gpg \
&& echo "deb [arch=$(dpkg --print-architecture) signed-by=/etc/apt/keyrings/githubcli-archive-keyring.gpg] https://cli.github.com/packages stable main" | sudo tee /etc/apt/sources.list.d/github-cli.list > /dev/null
# Update package lists
sudo apt-get update
sudo apt upgrade -y
# Install necessary packages
sudo apt-get install -y libpcap-dev gh
# Display a message
echo "Post-create script has been executed successfully."

View File

@@ -1,130 +0,0 @@
{
"extends": [
"airbnb-base",
"airbnb-typescript/base",
"plugin:@typescript-eslint/recommended",
"plugin:wc/recommended",
"plugin:lit/all",
"plugin:lit-a11y/recommended",
"prettier"
],
"parser": "@typescript-eslint/parser",
"parserOptions": {
"ecmaVersion": 2020,
"ecmaFeatures": {
"modules": true
},
"sourceType": "module",
"project": "./tsconfig.json"
},
"settings": {
"import/resolver": {
"webpack": {
"config": "./webpack.config.cjs"
}
}
},
"globals": {
"__DEV__": false,
"__DEMO__": false,
"__BUILD__": false,
"__VERSION__": false,
"__STATIC_PATH__": false,
"__SUPERVISOR__": false,
"Polymer": true
},
"env": {
"browser": true,
"es6": true
},
"rules": {
"class-methods-use-this": "off",
"new-cap": "off",
"prefer-template": "off",
"object-shorthand": "off",
"func-names": "off",
"no-underscore-dangle": "off",
"strict": "off",
"no-plusplus": "off",
"no-bitwise": "error",
"comma-dangle": "off",
"vars-on-top": "off",
"no-continue": "off",
"no-param-reassign": "off",
"no-multi-assign": "off",
"no-console": "error",
"radix": "off",
"no-alert": "off",
"no-nested-ternary": "off",
"prefer-destructuring": "off",
"no-restricted-globals": [2, "event"],
"prefer-promise-reject-errors": "off",
"import/prefer-default-export": "off",
"import/no-default-export": "off",
"import/no-unresolved": "off",
"import/no-cycle": "off",
"import/extensions": [
"error",
"ignorePackages",
{
"ts": "never",
"js": "never"
}
],
"no-restricted-syntax": ["error", "LabeledStatement", "WithStatement"],
"object-curly-newline": "off",
"default-case": "off",
"wc/no-self-class": "off",
"no-shadow": "off",
"@typescript-eslint/camelcase": "off",
"@typescript-eslint/ban-ts-comment": "off",
"@typescript-eslint/no-use-before-define": "off",
"@typescript-eslint/no-non-null-assertion": "off",
"@typescript-eslint/no-explicit-any": "off",
"@typescript-eslint/explicit-function-return-type": "off",
"@typescript-eslint/explicit-module-boundary-types": "off",
"@typescript-eslint/no-shadow": ["error"],
"@typescript-eslint/naming-convention": [
"off",
{
"selector": "default",
"format": ["camelCase", "snake_case"],
"leadingUnderscore": "allow",
"trailingUnderscore": "allow"
},
{
"selector": ["variable"],
"format": ["camelCase", "snake_case", "UPPER_CASE"],
"leadingUnderscore": "allow",
"trailingUnderscore": "allow"
},
{
"selector": "typeLike",
"format": ["PascalCase"]
}
],
"@typescript-eslint/no-unused-vars": "off",
"unused-imports/no-unused-vars": [
"error",
{
"vars": "all",
"varsIgnorePattern": "^_",
"args": "after-used",
"argsIgnorePattern": "^_",
"ignoreRestSiblings": true
}
],
"unused-imports/no-unused-imports": "error",
"lit/attribute-value-entities": "off",
"lit/no-template-map": "off",
"lit/no-native-attributes": "warn",
"lit/no-this-assign-in-render": "warn",
"lit-a11y/click-events-have-key-events": ["off"],
"lit-a11y/no-autofocus": "off",
"lit-a11y/alt-text": "warn",
"lit-a11y/anchor-is-valid": "warn",
"lit-a11y/role-has-required-aria-attrs": "warn"
},
"plugins": ["disable", "unused-imports"],
"processor": "disable/disable"
}

View File

@@ -7,11 +7,11 @@ body:
value: |
Make sure you are running the [latest version of Home Assistant][releases] before reporting an issue.
If you have a feature or enhancement request for the frontend, please [start an discussion][fr] instead of creating an issue.
If you have a feature or enhancement request for the frontend, please [start a discussion][fr] instead of creating an issue.
**Please not not report issues for custom cards.**
**Please do not report issues for custom cards.**
[fr]: https://github.com/home-assistant/frontend/discussions
[fr]: https://github.com/orgs/home-assistant/discussions
[releases]: https://github.com/home-assistant/home-assistant/releases
- type: checkboxes
attributes:
@@ -24,6 +24,7 @@ body:
required: true
- label: I have tried a different browser to see if it is related to my browser.
required: true
- label: I have tried reproducing the issue in [safe mode](https://www.home-assistant.io/blog/2023/11/01/release-202311/#restarting-into-safe-mode) to rule out problems with unsupported custom resources.
- type: markdown
attributes:
value: |
@@ -73,7 +74,7 @@ body:
If known, otherwise leave blank.
- type: input
attributes:
label: In which browser are you experiencing the issue with?
label: In which browser are you experiencing the issue?
placeholder: Google Chrome 88.0.4324.150
description: >
Provide the full name and don't forget to add the version!
@@ -107,9 +108,9 @@ body:
render: yaml
- type: textarea
attributes:
label: Javascript errors shown in your browser console/inspector
label: JavaScript errors shown in your browser console/inspector
description: >
If you come across any Javascript or other error logs, e.g., in your
If you come across any JavaScript or other error logs, e.g., in your
browser console/inspector please provide them.
render: txt
- type: textarea

View File

@@ -1,8 +1,8 @@
blank_issues_enabled: false
contact_links:
- name: Request a feature for the UI / Dashboards
url: https://github.com/home-assistant/frontend/discussions/category_choices
about: Request an new feature for the Home Assistant frontend.
url: https://github.com/orgs/home-assistant/discussions
about: Request a new feature for the Home Assistant frontend.
- name: Report a bug that is NOT related to the UI / Dashboards
url: https://github.com/home-assistant/core/issues
about: This is the issue tracker for our frontend. Please report other issues in the backend ("core") repository.

53
.github/ISSUE_TEMPLATE/task.yml vendored Normal file
View File

@@ -0,0 +1,53 @@
name: Task
description: For staff only - Create a task
type: Task
body:
- type: markdown
attributes:
value: |
## ⚠️ RESTRICTED ACCESS
**This form is restricted to Open Home Foundation staff and authorized contributors only.**
If you are a community member wanting to contribute, please:
- For bug reports: Use the [bug report form](https://github.com/home-assistant/frontend/issues/new?template=bug_report.yml)
- For feature requests: Submit to [Feature Requests](https://github.com/orgs/home-assistant/discussions)
---
### For authorized contributors
Use this form to create tasks for development work, improvements, or other actionable items that need to be tracked.
- type: textarea
id: description
attributes:
label: Description
description: |
Provide a clear and detailed description of the task that needs to be accomplished.
Be specific about what needs to be done, why it's important, and any constraints or requirements.
placeholder: |
Describe the task, including:
- What needs to be done
- Why this task is needed
- Expected outcome
- Any constraints or requirements
validations:
required: true
- type: textarea
id: additional_context
attributes:
label: Additional context
description: |
Any additional information, links, research, or context that would be helpful.
Include links to related issues, research, prototypes, roadmap opportunities etc.
placeholder: |
- Roadmap opportunity: [link]
- Epic: [link]
- Feature request: [link]
- Technical design documents: [link]
- Prototype/mockup: [link]
- Dependencies: [links]
validations:
required: false

View File

@@ -2,9 +2,7 @@
You are amazing! Thanks for contributing to our project!
Please, DO NOT DELETE ANY TEXT from this template! (unless instructed).
-->
## Breaking change
<!--
If your PR contains a breaking change for existing users, it is important
to tell them what breaks, how to make it work again and why we did this.
@@ -13,8 +11,8 @@
Note: Remove this section if this PR is NOT a breaking change.
-->
## Proposed change
## Proposed change
<!--
Describe the big picture of your changes here to communicate to the
maintainers why we should accept this pull request. If it fixes a bug
@@ -22,8 +20,8 @@
in the additional information section.
-->
## Type of change
## Type of change
<!--
What type of change does your PR introduce to the Home Assistant frontend?
NOTE: Please, check only 1! box!
@@ -38,7 +36,6 @@
- [ ] Code quality improvements to existing code or addition of tests
## Example configuration
<!--
Supplying a configuration snippet, makes it easier for a maintainer to test
your PR.
@@ -49,7 +46,6 @@
```
## Additional information
<!--
Details are important, and help maintainers processing your PR.
Please be sure to fill out additional details, if applicable.
@@ -60,7 +56,6 @@
- Link to documentation pull request:
## Checklist
<!--
Put an `x` in the boxes that apply. You can also fill these out after
creating the PR. If you're unsure about any of them, don't hesitate to ask.

596
.github/copilot-instructions.md vendored Normal file
View File

@@ -0,0 +1,596 @@
# GitHub Copilot & Claude Code Instructions
You are an assistant helping with development of the Home Assistant frontend. The frontend is built using Lit-based Web Components and TypeScript, providing a responsive and performant interface for home automation control.
## Table of Contents
- [Quick Reference](#quick-reference)
- [Core Architecture](#core-architecture)
- [Development Standards](#development-standards)
- [Component Library](#component-library)
- [Common Patterns](#common-patterns)
- [Text and Copy Guidelines](#text-and-copy-guidelines)
- [Development Workflow](#development-workflow)
- [Review Guidelines](#review-guidelines)
## Quick Reference
### Essential Commands
```bash
yarn lint # ESLint + Prettier + TypeScript + Lit
yarn format # Auto-fix ESLint + Prettier
yarn lint:types # TypeScript compiler
yarn test # Vitest
script/develop # Development server
```
### Component Prefixes
- `ha-` - Home Assistant components
- `hui-` - Lovelace UI components
- `dialog-` - Dialog components
### Import Patterns
```typescript
import type { HomeAssistant } from "../types";
import { fireEvent } from "../common/dom/fire_event";
import { showAlertDialog } from "../dialogs/generic/show-alert-dialog";
```
## Core Architecture
The Home Assistant frontend is a modern web application that:
- Uses Web Components (custom elements) built with Lit framework
- Is written entirely in TypeScript with strict type checking
- Communicates with the backend via WebSocket API
- Provides comprehensive theming and internationalization
## Development Standards
### Code Quality Requirements
**Linting and Formatting (Enforced by Tools)**
- ESLint config extends Airbnb, TypeScript strict, Lit, Web Components, Accessibility
- Prettier with ES5 trailing commas enforced
- No console statements (`no-console: "error"`) - use proper logging
- Import organization: No unused imports, consistent type imports
**Naming Conventions**
- PascalCase for types and classes
- camelCase for variables, methods
- Private methods require leading underscore
- Public methods forbid leading underscore
### TypeScript Usage
- **Always use strict TypeScript**: Enable all strict flags, avoid `any` types
- **Proper type imports**: Use `import type` for type-only imports
- **Define interfaces**: Create proper interfaces for data structures
- **Type component properties**: All Lit properties must be properly typed
- **No unused variables**: Prefix with `_` if intentionally unused
- **Consistent imports**: Use `@typescript-eslint/consistent-type-imports`
```typescript
// Good
import type { HomeAssistant } from "../types";
interface EntityConfig {
entity: string;
name?: string;
}
@property({ type: Object })
hass!: HomeAssistant;
// Bad
@property()
hass: any;
```
### Web Components with Lit
- **Use Lit 3.x patterns**: Follow modern Lit practices
- **Extend appropriate base classes**: Use `LitElement`, `SubscribeMixin`, or other mixins as needed
- **Define custom element names**: Use `ha-` prefix for components
```typescript
@customElement("ha-my-component")
export class HaMyComponent extends LitElement {
@property({ attribute: false })
hass!: HomeAssistant;
@state()
private _config?: MyComponentConfig;
static get styles() {
return css`
:host {
display: block;
}
`;
}
render() {
return html`<div>Content</div>`;
}
}
```
### Component Guidelines
- **Use composition**: Prefer composition over inheritance
- **Lazy load panels**: Heavy panels should be dynamically imported
- **Optimize renders**: Use `@state()` for internal state, `@property()` for public API
- **Handle loading states**: Always show appropriate loading indicators
- **Support themes**: Use CSS custom properties from theme
### Data Management
- **Use WebSocket API**: All backend communication via home-assistant-js-websocket
- **Cache appropriately**: Use collections and caching for frequently accessed data
- **Handle errors gracefully**: All API calls should have error handling
- **Update real-time**: Subscribe to state changes for live updates
```typescript
// Good
try {
const result = await fetchEntityRegistry(this.hass.connection);
this._processResult(result);
} catch (err) {
showAlertDialog(this, {
text: `Failed to load: ${err.message}`,
});
}
```
### Styling Guidelines
- **Use CSS custom properties**: Leverage the theme system
- **Mobile-first responsive**: Design for mobile, enhance for desktop
- **Follow Material Design**: Use Material Web Components where appropriate
- **Support RTL**: Ensure all layouts work in RTL languages
```typescript
static get styles() {
return css`
:host {
--spacing: 16px;
padding: var(--spacing);
color: var(--primary-text-color);
background-color: var(--card-background-color);
}
@media (max-width: 600px) {
:host {
--spacing: 8px;
}
}
`;
}
```
### Performance Best Practices
- **Code split**: Split code at the panel/dialog level
- **Lazy load**: Use dynamic imports for heavy components
- **Optimize bundle**: Keep initial bundle size minimal
- **Use virtual scrolling**: For long lists, implement virtual scrolling
- **Memoize computations**: Cache expensive calculations
### Testing Requirements
- **Write tests**: Add tests for data processing and utilities
- **Test with Vitest**: Use the established test framework
- **Mock appropriately**: Mock WebSocket connections and API calls
- **Test accessibility**: Ensure components are accessible
## Component Library
### Dialog Components
**Available Dialog Types:**
- `ha-md-dialog` - Preferred for new code (Material Design 3)
- `ha-dialog` - Legacy component still widely used
**Opening Dialogs (Fire Event Pattern - Recommended):**
```typescript
fireEvent(this, "show-dialog", {
dialogTag: "dialog-example",
dialogImport: () => import("./dialog-example"),
dialogParams: { title: "Example", data: someData },
});
```
**Dialog Implementation Requirements:**
- Implement `HassDialog<T>` interface
- Use `createCloseHeading()` for standard headers
- Import `haStyleDialog` for consistent styling
- Return `nothing` when no params (loading state)
- Fire `dialog-closed` event when closing
- Add `dialogInitialFocus` for accessibility
````
### Form Component (ha-form)
- Schema-driven using `HaFormSchema[]`
- Supports entity, device, area, target, number, boolean, time, action, text, object, select, icon, media, location selectors
- Built-in validation with error display
- Use `dialogInitialFocus` in dialogs
- Use `computeLabel`, `computeError`, `computeHelper` for translations
```typescript
<ha-form
.hass=${this.hass}
.data=${this._data}
.schema=${this._schema}
.error=${this._errors}
.computeLabel=${(schema) => this.hass.localize(`ui.panel.${schema.name}`)}
@value-changed=${this._valueChanged}
></ha-form>
````
### Alert Component (ha-alert)
- Types: `error`, `warning`, `info`, `success`
- Properties: `title`, `alert-type`, `dismissable`, `icon`, `action`, `rtl`
- Content announced by screen readers when dynamically displayed
```html
<ha-alert alert-type="error">Error message</ha-alert>
<ha-alert alert-type="warning" title="Warning">Description</ha-alert>
<ha-alert alert-type="success" dismissable>Success message</ha-alert>
```
## Common Patterns
### Creating a Panel
```typescript
@customElement("ha-panel-myfeature")
export class HaPanelMyFeature extends SubscribeMixin(LitElement) {
@property({ attribute: false })
hass!: HomeAssistant;
@property({ type: Boolean, reflect: true })
narrow!: boolean;
@property()
route!: Route;
hassSubscribe() {
return [
subscribeEntityRegistry(this.hass.connection, (entities) => {
this._entities = entities;
}),
];
}
}
```
### Creating a Dialog
```typescript
@customElement("dialog-my-feature")
export class DialogMyFeature
extends LitElement
implements HassDialog<MyDialogParams>
{
@property({ attribute: false })
hass!: HomeAssistant;
@state()
private _params?: MyDialogParams;
public async showDialog(params: MyDialogParams): Promise<void> {
this._params = params;
}
public closeDialog(): void {
this._params = undefined;
fireEvent(this, "dialog-closed", { dialog: this.localName });
}
protected render() {
if (!this._params) {
return nothing;
}
return html`
<ha-dialog
open
@closed=${this.closeDialog}
.heading=${createCloseHeading(this.hass, this._params.title)}
>
<!-- Dialog content -->
<ha-button
appearance="plain"
@click=${this.closeDialog}
slot="secondaryAction"
>
${this.hass.localize("ui.common.cancel")}
</ha-button>
<ha-button @click=${this._submit} slot="primaryAction">
${this.hass.localize("ui.common.save")}
</ha-button>
</ha-dialog>
`;
}
static styles = [haStyleDialog, css``];
}
```
### Dialog Design Guidelines
- Max width: 560px (Alert/confirmation: 320px fixed width)
- Close X-icon on top left (all screen sizes)
- Submit button grouped with cancel at bottom right
- Keep button labels short: "Save", "Delete", "Enable"
- Destructive actions use red warning button
- Always use a title (best practice)
- Strive for minimalism
#### Creating a Lovelace Card
**Purpose**: Cards allow users to tell different stories about their house (based on gallery)
```typescript
@customElement("hui-my-card")
export class HuiMyCard extends LitElement implements LovelaceCard {
@property({ attribute: false })
hass!: HomeAssistant;
@state()
private _config?: MyCardConfig;
public setConfig(config: MyCardConfig): void {
if (!config.entity) {
throw new Error("Entity required");
}
this._config = config;
}
public getCardSize(): number {
return 3; // Height in grid units
}
// Optional: Editor for card configuration
public static getConfigElement(): LovelaceCardEditor {
return document.createElement("hui-my-card-editor");
}
// Optional: Stub config for card picker
public static getStubConfig(): object {
return { entity: "" };
}
}
```
**Card Guidelines:**
- Cards are highly customizable for different households
- Implement `LovelaceCard` interface with `setConfig()` and `getCardSize()`
- Use proper error handling in `setConfig()`
- Consider all possible states (loading, error, unavailable)
- Support different entity types and states
- Follow responsive design principles
- Add configuration editor when needed
### Internationalization
- **Use localize**: Always use the localization system
- **Add translation keys**: Add keys to src/translations/en.json
- **Support placeholders**: Use proper placeholder syntax
```typescript
this.hass.localize("ui.panel.config.updates.update_available", {
count: 5,
});
```
### Accessibility
- **ARIA labels**: Add appropriate ARIA labels
- **Keyboard navigation**: Ensure all interactions work with keyboard
- **Screen reader support**: Test with screen readers
- **Color contrast**: Meet WCAG AA standards
## Development Workflow
### Setup and Commands
1. **Setup**: `script/setup` - Install dependencies
2. **Develop**: `script/develop` - Development server
3. **Lint**: `yarn lint` - Run all linting before committing
4. **Test**: `yarn test` - Add and run tests
5. **Build**: `script/build_frontend` - Test production build
### Common Pitfalls to Avoid
- Don't use `querySelector` - Use refs or component properties
- Don't manipulate DOM directly - Let Lit handle rendering
- Don't use global styles - Scope styles to components
- Don't block the main thread - Use web workers for heavy computation
- Don't ignore TypeScript errors - Fix all type issues
### Security Best Practices
- Sanitize HTML - Never use `unsafeHTML` with user content
- Validate inputs - Always validate user inputs
- Use HTTPS - All external resources must use HTTPS
- CSP compliance - Ensure code works with Content Security Policy
### Text and Copy Guidelines
#### Terminology Standards
**Delete vs Remove** (Based on gallery/src/pages/Text/remove-delete-add-create.markdown)
- **Use "Remove"** for actions that can be restored or reapplied:
- Removing a user's permission
- Removing a user from a group
- Removing links between items
- Removing a widget from dashboard
- Removing an item from a cart
- **Use "Delete"** for permanent, non-recoverable actions:
- Deleting a field
- Deleting a value in a field
- Deleting a task
- Deleting a group
- Deleting a permission
- Deleting a calendar event
**Create vs Add** (Create pairs with Delete, Add pairs with Remove)
- **Use "Add"** for already-existing items:
- Adding a permission to a user
- Adding a user to a group
- Adding links between items
- Adding a widget to dashboard
- Adding an item to a cart
- **Use "Create"** for something made from scratch:
- Creating a new field
- Creating a new task
- Creating a new group
- Creating a new permission
- Creating a new calendar event
#### Writing Style (Consistent with Home Assistant Documentation)
- **Use American English**: Standard spelling and terminology
- **Friendly, informational tone**: Be inspiring, personal, comforting, engaging
- **Address users directly**: Use "you" and "your"
- **Be inclusive**: Objective, non-discriminatory language
- **Be concise**: Use clear, direct language
- **Be consistent**: Follow established terminology patterns
- **Use active voice**: "Delete the automation" not "The automation should be deleted"
- **Avoid jargon**: Use terms familiar to home automation users
#### Language Standards
- **Always use "Home Assistant"** in full, never "HA" or "HASS"
- **Avoid abbreviations**: Spell out terms when possible
- **Use sentence case everywhere**: Titles, headings, buttons, labels, UI elements
- ✅ "Create new automation"
- ❌ "Create New Automation"
- ✅ "Device settings"
- ❌ "Device Settings"
- **Oxford comma**: Use in lists (item 1, item 2, and item 3)
- **Replace Latin terms**: Use "like" instead of "e.g.", "for example" instead of "i.e."
- **Avoid CAPS for emphasis**: Use bold or italics instead
- **Write for all skill levels**: Both technical and non-technical users
#### Key Terminology
- **"add-on"** (hyphenated, not "addon")
- **"integration"** (preferred over "component")
- **Technical terms**: Use lowercase (automation, entity, device, service)
#### Translation Considerations
- **Add translation keys**: All user-facing text must be translatable
- **Use placeholders**: Support dynamic content in translations
- **Keep context**: Provide enough context for translators
```typescript
// Good
this.hass.localize("ui.panel.config.automation.delete_confirm", {
name: automation.alias,
});
// Bad - hardcoded text
("Are you sure you want to delete this automation?");
```
### Common Review Issues (From PR Analysis)
#### User Experience and Accessibility
- **Form validation**: Always provide proper field labels and validation feedback
- **Form accessibility**: Prevent password managers from incorrectly identifying fields
- **Loading states**: Show clear progress indicators during async operations
- **Error handling**: Display meaningful error messages when operations fail
- **Mobile responsiveness**: Ensure components work well on small screens
- **Hit targets**: Make clickable areas large enough for touch interaction
- **Visual feedback**: Provide clear indication of interactive states
#### Dialog and Modal Patterns
- **Dialog width constraints**: Respect minimum and maximum width requirements
- **Interview progress**: Show clear progress for multi-step operations
- **State persistence**: Handle dialog state properly during background operations
- **Cancel behavior**: Ensure cancel/close buttons work consistently
- **Form prefilling**: Use smart defaults but allow user override
#### Component Design Patterns
- **Terminology consistency**: Use "Join"/"Apply" instead of "Group" when appropriate
- **Visual hierarchy**: Ensure proper font sizes and spacing ratios
- **Grid alignment**: Components should align to the design grid system
- **Badge placement**: Position badges and indicators consistently
- **Color theming**: Respect theme variables and design system colors
#### Code Quality Issues
- **Null checking**: Always check if entities exist before accessing properties
- **TypeScript safety**: Handle potentially undefined array/object access
- **Import organization**: Remove unused imports and use proper type imports
- **Event handling**: Properly subscribe and unsubscribe from events
- **Memory leaks**: Clean up subscriptions and event listeners
#### Configuration and Props
- **Optional parameters**: Make configuration fields optional when sensible
- **Smart defaults**: Provide reasonable default values
- **Future extensibility**: Design APIs that can be extended later
- **Validation**: Validate configuration before applying changes
## Review Guidelines
### Core Requirements Checklist
- [ ] TypeScript strict mode passes (`yarn lint:types`)
- [ ] No ESLint errors or warnings (`yarn lint:eslint`)
- [ ] Prettier formatting applied (`yarn lint:prettier`)
- [ ] Lit analyzer passes (`yarn lint:lit`)
- [ ] Component follows Lit best practices
- [ ] Proper error handling implemented
- [ ] Loading states handled
- [ ] Mobile responsive
- [ ] Theme variables used
- [ ] Translations added
- [ ] Accessible to screen readers
- [ ] Tests added (where applicable)
- [ ] No console statements (use proper logging)
- [ ] Unused imports removed
- [ ] Proper naming conventions
### Text and Copy Checklist
- [ ] Follows terminology guidelines (Delete vs Remove, Create vs Add)
- [ ] Localization keys added for all user-facing text
- [ ] Uses "Home Assistant" (never "HA" or "HASS")
- [ ] Sentence case for ALL text (titles, headings, buttons, labels)
- [ ] American English spelling
- [ ] Friendly, informational tone
- [ ] Avoids abbreviations and jargon
- [ ] Correct terminology (add-on not addon, integration not component)
### Component-Specific Checks
- [ ] Dialogs implement HassDialog interface
- [ ] Dialog styling uses haStyleDialog
- [ ] Dialog accessibility includes dialogInitialFocus
- [ ] ha-alert used correctly for messages
- [ ] ha-form uses proper schema structure
- [ ] Components handle all states (loading, error, unavailable)
- [ ] Entity existence checked before property access
- [ ] Event subscriptions properly cleaned up

56
.github/labeler.yml vendored
View File

@@ -1,31 +1,51 @@
Build:
- build-scripts/**
- .browserslistrc
- gulpfile.js
- changed-files:
- any-glob-to-any-file:
- build-scripts/**
- .browserslistrc
- gulpfile.js
Cast:
- cast/src/**
- src/cast/**
- changed-files:
- any-glob-to-any-file:
- cast/src/**
- src/cast/**
Demo:
- demo/src/**
- src/fake_data/**
- changed-files:
- any-glob-to-any-file:
- demo/src/**
- src/fake_data/**
Design:
- gallery/src/**
- src/fake_data/**
- changed-files:
- any-glob-to-any-file:
- gallery/src/**
- src/fake_data/**
Dependencies:
- package.json
- renovate.json
- yarn.lock
- .yarn/**
- .yarnrc.yml
- .nvmrc
- any:
- changed-files:
# Match when only these files are changed (i.e. don't match PRs that happen to add or remove packages)
- any-glob-to-all-files:
- package.json
- renovate.json
- yarn.lock
- .yarn/**
- .yarnrc.yml
- .nvmrc
# Dependabot and Renovate branches always match (i.e. compatibility tweaks by members considered minor)
- head-branch:
- "^renovate/"
- "^dependabot/"
GitHub Actions:
- .github/workflows/**
- .github/*.yml
- changed-files:
- any-glob-to-any-file:
- .github/workflows/**
- .github/*.yml
Supervisor:
- hassio/src/**
- changed-files:
- any-glob-to-any-file:
- hassio/src/**

View File

@@ -21,12 +21,12 @@ jobs:
url: ${{ steps.deploy.outputs.NETLIFY_LIVE_URL || steps.deploy.outputs.NETLIFY_URL }}
steps:
- name: Check out files from GitHub
uses: actions/checkout@v3.5.3
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
with:
ref: dev
- name: Setup Node
uses: actions/setup-node@v3.8.1
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -41,9 +41,8 @@ jobs:
- name: Deploy to Netlify
id: deploy
uses: netlify/actions/cli@master
with:
args: deploy --dir=cast/dist --alias dev
run: |
npx -y netlify-cli deploy --dir=cast/dist --alias dev
env:
NETLIFY_AUTH_TOKEN: ${{ secrets.NETLIFY_AUTH_TOKEN }}
NETLIFY_SITE_ID: ${{ secrets.NETLIFY_CAST_SITE_ID }}
@@ -57,12 +56,12 @@ jobs:
url: ${{ steps.deploy.outputs.NETLIFY_LIVE_URL || steps.deploy.outputs.NETLIFY_URL }}
steps:
- name: Check out files from GitHub
uses: actions/checkout@v3.5.3
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
with:
ref: master
- name: Setup Node
uses: actions/setup-node@v3.8.1
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -77,9 +76,8 @@ jobs:
- name: Deploy to Netlify
id: deploy
uses: netlify/actions/cli@master
with:
args: deploy --dir=cast/dist --prod
run: |
npx -y netlify-cli deploy --dir=cast/dist --prod
env:
NETLIFY_AUTH_TOKEN: ${{ secrets.NETLIFY_AUTH_TOKEN }}
NETLIFY_SITE_ID: ${{ secrets.NETLIFY_CAST_SITE_ID }}

View File

@@ -24,9 +24,9 @@ jobs:
runs-on: ubuntu-latest
steps:
- name: Check out files from GitHub
uses: actions/checkout@v3.5.3
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Setup Node
uses: actions/setup-node@v3.8.1
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -37,17 +37,20 @@ jobs:
- name: Build resources
run: ./node_modules/.bin/gulp gen-icons-json build-translations build-locale-data gather-gallery-pages
- name: Setup lint cache
uses: actions/cache@v3.3.1
uses: actions/cache@0400d5f644dc74513175e3cd8d07132dd4860809 # v4.2.4
with:
path: |
node_modules/.cache/prettier
node_modules/.cache/eslint
node_modules/.cache/typescript
key: lint-${{ github.sha }}
restore-keys: lint-
- name: Run eslint
run: yarn run lint:eslint --quiet
- name: Run tsc
run: yarn run lint:types
- name: Run lit-analyzer
run: yarn run lint:lit --quiet
- name: Run prettier
run: yarn run lint:prettier
test:
@@ -55,16 +58,16 @@ jobs:
runs-on: ubuntu-latest
steps:
- name: Check out files from GitHub
uses: actions/checkout@v3.5.3
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Setup Node
uses: actions/setup-node@v3.8.1
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
- name: Install dependencies
run: yarn install --immutable
- name: Build resources
run: ./node_modules/.bin/gulp build-translations build-locale-data
run: ./node_modules/.bin/gulp gen-icons-json build-translations build-locale-data
- name: Run Tests
run: yarn run test
build:
@@ -73,9 +76,9 @@ jobs:
runs-on: ubuntu-latest
steps:
- name: Check out files from GitHub
uses: actions/checkout@v3.5.3
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Setup Node
uses: actions/setup-node@v3.8.1
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -85,15 +88,21 @@ jobs:
run: ./node_modules/.bin/gulp build-app
env:
IS_TEST: "true"
- name: Upload bundle stats
uses: actions/upload-artifact@ea165f8d65b6e75b540449e92b4886f43607fa02 # v4.6.2
with:
name: frontend-bundle-stats
path: build/stats/*.json
if-no-files-found: error
supervisor:
name: Build supervisor
needs: [lint, test]
runs-on: ubuntu-latest
steps:
- name: Check out files from GitHub
uses: actions/checkout@v3.5.3
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Setup Node
uses: actions/setup-node@v3.8.1
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -103,3 +112,9 @@ jobs:
run: ./node_modules/.bin/gulp build-hassio
env:
IS_TEST: "true"
- name: Upload bundle stats
uses: actions/upload-artifact@ea165f8d65b6e75b540449e92b4886f43607fa02 # v4.6.2
with:
name: supervisor-bundle-stats
path: build/stats/*.json
if-no-files-found: error

View File

@@ -23,7 +23,7 @@ jobs:
steps:
- name: Checkout repository
uses: actions/checkout@v3.5.3
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
with:
# We must fetch at least the immediate parents so that if this is
# a pull request then we can checkout the head.
@@ -36,14 +36,14 @@ jobs:
# Initializes the CodeQL tools for scanning.
- name: Initialize CodeQL
uses: github/codeql-action/init@v2
uses: github/codeql-action/init@192325c86100d080feab897ff886c34abd4c83a3 # v3.30.3
with:
languages: ${{ matrix.language }}
# Autobuild attempts to build any compiled languages (C/C++, C#, or Java).
# If this step fails, then you should remove it and run the build manually (see below)
- name: Autobuild
uses: github/codeql-action/autobuild@v2
uses: github/codeql-action/autobuild@192325c86100d080feab897ff886c34abd4c83a3 # v3.30.3
# Command-line programs to run using the OS shell.
# 📚 https://git.io/JvXDl
@@ -57,4 +57,4 @@ jobs:
# make release
- name: Perform CodeQL Analysis
uses: github/codeql-action/analyze@v2
uses: github/codeql-action/analyze@192325c86100d080feab897ff886c34abd4c83a3 # v3.30.3

View File

@@ -22,12 +22,12 @@ jobs:
url: ${{ steps.deploy.outputs.NETLIFY_LIVE_URL || steps.deploy.outputs.NETLIFY_URL }}
steps:
- name: Check out files from GitHub
uses: actions/checkout@v3.5.3
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
with:
ref: dev
- name: Setup Node
uses: actions/setup-node@v3.8.1
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -42,9 +42,8 @@ jobs:
- name: Deploy to Netlify
id: deploy
uses: netlify/actions/cli@master
with:
args: deploy --dir=demo/dist --prod
run: |
npx -y netlify-cli deploy --dir=demo/dist --prod
env:
NETLIFY_AUTH_TOKEN: ${{ secrets.NETLIFY_AUTH_TOKEN }}
NETLIFY_SITE_ID: ${{ secrets.NETLIFY_DEMO_DEV_SITE_ID }}
@@ -58,12 +57,12 @@ jobs:
url: ${{ steps.deploy.outputs.NETLIFY_LIVE_URL || steps.deploy.outputs.NETLIFY_URL }}
steps:
- name: Check out files from GitHub
uses: actions/checkout@v3.5.3
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
with:
ref: master
- name: Setup Node
uses: actions/setup-node@v3.8.1
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -78,9 +77,8 @@ jobs:
- name: Deploy to Netlify
id: deploy
uses: netlify/actions/cli@master
with:
args: deploy --dir=demo/dist --prod
run: |
npx -y netlify-cli deploy --dir=demo/dist --prod
env:
NETLIFY_AUTH_TOKEN: ${{ secrets.NETLIFY_AUTH_TOKEN }}
NETLIFY_SITE_ID: ${{ secrets.NETLIFY_DEMO_SITE_ID }}

View File

@@ -16,10 +16,10 @@ jobs:
url: ${{ steps.deploy.outputs.NETLIFY_LIVE_URL || steps.deploy.outputs.NETLIFY_URL }}
steps:
- name: Check out files from GitHub
uses: actions/checkout@v3.5.3
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Setup Node
uses: actions/setup-node@v3.8.1
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -34,9 +34,8 @@ jobs:
- name: Deploy to Netlify
id: deploy
uses: netlify/actions/cli@master
with:
args: deploy --dir=gallery/dist --prod
run: |
npx -y netlify-cli deploy --dir=gallery/dist --prod
env:
NETLIFY_AUTH_TOKEN: ${{ secrets.NETLIFY_AUTH_TOKEN }}
NETLIFY_SITE_ID: ${{ secrets.NETLIFY_GALLERY_SITE_ID }}

View File

@@ -21,10 +21,10 @@ jobs:
if: github.repository == 'home-assistant/frontend' && contains(github.event.pull_request.labels.*.name, 'needs design preview')
steps:
- name: Check out files from GitHub
uses: actions/checkout@v3.5.3
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Setup Node
uses: actions/setup-node@v3.8.1
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -39,13 +39,14 @@ jobs:
- name: Deploy preview to Netlify
id: deploy
uses: netlify/actions/cli@master
with:
args: deploy --dir=gallery/dist --alias "deploy-preview-${{ github.event.number }}"
run: |
npx -y netlify-cli deploy --dir=gallery/dist --alias "deploy-preview-${{ github.event.number }}" \
--json > deploy_output.json
env:
NETLIFY_AUTH_TOKEN: ${{ secrets.NETLIFY_AUTH_TOKEN }}
NETLIFY_SITE_ID: ${{ secrets.NETLIFY_GALLERY_SITE_ID }}
- name: Generate summary
run: |
echo "${{ steps.deploy.outputs.NETLIFY_LIVE_URL || steps.deploy.outputs.NETLIFY_URL }}" >> "$GITHUB_STEP_SUMMARY"
NETLIFY_LIVE_URL=$(jq -r '.deploy_url' deploy_output.json)
echo "$NETLIFY_LIVE_URL" >> "$GITHUB_STEP_SUMMARY"

View File

@@ -10,6 +10,6 @@ jobs:
runs-on: ubuntu-latest
steps:
- name: Apply labels
uses: actions/labeler@v4.3.0
uses: actions/labeler@634933edcd8ababfe52f92936142cc22ac488b1b # v6.0.1
with:
sync-labels: true

View File

@@ -9,9 +9,10 @@ jobs:
lock:
runs-on: ubuntu-latest
steps:
- uses: dessant/lock-threads@v4.0.1
- uses: dessant/lock-threads@1bf7ec25051fe7c00bdd17e6a7cf3d7bfb7dc771 # v5.0.1
with:
github-token: ${{ github.token }}
process-only: "issues, prs"
issue-lock-inactive-days: "30"
issue-exclude-created-before: "2020-10-01T00:00:00Z"
issue-lock-reason: ""

View File

@@ -6,7 +6,7 @@ on:
- cron: "0 1 * * *"
env:
PYTHON_VERSION: "3.11"
PYTHON_VERSION: "3.13"
NODE_OPTIONS: --max_old_space_size=6144
permissions:
@@ -20,15 +20,15 @@ jobs:
contents: write
steps:
- name: Checkout the repository
uses: actions/checkout@v3.5.3
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Set up Python ${{ env.PYTHON_VERSION }}
uses: actions/setup-python@v4
uses: actions/setup-python@e797f83bcb11b83ae66e0230d6156d7c80228e7c # v6
with:
python-version: ${{ env.PYTHON_VERSION }}
- name: Setup Node
uses: actions/setup-node@v3.8.1
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -42,7 +42,7 @@ jobs:
LOKALISE_TOKEN: ${{ secrets.LOKALISE_TOKEN }}
- name: Bump version
run: script/version_bump.cjs nightly
run: script/version_bump.js nightly
- name: Build nightly Python wheels
run: |
@@ -57,14 +57,14 @@ jobs:
run: tar -czvf translations.tar.gz translations
- name: Upload build artifacts
uses: actions/upload-artifact@v3
uses: actions/upload-artifact@ea165f8d65b6e75b540449e92b4886f43607fa02 # v4.6.2
with:
name: wheels
path: dist/home_assistant_frontend*.whl
if-no-files-found: error
- name: Upload translations
uses: actions/upload-artifact@v3
uses: actions/upload-artifact@ea165f8d65b6e75b540449e92b4886f43607fa02 # v4.6.2
with:
name: translations
path: translations.tar.gz

25
.github/workflows/relative-ci.yaml vendored Normal file
View File

@@ -0,0 +1,25 @@
name: RelativeCI
on:
workflow_run:
workflows: [CI]
types:
- completed
jobs:
upload:
name: Upload stats
if: ${{ github.event.workflow_run.conclusion == 'success' }}
strategy:
matrix:
bundle: [frontend, supervisor]
build: [modern, legacy]
runs-on: ubuntu-latest
steps:
- name: Send bundle stats and build information to RelativeCI
uses: relative-ci/agent-action@1707825cbfcc7452b2913d273414705415ae64d4 # v3.0.1
with:
key: ${{ secrets[format('RELATIVE_CI_KEY_{0}_{1}', matrix.bundle, matrix.build)] }}
token: ${{ github.token }}
artifactName: ${{ format('{0}-bundle-stats', matrix.bundle) }}
webpackStatsFile: ${{ format('{0}-{1}.json', matrix.bundle, matrix.build) }}

View File

@@ -18,6 +18,6 @@ jobs:
pull-requests: read
runs-on: ubuntu-latest
steps:
- uses: release-drafter/release-drafter@v5
- uses: release-drafter/release-drafter@b1476f6e6eb133afa41ed8589daba6dc69b4d3f5 # v6.1.0
env:
GITHUB_TOKEN: ${{ secrets.GITHUB_TOKEN }}

View File

@@ -6,7 +6,7 @@ on:
- published
env:
PYTHON_VERSION: "3.11"
PYTHON_VERSION: "3.13"
NODE_OPTIONS: --max_old_space_size=6144
# Set default workflow permissions
@@ -23,18 +23,18 @@ jobs:
contents: write # Required to upload release assets
steps:
- name: Checkout the repository
uses: actions/checkout@v3.5.3
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Set up Python ${{ env.PYTHON_VERSION }}
uses: actions/setup-python@e797f83bcb11b83ae66e0230d6156d7c80228e7c # v6.0.0
with:
python-version: ${{ env.PYTHON_VERSION }}
- name: Verify version
uses: home-assistant/actions/helpers/verify-version@master
- name: Set up Python ${{ env.PYTHON_VERSION }}
uses: actions/setup-python@v4
with:
python-version: ${{ env.PYTHON_VERSION }}
- name: Setup Node
uses: actions/setup-node@v3.8.1
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
@@ -55,7 +55,7 @@ jobs:
script/release
- name: Upload release assets
uses: softprops/action-gh-release@v0.1.15
uses: softprops/action-gh-release@6cbd405e2c4e67a21c47fa9e383d020e4e28b836 # v2.3.3
with:
files: |
dist/*.whl
@@ -73,11 +73,70 @@ jobs:
version=$(echo "${{ github.ref }}" | awk -F"/" '{print $NF}' )
echo "home-assistant-frontend==$version" > ./requirements.txt
# home-assistant/wheels doesn't support SHA pinning
- name: Build wheels
uses: home-assistant/wheels@2023.04.0
uses: home-assistant/wheels@2025.07.0
with:
abi: cp311
abi: cp313
tag: musllinux_1_2
arch: amd64
wheels-key: ${{ secrets.WHEELS_KEY }}
requirements: "requirements.txt"
release-landing-page:
name: Release landing-page frontend
if: github.event.release.prerelease == false
runs-on: ubuntu-latest
permissions:
contents: write # Required to upload release assets
steps:
- name: Checkout the repository
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Setup Node
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
- name: Install dependencies
run: yarn install
- name: Download Translations
run: ./script/translations_download
env:
LOKALISE_TOKEN: ${{ secrets.LOKALISE_TOKEN }}
- name: Build landing-page
run: landing-page/script/build_landing_page
- name: Tar folder
run: tar -czf landing-page/home_assistant_frontend_landingpage-${{ github.event.release.tag_name }}.tar.gz -C landing-page/dist .
- name: Upload release asset
uses: softprops/action-gh-release@6cbd405e2c4e67a21c47fa9e383d020e4e28b836 # v2.3.3
with:
files: landing-page/home_assistant_frontend_landingpage-${{ github.event.release.tag_name }}.tar.gz
release-supervisor:
name: Release supervisor frontend
if: github.event.release.prerelease == false
runs-on: ubuntu-latest
permissions:
contents: write # Required to upload release assets
steps:
- name: Checkout the repository
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Setup Node
uses: actions/setup-node@a0853c24544627f65ddf259abe73b1d18a591444 # v5.0.0
with:
node-version-file: ".nvmrc"
cache: yarn
- name: Install dependencies
run: yarn install
- name: Download Translations
run: ./script/translations_download
env:
LOKALISE_TOKEN: ${{ secrets.LOKALISE_TOKEN }}
- name: Build supervisor
run: hassio/script/build_hassio
- name: Tar folder
run: tar -czf hassio/home_assistant_frontend_supervisor-${{ github.event.release.tag_name }}.tar.gz -C hassio/build .
- name: Upload release asset
uses: softprops/action-gh-release@6cbd405e2c4e67a21c47fa9e383d020e4e28b836 # v2.3.3
with:
files: hassio/home_assistant_frontend_supervisor-${{ github.event.release.tag_name }}.tar.gz

View File

@@ -0,0 +1,58 @@
name: Restrict task creation
# yamllint disable-line rule:truthy
on:
issues:
types: [opened]
jobs:
check-authorization:
runs-on: ubuntu-latest
# Only run if this is a Task issue type (from the issue form)
if: github.event.issue.type.name == 'Task'
steps:
- name: Check if user is authorized
uses: actions/github-script@ed597411d8f924073f98dfc5c65a23a2325f34cd # v8
with:
script: |
const issueAuthor = context.payload.issue.user.login;
// Check if user is an organization member
try {
await github.rest.orgs.checkMembershipForUser({
org: 'home-assistant',
username: issueAuthor
});
console.log(`✅ ${issueAuthor} is an organization member`);
return; // Authorized
} catch (error) {
console.log(`❌ ${issueAuthor} is not authorized to create Task issues`);
}
// Close the issue with a comment
await github.rest.issues.createComment({
owner: context.repo.owner,
repo: context.repo.repo,
issue_number: context.issue.number,
body: `Hi @${issueAuthor}, thank you for your contribution!\n\n` +
`Task issues are restricted to Open Home Foundation staff and authorized contributors.\n\n` +
`If you would like to:\n` +
`- Report a bug: Please use the [bug report form](https://github.com/home-assistant/frontend/issues/new?template=bug_report.yml)\n` +
`- Request a feature: Please submit to [Feature Requests](https://github.com/orgs/home-assistant/discussions)\n\n` +
`If you believe you should have access to create Task issues, please contact the maintainers.`
});
await github.rest.issues.update({
owner: context.repo.owner,
repo: context.repo.repo,
issue_number: context.issue.number,
state: 'closed'
});
// Add a label to indicate this was auto-closed
await github.rest.issues.addLabels({
owner: context.repo.owner,
repo: context.repo.repo,
issue_number: context.issue.number,
labels: ['auto-closed']
});

View File

@@ -10,7 +10,7 @@ jobs:
runs-on: ubuntu-latest
steps:
- name: 90 days stale policy
uses: actions/stale@v8.0.0
uses: actions/stale@3a9db7e6a41a89f618792c92c0e97cc736e1b13f # v10.0.0
with:
repo-token: ${{ secrets.GITHUB_TOKEN }}
days-before-stale: 90

View File

@@ -1,6 +1,7 @@
name: Translations
on:
workflow_dispatch:
push:
branches:
- dev
@@ -13,7 +14,7 @@ jobs:
runs-on: ubuntu-latest
steps:
- name: Checkout the repository
uses: actions/checkout@v3.5.3
uses: actions/checkout@08c6903cd8c0fde910a37f88322edcfb5dd907a8 # v5.0.0
- name: Upload Translations
run: |

10
.gitignore vendored
View File

@@ -47,3 +47,13 @@ src/cast/dev_const.ts
# Home Assistant config
/config/
# Jetbrains
/.idea/
# test coverage
test/coverage/
# AI tooling
.claude

View File

@@ -1,4 +1 @@
#!/usr/bin/env sh
. "$(dirname -- "$0")/_/husky.sh"
yarn run lint-staged --relative --shell "/bin/bash"
yarn run lint-staged --relative

2
.nvmrc
View File

@@ -1 +1 @@
18
lts/iron

View File

@@ -1,3 +1,4 @@
CLA.md
CODE_OF_CONDUCT.md
LICENSE.md
PULL_REQUEST_TEMPLATE.md

View File

@@ -4,6 +4,8 @@
"esbenp.prettier-vscode",
"runem.lit-plugin",
"github.vscode-pull-request-github",
"eamodio.gitlens"
"eamodio.gitlens",
"vitest.explorer",
"yeion7.styled-global-variables-autocomplete"
]
}

74
.vscode/tasks.json vendored
View File

@@ -1,6 +1,42 @@
{
"version": "2.0.0",
"tasks": [
{
"label": "Develop and serve Frontend",
"type": "shell",
"command": "script/develop_and_serve -c ${input:coreUrl}",
// Sync changes here to other tasks until issue resolved
// https://github.com/Microsoft/vscode/issues/61497
"problemMatcher": {
"owner": "ha-build",
"source": "ha-build",
"fileLocation": "absolute",
"severity": "error",
"pattern": [
{
"regexp": "(SyntaxError): (.+): (.+) \\((\\d+):(\\d+)\\)",
"severity": 1,
"file": 2,
"message": 3,
"line": 4,
"column": 5
}
],
"background": {
"activeOnStart": true,
"beginsPattern": "Changes detected. Starting compilation",
"endsPattern": "Build done @"
}
},
"isBackground": true,
"group": {
"kind": "build",
"isDefault": true
},
"runOptions": {
"instanceLimit": 1
}
},
{
"label": "Develop Frontend",
"type": "gulp",
@@ -100,6 +136,38 @@
"instanceLimit": 1
}
},
{
"label": "Develop Landing Page",
"type": "gulp",
"task": "develop-landing-page",
"problemMatcher": {
"owner": "ha-build",
"source": "ha-build",
"fileLocation": "absolute",
"severity": "error",
"pattern": [
{
"regexp": "(SyntaxError): (.+): (.+) \\((\\d+):(\\d+)\\)",
"severity": 1,
"file": 2,
"message": 3,
"line": 4,
"column": 5
}
],
"background": {
"activeOnStart": true,
"beginsPattern": "Changes detected. Starting compilation",
"endsPattern": "Build done @"
}
},
"isBackground": true,
"group": "build",
"runOptions": {
"instanceLimit": 1
}
},
{
"label": "Develop Demo",
"type": "gulp",
@@ -209,6 +277,12 @@
"id": "supervisorToken",
"type": "promptString",
"description": "The token for the Remote API proxy add-on"
},
{
"id": "coreUrl",
"type": "promptString",
"description": "The URL of the Home Assistant Core instance",
"default": "http://127.0.0.1:8123"
}
]
}

View File

@@ -0,0 +1,22 @@
diff --git a/mwc-formfield-base.js b/mwc-formfield-base.js
index 7b763326d7d51835ad52646bfbc80fe21989abd3..f2baa8224e6d03df1fdb0b9fd03f5c6d77fc8747 100644
--- a/mwc-formfield-base.js
+++ b/mwc-formfield-base.js
@@ -9,7 +9,7 @@ import { BaseElement } from '@material/mwc-base/base-element.js';
import { FormElement } from '@material/mwc-base/form-element.js';
import { observer } from '@material/mwc-base/observer.js';
import { html } from 'lit';
-import { property, query, queryAssignedNodes } from 'lit/decorators.js';
+import { property, query, queryAssignedElements } from 'lit/decorators.js';
import { classMap } from 'lit/directives/class-map.js';
export class FormfieldBase extends BaseElement {
constructor() {
@@ -96,7 +96,7 @@ __decorate([
query('.mdc-form-field')
], FormfieldBase.prototype, "mdcRoot", void 0);
__decorate([
- queryAssignedNodes('', true, '*')
+ queryAssignedElements({ slot: "", flatten: true, selector: "*" })
], FormfieldBase.prototype, "slottedInputs", void 0);
__decorate([
query('label')

View File

@@ -0,0 +1,26 @@
diff --git a/mwc-list-base.js b/mwc-list-base.js
index 1ba95b6a01dcecea4d85b5cbbbcc3dfb04c40d5f..dced13fdb7929c490d6661b1bbe7e9f96dcd2285 100644
--- a/mwc-list-base.js
+++ b/mwc-list-base.js
@@ -11,7 +11,7 @@ import { BaseElement } from '@material/mwc-base/base-element.js';
import { observer } from '@material/mwc-base/observer.js';
import { deepActiveElementPath, doesElementContainFocus, isNodeElement } from '@material/mwc-base/utils.js';
import { html } from 'lit';
-import { property, query, queryAssignedNodes } from 'lit/decorators.js';
+import { property, query, queryAssignedElements } from 'lit/decorators.js';
import { ifDefined } from 'lit/directives/if-defined.js';
import MDCListFoundation, { isIndexSet } from './mwc-list-foundation.js';
export { createSetFromIndex, isEventMulti, isIndexSet } from './mwc-list-foundation.js';
@@ -425,10 +425,10 @@ __decorate([
query('.mdc-deprecated-list')
], ListBase.prototype, "mdcRoot", void 0);
__decorate([
- queryAssignedNodes('', true, '*')
+ queryAssignedElements({ flatten: true, selector: "*" })
], ListBase.prototype, "assignedElements", void 0);
__decorate([
- queryAssignedNodes('', true, '[tabindex="0"]')
+ queryAssignedElements({ flatten: true, selector: '[tabindex="0"]' })
], ListBase.prototype, "tabbableElements", void 0);
__decorate([
property({ type: Boolean }),

View File

@@ -1,34 +0,0 @@
diff --git a/lib/legacy/class.js b/lib/legacy/class.js
index aee2511be1cd9bf900ee552bc98190c1631c57c0..f2f499d68bf52034cac9c28307c99e8ce6b8417d 100644
--- a/lib/legacy/class.js
+++ b/lib/legacy/class.js
@@ -304,17 +304,23 @@ function GenerateClassFromInfo(info, Base, behaviors) {
// only proceed if the generated class' prototype has not been registered.
const generatedProto = PolymerGenerated.prototype;
if (!generatedProto.hasOwnProperty(JSCompiler_renameProperty('__hasRegisterFinished', generatedProto))) {
- generatedProto.__hasRegisterFinished = true;
+ // make sure legacy lifecycle is called on the *element*'s prototype
+ // and not the generated class prototype; if the element has been
+ // extended, these are *not* the same.
+ const proto = Object.getPrototypeOf(this);
+ // Only set flag when generated prototype itself is registered,
+ // as this element may be extended from, and needs to run `registered`
+ // on all behaviors on the subclass as well.
+ if (proto === generatedProto) {
+ generatedProto.__hasRegisterFinished = true;
+ }
// ensure superclass is registered first.
super._registered();
// copy properties onto the generated class lazily if we're optimizing,
- if (legacyOptimizations) {
+ if (legacyOptimizations && !Object.hasOwnProperty(generatedProto, '__hasCopiedProperties')) {
+ generatedProto.__hasCopiedProperties = true;
copyPropertiesToProto(generatedProto);
}
- // make sure legacy lifecycle is called on the *element*'s prototype
- // and not the generated class prototype; if the element has been
- // extended, these are *not* the same.
- const proto = Object.getPrototypeOf(this);
let list = lifecycle.beforeRegister;
if (list) {
for (let i=0; i < list.length; i++) {

View File

@@ -1,39 +0,0 @@
diff --git a/modular/sortable.complete.esm.js b/modular/sortable.complete.esm.js
index 02e9f2d6bebeb430fe6e7c1cc3f9c3c9df051f14..bb8268b0844a1faa4108cc92c0be2a3dbaf23f83 100644
--- a/modular/sortable.complete.esm.js
+++ b/modular/sortable.complete.esm.js
@@ -1657,7 +1657,7 @@ Sortable.prototype =
target = parent; // store last element
}
/* jshint boss:true */
- while (parent = parent.parentNode);
+ while (parent = parent.parentNode || parent.getRootNode().host);
}
_unhideGhostForTarget();
diff --git a/modular/sortable.core.esm.js b/modular/sortable.core.esm.js
index b04c8b4634f7c6b4ef1aadbb48afe6564306dea9..39a107163c8c336ebd669b5ea8a936af87e1c1e7 100644
--- a/modular/sortable.core.esm.js
+++ b/modular/sortable.core.esm.js
@@ -1657,7 +1657,7 @@ Sortable.prototype =
target = parent; // store last element
}
/* jshint boss:true */
- while (parent = parent.parentNode);
+ while (parent = parent.parentNode || parent.getRootNode().host);
}
_unhideGhostForTarget();
diff --git a/modular/sortable.esm.js b/modular/sortable.esm.js
index 6ec7ed1bb557e21c2578200161e989c65d23150b..0a05475a22904472fac6c13f524c674da76584b0 100644
--- a/modular/sortable.esm.js
+++ b/modular/sortable.esm.js
@@ -1657,7 +1657,7 @@ Sortable.prototype =
target = parent; // store last element
}
/* jshint boss:true */
- while (parent = parent.parentNode);
+ while (parent = parent.parentNode || parent.getRootNode().host);
}
_unhideGhostForTarget();

View File

@@ -0,0 +1,60 @@
diff --git a/modular/sortable.core.esm.js b/modular/sortable.core.esm.js
index 8b5e49b011713c8859c669069fbe85ce53974e1d..6a0afc92787157b8a31c38cc5f67dfa526090a00 100644
--- a/modular/sortable.core.esm.js
+++ b/modular/sortable.core.esm.js
@@ -1781,11 +1781,16 @@ Sortable.prototype = /** @lends Sortable.prototype */{
}
if (_onMove(rootEl, el, dragEl, dragRect, target, targetRect, evt, !!target) !== false) {
capture();
- if (elLastChild && elLastChild.nextSibling) {
- // the last draggable element is not the last node
- el.insertBefore(dragEl, elLastChild.nextSibling);
- } else {
- el.appendChild(dragEl);
+ try {
+ if (elLastChild && elLastChild.nextSibling) {
+ // the last draggable element is not the last node
+ el.insertBefore(dragEl, elLastChild.nextSibling);
+ } else {
+ el.appendChild(dragEl);
+ }
+ }
+ catch(err) {
+ return completed(false);
}
parentEl = el; // actualization
@@ -1802,7 +1807,12 @@ Sortable.prototype = /** @lends Sortable.prototype */{
targetRect = getRect(target);
if (_onMove(rootEl, el, dragEl, dragRect, target, targetRect, evt, false) !== false) {
capture();
- el.insertBefore(dragEl, firstChild);
+ try {
+ el.insertBefore(dragEl, firstChild);
+ }
+ catch(err) {
+ return completed(false);
+ }
parentEl = el; // actualization
changed();
@@ -1849,10 +1859,15 @@ Sortable.prototype = /** @lends Sortable.prototype */{
_silent = true;
setTimeout(_unsilent, 30);
capture();
- if (after && !nextSibling) {
- el.appendChild(dragEl);
- } else {
- target.parentNode.insertBefore(dragEl, after ? nextSibling : target);
+ try {
+ if (after && !nextSibling) {
+ el.appendChild(dragEl);
+ } else {
+ target.parentNode.insertBefore(dragEl, after ? nextSibling : target);
+ }
+ }
+ catch(err) {
+ return completed(false);
}
// Undo chrome's scroll adjustment (has no effect on other browsers)

View File

@@ -0,0 +1,55 @@
diff --git a/build/inject-manifest.js b/build/inject-manifest.js
index 60e3d2bb51c11a19fbbedbad65e101082ec41c36..fed6026630f43f86e25446383982cf6fb694313b 100644
--- a/build/inject-manifest.js
+++ b/build/inject-manifest.js
@@ -104,7 +104,7 @@ async function injectManifest(config) {
replaceString: manifestString,
searchString: options.injectionPoint,
});
- filesToWrite[options.swDest] = source;
+ filesToWrite[options.swDest] = source.replace(url, encodeURI(upath_1.default.basename(destPath)));
filesToWrite[destPath] = map;
}
else {
diff --git a/build/lib/translate-url-to-sourcemap-paths.js b/build/lib/translate-url-to-sourcemap-paths.js
index 3220c5474eeac6e8a56ca9b2ac2bd9be48529e43..5f003879a904d4840529a42dd056d288fd213771 100644
--- a/build/lib/translate-url-to-sourcemap-paths.js
+++ b/build/lib/translate-url-to-sourcemap-paths.js
@@ -22,7 +22,7 @@ function translateURLToSourcemapPaths(url, swSrc, swDest) {
const possibleSrcPath = upath_1.default.resolve(upath_1.default.dirname(swSrc), url);
if (fs_extra_1.default.existsSync(possibleSrcPath)) {
srcPath = possibleSrcPath;
- destPath = upath_1.default.resolve(upath_1.default.dirname(swDest), url);
+ destPath = `${swDest}.map`;
}
else {
warning = `${errors_1.errors['cant-find-sourcemap']} ${possibleSrcPath}`;
diff --git a/src/inject-manifest.ts b/src/inject-manifest.ts
index 8795ddcaa77aea7b0356417e4bc4b19e2b3f860c..fcdc68342d9ac53936c9ed40a9ccfc2f5070cad3 100644
--- a/src/inject-manifest.ts
+++ b/src/inject-manifest.ts
@@ -129,7 +129,10 @@ export async function injectManifest(
searchString: options.injectionPoint!,
});
- filesToWrite[options.swDest] = source;
+ filesToWrite[options.swDest] = source.replace(
+ url!,
+ encodeURI(upath.basename(destPath)),
+ );
filesToWrite[destPath] = map;
} else {
// If there's no sourcemap associated with swSrc, a simple string
diff --git a/src/lib/translate-url-to-sourcemap-paths.ts b/src/lib/translate-url-to-sourcemap-paths.ts
index 072eac40d4ef5d095a01cb7f7e392a9e034853bd..f0bbe69e88ef3a415de18a7e9cb264daea273d71 100644
--- a/src/lib/translate-url-to-sourcemap-paths.ts
+++ b/src/lib/translate-url-to-sourcemap-paths.ts
@@ -28,7 +28,7 @@ export function translateURLToSourcemapPaths(
const possibleSrcPath = upath.resolve(upath.dirname(swSrc), url);
if (fse.existsSync(possibleSrcPath)) {
srcPath = possibleSrcPath;
- destPath = upath.resolve(upath.dirname(swDest), url);
+ destPath = `${swDest}.map`;
} else {
warning = `${errors['cant-find-sourcemap']} ${possibleSrcPath}`;
}

File diff suppressed because one or more lines are too long

File diff suppressed because one or more lines are too long

File diff suppressed because one or more lines are too long

942
.yarn/releases/yarn-4.9.4.cjs vendored Executable file

File diff suppressed because one or more lines are too long

View File

@@ -1,11 +1,9 @@
compressionLevel: mixed
defaultSemverRangePrefix: ""
enableGlobalCache: false
nodeLinker: node-modules
plugins:
- path: .yarn/plugins/@yarnpkg/plugin-typescript.cjs
spec: "@yarnpkg/plugin-typescript"
- path: .yarn/plugins/@yarnpkg/plugin-interactive-tools.cjs
spec: "@yarnpkg/plugin-interactive-tools"
yarnPath: .yarn/releases/yarn-3.6.2.cjs
yarnPath: .yarn/releases/yarn-4.9.4.cjs

1
CLAUDE.md Symbolic link
View File

@@ -0,0 +1 @@
.github/copilot-instructions.md

8
CODEOWNERS Normal file
View File

@@ -0,0 +1,8 @@
# People marked here will be automatically requested for a review
# when the code that they own is touched.
# https://github.com/blog/2392-introducing-code-owners
# https://docs.github.com/en/repositories/managing-your-repositorys-settings-and-features/customizing-your-repository/about-code-owners
# Part of the frontend that mobile developper should review
src/external_app/ @bgoncal @TimoPtr
test/external_app/ @bgoncal @TimoPtr

View File

@@ -27,3 +27,5 @@ A complete guide can be found at the following [link](https://www.home-assistant
Home Assistant is open-source and Apache 2 licensed. Feel free to browse the repository, learn and reuse parts in your own projects.
We use [BrowserStack](https://www.browserstack.com) to test Home Assistant on a large variety of devices.
[![Home Assistant - A project from the Open Home Foundation](https://www.openhomefoundation.org/badges/home-assistant.png)](https://www.openhomefoundation.org/)

View File

@@ -1,12 +0,0 @@
{
"extends": "../.eslintrc.json",
"rules": {
"no-console": "off",
"import/no-extraneous-dependencies": "off",
"import/extensions": "off",
"import/no-dynamic-require": "off",
"global-require": "off",
"@typescript-eslint/no-var-requires": "off",
"prefer-arrow-callback": "off"
}
}

View File

@@ -15,7 +15,7 @@ The Home Assistant build pipeline contains various steps to prepare a build.
Currently in Home Assistant we use a bundler to convert TypeScript, CSS and JSON files to JavaScript files that the browser understands.
We currently rely on Webpack but also have experimental Rollup support. Both of these programs bundle the converted files in both production and development.
We currently rely on Webpack. Both of these programs bundle the converted files in both production and development.
For development, bundling is optional. We just want to get the right files in the browser.

View File

@@ -0,0 +1,150 @@
import defineProvider from "@babel/helper-define-polyfill-provider";
import { join } from "node:path";
import paths from "../paths.cjs";
const POLYFILL_DIR = join(paths.root_dir, "src/resources/polyfills");
// List of polyfill keys with supported browser targets for the functionality
const polyfillSupport = {
// Note states and shadowRoot properties should be supported.
"element-internals": {
android: 90,
chrome: 90,
edge: 90,
firefox: 126,
ios: 17.4,
opera: 76,
opera_mobile: 64,
safari: 17.4,
samsung: 15.0,
},
"element-getattributenames": {
android: 61,
chrome: 61,
edge: 18,
firefox: 45,
ios: 10.3,
opera: 48,
opera_mobile: 45,
safari: 10.1,
samsung: 8.0,
},
"element-toggleattribute": {
android: 69,
chrome: 69,
edge: 18,
firefox: 63,
ios: 12.0,
opera: 56,
opera_mobile: 48,
safari: 12.0,
samsung: 10.0,
},
// FormatJS polyfill detects fix for https://bugs.chromium.org/p/v8/issues/detail?id=10682,
// so adjusted to several months after that was marked fixed
"intl-getcanonicallocales": {
android: 90,
chrome: 90,
edge: 90,
firefox: 48,
ios: 10.3,
opera: 76,
opera_mobile: 64,
safari: 10.1,
samsung: 15.0,
},
"intl-locale": {
android: 74,
chrome: 74,
edge: 79,
firefox: 75,
ios: 14.0,
opera: 62,
opera_mobile: 53,
safari: 14.0,
samsung: 11.0,
},
"intl-other": {
// Not specified (i.e. always try polyfill) since compatibility depends on supported locales
},
"resize-observer": {
android: 64,
chrome: 64,
edge: 79,
firefox: 69,
ios: 13.4,
opera: 51,
opera_mobile: 47,
safari: 13.1,
samsung: 9.0,
},
};
// Map of global variables and/or instance and static properties to the
// corresponding polyfill key and actual module to import
const polyfillMap = {
global: {
ResizeObserver: {
key: "resize-observer",
module: join(POLYFILL_DIR, "resize-observer.ts"),
},
},
instance: {
attachInternals: {
key: "element-internals",
module: "element-internals-polyfill",
},
...Object.fromEntries(
["getAttributeNames", "toggleAttribute"].map((prop) => {
const key = `element-${prop.toLowerCase()}`;
return [prop, { key, module: join(POLYFILL_DIR, `${key}.ts`) }];
})
),
},
static: {
Intl: {
getCanonicalLocales: {
key: "intl-getcanonicallocales",
module: join(POLYFILL_DIR, "intl-polyfill.ts"),
},
Locale: {
key: "intl-locale",
module: join(POLYFILL_DIR, "intl-polyfill.ts"),
},
...Object.fromEntries(
[
"DateTimeFormat",
"DurationFormat",
"DisplayNames",
"ListFormat",
"NumberFormat",
"PluralRules",
"RelativeTimeFormat",
].map((obj) => [
obj,
{ key: "intl-other", module: join(POLYFILL_DIR, "intl-polyfill.ts") },
])
),
},
},
};
// Create plugin using the same factory as for CoreJS
export default defineProvider(
({ createMetaResolver, debug, shouldInjectPolyfill }) => {
const resolvePolyfill = createMetaResolver(polyfillMap);
return {
name: "custom-polyfill",
polyfills: polyfillSupport,
usageGlobal(meta, utils) {
const polyfill = resolvePolyfill(meta);
if (polyfill && shouldInjectPolyfill(polyfill.desc.key)) {
debug(polyfill.desc.key);
utils.injectGlobalImport(polyfill.desc.module);
return true;
}
return false;
},
};
}
);

View File

@@ -1,6 +1,9 @@
const path = require("path");
const env = require("./env.cjs");
const paths = require("./paths.cjs");
const { dependencies } = require("../package.json");
const BABEL_PLUGINS = path.join(__dirname, "babel-plugins");
// GitHub base URL to use for production source maps
// Nightly builds use the commit SHA, otherwise assumes there is a tag that matches the version
@@ -12,50 +15,38 @@ module.exports.sourceMapURL = () => {
};
// Files from NPM Packages that should not be imported
// eslint-disable-next-line unused-imports/no-unused-vars
module.exports.ignorePackages = ({ latestBuild }) => [
// Part of yaml.js and only used for !!js functions that we don't use
require.resolve("esprima"),
];
module.exports.ignorePackages = () => [];
// Files from NPM packages that we should replace with empty file
module.exports.emptyPackages = ({ latestBuild, isHassioBuild }) =>
module.exports.emptyPackages = ({ isHassioBuild }) =>
[
// Contains all color definitions for all material color sets.
// We don't use it
require.resolve("@polymer/paper-styles/color.js"),
require.resolve("@polymer/paper-styles/default-theme.js"),
// Loads stuff from a CDN
require.resolve("@polymer/font-roboto/roboto.js"),
require.resolve("@vaadin/vaadin-material-styles/typography.js"),
require.resolve("@vaadin/vaadin-material-styles/font-icons.js"),
// Compatibility not needed for latest builds
latestBuild &&
// wrapped in require.resolve so it blows up if file no longer exists
require.resolve(
path.resolve(paths.polymer_dir, "src/resources/compatibility.ts")
),
// This polyfill is loaded in workers to support ES5, filter it out.
latestBuild && require.resolve("proxy-polyfill/src/index.js"),
// Icons in supervisor conflict with icons in HA so we don't load.
isHassioBuild &&
require.resolve(
path.resolve(paths.polymer_dir, "src/components/ha-icon.ts")
path.resolve(paths.root_dir, "src/components/ha-icon.ts")
),
isHassioBuild &&
require.resolve(
path.resolve(paths.polymer_dir, "src/components/ha-icon-picker.ts")
path.resolve(paths.root_dir, "src/components/ha-icon-picker.ts")
),
].filter(Boolean);
module.exports.definedVars = ({ isProdBuild, latestBuild, defineOverlay }) => ({
__DEV__: !isProdBuild,
__BUILD__: JSON.stringify(latestBuild ? "latest" : "es5"),
__BUILD__: JSON.stringify(latestBuild ? "modern" : "legacy"),
__VERSION__: JSON.stringify(env.version()),
__DEMO__: false,
__SUPERVISOR__: false,
__BACKWARDS_COMPAT__: false,
__STATIC_PATH__: "/static/",
__HASS_URL__: `\`${
"HASS_URL" in process.env
? process.env.HASS_URL
: // eslint-disable-next-line no-template-curly-in-string
"${location.protocol}//${location.host}"
}\``,
"process.env.NODE_ENV": JSON.stringify(
isProdBuild ? "production" : "development"
),
@@ -82,7 +73,25 @@ module.exports.terserOptions = ({ latestBuild, isTestBuild }) => ({
sourceMap: !isTestBuild,
});
module.exports.babelOptions = ({ latestBuild, isProdBuild, isTestBuild }) => ({
/** @type {import('@rspack/core').SwcLoaderOptions} */
module.exports.swcOptions = () => ({
jsc: {
loose: true,
externalHelpers: true,
target: "ES2021",
parser: {
syntax: "typescript",
decorators: true,
},
},
});
module.exports.babelOptions = ({
latestBuild,
isProdBuild,
isTestBuild,
sw,
}) => ({
babelrc: false,
compact: false,
assumptions: {
@@ -90,26 +99,21 @@ module.exports.babelOptions = ({ latestBuild, isProdBuild, isTestBuild }) => ({
setPublicClassFields: true,
setSpreadProperties: true,
},
browserslistEnv: latestBuild ? "modern" : "legacy",
// Must be unambiguous because some dependencies are CommonJS only
sourceType: "unambiguous",
browserslistEnv: latestBuild ? "modern" : `legacy${sw ? "-sw" : ""}`,
presets: [
[
"@babel/preset-env",
{
useBuiltIns: latestBuild ? false : "entry",
corejs: latestBuild ? false : { version: "3.32", proposals: true },
useBuiltIns: "usage",
corejs: dependencies["core-js"],
bugfixes: true,
shippedProposals: true,
},
],
"@babel/preset-typescript",
],
plugins: [
[
path.resolve(
paths.polymer_dir,
"build-scripts/babel-plugins/inline-constants-plugin.cjs"
),
path.join(BABEL_PLUGINS, "inline-constants-plugin.cjs"),
{
modules: ["@mdi/js"],
ignoreModuleNotFound: true,
@@ -120,35 +124,73 @@ module.exports.babelOptions = ({ latestBuild, isProdBuild, isTestBuild }) => ({
"template-html-minifier",
{
modules: {
lit: [
"html",
{ name: "svg", encapsulation: "svg" },
{ name: "css", encapsulation: "style" },
],
"@polymer/polymer/lib/utils/html-tag": ["html"],
...Object.fromEntries(
["lit", "lit-element", "lit-html"].map((m) => [
m,
[
"html",
{ name: "svg", encapsulation: "svg" },
{ name: "css", encapsulation: "style" },
],
])
),
"@polymer/polymer/lib/utils/html-tag.js": ["html"],
},
strictCSS: true,
htmlMinifier: module.exports.htmlMinifierOptions,
failOnError: true, // we can turn this off in case of false positives
failOnError: false, // we can turn this off in case of false positives
},
],
// Import helpers and regenerator from runtime package
[
"@babel/plugin-transform-runtime",
{ version: require("../package.json").dependencies["@babel/runtime"] },
{ version: dependencies["@babel/runtime"] },
],
// Support some proposals still in TC39 process
["@babel/plugin-proposal-decorators", { decoratorsBeforeExport: true }],
"@babel/plugin-transform-class-properties",
"@babel/plugin-transform-private-methods",
].filter(Boolean),
exclude: [
// \\ for Windows, / for Mac OS and Linux
/node_modules[\\/]core-js/,
/node_modules[\\/]webpack[\\/]buildin/,
],
sourceMaps: !isTestBuild,
overrides: [
{
// Add plugin to inject various polyfills, excluding the polyfills
// themselves to prevent self-injection.
plugins: [
[
path.join(BABEL_PLUGINS, "custom-polyfill-plugin.js"),
{ method: "usage-global" },
],
],
exclude: [
path.join(paths.root_dir, "src/resources/polyfills"),
...[
"@formatjs/(?:ecma402-abstract|intl-\\w+)",
"@lit-labs/virtualizer/polyfills",
"@webcomponents/scoped-custom-element-registry",
"element-internals-polyfill",
"proxy-polyfill",
"unfetch",
].map((p) => new RegExp(`/node_modules/${p}/`)),
],
},
{
// Use unambiguous for dependencies so that require() is correctly injected into CommonJS files
// Exclusions are needed in some cases where ES modules have no static imports or exports, such as polyfills
sourceType: "unambiguous",
include: /\/node_modules\//,
exclude: [
"element-internals-polyfill",
"@shoelace-style",
"@?lit(?:-labs|-element|-html)?",
].map((p) => new RegExp(`/node_modules/${p}/`)),
},
],
});
const nameSuffix = (latestBuild) => (latestBuild ? "-latest" : "-es5");
const nameSuffix = (latestBuild) => (latestBuild ? "-modern" : "-legacy");
const outputPath = (outputRoot, latestBuild) =>
path.resolve(outputRoot, latestBuild ? "frontend_latest" : "frontend_es5");
@@ -182,9 +224,14 @@ const publicPath = (latestBuild, root = "") =>
module.exports.config = {
app({ isProdBuild, latestBuild, isStatsBuild, isTestBuild, isWDS }) {
return {
name: "app" + nameSuffix(latestBuild),
name: "frontend" + nameSuffix(latestBuild),
entry: {
service_worker: "./src/entrypoints/service_worker.ts",
"service-worker": !latestBuild
? {
import: "./src/entrypoints/service-worker.ts",
layer: "sw",
}
: "./src/entrypoints/service-worker.ts",
app: "./src/entrypoints/app.ts",
authorize: "./src/entrypoints/authorize.ts",
onboarding: "./src/entrypoints/onboarding.ts",
@@ -280,4 +327,17 @@ module.exports.config = {
},
};
},
landingPage({ isProdBuild, latestBuild }) {
return {
name: "landing-page" + nameSuffix(latestBuild),
entry: {
entrypoint: path.resolve(paths.landingPage_dir, "src/entrypoint.js"),
},
outputPath: outputPath(paths.landingPage_output_root, latestBuild),
publicPath: publicPath(latestBuild),
isProdBuild,
latestBuild,
};
},
};

View File

@@ -2,34 +2,33 @@ const fs = require("fs");
const path = require("path");
const paths = require("./paths.cjs");
const isTrue = (value) => value === "1" || value?.toLowerCase() === "true";
module.exports = {
useRollup() {
return process.env.ROLLUP === "1";
},
useWDS() {
return process.env.WDS === "1";
},
isProdBuild() {
return (
process.env.NODE_ENV === "production" || module.exports.isStatsBuild()
);
},
isStatsBuild() {
return process.env.STATS === "1";
return isTrue(process.env.STATS);
},
isTestBuild() {
return process.env.IS_TEST === "true";
return isTrue(process.env.IS_TEST);
},
isNetlify() {
return process.env.NETLIFY === "true";
return isTrue(process.env.NETLIFY);
},
version() {
const version = fs
.readFileSync(path.resolve(paths.polymer_dir, "pyproject.toml"), "utf8")
.readFileSync(path.resolve(paths.root_dir, "pyproject.toml"), "utf8")
.match(/version\W+=\W"(\d{8}\.\d(?:\.dev)?)"/);
if (!version) {
throw Error("Version not found");
}
return version[1];
},
isDevContainer() {
return isTrue(process.env.DEV_CONTAINER);
},
};

View File

@@ -0,0 +1,16 @@
// @ts-check
import tseslint from "typescript-eslint";
import rootConfig from "../eslint.config.mjs";
export default tseslint.config(...rootConfig, {
rules: {
"no-console": "off",
"import/no-extraneous-dependencies": "off",
"import/extensions": "off",
"import/no-dynamic-require": "off",
"global-require": "off",
"@typescript-eslint/no-require-imports": "off",
"prefer-arrow-callback": "off",
},
});

View File

@@ -6,11 +6,9 @@ import "./entry-html.js";
import "./gather-static.js";
import "./gen-icons-json.js";
import "./locale-data.js";
import "./rollup.js";
import "./service-worker.js";
import "./translations.js";
import "./wds.js";
import "./webpack.js";
import "./rspack.js";
gulp.task(
"develop-app",
@@ -27,11 +25,7 @@ gulp.task(
"build-locale-data"
),
"copy-static-app",
env.useWDS()
? "wds-watch-app"
: env.useRollup()
? "rollup-watch-app"
: "webpack-watch-app"
"rspack-watch-app"
)
);
@@ -44,9 +38,20 @@ gulp.task(
"clean",
gulp.parallel("gen-icons-json", "build-translations", "build-locale-data"),
"copy-static-app",
env.useRollup() ? "rollup-prod-app" : "webpack-prod-app",
"rspack-prod-app",
gulp.parallel("gen-pages-app-prod", "gen-service-worker-app-prod"),
// Don't compress running tests
...(env.isTestBuild() ? [] : ["compress-app"]),
gulp.parallel("gen-pages-app-prod", "gen-service-worker-app-prod")
...(env.isTestBuild() || env.isStatsBuild() ? [] : ["compress-app"])
)
);
gulp.task(
"analyze-app",
gulp.series(
async function setEnv() {
process.env.STATS = "1";
},
"clean",
"rspack-prod-app"
)
);

View File

@@ -1,12 +1,10 @@
import gulp from "gulp";
import env from "../env.cjs";
import "./clean.js";
import "./entry-html.js";
import "./gather-static.js";
import "./rollup.js";
import "./service-worker.js";
import "./translations.js";
import "./webpack.js";
import "./rspack.js";
gulp.task(
"develop-cast",
@@ -19,7 +17,7 @@ gulp.task(
gulp.parallel("gen-icons-json", "build-translations", "build-locale-data"),
"copy-static-cast",
"gen-pages-cast-dev",
env.useRollup() ? "rollup-dev-server-cast" : "webpack-dev-server-cast"
"rspack-dev-server-cast"
)
);
@@ -33,7 +31,7 @@ gulp.task(
"translations-enable-merge-backend",
gulp.parallel("gen-icons-json", "build-translations", "build-locale-data"),
"copy-static-cast",
env.useRollup() ? "rollup-prod-cast" : "webpack-prod-cast",
"rspack-prod-cast",
"gen-pages-cast-prod"
)
);

View File

@@ -38,3 +38,14 @@ gulp.task(
])
)
);
gulp.task(
"clean-landing-page",
gulp.parallel("clean-translations", async () =>
deleteSync([
paths.landingPage_output_root,
paths.landingPage_build,
paths.build_dir,
])
)
);

View File

@@ -1,16 +1,86 @@
// Tasks to compress
import { constants } from "node:zlib";
import gulp from "gulp";
import brotli from "gulp-brotli";
import zopfli from "gulp-zopfli-green";
import paths from "../paths.cjs";
const filesGlob = "*.{js,json,css,svg,xml}";
const brotliOptions = {
skipLarger: true,
params: {
[constants.BROTLI_PARAM_QUALITY]: constants.BROTLI_MAX_QUALITY,
},
};
const zopfliOptions = { threshold: 150 };
const compressDist = (rootDir) =>
const compressModern = (rootDir, modernDir, compress) =>
gulp
.src([`${rootDir}/**/*.{js,json,css,svg}`])
.pipe(zopfli(zopfliOptions))
.src([`${modernDir}/**/${filesGlob}`, `${rootDir}/sw-modern.js`], {
base: rootDir,
allowEmpty: true,
})
.pipe(compress === "zopfli" ? zopfli(zopfliOptions) : brotli(brotliOptions))
.pipe(gulp.dest(rootDir));
gulp.task("compress-app", () => compressDist(paths.app_output_root));
gulp.task("compress-hassio", () => compressDist(paths.hassio_output_root));
const compressOther = (rootDir, modernDir, compress) =>
gulp
.src(
[
`${rootDir}/**/${filesGlob}`,
`!${modernDir}/**/${filesGlob}`,
`!${rootDir}/{sw-modern,service_worker}.js`,
`${rootDir}/{authorize,onboarding}.html`,
],
{ base: rootDir, allowEmpty: true }
)
.pipe(compress === "zopfli" ? zopfli(zopfliOptions) : brotli(brotliOptions))
.pipe(gulp.dest(rootDir));
const compressAppModernBrotli = () =>
compressModern(paths.app_output_root, paths.app_output_latest, "brotli");
const compressAppModernZopfli = () =>
compressModern(paths.app_output_root, paths.app_output_latest, "zopfli");
const compressHassioModernBrotli = () =>
compressModern(
paths.hassio_output_root,
paths.hassio_output_latest,
"brotli"
);
const compressHassioModernZopfli = () =>
compressModern(
paths.hassio_output_root,
paths.hassio_output_latest,
"zopfli"
);
const compressAppOtherBrotli = () =>
compressOther(paths.app_output_root, paths.app_output_latest, "brotli");
const compressAppOtherZopfli = () =>
compressOther(paths.app_output_root, paths.app_output_latest, "zopfli");
const compressHassioOtherBrotli = () =>
compressOther(paths.hassio_output_root, paths.hassio_output_latest, "brotli");
const compressHassioOtherZopfli = () =>
compressOther(paths.hassio_output_root, paths.hassio_output_latest, "zopfli");
gulp.task(
"compress-app",
gulp.parallel(
compressAppModernBrotli,
compressAppOtherBrotli,
compressAppModernZopfli,
compressAppOtherZopfli
)
);
gulp.task(
"compress-hassio",
gulp.parallel(
compressHassioModernBrotli,
compressHassioOtherBrotli,
compressHassioModernZopfli,
compressHassioOtherZopfli
)
);

View File

@@ -1,13 +1,11 @@
import gulp from "gulp";
import env from "../env.cjs";
import "./clean.js";
import "./entry-html.js";
import "./gather-static.js";
import "./gen-icons-json.js";
import "./rollup.js";
import "./service-worker.js";
import "./translations.js";
import "./webpack.js";
import "./rspack.js";
gulp.task(
"develop-demo",
@@ -24,7 +22,7 @@ gulp.task(
"build-locale-data"
),
"copy-static-demo",
env.useRollup() ? "rollup-dev-server-demo" : "webpack-dev-server-demo"
"rspack-dev-server-demo"
)
);
@@ -39,7 +37,18 @@ gulp.task(
"translations-enable-merge-backend",
gulp.parallel("gen-icons-json", "build-translations", "build-locale-data"),
"copy-static-demo",
env.useRollup() ? "rollup-prod-demo" : "webpack-prod-demo",
"rspack-prod-demo",
"gen-pages-demo-prod"
)
);
gulp.task(
"analyze-demo",
gulp.series(
async function setEnv() {
process.env.STATS = "1";
},
"clean",
"rspack-prod-demo"
)
);

View File

@@ -1,15 +1,19 @@
import fs from "fs/promises";
import gulp from "gulp";
import path from "path";
import mapStream from "map-stream";
import transform from "gulp-json-transform";
import { LokaliseApi } from "@lokalise/node-api";
import JSZip from "jszip";
const inDirFrontend = "translations/frontend";
const inDirBackend = "translations/backend";
const inDir = "translations";
const inDirFrontend = `${inDir}/frontend`;
const inDirBackend = `${inDir}/backend`;
const srcMeta = "src/translations/translationMetadata.json";
const encoding = "utf8";
function hasHtml(data) {
return /<[a-z][\s\S]*>/i.test(data);
return /<\S*>/i.test(data);
}
function recursiveCheckHasHtml(file, data, errors, recKey) {
@@ -68,8 +72,9 @@ gulp.task("convert-backend-translations", function () {
});
gulp.task("check-translations-html", function () {
// We exclude backend translations because they are not compliant with the HTML rule for now
return gulp.src([`${inDirFrontend}/*.json`]).pipe(checkHtml());
return gulp
.src([`${inDirFrontend}/*.json`, `${inDirBackend}/*.json`])
.pipe(checkHtml());
});
gulp.task("check-all-files-exist", async function () {
@@ -89,7 +94,88 @@ gulp.task("check-all-files-exist", async function () {
await Promise.allSettled(writings);
});
const lokaliseProjects = {
backend: "130246255a974bd3b5e8a1.51616605",
frontend: "3420425759f6d6d241f598.13594006",
};
gulp.task("fetch-lokalise", async function () {
let apiKey;
try {
apiKey =
process.env.LOKALISE_TOKEN ||
(await fs.readFile(".lokalise_token", { encoding }));
} catch {
throw new Error(
"An Administrator Lokalise API token is required to download the latest set of translations. Place your token in a new file `.lokalise_token` in the repo root directory."
);
}
const lokaliseApi = new LokaliseApi({ apiKey });
const mkdirPromise = Promise.all([
fs.mkdir(inDirFrontend, { recursive: true }),
fs.mkdir(inDirBackend, { recursive: true }),
]);
await Promise.all(
Object.entries(lokaliseProjects).map(([project, projectId]) =>
lokaliseApi
.files()
.download(projectId, {
format: "json",
original_filenames: false,
replace_breaks: false,
json_unescaped_slashes: true,
export_empty_as: "skip",
filter_data: ["verified"],
})
.then((download) => fetch(download.bundle_url))
.then((response) => {
if (response.status === 200 || response.status === 0) {
return response.arrayBuffer();
}
throw new Error(response.statusText);
})
.then(JSZip.loadAsync)
.then(async (contents) => {
await mkdirPromise;
return Promise.all(
Object.keys(contents.files).map(async (filename) => {
const file = contents.file(filename);
if (!file) {
// no file, probably a directory
return Promise.resolve();
}
return file
.async("nodebuffer")
.then((content) =>
fs.writeFile(
path.join(
inDir,
project,
filename.split("/").splice(-1)[0]
),
content,
{ flag: "w", encoding }
)
);
})
);
})
.catch((err) => {
console.error(err);
throw err;
})
)
);
});
gulp.task(
"check-downloaded-translations",
gulp.series("check-translations-html", "check-all-files-exist")
"download-translations",
gulp.series(
"fetch-lokalise",
"convert-backend-translations",
"check-translations-html",
"check-all-files-exist"
)
);

View File

@@ -1,28 +1,74 @@
// Tasks to generate entry HTML
import {
applyVersionsToRegexes,
compileRegex,
getPreUserAgentRegexes,
} from "browserslist-useragent-regexp";
import fs from "fs-extra";
import gulp from "gulp";
import { minify } from "html-minifier-terser";
import template from "lodash.template";
import path from "path";
import { dirname, extname, resolve } from "node:path";
import { htmlMinifierOptions, terserOptions } from "../bundle.cjs";
import env from "../env.cjs";
import paths from "../paths.cjs";
// macOS companion app has no way to obtain the Safari version used by WKWebView,
// and it is not in the default user agent string. So we add an additional regex
// to serve modern based on a minimum macOS version. We take the minimum Safari
// major version from browserslist and manually map that to a supported macOS
// version. Note this assumes the user has kept Safari updated.
const HA_MACOS_REGEX =
/Home Assistant\/[\d.]+ \(.+; macOS (\d+)\.(\d+)(?:\.(\d+))?\)/;
const SAFARI_TO_MACOS = {
15: [10, 15, 0],
16: [11, 0, 0],
17: [12, 0, 0],
18: [13, 0, 0],
};
const getCommonTemplateVars = () => {
const browserRegexes = getPreUserAgentRegexes({
env: "modern",
allowHigherVersions: true,
mobileToDesktop: true,
throwOnMissing: true,
});
const minSafariVersion = browserRegexes.find(
(regex) => regex.family === "safari"
)?.matchedVersions[0][0];
const minMacOSVersion = SAFARI_TO_MACOS[minSafariVersion];
if (!minMacOSVersion) {
throw Error(
`Could not find minimum MacOS version for Safari ${minSafariVersion}.`
);
}
const haMacOSRegex = applyVersionsToRegexes(
[
{
family: "ha_macos",
regex: HA_MACOS_REGEX,
matchedVersions: [minMacOSVersion],
requestVersions: [minMacOSVersion],
},
],
{ ignorePatch: true, allowHigherVersions: true }
);
return {
modernRegex: compileRegex(browserRegexes.concat(haMacOSRegex)).toString(),
hassUrl: process.env.HASS_URL || "",
};
};
const renderTemplate = (templateFile, data = {}) => {
const compiled = template(
fs.readFileSync(templateFile, { encoding: "utf-8" })
);
return compiled({
...data,
useRollup: env.useRollup(),
useWDS: env.useWDS(),
// Resolve any child/nested templates relative to the parent and pass the same data
renderTemplate: (childTemplate) =>
renderTemplate(
path.resolve(path.dirname(templateFile), childTemplate),
data
),
renderTemplate(resolve(dirname(templateFile), childTemplate), data),
});
};
@@ -45,36 +91,32 @@ const minifyHtml = (content, ext) => {
};
// Function to generate a dev task for each project's configuration
// Note Currently WDS paths are hard-coded to only work for app
const genPagesDevTask =
(
pageEntries,
inputRoot,
outputRoot,
useWDS = false,
inputSub = "src/html",
publicRoot = ""
) =>
async () => {
const commonVars = getCommonTemplateVars();
for (const [page, entries] of Object.entries(pageEntries)) {
const content = renderTemplate(
path.resolve(inputRoot, inputSub, `${page}.template`),
resolve(inputRoot, inputSub, `${page}.template`),
{
latestEntryJS: entries.map((entry) =>
useWDS
? `http://localhost:8000/src/entrypoints/${entry}.ts`
: `${publicRoot}/frontend_latest/${entry}.js`
...commonVars,
latestEntryJS: entries.map(
(entry) => `${publicRoot}/frontend_latest/${entry}.js`
),
es5EntryJS: entries.map(
(entry) => `${publicRoot}/frontend_es5/${entry}.js`
),
latestCustomPanelJS: useWDS
? "http://localhost:8000/src/entrypoints/custom-panel.ts"
: `${publicRoot}/frontend_latest/custom-panel.js`,
latestCustomPanelJS: `${publicRoot}/frontend_latest/custom-panel.js`,
es5CustomPanelJS: `${publicRoot}/frontend_es5/custom-panel.js`,
}
);
fs.outputFileSync(path.resolve(outputRoot, page), content);
fs.outputFileSync(resolve(outputRoot, page), content);
}
};
@@ -91,16 +133,18 @@ const genPagesProdTask =
) =>
async () => {
const latestManifest = fs.readJsonSync(
path.resolve(outputLatest, "manifest.json")
resolve(outputLatest, "manifest.json")
);
const es5Manifest = outputES5
? fs.readJsonSync(path.resolve(outputES5, "manifest.json"))
? fs.readJsonSync(resolve(outputES5, "manifest.json"))
: {};
const commonVars = getCommonTemplateVars();
const minifiedHTML = [];
for (const [page, entries] of Object.entries(pageEntries)) {
const content = renderTemplate(
path.resolve(inputRoot, inputSub, `${page}.template`),
resolve(inputRoot, inputSub, `${page}.template`),
{
...commonVars,
latestEntryJS: entries.map((entry) => latestManifest[`${entry}.js`]),
es5EntryJS: entries.map((entry) => es5Manifest[`${entry}.js`]),
latestCustomPanelJS: latestManifest["custom-panel.js"],
@@ -108,8 +152,8 @@ const genPagesProdTask =
}
);
minifiedHTML.push(
minifyHtml(content, path.extname(page)).then((minified) =>
fs.outputFileSync(path.resolve(outputRoot, page), minified)
minifyHtml(content, extname(page)).then((minified) =>
fs.outputFileSync(resolve(outputRoot, page), minified)
)
);
}
@@ -125,19 +169,14 @@ const APP_PAGE_ENTRIES = {
gulp.task(
"gen-pages-app-dev",
genPagesDevTask(
APP_PAGE_ENTRIES,
paths.polymer_dir,
paths.app_output_root,
env.useWDS()
)
genPagesDevTask(APP_PAGE_ENTRIES, paths.root_dir, paths.app_output_root)
);
gulp.task(
"gen-pages-app-prod",
genPagesProdTask(
APP_PAGE_ENTRIES,
paths.polymer_dir,
paths.root_dir,
paths.app_output_root,
paths.app_output_latest,
paths.app_output_es5
@@ -206,6 +245,28 @@ gulp.task(
)
);
const LANDING_PAGE_PAGE_ENTRIES = { "index.html": ["entrypoint"] };
gulp.task(
"gen-pages-landing-page-dev",
genPagesDevTask(
LANDING_PAGE_PAGE_ENTRIES,
paths.landingPage_dir,
paths.landingPage_output_root
)
);
gulp.task(
"gen-pages-landing-page-prod",
genPagesProdTask(
LANDING_PAGE_PAGE_ENTRIES,
paths.landingPage_dir,
paths.landingPage_output_root,
paths.landingPage_output_latest,
paths.landingPage_output_es5
)
);
const HASSIO_PAGE_ENTRIES = { "entrypoint.js": ["entrypoint"] };
gulp.task(
@@ -214,7 +275,6 @@ gulp.task(
HASSIO_PAGE_ENTRIES,
paths.hassio_dir,
paths.hassio_output_root,
undefined,
"src",
paths.hassio_publicPath
)

View File

@@ -9,7 +9,7 @@ import gulp from "gulp";
import jszip from "jszip";
import path from "path";
import process from "process";
import tar from "tar";
import { extract } from "tar";
const MAX_AGE = 24; // hours
const OWNER = "home-assistant";
@@ -66,7 +66,7 @@ gulp.task("fetch-nightly-translations", async function () {
tokenAuth = JSON.parse(await readFile(TOKEN_FILE, "utf-8"));
} catch {
if (!allowTokenSetup) {
console.log("No token found so build wil continue with English only");
console.log("No token found so build will continue with English only");
return;
}
const auth = createOAuthDeviceAuth({
@@ -156,7 +156,7 @@ gulp.task("fetch-nightly-translations", async function () {
console.log("Unpacking downloaded translations...");
const zip = await jszip.loadAsync(downloadResponse.data);
await deleteCurrent;
const extractStream = zip.file(/.*/)[0].nodeStream().pipe(tar.extract());
const extractStream = zip.file(/.*/)[0].nodeStream().pipe(extract());
await new Promise((resolve, reject) => {
extractStream.on("close", resolve).on("error", reject);
});

View File

@@ -4,16 +4,14 @@ import gulp from "gulp";
import yaml from "js-yaml";
import { marked } from "marked";
import path from "path";
import env from "../env.cjs";
import paths from "../paths.cjs";
import "./clean.js";
import "./entry-html.js";
import "./gather-static.js";
import "./gen-icons-json.js";
import "./rollup.js";
import "./service-worker.js";
import "./translations.js";
import "./webpack.js";
import "./rspack.js";
gulp.task("gather-gallery-pages", async function gatherPages() {
const pageDir = path.resolve(paths.gallery_dir, "src/pages");
@@ -158,9 +156,7 @@ gulp.task(
"copy-static-gallery",
"gen-pages-gallery-dev",
gulp.parallel(
env.useRollup()
? "rollup-dev-server-gallery"
: "webpack-dev-server-gallery",
"rspack-dev-server-gallery",
async function watchMarkdownFiles() {
gulp.watch(
[
@@ -189,7 +185,7 @@ gulp.task(
"gather-gallery-pages"
),
"copy-static-gallery",
env.useRollup() ? "rollup-prod-gallery" : "webpack-prod-gallery",
"rspack-prod-gallery",
"gen-pages-gallery-prod"
)
);

View File

@@ -6,8 +6,8 @@ import path from "path";
import paths from "../paths.cjs";
const npmPath = (...parts) =>
path.resolve(paths.polymer_dir, "node_modules", ...parts);
const polyPath = (...parts) => path.resolve(paths.polymer_dir, ...parts);
path.resolve(paths.root_dir, "node_modules", ...parts);
const polyPath = (...parts) => path.resolve(paths.root_dir, ...parts);
const copyFileDir = (fromFile, toDir) =>
fs.copySync(fromFile, path.join(toDir, path.basename(fromFile)));
@@ -59,12 +59,17 @@ function copyPolyfills(staticDir) {
npmPath("@webcomponents/webcomponentsjs/webcomponents-bundle.js.map"),
staticPath("polyfills/")
);
}
// Lit polyfill support
fs.copySync(
npmPath("lit/polyfill-support.js"),
path.join(staticPath("polyfills/"), "lit-polyfill-support.js")
);
function copyLoaderJS(staticDir) {
const staticPath = genStaticPath(staticDir);
copyFileDir(npmPath("systemjs/dist/s.min.js"), staticPath("js"));
copyFileDir(npmPath("systemjs/dist/s.min.js.map"), staticPath("js"));
// dialog-polyfill css
copyFileDir(
npmPath("dialog-polyfill/dialog-polyfill.css"),
staticPath("polyfills/")
);
}
function copyFonts(staticDir) {
@@ -90,12 +95,24 @@ function copyMapPanel(staticDir) {
npmPath("leaflet/dist/leaflet.css"),
staticPath("images/leaflet/")
);
copyFileDir(
npmPath("leaflet.markercluster/dist/MarkerCluster.css"),
staticPath("images/leaflet/")
);
fs.copySync(
npmPath("leaflet/dist/images"),
staticPath("images/leaflet/images/")
);
}
function copyZXingWasm(staticDir) {
const staticPath = genStaticPath(staticDir);
copyFileDir(
npmPath("zxing-wasm/dist/reader/zxing_reader.wasm"),
staticPath("js")
);
}
gulp.task("copy-locale-data", async () => {
const staticDir = paths.app_output_static;
copyLocaleData(staticDir);
@@ -111,6 +128,11 @@ gulp.task("copy-translations-supervisor", async () => {
copyTranslations(staticDir);
});
gulp.task("copy-translations-landing-page", async () => {
const staticDir = paths.landingPage_output_static;
copyTranslations(staticDir);
});
gulp.task("copy-static-supervisor", async () => {
const staticDir = paths.hassio_output_static;
copyLocaleData(staticDir);
@@ -121,8 +143,6 @@ gulp.task("copy-static-app", async () => {
const staticDir = paths.app_output_static;
// Basic static files
fs.copySync(polyPath("public"), paths.app_output_root);
copyLoaderJS(staticDir);
copyPolyfills(staticDir);
copyFonts(staticDir);
copyTranslations(staticDir);
@@ -133,6 +153,7 @@ gulp.task("copy-static-app", async () => {
copyMapPanel(staticDir);
// Qr Scanner assets
copyZXingWasm(staticDir);
copyQrScannerWorker(staticDir);
});
@@ -144,8 +165,6 @@ gulp.task("copy-static-demo", async () => {
);
// Copy demo static files
fs.copySync(path.resolve(paths.demo_dir, "public"), paths.demo_output_root);
copyLoaderJS(paths.demo_output_static);
copyPolyfills(paths.demo_output_static);
copyMapPanel(paths.demo_output_static);
copyFonts(paths.demo_output_static);
@@ -159,8 +178,6 @@ gulp.task("copy-static-cast", async () => {
fs.copySync(polyPath("public/static"), paths.cast_output_static);
// Copy cast static files
fs.copySync(path.resolve(paths.cast_dir, "public"), paths.cast_output_root);
copyLoaderJS(paths.cast_output_static);
copyPolyfills(paths.cast_output_static);
copyMapPanel(paths.cast_output_static);
copyFonts(paths.cast_output_static);
@@ -184,3 +201,14 @@ gulp.task("copy-static-gallery", async () => {
copyLocaleData(paths.gallery_output_static);
copyMdiIcons(paths.gallery_output_static);
});
gulp.task("copy-static-landing-page", async () => {
// Copy landing-page static files
fs.copySync(
path.resolve(paths.landingPage_dir, "public"),
paths.landingPage_output_root
);
copyFonts(paths.landingPage_output_static);
copyTranslations(paths.landingPage_output_static);
});

View File

@@ -5,9 +5,8 @@ import "./compress.js";
import "./entry-html.js";
import "./gather-static.js";
import "./gen-icons-json.js";
import "./rollup.js";
import "./translations.js";
import "./webpack.js";
import "./rspack.js";
gulp.task(
"develop-hassio",
@@ -22,7 +21,7 @@ gulp.task(
"copy-translations-supervisor",
"build-locale-data",
"copy-static-supervisor",
env.useRollup() ? "rollup-watch-hassio" : "webpack-watch-hassio"
"rspack-watch-hassio"
)
);
@@ -38,7 +37,7 @@ gulp.task(
"copy-translations-supervisor",
"build-locale-data",
"copy-static-supervisor",
env.useRollup() ? "rollup-prod-hassio" : "webpack-prod-hassio",
"rspack-prod-hassio",
"gen-pages-hassio-prod",
...// Don't compress running tests
(env.isTestBuild() ? [] : ["compress-hassio"])

View File

@@ -0,0 +1,17 @@
import "./app.js";
import "./cast.js";
import "./clean.js";
import "./compress.js";
import "./demo.js";
import "./download-translations.js";
import "./entry-html.js";
import "./fetch-nightly-translations.js";
import "./gallery.js";
import "./gather-static.js";
import "./gen-icons-json.js";
import "./hassio.js";
import "./landing-page.js";
import "./locale-data.js";
import "./rspack.js";
import "./service-worker.js";
import "./translations.js";

View File

@@ -0,0 +1,41 @@
import gulp from "gulp";
import "./clean.js";
import "./compress.js";
import "./entry-html.js";
import "./gather-static.js";
import "./gen-icons-json.js";
import "./translations.js";
import "./rspack.js";
gulp.task(
"develop-landing-page",
gulp.series(
async function setEnv() {
process.env.NODE_ENV = "development";
},
"clean-landing-page",
"translations-enable-merge-backend",
"build-landing-page-translations",
"copy-translations-landing-page",
"build-locale-data",
"copy-static-landing-page",
"gen-pages-landing-page-dev",
"rspack-watch-landing-page"
)
);
gulp.task(
"build-landing-page",
gulp.series(
async function setEnv() {
process.env.NODE_ENV = "production";
},
"clean-landing-page",
"build-landing-page-translations",
"copy-translations-landing-page",
"build-locale-data",
"copy-static-landing-page",
"rspack-prod-landing-page",
"gen-pages-landing-page-prod"
)
);

View File

@@ -1,51 +1,57 @@
import { deleteSync } from "del";
import { mkdir, readFile, writeFile } from "fs/promises";
import gulp from "gulp";
import path from "path";
import { join, resolve } from "node:path";
import paths from "../paths.cjs";
const outDir = path.join(paths.build_dir, "locale-data");
const formatjsDir = join(paths.root_dir, "node_modules", "@formatjs");
const outDir = join(paths.build_dir, "locale-data");
const INTL_PACKAGES = {
"intl-relativetimeformat": "RelativeTimeFormat",
const INTL_POLYFILLS = {
"intl-datetimeformat": "DateTimeFormat",
"intl-numberformat": "NumberFormat",
"intl-displaynames": "DisplayNames",
"intl-listformat": "ListFormat",
"intl-numberformat": "NumberFormat",
"intl-relativetimeformat": "RelativeTimeFormat",
};
const convertToJSON = async (pkg, lang) => {
const convertToJSON = async (
pkg,
lang,
subDir = "locale-data",
addFunc = "__addLocaleData",
skipMissing = true
) => {
let localeData;
try {
// use "pt" for "pt-BR", because "pt-BR" is unsupported by @formatjs
const language = lang === "pt-BR" ? "pt" : lang;
localeData = await readFile(
path.resolve(
paths.polymer_dir,
`node_modules/@formatjs/${pkg}/locale-data/${lang}.js`
),
join(formatjsDir, pkg, subDir, `${language}.js`),
"utf-8"
);
} catch (e) {
// Ignore if language is missing (i.e. not supported by @formatjs)
if (e.code === "ENOENT") {
if (e.code === "ENOENT" && skipMissing) {
console.warn(`Skipped missing data for language ${lang} from ${pkg}`);
return;
} else {
throw e;
}
throw e;
}
// Convert to JSON
const className = INTL_PACKAGES[pkg];
localeData = localeData
.replace(
new RegExp(
`\\/\\*\\s*@generated\\s*\\*\\/\\s*\\/\\/\\s*prettier-ignore\\s*if\\s*\\(Intl\\.${className}\\s*&&\\s*typeof\\s*Intl\\.${className}\\.__addLocaleData\\s*===\\s*'function'\\)\\s*{\\s*Intl\\.${className}\\.__addLocaleData\\(`,
"im"
),
""
)
.replace(/\)\s*}/im, "");
const obj = INTL_POLYFILLS[pkg];
const dataRegex = new RegExp(
`Intl\\.${obj}\\.${addFunc}\\((?<data>.*)\\)`,
"s"
);
localeData = localeData.match(dataRegex)?.groups?.data;
if (!localeData) {
throw Error(`Failed to extract data for language ${lang} from ${pkg}`);
}
// Parse to validate JSON, then stringify to minify
localeData = JSON.stringify(JSON.parse(localeData));
await writeFile(path.join(outDir, `${pkg}/${lang}.json`), localeData);
await writeFile(join(outDir, `${pkg}/${lang}.json`), localeData);
};
gulp.task("clean-locale-data", async () => deleteSync([outDir]));
@@ -53,17 +59,27 @@ gulp.task("clean-locale-data", async () => deleteSync([outDir]));
gulp.task("create-locale-data", async () => {
const translationMeta = JSON.parse(
await readFile(
path.resolve(paths.translations_src, "translationMetadata.json"),
resolve(paths.translations_src, "translationMetadata.json"),
"utf-8"
)
);
const conversions = [];
for (const pkg of Object.keys(INTL_PACKAGES)) {
await mkdir(path.join(outDir, pkg), { recursive: true });
for (const pkg of Object.keys(INTL_POLYFILLS)) {
// eslint-disable-next-line no-await-in-loop
await mkdir(join(outDir, pkg), { recursive: true });
for (const lang of Object.keys(translationMeta)) {
conversions.push(convertToJSON(pkg, lang));
}
}
conversions.push(
convertToJSON(
"intl-datetimeformat",
"add-all-tz",
".",
"__addTZData",
false
)
);
await Promise.all(conversions);
});

View File

@@ -1,147 +0,0 @@
// Tasks to run Rollup
import log from "fancy-log";
import gulp from "gulp";
import http from "http";
import open from "open";
import path from "path";
import { rollup } from "rollup";
import handler from "serve-handler";
import paths from "../paths.cjs";
import rollupConfig from "../rollup.cjs";
const bothBuilds = (createConfigFunc, params) =>
gulp.series(
async function buildLatest() {
await buildRollup(
createConfigFunc({
...params,
latestBuild: true,
})
);
},
async function buildES5() {
await buildRollup(
createConfigFunc({
...params,
latestBuild: false,
})
);
}
);
function createServer(serveOptions) {
const server = http.createServer((request, response) =>
handler(request, response, {
public: serveOptions.root,
})
);
server.listen(
serveOptions.port,
serveOptions.networkAccess ? "0.0.0.0" : undefined,
() => {
log.info(`Available at http://localhost:${serveOptions.port}`);
open(`http://localhost:${serveOptions.port}`);
}
);
}
function watchRollup(createConfig, extraWatchSrc = [], serveOptions = null) {
const { inputOptions, outputOptions } = createConfig({
isProdBuild: false,
latestBuild: true,
});
const watcher = rollup.watch({
...inputOptions,
output: [outputOptions],
watch: {
include: ["src/**"] + extraWatchSrc,
},
});
let startedHttp = false;
watcher.on("event", (event) => {
if (event.code === "BUNDLE_END") {
log(`Build done @ ${new Date().toLocaleTimeString()}`);
} else if (event.code === "ERROR") {
log.error(event.error);
} else if (event.code === "END") {
if (startedHttp || !serveOptions) {
return;
}
startedHttp = true;
createServer(serveOptions);
}
});
gulp.watch(
path.join(paths.translations_src, "en.json"),
gulp.series("build-translations", "copy-translations-app")
);
}
async function buildRollup(config) {
const bundle = await rollup.rollup(config.inputOptions);
await bundle.write(config.outputOptions);
}
gulp.task("rollup-watch-app", () => {
watchRollup(rollupConfig.createAppConfig);
});
gulp.task("rollup-watch-hassio", () => {
watchRollup(rollupConfig.createHassioConfig, ["hassio/src/**"]);
});
gulp.task("rollup-dev-server-demo", () => {
watchRollup(rollupConfig.createDemoConfig, ["demo/src/**"], {
root: paths.demo_output_root,
port: 8090,
});
});
gulp.task("rollup-dev-server-cast", () => {
watchRollup(rollupConfig.createCastConfig, ["cast/src/**"], {
root: paths.cast_output_root,
port: 8080,
networkAccess: true,
});
});
gulp.task("rollup-dev-server-gallery", () => {
watchRollup(rollupConfig.createGalleryConfig, ["gallery/src/**"], {
root: paths.gallery_output_root,
port: 8100,
});
});
gulp.task(
"rollup-prod-app",
bothBuilds(rollupConfig.createAppConfig, { isProdBuild: true })
);
gulp.task(
"rollup-prod-demo",
bothBuilds(rollupConfig.createDemoConfig, { isProdBuild: true })
);
gulp.task(
"rollup-prod-cast",
bothBuilds(rollupConfig.createCastConfig, { isProdBuild: true })
);
gulp.task("rollup-prod-hassio", () =>
bothBuilds(rollupConfig.createHassioConfig, { isProdBuild: true })
);
gulp.task("rollup-prod-gallery", () =>
buildRollup(
rollupConfig.createGalleryConfig({
isProdBuild: true,
latestBuild: true,
})
)
);

View File

@@ -1,11 +1,11 @@
// Tasks to run webpack.
// Tasks to run rspack.
import fs from "fs";
import path from "path";
import log from "fancy-log";
import gulp from "gulp";
import webpack from "webpack";
import WebpackDevServer from "webpack-dev-server";
import rspack from "@rspack/core";
import { RspackDevServer } from "@rspack/dev-server";
import env from "../env.cjs";
import paths from "../paths.cjs";
import {
@@ -14,7 +14,8 @@ import {
createDemoConfig,
createGalleryConfig,
createHassioConfig,
} from "../webpack.cjs";
createLandingPageConfig,
} from "../rspack.cjs";
const bothBuilds = (createConfigFunc, params) => [
createConfigFunc({ ...params, latestBuild: true }),
@@ -30,7 +31,7 @@ const isWsl =
/**
* @param {{
* compiler: import("webpack").Compiler,
* compiler: import("@rspack/core").Compiler,
* contentBase: string,
* port: number,
* listenHost?: string
@@ -40,9 +41,14 @@ const runDevServer = async ({
compiler,
contentBase,
port,
listenHost = "localhost",
listenHost = undefined,
proxy = undefined,
}) => {
const server = new WebpackDevServer(
if (listenHost === undefined) {
// For dev container, we need to listen on all hosts
listenHost = env.isDevContainer() ? "0.0.0.0" : "localhost";
}
const server = new RspackDevServer(
{
hot: false,
open: true,
@@ -52,13 +58,14 @@ const runDevServer = async ({
directory: contentBase,
watch: true,
},
proxy,
},
compiler
);
await server.start();
// Server listening
log("[webpack-dev-server]", `Project is running at http://localhost:${port}`);
log("[rspack-dev-server]", `Project is running at http://localhost:${port}`);
};
const doneHandler = (done) => (err, stats) => {
@@ -83,27 +90,27 @@ const doneHandler = (done) => (err, stats) => {
const prodBuild = (conf) =>
new Promise((resolve) => {
webpack(
rspack(
conf,
// Resolve promise when done. Because we pass a callback, webpack closes itself
// Resolve promise when done. Because we pass a callback, rspack closes itself
doneHandler(resolve)
);
});
gulp.task("webpack-watch-app", () => {
gulp.task("rspack-watch-app", () => {
// This command will run forever because we don't close compiler
webpack(
rspack(
process.env.ES5
? bothBuilds(createAppConfig, { isProdBuild: false })
: createAppConfig({ isProdBuild: false, latestBuild: true })
).watch({ poll: isWsl }, doneHandler());
gulp.watch(
path.join(paths.translations_src, "en.json"),
gulp.series("create-translations", "copy-translations-app")
gulp.series("build-translations", "copy-translations-app")
);
});
gulp.task("webpack-prod-app", () =>
gulp.task("rspack-prod-app", () =>
prodBuild(
bothBuilds(createAppConfig, {
isProdBuild: true,
@@ -113,25 +120,30 @@ gulp.task("webpack-prod-app", () =>
)
);
gulp.task("webpack-dev-server-demo", () =>
gulp.task("rspack-dev-server-demo", () =>
runDevServer({
compiler: webpack(bothBuilds(createDemoConfig, { isProdBuild: false })),
compiler: rspack(
createDemoConfig({ isProdBuild: false, latestBuild: true })
),
contentBase: paths.demo_output_root,
port: 8090,
})
);
gulp.task("webpack-prod-demo", () =>
gulp.task("rspack-prod-demo", () =>
prodBuild(
bothBuilds(createDemoConfig, {
isProdBuild: true,
isStatsBuild: env.isStatsBuild(),
})
)
);
gulp.task("webpack-dev-server-cast", () =>
gulp.task("rspack-dev-server-cast", () =>
runDevServer({
compiler: webpack(bothBuilds(createCastConfig, { isProdBuild: false })),
compiler: rspack(
createCastConfig({ isProdBuild: false, latestBuild: true })
),
contentBase: paths.cast_output_root,
port: 8080,
// Accessible from the network, because that's how Cast hits it.
@@ -139,7 +151,7 @@ gulp.task("webpack-dev-server-cast", () =>
})
);
gulp.task("webpack-prod-cast", () =>
gulp.task("rspack-prod-cast", () =>
prodBuild(
bothBuilds(createCastConfig, {
isProdBuild: true,
@@ -147,9 +159,9 @@ gulp.task("webpack-prod-cast", () =>
)
);
gulp.task("webpack-watch-hassio", () => {
gulp.task("rspack-watch-hassio", () => {
// This command will run forever because we don't close compiler
webpack(
rspack(
createHassioConfig({
isProdBuild: false,
latestBuild: true,
@@ -162,7 +174,7 @@ gulp.task("webpack-watch-hassio", () => {
);
});
gulp.task("webpack-prod-hassio", () =>
gulp.task("rspack-prod-hassio", () =>
prodBuild(
bothBuilds(createHassioConfig, {
isProdBuild: true,
@@ -172,17 +184,18 @@ gulp.task("webpack-prod-hassio", () =>
)
);
gulp.task("webpack-dev-server-gallery", () =>
gulp.task("rspack-dev-server-gallery", () =>
runDevServer({
// We don't use the es5 build, but the dev server will fuck up the publicPath if we don't
compiler: webpack(bothBuilds(createGalleryConfig, { isProdBuild: false })),
compiler: rspack(
createGalleryConfig({ isProdBuild: false, latestBuild: true })
),
contentBase: paths.gallery_output_root,
port: 8100,
listenHost: "0.0.0.0",
})
);
gulp.task("webpack-prod-gallery", () =>
gulp.task("rspack-prod-gallery", () =>
prodBuild(
createGalleryConfig({
isProdBuild: true,
@@ -190,3 +203,30 @@ gulp.task("webpack-prod-gallery", () =>
})
)
);
gulp.task("rspack-watch-landing-page", () => {
// This command will run forever because we don't close compiler
rspack(
process.env.ES5
? bothBuilds(createLandingPageConfig, { isProdBuild: false })
: createLandingPageConfig({ isProdBuild: false, latestBuild: true })
).watch({ poll: isWsl }, doneHandler());
gulp.watch(
path.join(paths.translations_src, "en.json"),
gulp.series(
"build-landing-page-translations",
"copy-translations-landing-page"
)
);
});
gulp.task("rspack-prod-landing-page", () =>
prodBuild(
bothBuilds(createLandingPageConfig, {
isProdBuild: true,
isStatsBuild: env.isStatsBuild(),
isTestBuild: env.isTestBuild(),
})
)
);

View File

@@ -1,20 +1,19 @@
// Generate service worker.
// Based on manifest, create a file with the content as service_worker.js
// Generate service workers
import fs from "fs-extra";
import { deleteAsync } from "del";
import gulp from "gulp";
import path from "path";
import sourceMapUrl from "source-map-url";
import workboxBuild from "workbox-build";
import { mkdir, readFile, symlink, writeFile } from "node:fs/promises";
import { basename, join, relative } from "node:path";
import { injectManifest } from "workbox-build";
import paths from "../paths.cjs";
const swDest = path.resolve(paths.app_output_root, "service_worker.js");
const SW_MAP = {
[paths.app_output_latest]: "modern",
[paths.app_output_es5]: "legacy",
};
const writeSW = (content) => fs.outputFileSync(swDest, content.trim() + "\n");
gulp.task("gen-service-worker-app-dev", (done) => {
writeSW(
`
const SW_DEV =
`
console.debug('Service worker disabled in development');
self.addEventListener('install', (event) => {
@@ -22,72 +21,67 @@ self.addEventListener('install', (event) => {
// removing any prod service worker the dev might have running
self.skipWaiting();
});
`
`.trim() + "\n";
gulp.task("gen-service-worker-app-dev", async () => {
await mkdir(paths.app_output_root, { recursive: true });
await Promise.all(
Object.values(SW_MAP).map((build) =>
writeFile(join(paths.app_output_root, `sw-${build}.js`), SW_DEV, {
encoding: "utf-8",
})
)
);
done();
});
gulp.task("gen-service-worker-app-prod", async () => {
// Read bundled source file
const bundleManifestLatest = fs.readJsonSync(
path.resolve(paths.app_output_latest, "manifest.json")
);
let serviceWorkerContent = fs.readFileSync(
paths.app_output_root + bundleManifestLatest["service_worker.js"],
"utf-8"
);
// Delete old file from frontend_latest so manifest won't pick it up
fs.removeSync(
paths.app_output_root + bundleManifestLatest["service_worker.js"]
);
fs.removeSync(
paths.app_output_root + bundleManifestLatest["service_worker.js.map"]
);
// Remove ES5
const bundleManifestES5 = fs.readJsonSync(
path.resolve(paths.app_output_es5, "manifest.json")
);
fs.removeSync(paths.app_output_root + bundleManifestES5["service_worker.js"]);
fs.removeSync(
paths.app_output_root + bundleManifestES5["service_worker.js.map"]
);
const workboxManifest = await workboxBuild.getManifest({
// Files that mach this pattern will be considered unique and skip revision check
// ignore JS files + translation files
dontCacheBustURLsMatching: /(frontend_latest\/.+|static\/translations\/.+)/,
globDirectory: paths.app_output_root,
globPatterns: [
"frontend_latest/*.js",
// Cache all English translations because we catch them as fallback
// Using pattern to match hash instead of * to avoid caching en-GB
// 'v' added as valid hash letter because in dev we hash with 'dev'
"static/translations/**/en-+([a-fv0-9]).json",
// Icon shown on splash screen
"static/icons/favicon-192x192.png",
"static/icons/favicon.ico",
// Common fonts
"static/fonts/roboto/Roboto-Light.woff2",
"static/fonts/roboto/Roboto-Medium.woff2",
"static/fonts/roboto/Roboto-Regular.woff2",
"static/fonts/roboto/Roboto-Bold.woff2",
],
});
for (const warning of workboxManifest.warnings) {
console.warn(warning);
}
// remove source map and add WB manifest
serviceWorkerContent = sourceMapUrl.removeFrom(serviceWorkerContent);
serviceWorkerContent = serviceWorkerContent.replace(
"WB_MANIFEST",
JSON.stringify(workboxManifest.manifestEntries)
);
// Write new file to root
fs.writeFileSync(swDest, serviceWorkerContent);
});
gulp.task("gen-service-worker-app-prod", () =>
Promise.all(
Object.entries(SW_MAP).map(async ([outPath, build]) => {
const manifest = JSON.parse(
await readFile(join(outPath, "manifest.json"), "utf-8")
);
const swSrc = join(paths.app_output_root, manifest["service-worker.js"]);
const swDest = join(paths.app_output_root, `sw-${build}.js`);
const buildDir = relative(paths.app_output_root, outPath);
const { warnings } = await injectManifest({
swSrc,
swDest,
injectionPoint: "__WB_MANIFEST__",
// Files that mach this pattern will be considered unique and skip revision check
// ignore JS files + translation files
dontCacheBustURLsMatching: new RegExp(
`(?:${buildDir}/.+|static/translations/.+)`
),
globDirectory: paths.app_output_root,
globPatterns: [
`${buildDir}/*.js`,
// Cache all English translations because we catch them as fallback
// Using pattern to match hash instead of * to avoid caching en-GB
// 'v' added as valid hash letter because in dev we hash with 'dev'
"static/translations/**/en-+([a-fv0-9]).json",
// Icon shown on splash screen
"static/icons/favicon-192x192.png",
"static/icons/favicon.ico",
// Common fonts
"static/fonts/roboto/Roboto-Light.woff2",
"static/fonts/roboto/Roboto-Medium.woff2",
"static/fonts/roboto/Roboto-Regular.woff2",
"static/fonts/roboto/Roboto-Bold.woff2",
],
globIgnores: [`${buildDir}/service-worker*`],
});
if (warnings.length > 0) {
console.warn(
`Problems while injecting ${build} service worker:\n`,
warnings.join("\n")
);
}
await deleteAsync(`${swSrc}?(.map)`);
// Needed to install new SW from a cached HTML
if (build === "modern") {
const swOld = join(paths.app_output_root, "service_worker.js");
await symlink(basename(swDest), swOld);
}
})
)
);

View File

@@ -1,97 +1,103 @@
import { createHash } from "crypto";
import { deleteSync } from "del";
import {
mkdirSync,
readdirSync,
readFileSync,
renameSync,
writeFile,
} from "fs";
/* eslint-disable max-classes-per-file */
import { deleteAsync } from "del";
import { glob } from "glob";
import gulp from "gulp";
import flatmap from "gulp-flatmap";
import transform from "gulp-json-transform";
import merge from "gulp-merge-json";
import rename from "gulp-rename";
import path from "path";
import vinylBuffer from "vinyl-buffer";
import source from "vinyl-source-stream";
import merge from "lodash.merge";
import { createHash } from "node:crypto";
import { mkdir, readFile } from "node:fs/promises";
import { basename, join } from "node:path";
import { PassThrough, Transform } from "node:stream";
import { finished } from "node:stream/promises";
import env from "../env.cjs";
import paths from "../paths.cjs";
import { mapFiles } from "../util.cjs";
import "./fetch-nightly-translations.js";
const inFrontendDir = "translations/frontend";
const inBackendDir = "translations/backend";
const workDir = "build/translations";
const fullDir = workDir + "/full";
const coreDir = workDir + "/core";
const outDir = workDir + "/output";
const outDir = join(workDir, "output");
const EN_SRC = join(paths.translations_src, "en.json");
const TEST_LOCALE = "en-x-test";
let mergeBackend = false;
gulp.task(
"translations-enable-merge-backend",
gulp.parallel((done) => {
gulp.parallel(async () => {
mergeBackend = true;
done();
}, "allow-setup-fetch-nightly-translations")
);
// Panel translations which should be split from the core translations.
const TRANSLATION_FRAGMENTS = Object.keys(
JSON.parse(
readFileSync(
path.resolve(paths.polymer_dir, "src/translations/en.json"),
"utf-8"
)
).ui.panel
);
// Transform stream to apply a function on Vinyl JSON files (buffer mode only).
// The provided function can either return a new object, or an array of
// [object, subdirectory] pairs for fragmentizing the JSON.
class CustomJSON extends Transform {
constructor(func, reviver = null) {
super({ objectMode: true });
this._func = func;
this._reviver = reviver;
}
function recursiveFlatten(prefix, data) {
let output = {};
Object.keys(data).forEach((key) => {
if (typeof data[key] === "object") {
output = {
...output,
...recursiveFlatten(prefix + key + ".", data[key]),
};
// eslint-disable-next-line @typescript-eslint/naming-convention
async _transform(file, _, callback) {
let obj = JSON.parse(file.contents.toString(), this._reviver);
if (this._func) obj = this._func(obj, file.path);
for (const [outObj, dir] of Array.isArray(obj) ? obj : [[obj, ""]]) {
const outFile = file.clone({ contents: false });
outFile.contents = Buffer.from(JSON.stringify(outObj));
outFile.dirname += `/${dir}`;
this.push(outFile);
}
callback(null);
}
}
// Transform stream to merge Vinyl JSON files (buffer mode only).
class MergeJSON extends Transform {
_objects = [];
constructor(stem, startObj = {}, reviver = null) {
super({ objectMode: true, allowHalfOpen: false });
this._stem = stem;
this._startObj = structuredClone(startObj);
this._reviver = reviver;
}
// eslint-disable-next-line @typescript-eslint/naming-convention
async _transform(file, _, callback) {
this._objects.push(JSON.parse(file.contents.toString(), this._reviver));
if (!this._outFile) this._outFile = file.clone({ contents: false });
callback(null);
}
// eslint-disable-next-line @typescript-eslint/naming-convention
async _flush(callback) {
const mergedObj = merge(this._startObj, ...this._objects);
this._outFile.contents = Buffer.from(JSON.stringify(mergedObj));
this._outFile.stem = this._stem;
callback(null, this._outFile);
}
}
// Utility to flatten object keys to single level using separator
const flatten = (data, prefix = "", sep = ".") => {
const output = {};
for (const [key, value] of Object.entries(data)) {
if (typeof value === "object") {
Object.assign(output, flatten(value, prefix + key + sep, sep));
} else {
output[prefix + key] = data[key];
output[prefix + key] = value;
}
});
}
return output;
}
};
function flatten(data) {
return recursiveFlatten("", data);
}
function emptyFilter(data) {
const newData = {};
Object.keys(data).forEach((key) => {
if (data[key]) {
if (typeof data[key] === "object") {
newData[key] = emptyFilter(data[key]);
} else {
newData[key] = data[key];
}
}
});
return newData;
}
function recursiveEmpty(data) {
const newData = {};
Object.keys(data).forEach((key) => {
if (data[key]) {
if (typeof data[key] === "object") {
newData[key] = recursiveEmpty(data[key]);
} else {
newData[key] = "TRANSLATED";
}
}
});
return newData;
}
// Filter functions that can be passed directly to JSON.parse()
const emptyReviver = (_key, value) => value || undefined;
const testReviver = (_key, value) =>
value && typeof value === "string" ? "TRANSLATED" : value;
/**
* Replace Lokalise key placeholders with their actual values.
@@ -100,64 +106,44 @@ function recursiveEmpty(data) {
* be included in src/translations/en.json, but still be usable while
* developing locally.
*
* @link https://docs.lokalise.co/article/KO5SZWLLsy-key-referencing
* @link https://docs.lokalise.com/en/articles/1400528-key-referencing
*/
const re_key_reference = /\[%key:([^%]+)%\]/;
function lokaliseTransform(data, original, file) {
const KEY_REFERENCE = /\[%key:([^%]+)%\]/;
const lokaliseTransform = (data, path, original = data) => {
const output = {};
Object.entries(data).forEach(([key, value]) => {
if (value instanceof Object) {
output[key] = lokaliseTransform(value, original, file);
for (const [key, value] of Object.entries(data)) {
if (typeof value === "object") {
output[key] = lokaliseTransform(value, path, original);
} else {
output[key] = value.replace(re_key_reference, (_match, lokalise_key) => {
output[key] = value.replace(KEY_REFERENCE, (_match, lokalise_key) => {
const replace = lokalise_key.split("::").reduce((tr, k) => {
if (!tr) {
throw Error(
`Invalid key placeholder ${lokalise_key} in ${file.path}`
);
throw Error(`Invalid key placeholder ${lokalise_key} in ${path}`);
}
return tr[k];
}, original);
if (typeof replace !== "string") {
throw Error(
`Invalid key placeholder ${lokalise_key} in ${file.path}`
);
throw Error(`Invalid key placeholder ${lokalise_key} in ${path}`);
}
return replace;
});
}
});
}
return output;
}
};
gulp.task("clean-translations", async () => deleteSync([workDir]));
gulp.task("clean-translations", () => deleteAsync([workDir]));
gulp.task("ensure-translations-build-dir", async () => {
mkdirSync(workDir, { recursive: true });
});
const makeWorkDir = () => mkdir(workDir, { recursive: true });
gulp.task("create-test-metadata", (cb) => {
writeFile(
workDir + "/testMetadata.json",
JSON.stringify({
test: {
nativeName: "Test",
},
}),
cb
);
});
gulp.task(
"create-test-translation",
gulp.series("create-test-metadata", () =>
gulp
.src(path.join(paths.translations_src, "en.json"))
.pipe(transform((data, _file) => recursiveEmpty(data)))
.pipe(rename("test.json"))
.pipe(gulp.dest(workDir))
)
);
const createTestTranslation = () =>
env.isProdBuild()
? Promise.resolve()
: gulp
.src(EN_SRC)
.pipe(new CustomJSON(null, testReviver))
.pipe(rename(`${TEST_LOCALE}.json`))
.pipe(gulp.dest(workDir));
/**
* This task will build a master translation file, to be used as the base for
@@ -168,286 +154,174 @@ gulp.task(
* project is buildable immediately after merging new translation keys, since
* the Lokalise update to translations/en.json will not happen immediately.
*/
gulp.task("build-master-translation", () => {
const src = [path.join(paths.translations_src, "en.json")];
const createMasterTranslation = () =>
gulp
.src([EN_SRC, ...(mergeBackend ? [`${inBackendDir}/en.json`] : [])])
.pipe(new CustomJSON(lokaliseTransform))
.pipe(new MergeJSON("en"))
.pipe(gulp.dest(workDir));
if (mergeBackend) {
src.push(path.join(inBackendDir, "en.json"));
const FRAGMENTS = ["base"];
const setFragment = (fragment) => async () => {
FRAGMENTS[0] = fragment;
};
const panelFragment = (fragment) =>
fragment !== "base" &&
fragment !== "supervisor" &&
fragment !== "landing-page";
const HASHES = new Map();
const createTranslations = async () => {
// Parse and store the master to avoid repeating this for each locale, then
// add the panel fragments when processing the app.
const enMaster = JSON.parse(await readFile(`${workDir}/en.json`, "utf-8"));
if (FRAGMENTS[0] === "base") {
FRAGMENTS.push(...Object.keys(enMaster.ui.panel));
}
return gulp
.src(src)
.pipe(transform((data, file) => lokaliseTransform(data, data, file)))
// The downstream pipeline is setup first. It hashes the merged data for
// each locale, then fragmentizes and flattens the data for final output.
const translationFiles = await glob([
`${inFrontendDir}/!(en).json`,
...(env.isProdBuild() ? [] : [`${workDir}/${TEST_LOCALE}.json`]),
]);
const hashStream = new Transform({
objectMode: true,
transform: async (file, _, callback) => {
const hash = env.isProdBuild()
? createHash("md5").update(file.contents).digest("hex")
: "dev";
HASHES.set(file.stem, hash);
file.stem += `-${hash}`;
callback(null, file);
},
}).setMaxListeners(translationFiles.length + 1);
const fragmentsStream = hashStream
.pipe(
merge({
fileName: "en.json",
})
)
.pipe(gulp.dest(fullDir));
});
gulp.task("build-merged-translations", () =>
gulp
.src(
[
inFrontendDir + "/*.json",
"!" + inFrontendDir + "/en.json",
workDir + "/test.json",
],
{
allowEmpty: true,
}
)
.pipe(transform((data, file) => lokaliseTransform(data, data, file)))
.pipe(
flatmap((stream, file) => {
// For each language generate a merged json file. It begins with the master
// translation as a failsafe for untranslated strings, and merges all parent
// tags into one file for each specific subtag
//
// TODO: This is a naive interpretation of BCP47 that should be improved.
// Will be OK for now as long as we don't have anything more complicated
// than a base translation + region.
const tr = path.basename(file.history[0], ".json");
const subtags = tr.split("-");
const src = [fullDir + "/en.json"];
for (let i = 1; i <= subtags.length; i++) {
const lang = subtags.slice(0, i).join("-");
if (lang === "test") {
src.push(workDir + "/test.json");
} else if (lang !== "en") {
src.push(inFrontendDir + "/" + lang + ".json");
if (mergeBackend) {
src.push(inBackendDir + "/" + lang + ".json");
}
new CustomJSON((data) =>
FRAGMENTS.map((fragment) => {
switch (fragment) {
case "base":
// Remove the panels and supervisor to create the base translations
return [
flatten({
...data,
ui: { ...data.ui, panel: undefined },
supervisor: undefined,
}),
"",
];
case "supervisor":
// Supervisor key is at the top level
return [flatten(data.supervisor), ""];
case "landing-page":
// landing-page key is at the top level
return [flatten(data["landing-page"]), ""];
default:
// Create a fragment with only the given panel
return [
flatten(data.ui.panel[fragment], `ui.panel.${fragment}.`),
fragment,
];
}
}
return gulp
.src(src, { allowEmpty: true })
.pipe(transform((data) => emptyFilter(data)))
.pipe(
merge({
fileName: tr + ".json",
})
)
.pipe(gulp.dest(fullDir));
})
)
);
let taskName;
const splitTasks = [];
TRANSLATION_FRAGMENTS.forEach((fragment) => {
taskName = "build-translation-fragment-" + fragment;
gulp.task(taskName, () =>
// Return only the translations for this fragment.
gulp
.src(fullDir + "/*.json")
.pipe(
transform((data) => ({
ui: {
panel: {
[fragment]: data.ui.panel[fragment],
},
},
}))
)
.pipe(gulp.dest(workDir + "/" + fragment))
);
splitTasks.push(taskName);
});
taskName = "build-translation-core";
gulp.task(taskName, () =>
// Remove the fragment translations from the core translation.
gulp
.src(fullDir + "/*.json")
.pipe(
transform((data, _file) => {
TRANSLATION_FRAGMENTS.forEach((fragment) => {
delete data.ui.panel[fragment];
});
delete data.supervisor;
return data;
})
)
.pipe(gulp.dest(coreDir))
);
splitTasks.push(taskName);
gulp.task("build-flattened-translations", () =>
// Flatten the split versions of our translations, and move them into outDir
gulp
.src(
TRANSLATION_FRAGMENTS.map(
(fragment) => workDir + "/" + fragment + "/*.json"
).concat(coreDir + "/*.json"),
{ base: workDir }
)
.pipe(
transform((data) =>
// Polymer.AppLocalizeBehavior requires flattened json
flatten(data)
})
)
)
.pipe(
rename((filePath) => {
if (filePath.dirname === "core") {
filePath.dirname = "";
.pipe(gulp.dest(outDir));
// Send the English master downstream first, then for each other locale
// generate merged JSON data to continue piping. It begins with the master
// translation as a failsafe for untranslated strings, and merges all parent
// tags into one file for each specific subtag
//
// TODO: This is a naive interpretation of BCP47 that should be improved.
// Will be OK for now as long as we don't have anything more complicated
// than a base translation + region.
const masterStream = gulp
.src(`${workDir}/en.json`)
.pipe(new PassThrough({ objectMode: true }));
masterStream.pipe(hashStream, { end: false });
const mergesFinished = [finished(masterStream)];
for (const translationFile of translationFiles) {
const locale = basename(translationFile, ".json");
const subtags = locale.split("-");
const mergeFiles = [];
for (let i = 1; i <= subtags.length; i++) {
const lang = subtags.slice(0, i).join("-");
if (lang === TEST_LOCALE) {
mergeFiles.push(`${workDir}/${TEST_LOCALE}.json`);
} else if (lang !== "en") {
mergeFiles.push(`${inFrontendDir}/${lang}.json`);
if (mergeBackend) {
mergeFiles.push(`${inBackendDir}/${lang}.json`);
}
// In dev we create the file with the fake hash in the filename
if (!env.isProdBuild()) {
filePath.basename += "-dev";
}
})
)
.pipe(gulp.dest(outDir))
);
const fingerprints = {};
gulp.task("build-translation-fingerprints", () => {
// Fingerprint full file of each language
const files = readdirSync(fullDir);
for (let i = 0; i < files.length; i++) {
fingerprints[files[i].split(".")[0]] = {
// In dev we create fake hashes
hash: env.isProdBuild()
? createHash("md5")
.update(readFileSync(path.join(fullDir, files[i]), "utf-8"))
.digest("hex")
: "dev",
};
}
// In dev we create the file with the fake hash in the filename
if (env.isProdBuild()) {
mapFiles(outDir, ".json", (filename) => {
const parsed = path.parse(filename);
// nl.json -> nl-<hash>.json
if (!(parsed.name in fingerprints)) {
throw new Error(`Unable to find hash for ${filename}`);
}
renameSync(
filename,
`${parsed.dir}/${parsed.name}-${fingerprints[parsed.name].hash}${
parsed.ext
}`
);
});
}
const mergeStream = gulp
.src(mergeFiles, { allowEmpty: true })
.pipe(new MergeJSON(locale, enMaster, emptyReviver));
mergesFinished.push(finished(mergeStream));
mergeStream.pipe(hashStream, { end: false });
}
const stream = source("translationFingerprints.json");
stream.write(JSON.stringify(fingerprints));
process.nextTick(() => stream.end());
return stream.pipe(vinylBuffer()).pipe(gulp.dest(workDir));
});
// Wait for all merges to finish, then it's safe to end writing to the
// downstream pipeline and wait for all fragments to finish writing.
await Promise.all(mergesFinished);
hashStream.end();
await finished(fragmentsStream);
};
gulp.task("build-translation-fragment-supervisor", () =>
const writeTranslationMetaData = () =>
gulp
.src(fullDir + "/*.json")
.pipe(transform((data) => data.supervisor))
.src([`${paths.translations_src}/translationMetadata.json`])
.pipe(
rename((filePath) => {
// In dev we create the file with the fake hash in the filename
new CustomJSON((meta) => {
// Add the test translation in development.
if (!env.isProdBuild()) {
filePath.basename += "-dev";
meta[TEST_LOCALE] = { nativeName: "Translation Test" };
}
})
)
.pipe(gulp.dest(workDir + "/supervisor"))
);
gulp.task("build-translation-flatten-supervisor", () =>
gulp
.src(workDir + "/supervisor/*.json")
.pipe(
transform((data) =>
// Polymer.AppLocalizeBehavior requires flattened json
flatten(data)
)
)
.pipe(gulp.dest(outDir))
);
gulp.task("build-translation-write-metadata", () =>
gulp
.src(
[
path.join(paths.translations_src, "translationMetadata.json"),
workDir + "/testMetadata.json",
workDir + "/translationFingerprints.json",
],
{ allowEmpty: true }
)
.pipe(merge({}))
.pipe(
transform((data) => {
const newData = {};
Object.entries(data).forEach(([key, value]) => {
// Filter out translations without native name.
if (value.nativeName) {
newData[key] = value;
} else {
// Filter out locales without a native name, and add the hashes.
for (const locale of Object.keys(meta)) {
if (!meta[locale].nativeName) {
meta[locale] = undefined;
console.warn(
`Skipping language ${key}. Native name was not translated.`
`Skipping locale ${locale} because native name is not translated.`
);
} else {
meta[locale].hash = HASHES.get(locale);
}
});
return newData;
}
return {
fragments: FRAGMENTS.filter(panelFragment),
translations: meta,
};
})
)
.pipe(
transform((data) => ({
fragments: TRANSLATION_FRAGMENTS,
translations: data,
}))
)
.pipe(rename("translationMetadata.json"))
.pipe(gulp.dest(workDir))
);
gulp.task(
"create-translations",
gulp.series(
...(env.isProdBuild() ? [] : ["create-test-translation"]),
"build-master-translation",
"build-merged-translations",
gulp.parallel(...splitTasks),
"build-flattened-translations"
)
);
.pipe(gulp.dest(workDir));
gulp.task(
"build-translations",
gulp.series(
gulp.parallel(
"fetch-nightly-translations",
gulp.series("clean-translations", "ensure-translations-build-dir")
gulp.series("clean-translations", makeWorkDir)
),
"create-translations",
"build-translation-fingerprints",
"build-translation-write-metadata"
createTestTranslation,
createMasterTranslation,
createTranslations,
writeTranslationMetaData
)
);
gulp.task(
"build-supervisor-translations",
gulp.series(
gulp.parallel(
"fetch-nightly-translations",
gulp.series("clean-translations", "ensure-translations-build-dir")
),
"build-master-translation",
"build-merged-translations",
"build-translation-fragment-supervisor",
"build-translation-flatten-supervisor",
"build-translation-fingerprints",
"build-translation-write-metadata"
)
gulp.series(setFragment("supervisor"), "build-translations")
);
gulp.task(
"build-landing-page-translations",
gulp.series(setFragment("landing-page"), "build-translations")
);

View File

@@ -1,10 +0,0 @@
import gulp from "gulp";
import { startDevServer } from "@web/dev-server";
gulp.task("wds-watch-app", async () => {
startDevServer({
config: {
watch: true,
},
});
});

View File

@@ -6,6 +6,8 @@ import presetEnv from "@babel/preset-env";
import compilationTargets from "@babel/helper-compilation-targets";
import coreJSCompat from "core-js-compat";
import { logPlugin } from "@babel/preset-env/lib/debug.js";
// eslint-disable-next-line import/no-relative-packages
import shippedPolyfills from "../node_modules/babel-plugin-polyfill-corejs3/lib/shipped-proposals.js";
import { babelOptions } from "./bundle.cjs";
const detailsOpen = (heading) =>
@@ -14,6 +16,7 @@ const detailsClose = "</details>\n";
const dummyAPI = {
version: babelVersion,
// eslint-disable-next-line @typescript-eslint/no-empty-function
assertVersion: () => {},
caller: (callback) =>
callback({
@@ -26,6 +29,22 @@ const dummyAPI = {
targets: () => ({}),
};
// Generate filter function based on proposal/method inputs
// Copied and adapted from babel-plugin-polyfill-corejs3/esm/index.mjs
const polyfillFilter = (method, proposals, shippedProposals) => (name) => {
if (proposals || method === "entry-global") return true;
if (shippedProposals && shippedPolyfills.default.has(name)) {
return true;
}
if (name.startsWith("esnext.")) {
const esName = `es.${name.slice(7)}`;
// If its imaginative esName is not in latest compat data, it means the proposal is not stage 4
return esName in coreJSCompat.data;
}
return true;
};
// Log the plugins and polyfills for each build environment
for (const buildType of ["Modern", "Legacy"]) {
const browserslistEnv = buildType.toLowerCase();
const babelOpts = babelOptions({ latestBuild: browserslistEnv === "modern" });
@@ -46,7 +65,13 @@ for (const buildType of ["Modern", "Legacy"]) {
const targets = compilationTargets.default(babelOpts?.targets, {
browserslistEnv,
});
const polyfillList = coreJSCompat({ targets }).list;
const polyfillList = coreJSCompat({ targets }).list.filter(
polyfillFilter(
`${presetEnvOpts.useBuiltIns}-global`,
presetEnvOpts?.corejs?.proposals,
presetEnvOpts?.shippedProposals
)
);
console.log(
"The following %i polyfills may be injected by Babel:\n",
polyfillList.length

View File

@@ -1,7 +1,7 @@
const path = require("path");
module.exports = {
polymer_dir: path.resolve(__dirname, ".."),
root_dir: path.resolve(__dirname, ".."),
build_dir: path.resolve(__dirname, "../build"),
app_output_root: path.resolve(__dirname, "../hass_frontend"),
@@ -33,6 +33,22 @@ module.exports = {
),
gallery_output_static: path.resolve(__dirname, "../gallery/dist/static"),
landingPage_dir: path.resolve(__dirname, "../landing-page"),
landingPage_build: path.resolve(__dirname, "../landing-page/build"),
landingPage_output_root: path.resolve(__dirname, "../landing-page/dist"),
landingPage_output_latest: path.resolve(
__dirname,
"../landing-page/dist/frontend_latest"
),
landingPage_output_es5: path.resolve(
__dirname,
"../landing-page/dist/frontend_es5"
),
landingPage_output_static: path.resolve(
__dirname,
"../landing-page/dist/static"
),
hassio_dir: path.resolve(__dirname, "../hassio"),
hassio_output_root: path.resolve(__dirname, "../hassio/build"),
hassio_output_static: path.resolve(__dirname, "../hassio/build/static"),

View File

@@ -1,14 +0,0 @@
module.exports = function (opts = {}) {
const dontHash = opts.dontHash || new Set();
return {
name: "dont-hash",
renderChunk(_code, chunk, _options) {
if (!chunk.isEntry || !dontHash.has(chunk.name)) {
return null;
}
chunk.fileName = `${chunk.name}.js`;
return null;
},
};
};

View File

@@ -1,24 +0,0 @@
module.exports = function (userOptions = {}) {
// Files need to be absolute paths.
// This only works if the file has no exports
// and only is imported for its side effects
const files = userOptions.files || [];
if (files.length === 0) {
return {
name: "ignore",
};
}
return {
name: "ignore",
load(id) {
return files.some((toIgnorePath) => id.startsWith(toIgnorePath))
? {
code: "",
}
: null;
},
};
};

View File

@@ -1,34 +0,0 @@
const url = require("url");
const defaultOptions = {
publicPath: "",
};
module.exports = function (userOptions = {}) {
const options = { ...defaultOptions, ...userOptions };
return {
name: "manifest",
generateBundle(outputOptions, bundle) {
const manifest = {};
for (const chunk of Object.values(bundle)) {
if (!chunk.isEntry) {
continue;
}
// Add js extension to mimic Webpack manifest.
manifest[`${chunk.name}.js`] = url.resolve(
options.publicPath,
chunk.fileName
);
}
this.emitFile({
type: "asset",
source: JSON.stringify(manifest, undefined, 2),
name: "manifest.json",
fileName: "manifest.json",
});
},
};
};

View File

@@ -1,152 +0,0 @@
// Worker plugin
// Each worker will include all of its dependencies
// instead of relying on an importer.
// Forked from v.1.4.1
// https://github.com/surma/rollup-plugin-off-main-thread
/**
* Copyright 2018 Google Inc. All Rights Reserved.
* Licensed under the Apache License, Version 2.0 (the "License");
* you may not use this file except in compliance with the License.
* You may obtain a copy of the License at
* http://www.apache.org/licenses/LICENSE-2.0
* Unless required by applicable law or agreed to in writing, software
* distributed under the License is distributed on an "AS IS" BASIS,
* WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
* See the License for the specific language governing permissions and
* limitations under the License.
*/
const rollup = require("rollup");
const path = require("path");
const MagicString = require("magic-string");
const defaultOpts = {
// A RegExp to find `new Workers()` calls. The second capture group _must_
// capture the provided file name without the quotes.
workerRegexp: /new Worker\((["'])(.+?)\1(,[^)]+)?\)/g,
plugins: ["node-resolve", "commonjs", "babel", "terser", "ignore"],
};
async function getBundledWorker(workerPath, rollupOptions) {
const bundle = await rollup.rollup({
...rollupOptions,
input: {
worker: workerPath,
},
});
const { output } = await bundle.generate({
// Generates cleanest output, we shouldn't have any imports/exports
// that would be incompatible with ES5.
format: "es",
// We should not export anything. This will fail build if we are.
exports: "none",
});
let code;
for (const chunkOrAsset of output) {
if (chunkOrAsset.name === "worker") {
code = chunkOrAsset.code;
} else if (chunkOrAsset.type !== "asset") {
throw new Error("Unexpected extra output");
}
}
return code;
}
module.exports = function (opts = {}) {
opts = { ...defaultOpts, ...opts };
let rollupOptions;
let refIds;
return {
name: "hass-worker",
async buildStart(options) {
refIds = {};
rollupOptions = {
plugins: options.plugins.filter((plugin) =>
opts.plugins.includes(plugin.name)
),
};
},
async transform(code, id) {
// Copy the regexp as they are stateful and this hook is async.
const workerRegexp = new RegExp(
opts.workerRegexp.source,
opts.workerRegexp.flags
);
if (!workerRegexp.test(code)) {
return undefined;
}
const ms = new MagicString(code);
// Reset the regexp
workerRegexp.lastIndex = 0;
for (;;) {
const match = workerRegexp.exec(code);
if (!match) {
break;
}
const workerFile = match[2];
let optionsObject = {};
// Parse the optional options object
if (match[3] && match[3].length > 0) {
// FIXME: ooooof!
// eslint-disable-next-line @typescript-eslint/no-implied-eval
optionsObject = new Function(`return ${match[3].slice(1)};`)();
}
delete optionsObject.type;
if (!/^.*\//.test(workerFile)) {
this.warn(
`Paths passed to the Worker constructor must be relative or absolute, i.e. start with /, ./ or ../ (just like dynamic import!). Ignoring "${workerFile}".`
);
continue;
}
// Find worker file and store it as a chunk with ID prefixed for our loader
// eslint-disable-next-line no-await-in-loop
const resolvedWorkerFile = (await this.resolve(workerFile, id)).id;
let chunkRefId;
if (resolvedWorkerFile in refIds) {
chunkRefId = refIds[resolvedWorkerFile];
} else {
this.addWatchFile(resolvedWorkerFile);
// eslint-disable-next-line no-await-in-loop
const source = await getBundledWorker(
resolvedWorkerFile,
rollupOptions
);
chunkRefId = refIds[resolvedWorkerFile] = this.emitFile({
name: path.basename(resolvedWorkerFile),
source,
type: "asset",
});
}
const workerParametersStartIndex = match.index + "new Worker(".length;
const workerParametersEndIndex =
match.index + match[0].length - ")".length;
ms.overwrite(
workerParametersStartIndex,
workerParametersEndIndex,
`import.meta.ROLLUP_FILE_URL_${chunkRefId}, ${JSON.stringify(
optionsObject
)}`
);
}
return {
code: ms.toString(),
map: ms.generateMap({ hires: true }),
};
},
};
};

View File

@@ -1,146 +0,0 @@
const path = require("path");
const commonjs = require("@rollup/plugin-commonjs");
const resolve = require("@rollup/plugin-node-resolve");
const json = require("@rollup/plugin-json");
const { babel } = require("@rollup/plugin-babel");
const replace = require("@rollup/plugin-replace");
const visualizer = require("rollup-plugin-visualizer");
const { string } = require("rollup-plugin-string");
const { terser } = require("rollup-plugin-terser");
const manifest = require("./rollup-plugins/manifest-plugin.cjs");
const worker = require("./rollup-plugins/worker-plugin.cjs");
const dontHashPlugin = require("./rollup-plugins/dont-hash-plugin.cjs");
const ignore = require("./rollup-plugins/ignore-plugin.cjs");
const bundle = require("./bundle.cjs");
const paths = require("./paths.cjs");
const extensions = [".js", ".ts"];
/**
* @param {Object} arg
* @param { import("rollup").InputOption } arg.input
*/
const createRollupConfig = ({
entry,
outputPath,
defineOverlay,
isProdBuild,
latestBuild,
isStatsBuild,
publicPath,
dontHash,
isWDS,
}) => ({
/**
* @type { import("rollup").InputOptions }
*/
inputOptions: {
input: entry,
// Some entry points contain no JavaScript. This setting silences a warning about that.
// https://rollupjs.org/configuration-options/#preserveentrysignatures
preserveEntrySignatures: false,
plugins: [
ignore({
files: bundle
.emptyPackages({ latestBuild })
// TEMP HACK: Makes Rollup build work again
.concat(
require.resolve(
"@webcomponents/scoped-custom-element-registry/scoped-custom-element-registry.min"
)
),
}),
resolve({
extensions,
preferBuiltins: false,
browser: true,
rootDir: paths.polymer_dir,
}),
commonjs(),
json(),
babel({
...bundle.babelOptions({ latestBuild, isProdBuild }),
extensions,
babelHelpers: isWDS ? "inline" : "bundled",
}),
string({
// Import certain extensions as strings
include: [path.join(paths.polymer_dir, "node_modules/**/*.css")],
}),
replace(bundle.definedVars({ isProdBuild, latestBuild, defineOverlay })),
!isWDS &&
manifest({
publicPath,
}),
!isWDS && worker(),
!isWDS && dontHashPlugin({ dontHash }),
!isWDS && isProdBuild && terser(bundle.terserOptions({ latestBuild })),
!isWDS &&
isStatsBuild &&
visualizer({
// https://github.com/btd/rollup-plugin-visualizer#options
open: true,
sourcemap: true,
}),
].filter(Boolean),
},
/**
* @type { import("rollup").OutputOptions }
*/
outputOptions: {
// https://rollupjs.org/configuration-options/#output-dir
dir: outputPath,
// https://rollupjs.org/configuration-options/#output-format
format: latestBuild ? "es" : "systemjs",
// https://rollupjs.org/configuration-options/#output-externallivebindings
externalLiveBindings: false,
// https://rollupjs.org/configuration-options/#output-entryfilenames
// https://rollupjs.org/configuration-options/#output-chunkfilenames
// https://rollupjs.org/configuration-options/#output-assetfilenames
entryFileNames:
isProdBuild && !isStatsBuild ? "[name]-[hash].js" : "[name].js",
chunkFileNames: isProdBuild && !isStatsBuild ? "c.[hash].js" : "[name].js",
assetFileNames: isProdBuild && !isStatsBuild ? "a.[hash].js" : "[name].js",
// https://rollupjs.org/configuration-options/#output-sourcemap
sourcemap: isProdBuild ? true : "inline",
},
});
const createAppConfig = ({ isProdBuild, latestBuild, isStatsBuild, isWDS }) =>
createRollupConfig(
bundle.config.app({
isProdBuild,
latestBuild,
isStatsBuild,
isWDS,
})
);
const createDemoConfig = ({ isProdBuild, latestBuild, isStatsBuild }) =>
createRollupConfig(
bundle.config.demo({
isProdBuild,
latestBuild,
isStatsBuild,
})
);
const createCastConfig = ({ isProdBuild, latestBuild }) =>
createRollupConfig(bundle.config.cast({ isProdBuild, latestBuild }));
const createHassioConfig = ({ isProdBuild, latestBuild }) =>
createRollupConfig(bundle.config.hassio({ isProdBuild, latestBuild }));
const createGalleryConfig = ({ isProdBuild, latestBuild }) =>
createRollupConfig(bundle.config.gallery({ isProdBuild, latestBuild }));
module.exports = {
createAppConfig,
createDemoConfig,
createCastConfig,
createHassioConfig,
createGalleryConfig,
createRollupConfig,
};

View File

@@ -1,10 +1,18 @@
const { existsSync } = require("fs");
const path = require("path");
const webpack = require("webpack");
const rspack = require("@rspack/core");
// eslint-disable-next-line @typescript-eslint/naming-convention
const { RsdoctorRspackPlugin } = require("@rsdoctor/rspack-plugin");
// eslint-disable-next-line @typescript-eslint/naming-convention
const { StatsWriterPlugin } = require("webpack-stats-plugin");
const filterStats = require("@bundle-stats/plugin-webpack-filter");
// eslint-disable-next-line @typescript-eslint/naming-convention
const TerserPlugin = require("terser-webpack-plugin");
const { WebpackManifestPlugin } = require("webpack-manifest-plugin");
// eslint-disable-next-line @typescript-eslint/naming-convention
const { WebpackManifestPlugin } = require("rspack-manifest-plugin");
const log = require("fancy-log");
const WebpackBar = require("webpackbar");
// eslint-disable-next-line @typescript-eslint/naming-convention
const WebpackBar = require("webpackbar/rspack");
const paths = require("./paths.cjs");
const bundle = require("./bundle.cjs");
@@ -22,7 +30,7 @@ class LogStartCompilePlugin {
}
}
const createWebpackConfig = ({
const createRspackConfig = ({
name,
entry,
outputPath,
@@ -49,25 +57,40 @@ const createWebpackConfig = ({
devtool: isTestBuild
? false
: isProdBuild
? "nosources-source-map"
: "eval-cheap-module-source-map",
? "nosources-source-map"
: "eval-cheap-module-source-map",
entry,
node: false,
module: {
rules: [
{
test: /\.m?js$|\.ts$/,
use: {
loader: "babel-loader",
options: {
...bundle.babelOptions({ latestBuild, isProdBuild, isTestBuild }),
cacheDirectory: !isProdBuild,
cacheCompression: false,
exclude: /node_modules[\\/]core-js/,
use: (info) => [
{
loader: "babel-loader",
options: {
...bundle.babelOptions({
latestBuild,
isProdBuild,
isTestBuild,
sw: info.issuerLayer === "sw",
}),
cacheDirectory: !isProdBuild,
cacheCompression: false,
},
},
},
{
loader: "builtin:swc-loader",
options: bundle.swcOptions(),
},
],
resolve: {
fullySpecified: false,
},
parser: {
worker: ["*context.audioWorklet.addModule()", "..."],
},
},
{
test: /\.css$/,
@@ -86,11 +109,20 @@ const createWebpackConfig = ({
moduleIds: isProdBuild && !isStatsBuild ? "deterministic" : "named",
chunkIds: isProdBuild && !isStatsBuild ? "deterministic" : "named",
splitChunks: {
// Disable splitting for web workers with ESM output
// Imports of external chunks are broken
chunks: latestBuild
? (chunk) => !chunk.canBeInitial() && !/^.+-worker$/.test(chunk.name)
: undefined,
// Disable splitting for web workers and worklets because imports of
// external chunks are broken for:
chunks: !isProdBuild
? // improve incremental build speed, but blows up bundle size
new RegExp(
`^(?!(${Object.keys(entry).join("|")}|.*work(?:er|let))$)`
)
: // - ESM output: https://github.com/webpack/webpack/issues/17014
// - Worklets use `importScripts`: https://github.com/webpack/webpack/issues/11543
(chunk) =>
!chunk.canBeInitial() &&
!new RegExp(
`^.+-work${latestBuild ? "(?:let|er)" : "let"}$`
).test(chunk.name),
},
},
plugins: [
@@ -99,10 +131,10 @@ const createWebpackConfig = ({
// Only include the JS of entrypoints
filter: (file) => file.isInitial && !file.name.endsWith(".map"),
}),
new webpack.DefinePlugin(
new rspack.DefinePlugin(
bundle.definedVars({ isProdBuild, latestBuild, defineOverlay })
),
new webpack.IgnorePlugin({
new rspack.IgnorePlugin({
checkResource(resource, context) {
// Only use ignore to intercept imports that we don't control
// inside node_module dependencies.
@@ -111,7 +143,8 @@ const createWebpackConfig = ({
// calling define.amd will call require("!!webpack amd options")
resource.startsWith("!!webpack") ||
// loaded by webpack dev server but doesn't exist.
resource === "webpack/hot"
resource === "webpack/hot" ||
resource.startsWith("@swc/helpers")
) {
return false;
}
@@ -134,28 +167,34 @@ const createWebpackConfig = ({
);
},
}),
new webpack.NormalModuleReplacementPlugin(
new RegExp(
bundle.emptyPackages({ latestBuild, isHassioBuild }).join("|")
),
path.resolve(paths.polymer_dir, "src/util/empty.js")
new rspack.NormalModuleReplacementPlugin(
new RegExp(bundle.emptyPackages({ isHassioBuild }).join("|")),
path.resolve(paths.root_dir, "src/util/empty.js")
),
// See `src/resources/intl-polyfill-legacy.ts` for explanation
!latestBuild &&
new webpack.NormalModuleReplacementPlugin(
new RegExp(
path.resolve(paths.polymer_dir, "src/resources/intl-polyfill.ts")
),
path.resolve(
paths.polymer_dir,
"src/resources/intl-polyfill-legacy.ts"
)
),
!isProdBuild && new LogStartCompilePlugin(),
isProdBuild &&
new StatsWriterPlugin({
filename: path.relative(
outputPath,
path.join(paths.build_dir, "stats", `${name}.json`)
),
stats: { assets: true, chunks: true, modules: true },
transform: (stats) => JSON.stringify(filterStats(stats)),
}),
isProdBuild &&
isStatsBuild &&
new RsdoctorRspackPlugin({
reportDir: path.join(paths.build_dir, "rsdoctor"),
features: ["plugins", "bundle"],
supports: {
generateTileGraph: true,
},
}),
].filter(Boolean),
resolve: {
extensions: [".ts", ".js", ".json"],
alias: {
"lit/static-html$": "lit/static-html.js",
"lit/decorators$": "lit/decorators.js",
"lit/directive$": "lit/directive.js",
"lit/directives/until$": "lit/directives/until.js",
@@ -164,12 +203,17 @@ const createWebpackConfig = ({
"lit/directives/if-defined$": "lit/directives/if-defined.js",
"lit/directives/guard$": "lit/directives/guard.js",
"lit/directives/cache$": "lit/directives/cache.js",
"lit/directives/join$": "lit/directives/join.js",
"lit/directives/repeat$": "lit/directives/repeat.js",
"lit/directives/live$": "lit/directives/live.js",
"lit/directives/keyed$": "lit/directives/keyed.js",
"lit/polyfill-support$": "lit/polyfill-support.js",
"@lit-labs/virtualizer/layouts/grid":
"@lit-labs/virtualizer/layouts/grid.js",
"@lit-labs/virtualizer/polyfills/resize-observer-polyfill/ResizeObserver":
"@lit-labs/virtualizer/polyfills/resize-observer-polyfill/ResizeObserver.js",
"@lit-labs/observers/resize-controller":
"@lit-labs/observers/resize-controller.js",
},
},
output: {
@@ -177,14 +221,13 @@ const createWebpackConfig = ({
filename: ({ chunk }) =>
!isProdBuild || isStatsBuild || dontHash.has(chunk.name)
? "[name].js"
: "[name]-[contenthash].js",
: "[name].[contenthash].js",
chunkFilename:
isProdBuild && !isStatsBuild ? "[id]-[contenthash].js" : "[name].js",
isProdBuild && !isStatsBuild ? "[name].[contenthash].js" : "[name].js",
assetModuleFilename:
isProdBuild && !isStatsBuild ? "[id]-[contenthash][ext]" : "[id][ext]",
isProdBuild && !isStatsBuild ? "[id].[contenthash][ext]" : "[id][ext]",
crossOriginLoading: "use-credentials",
hashFunction: "xxhash64",
hashDigest: "base64url",
hashDigestLength: 11, // full length of 64 bit base64url
path: outputPath,
publicPath,
// To silence warning in worker plugin
@@ -214,6 +257,7 @@ const createWebpackConfig = ({
),
},
experiments: {
layers: true,
outputModule: true,
},
};
@@ -225,17 +269,17 @@ const createAppConfig = ({
isStatsBuild,
isTestBuild,
}) =>
createWebpackConfig(
createRspackConfig(
bundle.config.app({ isProdBuild, latestBuild, isStatsBuild, isTestBuild })
);
const createDemoConfig = ({ isProdBuild, latestBuild, isStatsBuild }) =>
createWebpackConfig(
createRspackConfig(
bundle.config.demo({ isProdBuild, latestBuild, isStatsBuild })
);
const createCastConfig = ({ isProdBuild, latestBuild }) =>
createWebpackConfig(bundle.config.cast({ isProdBuild, latestBuild }));
createRspackConfig(bundle.config.cast({ isProdBuild, latestBuild }));
const createHassioConfig = ({
isProdBuild,
@@ -243,7 +287,7 @@ const createHassioConfig = ({
isStatsBuild,
isTestBuild,
}) =>
createWebpackConfig(
createRspackConfig(
bundle.config.hassio({
isProdBuild,
latestBuild,
@@ -253,7 +297,10 @@ const createHassioConfig = ({
);
const createGalleryConfig = ({ isProdBuild, latestBuild }) =>
createWebpackConfig(bundle.config.gallery({ isProdBuild, latestBuild }));
createRspackConfig(bundle.config.gallery({ isProdBuild, latestBuild }));
const createLandingPageConfig = ({ isProdBuild, latestBuild }) =>
createRspackConfig(bundle.config.landingPage({ isProdBuild, latestBuild }));
module.exports = {
createAppConfig,
@@ -261,5 +308,6 @@ module.exports = {
createCastConfig,
createHassioConfig,
createGalleryConfig,
createWebpackConfig,
createRspackConfig,
createLandingPageConfig,
};

View File

@@ -1,16 +0,0 @@
const path = require("path");
const fs = require("fs");
// Helper function to map recursively over files in a folder and it's subfolders
module.exports.mapFiles = function mapFiles(startPath, filter, mapFunc) {
const files = fs.readdirSync(startPath);
for (let i = 0; i < files.length; i++) {
const filename = path.join(startPath, files[i]);
const stat = fs.lstatSync(filename);
if (stat.isDirectory()) {
mapFiles(filename, filter, mapFunc);
} else if (filename.indexOf(filter) >= 0) {
mapFunc(filename);
}
}
};

View File

@@ -25,7 +25,7 @@ Home Assistant Cast is made up of two separate applications:
### Setting dev variables
Open `src/cast/dev_const.ts` and change `CAST_DEV_APP_ID` to the ID of the app you just created. And set the `CAST_DEV_HASS_URL` to the url of you development machine.
Open `src/cast/dev_const.ts` and change `CAST_DEV_APP_ID` to the ID of the app you just created. And set the `CAST_DEV_HASS_URL` to the url of your development machine.
### Changing configuration

Binary file not shown.

Before

Width:  |  Height:  |  Size: 16 KiB

After

Width:  |  Height:  |  Size: 15 KiB

Binary file not shown.

After

Width:  |  Height:  |  Size: 9.8 KiB

View File

@@ -14,5 +14,5 @@
"name": "Home Assistant Cast",
"short_name": "HA Cast",
"start_url": "/?homescreen=1",
"theme_color": "#03A9F4"
"theme_color": "#009ac7"
}

5
cast/public/sw-legacy.js Normal file
View File

@@ -0,0 +1,5 @@
"use strict";
self.addEventListener("fetch", (event) => {
event.respondWith(fetch(event.request));
});

View File

@@ -1,10 +0,0 @@
import rollup from "../build-scripts/rollup.cjs";
import env from "../build-scripts/env.cjs";
const config = rollup.createCastConfig({
isProdBuild: env.isProdBuild(),
latestBuild: true,
isStatsBuild: env.isStatsBuild(),
});
export default { ...config.inputOptions, output: config.outputOptions };

View File

@@ -36,13 +36,7 @@
</head>
<body>
<%= renderTemplate("../../../src/html/_js_base.html.template") %>
<script>
<% for (const entry of latestEntryJS) { %>
import("<%= entry %>");
<% } %>
window.latestJS = true;
</script>
<%= renderTemplate("../../../src/html/_script_load_es5.html.template") %>
<%= renderTemplate("../../../src/html/_script_loader.html.template") %>
<hc-layout subtitle="FAQ">
<style>
a {
@@ -145,7 +139,7 @@
</p>
</div>
<div class="section-header">Wat does Home Assistant Cast do?</div>
<div class="section-header">What does Home Assistant Cast do?</div>
<div class="card-content">
<p>
Home Assistant Cast is a receiver application for the Chromecast. When
@@ -232,17 +226,5 @@ http:
</p>
</div>
</hc-layout>
<script>
var _gaq = [["_setAccount", "UA-57927901-9"], ["_trackPageview"]];
(function (d, t) {
var g = d.createElement(t),
s = d.getElementsByTagName(t)[0];
g.src =
("https:" == location.protocol ? "//ssl" : "//www") +
".google-analytics.com/ga.js";
s.parentNode.insertBefore(g, s);
})(document, "script");
</script>
</body>
</html>

View File

@@ -13,15 +13,9 @@
<%= renderTemplate("_social_meta.html.template") %>
</head>
<body>
<%= renderTemplate("../../../src/html/_js_base.html.template") %>
<hc-connect></hc-connect>
<script>
<% for (const entry of latestEntryJS) { %>
import("<%= entry %>");
<% } %>
window.latestJS = true;
</script>
<%= renderTemplate("../../../src/html/_script_load_es5.html.template") %>
<%= renderTemplate("../../../src/html/_js_base.html.template") %>
<%= renderTemplate("../../../src/html/_script_loader.html.template") %>
<script>
(function(i,s,o,g,r,a,m){i['GoogleAnalyticsObject']=r;i[r]=i[r]||function(){
(i[r].q=i[r].q||[]).push(arguments)},i[r].l=1*new Date();a=s.createElement(o),

View File

@@ -14,22 +14,10 @@
--background-color: #41bdf5;
}
</style>
<script>
var _gaq=[['_setAccount','UA-57927901-10'],['_trackPageview']];
(function(d,t){var g=d.createElement(t),s=d.getElementsByTagName(t)[0];
g.src=('https:'==location.protocol?'//ssl':'//www')+'.google-analytics.com/ga.js';
s.parentNode.insertBefore(g,s)}(document,'script'));
</script>
</head>
<body>
<%= renderTemplate("../../../src/html/_js_base.html.template") %>
<cast-media-player></cast-media-player>
<script>
<% for (const entry of latestEntryJS) { %>
import("<%= entry %>");
<% } %>
window.latestJS = true;
</script>
<%= renderTemplate("../../../src/html/_script_load_es5.html.template") %>
<%= renderTemplate("../../../src/html/_js_base.html.template") %>
<%= renderTemplate("../../../src/html/_script_loader.html.template") %>
</body>
</html>

View File

@@ -7,14 +7,7 @@
<%= renderTemplate("../../../src/html/_style_base.html.template") %>
<style>
body {
background-color: white;
font-size: initial;
}
</style>
<script>
var _gaq=[['_setAccount','UA-57927901-10'],['_trackPageview']];
(function(d,t){var g=d.createElement(t),s=d.getElementsByTagName(t)[0];
g.src=('https:'==location.protocol?'//ssl':'//www')+'.google-analytics.com/ga.js';
s.parentNode.insertBefore(g,s)}(document,'script'));
</script>
</html>

View File

@@ -1,4 +1,3 @@
import "../../../src/resources/safari-14-attachshadow-patch";
import "../../../src/resources/ha-style";
import "../../../src/resources/roboto";
import "./layout/hc-connect";
import("../../../src/resources/append-ha-style");

View File

@@ -1,11 +1,10 @@
import "@material/mwc-button/mwc-button";
import { mdiCast, mdiCastConnected } from "@mdi/js";
import "@polymer/paper-item/paper-icon-item";
import "@polymer/paper-listbox/paper-listbox";
import { Auth, Connection } from "home-assistant-js-websocket";
import { css, CSSResultGroup, html, LitElement, TemplateResult } from "lit";
import type { ActionDetail } from "@material/mwc-list/mwc-list";
import { mdiCast, mdiCastConnected, mdiViewDashboard } from "@mdi/js";
import type { Auth, Connection } from "home-assistant-js-websocket";
import type { TemplateResult } from "lit";
import { LitElement, css, html } from "lit";
import { customElement, property, state } from "lit/decorators";
import { CastManager } from "../../../../src/cast/cast_manager";
import type { CastManager } from "../../../../src/cast/cast_manager";
import {
castSendShowLovelaceView,
ensureConnectedCastSession,
@@ -18,30 +17,34 @@ import {
import { atLeastVersion } from "../../../../src/common/config/version";
import { toggleAttribute } from "../../../../src/common/dom/toggle_attribute";
import "../../../../src/components/ha-icon";
import "../../../../src/components/ha-list";
import "../../../../src/components/ha-button";
import "../../../../src/components/ha-list-item";
import "../../../../src/components/ha-svg-icon";
import {
getLegacyLovelaceCollection,
getLovelaceCollection,
LovelaceConfig,
} from "../../../../src/data/lovelace";
import { isStrategyDashboard } from "../../../../src/data/lovelace/config/types";
import type { LovelaceViewConfig } from "../../../../src/data/lovelace/config/view";
import "../../../../src/layouts/hass-loading-screen";
import { generateDefaultViewConfig } from "../../../../src/panels/lovelace/common/generate-lovelace-config";
import "./hc-layout";
@customElement("hc-cast")
class HcCast extends LitElement {
@property() public auth!: Auth;
@property({ attribute: false }) public auth!: Auth;
@property() public connection!: Connection;
@property({ attribute: false }) public connection!: Connection;
@property() public castManager!: CastManager;
@property({ attribute: false }) public castManager!: CastManager;
@state() private askWrite = false;
@state() private lovelaceConfig?: LovelaceConfig | null;
@state() private lovelaceViews?: LovelaceViewConfig[] | null;
protected render(): TemplateResult {
if (this.lovelaceConfig === undefined) {
if (this.lovelaceViews === undefined) {
return html`<hass-loading-screen no-toolbar></hass-loading-screen>`;
}
@@ -59,12 +62,20 @@ class HcCast extends LitElement {
<p class="question action-item">
Stay logged in?
<span>
<mwc-button @click=${this._handleSaveTokens}>
<ha-button
appearance="plain"
size="small"
@click=${this._handleSaveTokens}
>
YES
</mwc-button>
<mwc-button @click=${this._handleSkipSaveTokens}>
</ha-button>
<ha-button
appearance="plain"
size="small"
@click=${this._handleSkipSaveTokens}
>
NO
</mwc-button>
</ha-button>
</span>
</p>
`
@@ -72,54 +83,67 @@ class HcCast extends LitElement {
${error
? html` <div class="card-content">${error}</div> `
: !this.castManager.status
? html`
<p class="center-item">
<mwc-button raised @click=${this._handleLaunch}>
<ha-svg-icon .path=${mdiCast}></ha-svg-icon>
Start Casting
</mwc-button>
</p>
`
: html`
<div class="section-header">PICK A VIEW</div>
<paper-listbox
attr-for-selected="data-path"
.selected=${this.castManager.status.lovelacePath || ""}
>
${(this.lovelaceConfig
? this.lovelaceConfig.views
: [generateDefaultViewConfig({}, {}, {}, {}, () => "")]
).map(
(view, idx) => html`
<paper-icon-item
@click=${this._handlePickView}
data-path=${view.path || idx}
>
${view.icon
? html`
<ha-icon
.icon=${view.icon}
? html`
<p class="center-item">
<ha-button @click=${this._handleLaunch}>
<ha-svg-icon slot="start" .path=${mdiCast}></ha-svg-icon>
Start Casting
</ha-button>
</p>
`
: html`
<div class="section-header">PICK A VIEW</div>
<ha-list @action=${this._handlePickView} activatable>
${(
this.lovelaceViews ?? [
generateDefaultViewConfig({}, {}, {}, {}, () => ""),
]
).map(
(view, idx) => html`
<ha-list-item
graphic="avatar"
.activated=${this.castManager.status?.lovelacePath ===
(view.path ?? idx)}
.selected=${this.castManager.status?.lovelacePath ===
(view.path ?? idx)}
>
${view.title || view.path || "Unnamed view"}
${view.icon
? html`
<ha-icon
.icon=${view.icon}
slot="graphic"
></ha-icon>
`
: html`<ha-svg-icon
slot="item-icon"
></ha-icon>
`
: ""}
${view.title || view.path}
</paper-icon-item>
`
)}
</paper-listbox>
`}
.path=${mdiViewDashboard}
></ha-svg-icon>`}
</ha-list-item>
`
)}</ha-list
>
`}
<div class="card-actions">
${this.castManager.status
? html`
<mwc-button @click=${this._handleLaunch}>
<ha-svg-icon .path=${mdiCastConnected}></ha-svg-icon>
<ha-button appearance="plain" @click=${this._handleLaunch}>
<ha-svg-icon
slot="start"
.path=${mdiCastConnected}
></ha-svg-icon>
Manage
</mwc-button>
</ha-button>
`
: ""}
<div class="spacer"></div>
<mwc-button @click=${this._handleLogout}>Log out</mwc-button>
<ha-button
variant="danger"
appearance="plain"
@click=${this._handleLogout}
>Log out</ha-button
>
</div>
</hc-layout>
`;
@@ -136,11 +160,15 @@ class HcCast extends LitElement {
llColl.refresh().then(
() => {
llColl.subscribe((config) => {
this.lovelaceConfig = config;
if (isStrategyDashboard(config)) {
this.lovelaceViews = null;
} else {
this.lovelaceViews = config.views;
}
});
},
async () => {
this.lovelaceConfig = null;
this.lovelaceViews = null;
}
);
@@ -159,9 +187,7 @@ class HcCast extends LitElement {
toggleAttribute(
this,
"hide-icons",
this.lovelaceConfig
? !this.lovelaceConfig.views.some((view) => view.icon)
: true
this.lovelaceViews ? !this.lovelaceViews.some((view) => view.icon) : true
);
}
@@ -178,8 +204,8 @@ class HcCast extends LitElement {
this.castManager.requestSession();
}
private async _handlePickView(ev: Event) {
const path = (ev.currentTarget as any).getAttribute("data-path");
private async _handlePickView(ev: CustomEvent<ActionDetail>) {
const path = this.lovelaceViews![ev.detail.index].path ?? ev.detail.index;
await ensureConnectedCastSession(this.castManager!, this.auth!);
castSendShowLovelaceView(this.castManager, this.auth.data.hassUrl, path);
}
@@ -193,83 +219,65 @@ class HcCast extends LitElement {
}
this.connection.close();
location.reload();
} catch (err: any) {
} catch (_err: any) {
alert("Unable to log out!");
}
}
static get styles(): CSSResultGroup {
return css`
.center-item {
display: flex;
justify-content: space-around;
}
static styles = css`
.center-item {
display: flex;
justify-content: space-around;
}
.action-item {
display: flex;
align-items: center;
justify-content: space-between;
}
.action-item {
display: flex;
align-items: center;
justify-content: space-between;
}
.question {
position: relative;
padding: 8px 16px;
}
.question {
position: relative;
padding: 8px 16px;
}
.question:before {
border-radius: 4px;
position: absolute;
top: 0;
right: 0;
bottom: 0;
left: 0;
pointer-events: none;
content: "";
background-color: var(--primary-color);
opacity: 0.12;
will-change: opacity;
}
.question:before {
border-radius: 4px;
position: absolute;
top: 0;
right: 0;
bottom: 0;
left: 0;
pointer-events: none;
content: "";
background-color: var(--primary-color);
opacity: 0.12;
will-change: opacity;
}
.connection,
.connection a {
color: var(--secondary-text-color);
}
.connection,
.connection a {
color: var(--secondary-text-color);
}
mwc-button ha-svg-icon {
margin-right: 8px;
height: 18px;
}
ha-list-item ha-icon,
ha-list-item ha-svg-icon {
padding: 12px;
color: var(--secondary-text-color);
}
paper-listbox {
padding-top: 0;
}
:host([hide-icons]) ha-icon {
display: none;
}
paper-listbox ha-icon {
padding: 12px;
color: var(--secondary-text-color);
}
.spacer {
flex: 1;
}
paper-icon-item {
cursor: pointer;
}
paper-icon-item[disabled] {
cursor: initial;
}
:host([hide-icons]) paper-icon-item {
--paper-item-icon-width: 0px;
}
.spacer {
flex: 1;
}
.card-content a {
color: var(--primary-color);
}
`;
}
.card-content a {
color: var(--primary-color);
}
`;
}
declare global {

View File

@@ -1,20 +1,22 @@
import "@material/mwc-button";
import { mdiCastConnected, mdiCast } from "@mdi/js";
import "@polymer/paper-input/paper-input";
import {
import type {
Auth,
Connection,
getAuthOptions,
} from "home-assistant-js-websocket";
import {
createConnection,
ERR_CANNOT_CONNECT,
ERR_HASS_HOST_REQUIRED,
ERR_INVALID_AUTH,
ERR_INVALID_HTTPS_TO_HTTP,
getAuth,
getAuthOptions,
} from "home-assistant-js-websocket";
import { css, CSSResultGroup, html, LitElement, TemplateResult } from "lit";
import type { TemplateResult } from "lit";
import { css, html, LitElement } from "lit";
import { customElement, state } from "lit/decorators";
import { CastManager, getCastManager } from "../../../../src/cast/cast_manager";
import type { CastManager } from "../../../../src/cast/cast_manager";
import { getCastManager } from "../../../../src/cast/cast_manager";
import { castSendShowDemo } from "../../../../src/cast/receiver_messages";
import {
loadTokens,
@@ -24,6 +26,8 @@ import "../../../../src/components/ha-svg-icon";
import "../../../../src/layouts/hass-loading-screen";
import { registerServiceWorker } from "../../../../src/util/register-service-worker";
import "./hc-layout";
import "../../../../src/components/ha-textfield";
import "../../../../src/components/ha-button";
const seeFAQ = (qid) => html`
See <a href="./faq.html${qid ? `#${qid}` : ""}">the FAQ</a> for more
@@ -33,13 +37,13 @@ const translateErr = (err) =>
err === ERR_CANNOT_CONNECT
? "Unable to connect"
: err === ERR_HASS_HOST_REQUIRED
? "Please enter a Home Assistant URL."
: err === ERR_INVALID_HTTPS_TO_HTTP
? html`
Cannot connect to Home Assistant instances over "http://".
${seeFAQ("https")}
`
: `Unknown error (${err}).`;
? "Please enter a Home Assistant URL."
: err === ERR_INVALID_HTTPS_TO_HTTP
? html`
Cannot connect to Home Assistant instances over "http://".
${seeFAQ("https")}
`
: `Unknown error (${err}).`;
const INTRO = html`
<p>
@@ -79,11 +83,14 @@ export class HcConnect extends LitElement {
Unable to connect to ${tokens!.hassUrl}.
</div>
<div class="card-actions">
<a href="/">
<mwc-button> Retry </mwc-button>
</a>
<ha-button appearance="plain" href="/">Retry</ha-button>
<div class="spacer"></div>
<mwc-button @click=${this._handleLogout}>Log out</mwc-button>
<ha-button
appearance="plain"
variant="danger"
@click=${this._handleLogout}
>Log out</ha-button
>
</div>
</hc-layout>
`;
@@ -116,26 +123,27 @@ export class HcConnect extends LitElement {
To get started, enter your Home Assistant URL and click authorize.
If you want a preview instead, click the show demo button.
</p>
<p>
<paper-input
label="Home Assistant URL"
placeholder="https://abcdefghijklmnop.ui.nabu.casa"
@keydown=${this._handleInputKeyDown}
></paper-input>
</p>
<ha-textfield
label="Home Assistant URL"
placeholder="https://abcdefghijklmnop.ui.nabu.casa"
@keydown=${this._handleInputKeyDown}
></ha-textfield>
${this.error ? html` <p class="error">${this.error}</p> ` : ""}
</div>
<div class="card-actions">
<mwc-button @click=${this._handleDemo}>
<ha-button appearance="plain" @click=${this._handleDemo}>
Show Demo
<ha-svg-icon
slot="end"
.path=${this.castManager.castState === "CONNECTED"
? mdiCastConnected
: mdiCast}
></ha-svg-icon>
</mwc-button>
</ha-button>
<div class="spacer"></div>
<mwc-button @click=${this._handleConnect}>Authorize</mwc-button>
<ha-button appearance="plain" @click=${this._handleConnect}
>Authorize</ha-button
>
</div>
</hc-layout>
`;
@@ -196,7 +204,7 @@ export class HcConnect extends LitElement {
}
private async _handleConnect() {
const inputEl = this.shadowRoot!.querySelector("paper-input")!;
const inputEl = this.shadowRoot!.querySelector("ha-textfield")!;
const value = inputEl.value || "";
this.error = undefined;
@@ -213,7 +221,7 @@ export class HcConnect extends LitElement {
let url: URL;
try {
url = new URL(value);
} catch (err: any) {
} catch (_err: any) {
this.error = "Invalid URL";
return;
}
@@ -250,7 +258,7 @@ export class HcConnect extends LitElement {
this.loading = false;
return;
} finally {
// Clear url if we have a auth callback in url.
// Clear url if we have an auth callback in url.
if (location.search.includes("auth_callback=1")) {
history.replaceState(null, "", location.pathname);
}
@@ -286,37 +294,35 @@ export class HcConnect extends LitElement {
try {
saveTokens(null);
location.reload();
} catch (err: any) {
} catch (_err: any) {
alert("Unable to log out!");
}
}
static get styles(): CSSResultGroup {
return css`
.card-content a {
color: var(--primary-color);
}
.card-actions a {
text-decoration: none;
}
.error {
color: red;
font-weight: bold;
}
static styles = css`
.card-content a {
color: var(--primary-color);
}
.card-actions a {
text-decoration: none;
}
.error {
color: red;
font-weight: var(--ha-font-weight-bold);
}
.error a {
color: darkred;
}
.error a {
color: darkred;
}
mwc-button ha-svg-icon {
margin-left: 8px;
}
.spacer {
flex: 1;
}
.spacer {
flex: 1;
}
`;
}
ha-textfield {
width: 100%;
}
`;
}
declare global {

View File

@@ -1,22 +1,19 @@
import {
Auth,
Connection,
getUser,
HassUser,
} from "home-assistant-js-websocket";
import { css, CSSResultGroup, html, LitElement, TemplateResult } from "lit";
import type { Auth, Connection, HassUser } from "home-assistant-js-websocket";
import { getUser } from "home-assistant-js-websocket";
import type { TemplateResult } from "lit";
import { css, html, LitElement } from "lit";
import { customElement, property } from "lit/decorators";
import "../../../../src/components/ha-card";
@customElement("hc-layout")
class HcLayout extends LitElement {
@property() public subtitle?: string | undefined;
@property() public subtitle?: string;
@property() public auth?: Auth;
@property({ attribute: false }) public auth?: Auth;
@property() public connection?: Connection;
@property({ attribute: false }) public connection?: Connection;
@property() public user?: HassUser;
@property({ attribute: false }) public user?: HassUser;
protected render(): TemplateResult {
return html`
@@ -66,96 +63,94 @@ class HcLayout extends LitElement {
}
}
static get styles(): CSSResultGroup {
return css`
static styles = css`
:host {
display: flex;
min-height: 100%;
align-items: center;
justify-content: center;
flex-direction: column;
}
ha-card {
display: flex;
width: 100%;
max-width: 500px;
}
.layout {
display: flex;
flex-direction: column;
}
.card-header {
color: var(--ha-card-header-color, var(--primary-text-color));
font-family: var(--ha-card-header-font-family, inherit);
font-size: var(--ha-card-header-font-size, var(--ha-font-size-2xl));
letter-spacing: -0.012em;
line-height: var(--ha-line-height-condensed);
padding: 24px 16px 16px;
display: block;
margin: 0;
}
.hero {
border-radius: 4px 4px 0 0;
}
.subtitle {
font-size: var(--ha-font-size-m);
color: var(--secondary-text-color);
line-height: initial;
}
.subtitle a {
color: var(--secondary-text-color);
}
:host ::slotted(.card-content:not(:first-child)),
slot:not(:first-child)::slotted(.card-content) {
padding-top: 0px;
margin-top: -8px;
}
:host ::slotted(.section-header) {
font-weight: var(--ha-font-weight-medium);
padding: 4px 16px;
text-transform: uppercase;
}
:host ::slotted(.card-content) {
padding: 16px;
flex: 1;
}
:host ::slotted(.card-actions) {
border-top: 1px solid #e8e8e8;
padding: 5px 16px;
display: flex;
}
img {
width: 100%;
}
.footer {
text-align: center;
font-size: var(--ha-font-size-s);
padding: 8px 0 24px;
color: var(--secondary-text-color);
}
.footer a {
color: var(--secondary-text-color);
}
@media all and (max-width: 500px) {
:host {
display: flex;
min-height: 100%;
align-items: center;
justify-content: center;
flex-direction: column;
justify-content: flex-start;
min-height: 90%;
margin-bottom: 30px;
}
ha-card {
display: flex;
width: 100%;
max-width: 500px;
}
.layout {
display: flex;
flex-direction: column;
}
.card-header {
color: var(--ha-card-header-color, --primary-text-color);
font-family: var(--ha-card-header-font-family, inherit);
font-size: var(--ha-card-header-font-size, 24px);
letter-spacing: -0.012em;
line-height: 32px;
padding: 24px 16px 16px;
display: block;
margin: 0;
}
.hero {
border-radius: 4px 4px 0 0;
}
.subtitle {
font-size: 14px;
color: var(--secondary-text-color);
line-height: initial;
}
.subtitle a {
color: var(--secondary-text-color);
}
:host ::slotted(.card-content:not(:first-child)),
slot:not(:first-child)::slotted(.card-content) {
padding-top: 0px;
margin-top: -8px;
}
:host ::slotted(.section-header) {
font-weight: 500;
padding: 4px 16px;
text-transform: uppercase;
}
:host ::slotted(.card-content) {
padding: 16px;
flex: 1;
}
:host ::slotted(.card-actions) {
border-top: 1px solid #e8e8e8;
padding: 5px 16px;
display: flex;
}
img {
width: 100%;
}
.footer {
text-align: center;
font-size: 12px;
padding: 8px 0 24px;
color: var(--secondary-text-color);
}
.footer a {
color: var(--secondary-text-color);
}
@media all and (max-width: 500px) {
:host {
justify-content: flex-start;
min-height: 90%;
margin-bottom: 30px;
}
}
`;
}
}
`;
}
declare global {

View File

@@ -5,17 +5,17 @@ const castContext = framework.CastReceiverContext.getInstance();
const playerManager = castContext.getPlayerManager();
playerManager.setMessageInterceptor(
framework.messages.MessageType.LOAD,
"LOAD" as framework.messages.MessageType.LOAD,
(loadRequestData) => {
const media = loadRequestData.media;
// Special handling if it came from Google Assistant
if (media.entity) {
media.contentId = media.entity;
media.streamType = framework.messages.StreamType.LIVE;
media.streamType = "LIVE" as framework.messages.StreamType.LIVE;
media.contentType = "application/vnd.apple.mpegurl";
// @ts-ignore
media.hlsVideoSegmentFormat =
framework.messages.HlsVideoSegmentFormat.FMP4;
"fmp4" as framework.messages.HlsVideoSegmentFormat.FMP4;
}
return loadRequestData;
}

View File

@@ -1,4 +1,5 @@
import { convertEntities, Entity } from "../../../../src/fake_data/entity";
import type { Entity } from "../../../../src/fake_data/entity";
import { convertEntities } from "../../../../src/fake_data/entity";
export const castDemoEntities: () => Entity[] = () =>
convertEntities({

View File

@@ -1,7 +1,5 @@
import {
LovelaceCardConfig,
LovelaceConfig,
} from "../../../../src/data/lovelace";
import type { LovelaceCardConfig } from "../../../../src/data/lovelace/config/card";
import type { LovelaceConfig } from "../../../../src/data/lovelace/config/types";
import { castContext } from "../cast_context";
export const castDemoLovelace: () => LovelaceConfig = () => {

View File

@@ -1,10 +1,10 @@
import { framework } from "./cast_framework";
import { CAST_NS } from "../../../src/cast/const";
import { HassMessage } from "../../../src/cast/receiver_messages";
import type { HassMessage } from "../../../src/cast/receiver_messages";
import "../../../src/resources/custom-card-support";
import { castContext } from "./cast_context";
import { HcMain } from "./layout/hc-main";
import { ReceivedMessage } from "./types";
import type { ReceivedMessage } from "./types";
const lovelaceController = new HcMain();
document.body.append(lovelaceController);
@@ -40,7 +40,8 @@ const playDummyMedia = (viewTitle?: string) => {
loadRequestData.media.contentId =
"https://cast.home-assistant.io/images/google-nest-hub.png";
loadRequestData.media.contentType = "image/jpeg";
loadRequestData.media.streamType = framework.messages.StreamType.NONE;
loadRequestData.media.streamType =
"NONE" as framework.messages.StreamType.NONE;
const metadata = new framework.messages.GenericMediaMetadata();
metadata.title = viewTitle;
loadRequestData.media.metadata = metadata;
@@ -89,7 +90,7 @@ const showMediaPlayer = () => {
const options = new framework.CastReceiverOptions();
options.disableIdleTimeout = true;
options.customNamespaces = {
[CAST_NS]: framework.system.MessageType.JSON,
[CAST_NS]: "json" as framework.system.MessageType.JSON,
};
castContext.addCustomMessageListener(
@@ -97,9 +98,7 @@ castContext.addCustomMessageListener(
// @ts-ignore
(ev: ReceivedMessage<HassMessage>) => {
// We received a show Lovelace command, stop media from playing, hide media player and show Lovelace controller
if (
playerManager.getPlayerState() !== framework.messages.PlayerState.IDLE
) {
if (playerManager.getPlayerState() !== "IDLE") {
playerManager.stop();
} else {
showLovelaceController();
@@ -113,7 +112,7 @@ castContext.addCustomMessageListener(
const playerManager = castContext.getPlayerManager();
playerManager.setMessageInterceptor(
framework.messages.MessageType.LOAD,
"LOAD" as framework.messages.MessageType.LOAD,
(loadRequestData) => {
if (
loadRequestData.media.contentId ===
@@ -127,24 +126,23 @@ playerManager.setMessageInterceptor(
// Special handling if it came from Google Assistant
if (media.entity) {
media.contentId = media.entity;
media.streamType = framework.messages.StreamType.LIVE;
media.streamType = "LIVE" as framework.messages.StreamType.LIVE;
media.contentType = "application/vnd.apple.mpegurl";
// @ts-ignore
media.hlsVideoSegmentFormat =
framework.messages.HlsVideoSegmentFormat.FMP4;
"fmp4" as framework.messages.HlsVideoSegmentFormat.FMP4;
}
return loadRequestData;
}
);
playerManager.addEventListener(
framework.events.EventType.MEDIA_STATUS,
"MEDIA_STATUS" as framework.events.EventType.MEDIA_STATUS,
(event) => {
if (
event.mediaStatus?.playerState === framework.messages.PlayerState.IDLE &&
event.mediaStatus?.playerState === "IDLE" &&
event.mediaStatus?.idleReason &&
event.mediaStatus?.idleReason !==
framework.messages.IdleReason.INTERRUPTED
event.mediaStatus?.idleReason !== "INTERRUPTED"
) {
// media finished or stopped, return to default Lovelace
showLovelaceController();

View File

@@ -1,13 +1,11 @@
import { html, nothing } from "lit";
import { customElement, property, state } from "lit/decorators";
import { mockHistory } from "../../../../demo/src/stubs/history";
import { LovelaceConfig } from "../../../../src/data/lovelace";
import {
MockHomeAssistant,
provideHass,
} from "../../../../src/fake_data/provide_hass";
import type { LovelaceConfig } from "../../../../src/data/lovelace/config/types";
import type { MockHomeAssistant } from "../../../../src/fake_data/provide_hass";
import { provideHass } from "../../../../src/fake_data/provide_hass";
import { HassElement } from "../../../../src/state/hass-element";
import { HomeAssistant } from "../../../../src/types";
import type { HomeAssistant } from "../../../../src/types";
import { castDemoEntities } from "../demo/cast-demo-entities";
import { castDemoLovelace } from "../demo/cast-demo-lovelace";
import "./hc-lovelace";

Some files were not shown because too many files have changed in this diff Show More